Summary:
Project Manager with 16 years of working experience and 8 years of project
management experience in the construction sector, have held a variety of positions
from site engineer till PM, have worked at reputable organizations on commercial
and residential projects, as well as specialized construction (bridges construction-
roads construction).
A project Manager with experience in consulting and contracting organizations, with
effective management of technical and administrative teams with all associated
conflicts, aiming to achieve the best performance and quality within the designated
budget and time frame to satisfy the concerned stakeholders.

Experience

AUG. 2021 till Present time, ECD (Engineering company for


contracting & Decoration).
Job Title: Project manager
Project: Constructing, finishing and furnishing Aswan Taxes
Building – Aswan Governate.
- client: Egyptian Real-estate tax authority.
- project details:
Administrative building with total area of 1800m2 contains:
1-under ground basement + GF + 4 Typical Floors + Roof services rooms.
Project Budget: 200,000,000 L.E.

Duties & Responsibilities:


1-Collaborating with Planning team to set project's schedule.
2-Assigning tasks to team, contractors and subcontractors.
3-Tracking activities in the project from beginning to end.
4-Working with vendors / suppliers.
5-Tracking deadlines and taking further actions when needed regarding Crashing or
Fast-tracking.
6-Negotiating contracts with external vendors to reach profitable agreements.
7-Managing / Allocating project's resources.
8-Create status / progress reports for company's top management.
9-Facilitating solutions of all project's and team's related issues.
Mar.2015 till AUG. 2021, EHAF consulting engineers
Job Title: Project Manager.
Projects:
1-Palm ktamyia extension (PK2-2) – PM.
- Client: Palm Hills Development.
- project details:
Residential compound with total area of 50 feddans consists of 167 villas (core
and shell units).
-Main Contractor: solid construction company.
-Project budget: 340,000,000 L.E
-From 1/2018 till 8/2021.

2-V. G (Village Gate)- PM.


-Client: Palm Hills Development.
-project details:
Residential compound with total area of 31 feddans consists of 44 building
with 18 units of each one (fully finished units).
-Main Contractors:
#UECC (united engineering contracting company).
# Anis Helmy’s sons engineers & contractors.
#Concrete Plus contracting.
#Melco-mec (Mitsubishi Egypt-Elevators).
#Al Tawheed-Elec. Network.
-Project budget: 305,182,830 L.E
-From 9/2016 till 12/2017.

3-V. A (Village Avenue)- PM.


-Client: Palm Hills Development.
-project details:
Residential compound with total area of 8 feddans consists of 12 buildings with
8 apartments of each building (core & shell) units and finished elevations.
-Main contractors:
#Anis Helmy’s sons engineers & contractors.
#Schindler (elevators).
-Project budget: 58,800,000 L.E.
-From 4/2016 till 9/2016.

4-PHK (Palm hills Kttamya)- (Senior site Engineer).


-Client: Palm Hills Development.
-project details:
Residential compound with total area 230 feddans consists of 520 villa
(core&shell) inside and finished elevations outside.
Duties & Responsibilities:
1-Daily site supervision and technical IRs.
2-Reviewing monthly payment certificates.
3-Preparing and reviewing final payment certificate with its whole supporting documents.
-From 3/2015 till 3/2016.
Feb 2013 till Feb 2015, Rooya contracting company
-Job Title: Zone manager (63 villas divided into fully finished units).
-project details:
Telal El Sokhna project.
six kilometers beach front and 238 feddans of land, the master plane consists
of two thousand units was creatively designed on different levels in a way that
would allow each of any residential unit to enjoy sea view.
Duties & Responsibilities:
1-Excuting, controlling and monitoring all activities from plain concrete till delivering
units to the clients.
2-Preparing Progress reports.
3-Collaborating with technical office, issuing monthly invoices.
Dec.2010-till Jan 2013, wadi El Nile contracting and real estate
investment.
-Job Title: site engineer
-project details:
El Obour Production Work Shops.
-4 factories (steel, aluminum, wood, painting)-steel structures
(10,000m2/each).
- Administration Building (5,000 m2)
- 2 underground concrete tanks (600m3 & 400m3).
Duties & Responsibilities:
1-Excuting, controlling and monitoring all activities from plain concrete till delivering
units to the clients.
2-Preparing Progress reports.
3-Collaborating with technical office, issuing monthly invoices.
Project budget: 175,000,000EGP.
Sept. 2009-sept.2010, El-Falah Co. Afif, Saudi Arabia.
-Job Title: site engineer (Road’s construction Department).
-projects details:
1-El-Mahd Afif High way Road 36km.
2-EL Madina El Monwra links (sub roads) 91km.
Duties & Responsibilities:
1-Allocating all project’s resources (Manpower & equipment).
2-Executing, Monitoring and controlling all site works (cut-fill-sub-base layers-asphalt).
3-Reponsible for all paper works of the project including documentation.
4-handing over all work’s related IRs to consultant (Abd El Rahman El Naim C.E)
5-Preparing monthly payment certificates.
Project budget: 90,000,000SAR.
sept. 2007-sept. 2009, Arab Contractors Co. Cairo, Egypt
-Job Title: Site Engineer (Bridges and specialized construction sector)
-Project: Mariotya Corridor (Ring Road).
Duties & Responsibilities:
1-Executing all project’s assigned items:
foundations (bored piles) / pile caps including / cross girders for the superstructure /
top slab of the superstructure.
2-Handing over IRs to the consultant engineer (ACE-Moharm-Bakhom).
Project budget: 500,000,000EGP.
Education
B.Sc. – Civil Engineering - 2007
Benha University – shoubra faculty of engineering, Cairo, Egypt
graduation project: Geotechnical engineering (foundations & soil mechanics).
Graduation project grade: excellent.
Senior year grade: Very Good.

High school: Al-Ibrahymeya secondary – (92%) – (2002), Cairo, Egypt.

Training Courses 1- Attending PMP Prep. Course (online) – (2023).


2- Finishing PMP preparation course 2015.
3- YPDC (Yat Professional Diploma in civil engineering) including:
-AutoCAD 2007.
-primavera P3.
-SAP2000 v10.
-Excel 2007.

Interpersonal Skills:
Skills 1- Leadership.
2- Negotiation.
3- Communication.
4- Coaching/ Mentoring.
5- Organizing.
6- Collaborating.
7- Problem Solving.
8- Teamworking.
9- Commitment.
Technical Skills:
1- Project Management.
2- Construction Management.
3- Pre-construction.
4- AutoCAD – 2D (Good).
5- MS-Office (Very Good).

Languages Arabic : Mother Tongue.

English : Very Good (Spoken & written).