Jsa For Drilling Well
Jsa For Drilling Well
Jsa For Drilling Well
Personnel injury, failure of Daily inspection check-list should be filled out by operator Permit
equipment, property & to ensure truck is ready and safe for the job. Receiver /
material damage. Truck operator must be certified. Engineer/
Pinch point and incorrect Flagman/banks man should be in place during the operation Supervisor/
position of load. and movement truck. Safety Officers
Injury due to damage tools Keep clean all working area from scattered steel scrape,
Hand injuries protruding nails and sharp edges materials.
Weather condition Train all craftsmen to be aware of pinch point and crush
Mobilization of Truck falling in trench point.
2. equipment’s Personnel Eye injury The supervisor should watch personal position and position
and Materials at site. Traffic of load & all unauthorized personnel.
Dust Equipment blinking light & back up alarm shall be
Rain fall functional.
WELL DRILLING
Personal injury Damage to 1.Personnel shall be provided with proper PPEs for hand Permit
underground utilitiesDamage to protection, eyes, body, head and other PPEs as needed. 2.Only Receiver /
underground utilitiesCave in experienced and competent person/ authorized personnel are to Issuer/
(collapse of sidewalls)Water spray perform hand digging and be allowed in the area. 3.Ensure that first Engineer/Superv
by water tanker shall be apply to aid kit and aider is available on site.4.Pre- task meeting shall be isor/Safety
stabilize soil and prevent cave in conducted to workers to inform them of the hazards and methods Officers
Struck by hand tools spade or pick on carrying out the hand digging. 5.Ensure that possible locations
Personal injury of utilities are clearly marked and understood by everyone (verify
Mud Pit Excavation
4. as-built plans &/or use detectors if necessary). 6.A pre-excavation
Work
check-list shall be completed prior to start of work.7.Sloping
workers to be kept away from each other to prevent injury during
manual excavation.
8.Barricade to be installed to the open pt area ,and restrict
unauthorized access.
1.Mishap resulting to 1.All personnel should constantly watch tripping hazards.2.Use Permit
body injury. appropriate footwear such as steel toed boots.3.Use gloves or Receiver /
other protection to prevent hand injuries.4.All three main Engineer/
Clean up and 2.Slips, trips, and falls, back and factors (load location, task repetition and load weight) must be Supervisor/
5. hand injury during manual considered when evaluation what is safe or unsafe o lift.5.all Safety Officers
movementof drill rig.
handling of materials manual hand carefully planned to avoid injuries and damage to Foremen
equipment.
WELL DRILLING