WELL DRILLING

JOB SAFETY ANALYSIS


Rev. 0 Status IFA
Document no: CPP -PS5 Page: 1 of 5

S/N SEQUENCE OF BASIC POTENTIAL HAZARD/S CONTROL MEASURES ACTION BY


STEPS
 Lack of equipment WPR / Permit
documents  Issuer and Receiver shall conduct Joint site inspection prior Issuer/
 Equipment mechanical to any work activities. Engineer/
1. fault.  Obtain adequate work permit as per EACOP standards. Supervisor/
 Lack of work permit.  Emergency Response Plan/Procedure shall be followed by Safety Officers
CPP and sub-contractor personnel.
Preparation of Work  Ensure all vehicle drivers shall have valid driving license
 Ensure of using all required PPE including safety shoes,
safety goggles, safety helmet, safety gloves and fire
resistant clothing .
 All equipment shall have inspection & valid sticker in
place.

 Personnel injury, failure of  Daily inspection check-list should be filled out by operator Permit
equipment, property & to ensure truck is ready and safe for the job. Receiver /
material damage.  Truck operator must be certified. Engineer/
 Pinch point and incorrect  Flagman/banks man should be in place during the operation Supervisor/
position of load. and movement truck. Safety Officers
 Injury due to damage tools  Keep clean all working area from scattered steel scrape,
 Hand injuries protruding nails and sharp edges materials.
 Weather condition  Train all craftsmen to be aware of pinch point and crush
Mobilization of  Truck falling in trench point.
2. equipment’s Personnel  Eye injury  The supervisor should watch personal position and position
and Materials at site.  Traffic of load & all unauthorized personnel.
 Dust  Equipment blinking light & back up alarm shall be
 Rain fall functional.
WELL DRILLING

JOB SAFETY ANALYSIS


Rev. 0 Status IFA
Document no: CPP -PS5 Page: 2 of 5

S/N SEQUENCE OF BASIC POTENTIAL HAZARD/S CONTROL MEASURES ACTION BY


STEPS
1. Mishaps and resulting body 1. Pay attention to visitors approaching the area, if necessary, set up Permit
injury. barriers to keep vehicles and visitors out of the work area and use Receiver /
2. Drilling into underground signage, caution tape if available. Engineer/
utilities Supervisor/
3. striking overhead lines or objects 2.underground utilities should be marked out before drilling. Foremen and
3. Safety Officers
2. Drill location set up
3. Observe overhead lines, tree limbs or other objects before raising
drill rig.
the drill rig. Anticipate the radius going up and down
and plan appropriately

4.Restrict to unauthorised access,by making line of fore with


barricades.

Personal injury Damage to 1.Personnel shall be provided with proper PPEs for hand Permit
underground utilitiesDamage to protection, eyes, body, head and other PPEs as needed. 2.Only Receiver /
underground utilitiesCave in experienced and competent person/ authorized personnel are to Issuer/
(collapse of sidewalls)Water spray perform hand digging and be allowed in the area. 3.Ensure that first Engineer/Superv
by water tanker shall be apply to aid kit and aider is available on site.4.Pre- task meeting shall be isor/Safety
stabilize soil and prevent cave in conducted to workers to inform them of the hazards and methods Officers
Struck by hand tools spade or pick on carrying out the hand digging. 5.Ensure that possible locations
Personal injury of utilities are clearly marked and understood by everyone (verify
Mud Pit Excavation
4. as-built plans &/or use detectors if necessary). 6.A pre-excavation
Work
check-list shall be completed prior to start of work.7.Sloping
workers to be kept away from each other to prevent injury during
manual excavation.
8.Barricade to be installed to the open pt area ,and restrict
unauthorized access.

4. Drilling activity and  Injury to hearing from Permit


casing. noise  Keep wear approved safety ear plugs when working close Receiver /
 Inhalation hazards from enough to drill rig that you have to speak louder than your Engineer/
WELL DRILLING

JOB SAFETY ANALYSIS


Rev. 0 Status IFA
Document no: CPP -PS5 Page: 3 of 5

S/N SEQUENCE OF BASIC POTENTIAL HAZARD/S CONTROL MEASURES ACTION BY


STEPS
dust and drilling activities normal voice to someone standing next to you. Supervisor/
Physical Injury from  when necessary, wear appropriate PPE to protect from dust Safety Officers
moving for inhalation hazard.
 parts of machinery,  Avoid moving parts of machinery. Keep fingers, hands, and
including change of drill arms away from rotating drill or near the bottom (hole
pipes entrance). Wear approved gloves when handling objects
 Physical injury from and steel toed boots and hard hat at all times. Keep fingers
storing of drill pipes. away from pinch points. Keep drill bits secured when not in
 Physical hazards to use to prevent rolling off the rig or other movement.
personnel on the ground in  Stand clear as drill pipe is lowered into rack by cables,
the vicinity of the heavy pipes comes down fast and could make contact with
machinery. persons head, body or hand. Wear gloves and hard hat.
 Physical Injury when  Personnel on the ground should keep away from the drill
lifting and connecting rig unless they are required to the task, drillers and helpers
casing lengths (potential should work together to carry and lift the drill pipes, casing
hand and back injuries) and other materials use for drilling.
 Slippery working surface  Rig can lift of about 6m in length of casing preventing
 Hanging core barrel/Drill manual handling, but a potential pinch point occurs when
bit can swing and lifting a strap around casing length. Work with a partner
potentially knock someone just enough to put the strap to be placed. Use proper lifting
on the ground techniques to avoid back strain. Wear gloves.
 Cuts, burns, eye damage,  Wear work boots.
electrocution, explosion.  when not in use secured to prevent movement.
 Refer to JHA for hot-work activity
 away any moving machinery and keep hand, arms and
fingers from any rotating parts of the equipment.
 Personnel on the ground must be keep away from drilling
machine.
 Use proper lifting techniques to avoid back strain. Wear
gloves when screwing casing lengths together.
 All employees involve for drilling must undergone H2S
awareness training.
WELL DRILLING

JOB SAFETY ANALYSIS


Rev. 0 Status IFA
Document no: CPP -PS5 Page: 4 of 5

S/N SEQUENCE OF BASIC POTENTIAL HAZARD/S CONTROL MEASURES ACTION BY


STEPS
 All personnel should be constantly watching for trip
hazards such as uneven terrain, holes, ditches, stretched
wires or ropes, or any other materials or pieces of
equipment in their path.
 Wear goggles or face shield when working directly over
open boring with ground water near the surface.
 Borehole opening must be closed by cement or backfilled,
do not abandon any borehole opening
 Reflective vest shall be worn.
 Eye & Ear protection signage shall be displayed.
 Drill machine & other equipment shall be barricade.
 Any opening shall be barricaded and protected.

1.Mishap resulting to 1.All personnel should constantly watch tripping hazards.2.Use Permit
body injury. appropriate footwear such as steel toed boots.3.Use gloves or Receiver /
other protection to prevent hand injuries.4.All three main Engineer/
Clean up and 2.Slips, trips, and falls, back and factors (load location, task repetition and load weight) must be Supervisor/
5. hand injury during manual considered when evaluation what is safe or unsafe o lift.5.all Safety Officers
movementof drill rig.
handling of materials manual hand carefully planned to avoid injuries and damage to Foremen
equipment.
WELL DRILLING

JOB SAFETY ANALYSIS


Rev. 0 Status IFA
Document no: CPP -PS5 Page: 5 of 5

S/N SEQUENCE OF BASIC POTENTIAL HAZARD/S CONTROL MEASURES ACTION BY


STEPS
Traffic incidentsSlips, trips and Use MGS traffic management plan.Keep all materials in place Permit
fallHealth hazards and ensure proper house keeping .Regular housekeeping and Receiver /
disposal of wastes to be carried out.All tools and materials Engineer/
should be arranged properly and secured in a safe Supervisor/
place.Trash cans with cover for waste, used paper cups, Safety Officers
scrap and debris shall be provided. Drinking water
containers shall be in good sanitary, tightly capped, and
clearly marked for use and disposable cups shall be
provided. Provide the collection drums for waste materials
6 Demobilization. and regularly take them to the designated drum area.
Improved housekeeping prior of closing work permit.
Restore the area into its normal environment.All combustible
material shall be removed on daily basis to prevent any
accidentally fire.