Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

,4~

.,..

PAGE NO.1
SL VOLUME I
CLAUSE EXISTING CLAUSE REVISED CLAUSE
NO. SECTION I
- i
-...--.-- NO. - I
1. Volume- II: Content elJ1arks:' : .
Part A Sheet M6 - Ozonizati.on PInt .:..Deletecl
M6A...,ChlorinationPlant- Added
I

2. Volume - II: Page:S - .' . Ozone generation and dosing system . Chlorinationplant for raw water system.
Part A IV: 2
Specification Clause 3
MOSection-IV 2ndItem
3. Volume- II: Page: S - . Ozone generation and dosing unit . Chlrination plant for irculating water
Part A IV: 3 sy em.
I
Specification Clause 6 i) ,
I
MOSection-IV
4, Volume - II: Page: S - Coal wagons unloading system (with Rotaside Coal.agons unloading system (with Rotaside
, PartA IV: 3 wagon tipplers, side rm chargers land apron wagon tipplers, side arm chargers and apron
Specification Clause 81) 1 feeders as well as track hoppers with paddle feeders.
MOSection-IV feeders for bottom discharqe waqqns).
5. Volume -II:' Air Compressors deleted. ,
Page: S - Air Compressors (3 x 50% for bdth units) with
Part A IV: 4 Air Receiver
Specification Clause 82) !
MOSection-IV 5. .!
6. Volume- II: Page NO.4 - Paraartmh to be added:
Part A CI. No: Gravity filter house shall be covered under a
Specification 1.05.02 closed shed of structural steel construction
M1Section-IV with colour coated sheets for roof and sides.
The brick wall cladding shall be provided upto
top of doers and windows. However, the MCC
. room! control room etc. shall be provided with
a buildina of RCC construction.

[ BhllsawalTPSExpansionProject
2 X 500MW.Balanceof PlantPackage
AmendmentNo:1
BidSpecification:
DG/BHUSAWAL EXPN./BOP/T.2
Page No. .1 of 18
ANNEXURE-II
BHUSAWAL TPS EXPANSION PROJECT 2 X 500 MW BOP PACKAGE
AMENDMENTS TO TECHNICAL SPECIFICATION FOR MECHANICAL WORKS

SL PAGE NO. I
VOLUME I
CLAUSE .EXISTING CLAUSE- REVISED CLAUSE.
NO. SF.CTION -
NO.
7. Volume - II: Page NO.6 - Paraaraph to be added:
Part A Cf. No: DM . and softening plant building shall. be
Specification 3.01.06 covered under a closed shed of structural
M2 Section-I steel construction with colour coated sheets
for roof and sides. The brick wall cladding
shall be provided upto top of doors' and
windows. However, the MCC room/ control
room etc. shall be provided with a building of
RCC construction.
8. Volume - II: Page 10 v) Three (3) reciprocating air compressors ----- The clause is deleted.
Part A Cf. No: -------------------------------- capacity 10 Nm3/min.
Specification 4.03.00
M2 Section-I w) Two (2) Air drying plants .--------------------- The clause is deleted.
------------------------------ capacity 20 Nm3/min.
9. Volume - II: The section is deleted. ,
Technical specification for compressed air
Part A system
Specification
M2 Section-V
10. Volume - II: Page AI-39 A. Instrument Air/ Service AirColllpfessors The-elal:lse is.deleted.'
Part A and AI-41
Specification Cf. No: 17.0 C. Air Drying Plant The=clause.is-deleted ;"
M2, A&C
Appendix-I
Page AI-40 B. Instrument Air and Service Air Receiver Instrl:Jment-Airand .Service Air Receivers (to
Cf.No: 17.08 be fed from main compressed air plant)
'11. Volume - II: Peg'3 No. 2 _ - Paraaraph to be added:
. , Part A Cf. No: Raw water pump house shall be covered
Specification 4.01.01 b) under a closed shed of structural steel
,
M3 construction with colour coated sheets for roof
and. sides. The brick wall claddinQ shall 6«:1

Bhusawal TPS Expansion Project Amendment No: 1 .


Page No. - 2 of 18 .I\
2 X 500 MW. Balance of Plant Package Bid Specification: DG/BHUSAWAL EXPN./BOPIT-2
, '
'BHUSAW~L \
,ANNE~URE.!!'
TPS EXPANSlbN PR JECT 2 X 500MW BOP I
, '
ACKAGEi A{
",.,.ENDMEN to' . V . "'V""'Vr"'" , ...,1 ""'II IV'""' I I"'" . "." ...--.... .....-. .:- ...._......
! I
PAGE NO.r " I '
SL VOLUME'/ REVISED CLAUSE,
" CLAUSE EX\STIG CL"!USE '
,
NO. SECTION
NO. .
:" provided- upto top of doors and windows.,
HdweverI the MCC room/ control room etc.
shfill be provided with a building of RCC
construction.
12. Volume - II: Page NO.,A - Clause to be added:
, I
'
Part A 'CI. No: F\,Jeloil pump h?use shall be covered under a
Specification 2.06.00 closed shed of structuralsteel construction
M8 with colou.rcoatbd
I
sheets for roof and sides.
The brick wall cl,adding shall be provided upto
I
tQP of doors and windows. However, the MCC
, rQom/control ropm etc. shall be provided with
a buildina of RCC construction.
13, Volume - II: Page No. 1 Six (6) Instr. air compressors (for two units) Six (6) Instr. air compressors (for two units)
Part A CI. No: each of capacity 21 Nm3/mih at pressure 8.5 ech of capacity 31 Nm3/min at pressure 8.5
Specification 2.,01.02(a) kg/cm2 9 shall run to cater the instrument air. kg)cm2 9 shall run to cater the instrument air.
M10
2.01.02 (b) Five (5) Service air compressors (for two units) FIve (5) Service air compressors (for two
each of capacity 21 Nm3/min at pressure 8.5 units) each of capacity 31 Nm3/min at pressure
kq/cm2q shallrunto catertheserviceair. ' 8/5 kg/cm29 shall run to cater the service air.
14,' Volume - II: Page AI-2 Reciprocatinqair combressorsand auxiliaries Reciprocatinqair compressorsand auxiliaries
Part A CI. No: 2.A Freeair delivery:21 Nm3/min(each) Ftee air delivery:31 Nm3/min(each)
Specification
M10, Page AI-8 Air dr'Vinaplant performancespecification Air drvina clant performancespecification
Appendix-I CI. No: 3.B Capacity:42 Nm3/mirl(each) C'apacity:62 Nm3/min(each)
15., Volume - II: Page 2 Control Room and CompressorHouse building The clauseis deleted. I

Part A CI. No: including transformer rooms.


Specification 3.00.00 g)
M16
Page 2 Te clause is deleted.
CI. No: Electric
& motorsHoist (3 Te) for han)g
in compressor roo .' Compressors

BhusawalTPSExpansionProject Amendment No: 1


Page No. - 3 of 18
2 X 500MW,Balanceof PlantPackage Bid Specification:DG/BHUSAWALEXPN.IBOP/T-2
ANNEXURE-II
BHUSAWAL TPS EXPANSION PROJECT 2 X 500 MW BOP PACKAGE
~.,.
AMENDMENTS TO TECHNICAL SPECIFICATION FOR MECHANICAL WORKS
-
SL VOLUME I PAGE NO.1
NO. CLAUSE EXISTINGCLAUSE REVISED CLAUSE
SECTION
_... NO. -
-
3.00.00 n)

Page 3 Split type Room Air Conditioners ---------------.-- The clause is deleted.
CI. No: ------=-------------Owner's/ Consultant's approval.
3.00.00 x)

Page 6 The air compressors shall b"elocated in the Mill The clause "is.deleted.
CI. No: Rejects Control building.
4.05.01 a)
16. Volume - II: Page AI-4 Air compressors " The clauseis deleted.
Part A CI. No: 9
Specification
M16
ADDendix-I
17. Volume - II: M17-Yol-1I Coal from track hopper. will be scooped by Deleted "

Part A Pg.1 .. ............... ........... Transfer House TP-01


Specification CI. No.
M17 1.01.01 b)
18. M17.Yol-1i When coal comes in 80x/80x-N type wagons, To add in existing clause.
Pg.1 coal.-will-be-I:JAI0aeled-if.1-wagon-tippler-hopper. " Theapron-feeder--below-yv.:r,.3-can-feed to
Volume - II: CI. No; Two number of wagon tipplers along with conveyor no. 103.
Part A 1.01.01 c) . apron "feedershave-been-considered=for' this-
Specification purpose. The apron feeder below wagon
M17 tippler WT-1 can feed to Conveyor 101A.
Similarly, the apron feeder-below-wag0n-tippler- .--- -
WT-2 can feed to Convevor 1018.
19. Volume - II: M17-Vol-1I Conveyor 101A & 1018 can feed Conveyor Conveyor 101A & 1018 can feed Conveyor
Part A Pg. 1 104A and 1048 respectively in TP-102 by 104A or 1048 in TP-102 by means of suitable
Specification CI. No. means of suitable chute. The same Conveyors arrangement of traveling head discharge
M17 1.0.1.01 d) 104A and 1048 can also bo fed from Conveyor pulley. The same Conveyors 104A and 1048

......-
BhusawalTPS Expansion Projoct Amendment No: 1
Page.No..40U8
2 X 500 MW, Balance of PlantPackage Bid Specification: DG/BHUSAWAL EXPN./BOP/T-2
,
I ANNEXURE.II .
BHUSAWAL TPS EXPANSIoN PRbJECT2 X 500 MW BOP PACKAGE --+.<
AMENDMENTS TO TECHNICAL SPECIFICATION FOR MECHANICAL WORKS
~--, ~

SL VOLUMEI
PAGE NO.1 -
CLAUSE EIST'NG CLAUSE REVISED CLAUSE
NO. SECTION
NO. I
103A .and 103B respectively through Track can also be fed from Conveyor 103 by means
Hopper route as described above. Thus bf suitable arrangement of traveling head
arrangement has been made so that Conveyor ischarge pulley, through WT-3 route as
104A or 104B can be fed from wagon tippler or described above. Thus arrangement has been
from track hopper in TP-102. , made so that Conveyor 104A or 104B can be
fed from waQon tippler WT-1, WT-2 OR WT-3.
20. Volume - II: M17-Vol-1I The net capacity of each of the,COCl.l bunkers The net capacity of each of the coal bunkers
Part A Pg.3 feeding the coal pUlverizers shall be 860 tons. feeding the coal pulverizers shall be 625 tons.
Specification CI. No. ............... Bidder and shall be got approved
M17 1.01.01 k} by the Owner b.............
)y the Owner. Bidder and shall be got approved
21. M17-Vol-II Track Hopper Complex Clause a) to i) peteted
- Pg.4
Volume - II: CI. No. .

Part A 1.01,02.01
Specification Track
M17 Hopper
Complex ..
a} to i} I . I
22. M17 -Vol-II b) Conveyor nos. 102A& 102B pelcted
Pg.6 I
Volume -II: CI. No. i ,
.' I ,
Part A 1.01.02.02 I
Specification Belt
M17 Conveyor ,
b)
I
23. Volume - II: M17-Vol-1I 1
Part A Pg.6 -
c) Conveyor nos. 1 3., I
I
Specification CI. No. cj Conveyor nos. 103A & 1ra
M17 1.01.02:02 I

Bhusawalrps ExpansionProject Amendment No: 1


2 X 500 MW, Balanceof PlantPackage Page No. . 5 of 18
Bid Specification:DG/BHUSAWALEXPN./BOP/T-2
ANNEXURE-II
BHUSAWAL TPS EXPANSIONPROJECT2 X 500 MW BOP PACKAGE
AMENDMENTSTO TECHNICALSPECIFICATIONFOR MECHANICALWqRKS

EXISTING CLAUSE REVISED CLAUSE


SL
- , NO. I VOLUME
SECTION I I PAGE NO.1
CLAUSE
NO.
Belt
Gonveyor
c)
_I ---L
24. All . transfer chutes with all necessary All transfer chutes with all nacessary
supporting structure, liners etc. shall have to. supporting structure. liners etc. shall have to
I

Volume -II: M17-Vol-1I be providedat all transfer points (Viz. TP-101, be providedat all transfer points (Viz. TP-102,
Part A TP-102,TP-103, TP-104, TP-105. TP-106,TP- TP-103, TP-104. TP-105. TP-106, TP-107,
Pg..7
CI. No. 107, TP-108. TP-109, TP-110 Crusher House, TP-108, TP-109, TP-110 Crusher House,
Specification
M17 1.01.02.05 Track Hopper Complex, Wagon Tippler Wagon Tippler Complex, Boiler Bunker top.
Complex, Boiler Bunker top. Separate tramp Separate tramp iron chute upto ground level
iron chute upto ground level with associated with assC'\ciated structures and bins for
structuresand bins for ma netic se arators. ma netic se arators.
25. a) Two (2) Rotaside wagon tippler data. a) Three (3) Rotaside wagon tippler data
M17-Vol-II sheet enclosed. sheet enclosed.
Volume - II: Pg.8 b) Two (2) side arm charger of the plant b) Three (3) side arm charger of the plant
Part A CI. No. d) Two (2) RCC wagon tippler hopper 250 d) Three (3) RCC wagon tippler hopper 250
Specification . 1.01.02.07 metric tonne. metric tonne.
M1.7 a), b), d), f) f) Two (2) nos. of apron feeders ;as-perf) Three, (3)--nos:-of apron-feesers ~sper-
& h) requirement. .. . requirement
h Two 2' nos sum its & sum Dum s. 'h Tilree- 3 nos sam "ts&'sum . urn s.
26. Briefly, the buildings included in. this Briefly, the buildings included in this
M17-Vol-1I Specification.
are Ir.ackJiopperComplexwith Specificationare . TP-102,TP-103,TP-104,
Volume - II: shed and buildings. TP-r011.P=T02~-o3:- P';105,' TP-106, TP-107, TP-108, T-P-109,
Pg. 10 TP-104, TP-105, TP-106, TP-107. TP-108,TP- TP-110, Drive House DH, Crusher House,
Part A CI..No.
1.01.02.17 109, TP-110, Drive House DH, Crusher House, Wagon Tippler.Hopper,wagon tippler Control
Specification
M17 Second Wagon Tippler Hopper, wagon. tipplerl track Room. Compressor Room, Substation at TP-
hopper Control Room. In-MotionWeiah 104 completewith switchgear,Transformer
r:.
par~graph. Bridae: CompressorRoom..Substationat Tp. area & Controlroom,CHPcontrolroom cum
..
104 complete with switchgear, Transformer loco maintenancebuildina.

Bhus~wal TPS Expansion Project Amendment No: 1. .


Page No. - 6 of 18
2 X 500 MW, Balance of Plant Package Bid Specification:DG/BHI:ISAWALEXPN. IROPfT-2