Professional Documents
Culture Documents
Mahagenco: Specification: M8 - Iv Technical Specification For Steam Tracing of Oil Piping & Equipment
Mahagenco: Specification: M8 - Iv Technical Specification For Steam Tracing of Oil Piping & Equipment
VOLUME: II
SPECIFICATION: M8 - IV
CONTENTS
1.00.00 INTRODUCTION 1
SPECIFICATION: M8-IV
STEAM TRACING OF OIL PIPING & EQUIPMENT
1.00.00 INTRODUCTION
The Oil handling and transfer system covers HFO and LDO. The HFO is a
highly viscous fluid, hence to reduce the viscosity and flowability of fuel oil
steam tracing is considered.
The scope of supply covers entire steam tracing of the fuel oil piping, pumps
and other equipment coming in the HFO unloading and transfer system. The
generally will be on follows.
2.03.00 Piping, fittings valves from wagon unloading to the inlet of the HFO unloading
pump; unloading pumps to storage tank and all other necessary piping.
2.08.00 Steam traps, drains, vent, y strainers, as required. In short, steam tracing
system whenever required in full fuel oil package specification.
2.10.00 All steam lines required for floor cleaning. Oil heating in wagon etc.
2.11.00 Entire condensate piping terminated in flash tank or oil water separator.
2.13.00 Thermal insulation for all traced lines and equipment, such as pumps, flash
tank etc.
3.05.00 All other related IS/BS/ASTM code not specifically mentioned but required.
4.01.00 GENERAL
This type of heating shall be used for inside plot piping and for outside plot
lines, containing a number of fittings and valves.
Generally the tracers shall be made of schedule 80, seamless steel pipe in
sizes 15 mm or 20 mm
As guidance as to the number and size of tracers required for different line
sizes and conditions, the following table may be used.
Nominal line
size (in.) 11/2 2 3 4 6 8 10 12 14 16
To prevent 1x1/2 1x1/2 1x1/2 1x1/2 1x1/2 1x1/2 1x1/4 1x1/4 1x1/4 2x1/4
freezing or
congealing
To maintain 1x1/2 1x1/2 1x1/2 1x1/2 1x1/4 2x1/2 2x1/4 2x1/4 2x1/4 3x1/4
initial
temperature*
10 mm. OD copper tubing may be used for tracing of process and utility lines
upto to 40 mm., instruments and instrument piping and may be spirally
wrapped where required.
The tracers shall follow the contours of the piping to be heated, starting at the
highest point and sloping towards the steam trap, pockets shall be avoided.
One or more tracers may be connected to one common steam supply line,
but must be provided with individual steam traps.
For horizontal lines, single and/or multiple tracers shall run along the
underside of the pipe or at either side of the supporting tees, if any. For
vertical pipelines single tracers shall be straight or spirally wound, multiple
tracers shall be equally spaced around the periphery of the pipe.
The maximum length of tracers for steam pressures of 3.5 kg/cm shall not
exceed 50 m, measured from the point of steam supply to the steam trap.
For lower steam pressures the tracer length may be relatively shorter. The
minimum length is 15 m.
It should be noted that the wall thickness of the inner pipe may require
checking against external pressure.
Butt welds, drains, vents or other connections to the inner pipe within the
jacket are not permitted.
If such connections are required, a gap must be left in the jacket, which shall
be sufficient to expose the welding on the inner pipe.
4.04.00 Steam jacketing for the equipment shall be carried out as per the
recommendation of the equipment supplier.
Bhusawal TPS Expansion Project Volume – II Page No.
2 x 500 MW, Balance of Plant Package M8-IV 3
:
MAHAGENCO
Maharashtra State Power Generation Co. Ltd
4.08.00 The piping material shall be as indicated in piping specification no. M-5.
4.09.00 The number of traces shall be selected to maintain HFO temp of 50oC by
cutting of steam supply to required number of tracers.
The valves, traps etc. shall be tested as per the requirements given in piping
specification.
(b) All fillet welds as well as butt welds shall be subjected to dye pentrant
test.