TYPE OF PLANT FUNCTIONAL NON FUNCTIONAL SOURCE OF ENERGY
Name of
S.No O/M With
Program R.O U.F R.O U.F R.O U.F
SOLAR ELECTRICITY DIESEL
PLANTS PLANTS PLANTS PLANTS PLANTS PLANTS
1 2 3 4 5 6 7 8 9 10 11 12
1 SID - I B.M Jafrani 7 4 2 2 5 2 9 1 1
2 SID - II B.M Jafrani 6 5 4 3 2 2 11 - -
3 SCA B.M Jafrani 2 0 0 0 2 0 - - 2
4 Fishries B.M Jafrani 3 0 0 0 3 0 - - 3
6 PHED B.M Jafrani 1 0 0 0 1 0 1 - -
Total 19 9 6 5 13 4 21 1 6
Grand Total 28 11 17 28

Executive Engineer (O&M)


Public Health Engineering
Division Sujawal
LIST OF NON-FUNCTIONAL RO UF PLANTS
PUBLIC HEALTH ENGINEERING (O&M) DIVISION DISRICT SUJAWAL
Description Water Test Result
Sr. Plant Name / Name Of Current Status
Taluka O/M Source of Source Product Missing Components Remarks
No. Location Program R.O / U.F Capacity: of Plant pH:
Energy TDS: TDS:
1 2 3 4 5 6 7 8 9 10 11 12 13 14

B.M Non- 1. Dismental of Solar Frame, due to craked


1 Jati Town Jati SID-II U.F 15000 Solar
Jafrani Functional and damaged from various points

Haji Saleh B.M Non- 1. Plant is non functional due to error in


2 Jati SID-I U.F 15000 Solar - - 1. Battery and inverter
Mohd: Khoso Jafrani Functional panel.

Mirpur B.M Non-


3 Sufi shah inayat SID-I U.F 15000 Solar - - 1. Dunkey motor not working
Bathoro Jafrani Functional

Shah B.M Non- 1. Bore pipe damaged from various location,


4 Chuhar Jamali SID-II U.F 15000 Solar
Bunder Jafrani Functional need maintenance

B.M Non- 1. Overall Maintenance required of plant


5 Zero Gungro Jati SCA R.O 75000 Generator - - 1. Dozing pump and tank
Jafrani Functional and generator

B.M Non- 1. Overall Maintenance required of plant


6 Dongar Jut Jati SCA R.O 75000 Generator 1. Dozing pump and tank
Jafrani Functional and generator

1. Due to flood the solar frame damaged,


Yaqoob B.M Non-
7 Jati SID-I R.O 15000 Solar - - 1. PH meter new will be fabricated by contractor
Munharo Jafrani Functional
2. 4 Solar plates are damaged (new required)

B.M Non- 1. New Bore required (will be done by


8 Amin Bori Jati SID-II R.O 15000 Solar - -
Jafrani Functional contractor as bore machines will be received)

Village Hussain Mirpur B.M Non-


9 SID-I R.O 15000 Solar 860 - 1. High pressure pump leakage
Pur Bathoro Jafrani Functional

1. Bore pump is damaged from inside due to


Mirpur B.M Non- high TDS of water (need maintenance).
10 Village Lakha SID-I R.O 15000 Generator - -
Bathoro Jafrani Functional Work is to be done in next visit of technical
team
Description Water Test Result
Sr. Plant Name / Name Of Current Status
Taluka O/M Source of Source Product Missing Components Remarks
No. Location Program R.O / U.F Capacity: of Plant pH:
Energy TDS: TDS:
1 2 3 4 5 6 7 8 9 10 11 12 13 14

1. 1 No Solar plate 1. Fault in dunkey pump


Mirpur B.M Non-
11 Mahi Dal SID-I R.O 15000 Solar - - 2. TDs and PH meter 2. Raw water tank leakage and stand damage
Bathoro Jafrani Functional
3. Battery and inverter 3. Outlet water pipe damaged

1. Both VFDs
Mirpur B.M Non- 1. Overall Maintenance required
12 Jhoke Sharif SID-I R.O 15000 Solar - - 2. Battery and Inverter
Bathoro Jafrani Functional 2. Mostly components are missing
3. Dosing and pump

1. 3 Nos Solar Plates stolen, Complain lodged


Mirpur B.M Non- at police station by operator
13 Mirpur Bathoro SID-II R.O 15000 Solar - - 1. Inverter and battery
Bathoro Jafrani Functional 2. Bore is not working properly, need new
bore

Shah B.M Non-


14 Shah Bunder Fisheries R.O 75000 Generator 1. Overall Maintenance required
Bunder Jafrani Functional

B.M Non-
15 Kalka chain Jati Fisheries R.O 75000 Generator 1. Overall Maintenance required
Jafrani Functional

B.M Non-
16 Zero Point Jati Fisheries R.O 75000 Generator 1. Overall Maintenance required
Jafrani Functional

1. TDS and PH meter


Haji Usman B.M Non- 1. Bore pump not working , need new pump
17 Jati PHED R.O 15000 Solar 2. Battery and Inverter
Malkani Jafrani Functional and motor
3. Dosing tank

Executive Engineer (O&M)


Public Health Engineering
Division Sujawal
LIST OF FUNCTIONAL RO UF PLANTS
PUBLIC HEALTH ENGINEERING (O&M) DIVISION DISRICT SUJAWAL
Description Water Test Result
Sr. Plant Name / Name Of Current Status
Taluka O/M Source of Source Product Missing Components Remarks
No. Location Program R.O / U.F Capacity: of Plant pH:
Energy TDS: TDS:
1 2 3 4 5 6 7 8 9 10 11 12 13 14

B.M
1 Sujawal Town Sujawal SID-II U.F 15000 Solar Functional 380 365 1. Bag Filter changed recently
Jafrani

B.M 1. New bibcock installed


2 Lar Sugar Mill Sujawal SID-II U.F 15000 Solar Functional 485 466
Jafrani 2. bag filter changed

B.M 1. Recently VFD change


3 Athriya Jati SID-II U.F 15000 Solar Functional 550 545
Jafrani 2. Change of bag filter
1. Bag filter has been changed
Haji Abdul B.M
4 Jati SID-I U.F 15000 Solar Functional 466 440 2. Replace of Dunkey motor and pump (full
Sattar Kehar Jafrani
set)
Haji Usman 1. Plant is temporary shutdown due to non
B.M
5 Malkani (Raj Jati SID-I U.F 15000 Hesco Functional - - 1. TDS and PH meter availability of light in village
Jafrani
Malik) 2.Dunkey Pump maintenance done

1. 1 No Solar plate
Dargah Bai B.M 1. New Bore have been done and 04 Nos
6 Jati SID-II R.O 15000 Solar Functional 2890 345 2. TDS and PH meter
Budhi Jafrani Solar plates installed by Contractor
3. Battery and Inverter

1. Maintenance done of Pipe connected to


Mohd: Moosa B.M
7 Jati SID-II R.O 15000 Solar Functional 1030 360 membrane
Malkani Jafrani
2. Leakage in product tank

Ali Nawaz Mirpur B.M 1. Flushing of membrane done


8 SID-I R.O 15000 Solar Functional 630 390
Magsi Bathoro Jafrani 2. Bag filter changed

1. overall maintenance of solar system done


Mirpur B.M
9 Village Abral SID-I R.O 15000 Solar Functional 1380 356 2. Flushing of membrane has been done
Bathoro Jafrani
3. bag filter new installed

Chach Jahan Shah B.M 1. PH meter 1. Washed of membrane done with overall
10 SID-II R.O 15000 Solar Functional 2998 396
Khan Bunder Jafrani 2. Dosing tanks maintenance of plant

1. 100 Ft bore pipe changed recently with


Shah B.M new one
11 Waari SID-II R.O 15000 Solar Functional 1356 375
Bunder Jafrani 2. Bag Filter and bibcock changed (provided
new)
Description Water Test Result
Sr. Plant Name / Name Of Current Status
Taluka O/M Source of Source Product Missing Components Remarks
No. Location Program R.O / U.F Capacity: of Plant pH:
Energy TDS: TDS:
1 2 3 4 5 6 7 8 9 10 11 12 13 14

Executive Engineer (O&M)


Public Health Engineering
Division Sujawal

You might also like