H25 H29

H26 H30 H30


H26

H26
H30
H26 H30
531

464
H25 H29

75 508 75
75 550 75

700 531 658 464

DETAIL OF - H29 DETAIL OF - H30


DETAIL OF - H25 DETAIL OF - H26 NOTES:
SUPPORT ID QUANTITY (NOs)
1.ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED.
POS-0125-310-129C-VR-00015 1 2.ALL MATERIALS FOR PIPE SUPPORTS SHALL BE A36 / S275JR / S355JR / EQ UNLESS
SUPPORT ID QUANTITY (NOs) OTHERWISE MENTIONED IN THE DRAWING.
3. ALL PIPE SUPPORT DRAWING SHALL BE PREPARED AS PER THE EXCEL SHEET DIMENSIONS
POS-0123-310-129C-VR-00015 1 & DOCUMENT-301-00-PI-SPC-00057.
4. ALL WELDS ARE "BUTT WELD" AND CONTIINUOUS WELD UNLESS
OTHERWISE INDICATED

FOR FILLET WELDS SEE DETAILS BELOW


BILL OF MATERIALS ASSY QTY : 1 BILL OF MATERIALS ASSY QTY : 1

Item Qty./ Profile Size Wt./Meter Length Wt./Item Total Total Wt. Material Item Qty./ Profile Size Wt./Meter Length Wt./Item Total Total Wt. Material
Mark Assembly (kg/m) (mm) (kg) Qty. (kg) Mark Assembly (kg/m) (mm) (kg) Qty. (kg)

H25 1 HEB100 20.4 700 14.28 1 14.28 S275 H29 1 HEB100 20.4 658 13.42 1 13.42 S275
H26 2 HEB100 20.4 531 10.8324 2 21.66 S275 H30 2 HEB100 20.4 464 9.47 2 18.94 S275
WELD ON BOTH SIDES WELD ON ONE SIDE
Total 35.94 Total 32.36 a =0.5 X E min a= 0.7 X E min
H27 H31
H28 H32 H32
H28
REFERENCE DRAWING

S.NO DOC.NO REMARKS

1 301-00-PI-SPC-00057

H28 H32 0 ISSUED FOR APPROVAL MH 19.01.2024 SA 19.01.2024


H28 H32 987
REV By Date By Date
463

DETAIL OF - H32 DESCRIPTION


MARK CREATED CHECKED
987

PROJECT TITLE :
H27
North Field East Project
Onshore LNG Facilities
75 550 75
CONTRACTOR :
H31

700 463

DETAIL OF - H27 DETAIL OF - H28 SUB CONTRACTOR :


75 1000 75 ALMANA STEEL STRUCTURES CO W.L.L
P.O.BOX NO.40990
SUPPORT ID QUANTITY (NOs)
DOHA-QATAR
POS-0124-310-129C-VR-00015 1 SUPPORT ID QUANTITY (NOs) PH:+974-4600809
1150
POS-0005-304-99-WU-17507 1 EMAIL : almanagroup@almanagroup.com
DETAIL OF - H31 web:www.almanagroup.com

SCALE : PROJECT NO. : J812


BILL OF MATERIALS ASSY QTY : 1 BILL OF MATERIALS ASSY QTY : 1
PROJECT SUPPORT MARK SHT SIZE REVISION
Item Qty./ Profile Size Wt./Meter Length Wt./Item Total Total Wt. Material Item Qty./ Profile Size Wt./Meter Length Wt./Item Total Total Wt. Material
Mark Assembly (kg/m) (mm) (kg) Qty. (kg) Mark Assembly (kg/m) (mm) (kg) Qty. (kg)
NFE1 PS13 55/58 A2 0
H27 1 HEB100 20.4 700 14.28 1 14.28 S275 H31 1 HEB100 20.4 1150 23.46 1 23.46 S275

H28 2 HEB100 20.4 463 9.4452 2 18.89 S275 H32 2 HEB100 20.4 987 20.13 2 40.27 S275

Total 33.17 Total 63.73 Ope. Center Doc No.