OIL-BASED MUD REPORT No.

47
ADNOC Offshore
Operator : ADNOC OFFSHORE Field/Area : ZAKUM Depth/TVD : 11360 ft/8256 ft
Report For : KHALED / SHAWALI Description : SINGLE OIL PRODUCER Date : 10-Jul-23
Well Name : ZK-082 Location : OFFSHORE ABU DHABI Spud Date : 25-May-23
Contractor/Rig: ADNOC DRILLING / NURAI Water Depth : 29 Mud Type : VERSACLEAN
Report For : MOHAMED EBRAHIM / PERDO / FRIDAY Log-It # : O.1023553.04 Activity : L/D 12 1/4" BHA
DRILLING ASSEMBLY CASING MUD VOLUME (bbl) CIRCULATION DATA
30 in csg @265 ft (265 TVD) Hole Active Pits Pump Make NOV 14-P-220 NOV 14-P-220
13.375 in csg @5523 ft (5109 TVD) 1678 314.58 Pump Liner x Stk 6.5x14in 6.5x14in
Total Circulating Volume Pump Capacity 5.85 gal/stk 5.85 gal/stk
315 Pump stk/min @97% @97%
Depth Drilled Last 24 hr Flow Rate gal/min
283 ft Pump Pressure psi
Volume Drilled Last 24 hr Bottoms Up 0 min/ 0 stk
41.25 bbl Total Circulation 0 min/ 0stk
MUD PROPERTIES PRODUCTS USED Last 24 hr
Sample From Active Pit @ 22:00 Active Pit @ 14:00 Active Pit @ 04:00 Products Size Amount
FlowLine Temp °F 176 G-SEAL PLUS 25 KG BG 20
Depth/TVD ft 11360 / 8236 11360 / 8236 11295 / 8248 VERSATROL M 50 LB BG 16
Mud Weight /Temp lb/gal @ °F 11.5 @ 124 11.4 @ 148 11.4 @ 160 VERSAWET 55 GA DM 2
Funnel Viscosity sec/qt 57 54 52 VERSACOAT HF 55 GA DM 4
Rheology Temp °F 150 150 150
R600/R300 60 / 39 60 / 39 60 / 39
R200/R100 32 / 22 32 / 22 31 / 21
R6/R3 10 / 9 10 / 9 10 / 9
PV cP 21 21 21
YP lbf/100ft² 18 18 18
10s/10m/30m Gel 10 / 14 / 18 10 / 14 / 18 10 / 14 / 18
API Fluid Loss cc/30min N/A N/A N/A
HTHP Fluid Loss cc/30min 2.8 @ 250 2.8 @ 250 3 @ 250
Cake APT/HT 1/32" /1 /1 /1
Unc Ret Solids %vol 23 23 23
Correct Solids %vol 20.73 20.73 20.73 Drilling Fluids Specialist 1
Oil %vol 57 57 57 Drilling Fluids Specialist 1
Uncorr Water %vol 20 20 20
Oil/Water Ratio 74/26 74/26 74/26 SOLIDS CONTROL EQUIPMENT Last 24 hr
Alkal Mud (Pom) 3.9 3.9 4 Type Model/Size Hrs Used
Cl- Whole Mud mg/L 55,000 55,000 55,000 DERRICK FLC-504 4 x API-200 11
Water Phase Cl mg/L 246,981 246,981 246,981 DERRICK FLC-504 4 x API-200 11
Lime lb/bbl 5.05 5.05 5.18 DERRICK FLC-504 4 x API-200 11
Emul Stability volt 729 722 701 DERRICK FLC-504 4 x API-170 11
ASG 3.65 3.65 3.65 DERRICK CENTRIFUGE DE-1000 6
Low Gravity Solid %vol 7.19 7.19 7.15 GN SOLID CONTROL GNZJ703F-3516N
Low Gravity Solid ppb 65.5 65.5 65.16 DERRICK CENTRIFUGE DE-1000
High Gravity Solid %vol 13.54 13.54 13.58
High Gravity Solid ppb 199.3 199.3 199.85 Daily Drilling Data
Water Phase Salinity mg/L 246,981 246,981 246,981 Rotary RPM WOB
Bit RPM ROP
Rotating Hours BHCT (F) 222
Inclination (deg) 82.05 Azimuth (deg) 48.58
Bulk Stocks
Barite (MT) 176 Adnoc Polymer 97
Bentonite (MT) 56 MI-Duovis / Flovis +
REMARKS AND TREATMENT REMARKS
Slowly bled-in Briding Pill (130 ppb) from Slug Pit into Active to maintain coarser size of bridging material. Compensated Evaporation Drilling 12 1/4'' hole from 11,077 ft to phase TD at 11,360 ft LD / 11,383 ft DD (Drlg Parameters: WOB: 15-35 KLB -- 1030
losses by Bleeding Water into Active system. Treated Active system during final circulation with Versatrol to maintain HTHP Fluid loss, G- GPM / 3,850 - 3,900 psi. Surface RPM: 160-170 RPM / 17-22 K FT.LB. (Off / On) BTM Pressure: (3,850 / 3,950) PSI. (Off /
Seal Plus for bridging, Versacoat HF to maintain Emulsion Stability, Versawet as wetting agent for running 9-5/8" CSG. On) BTM TQ: (8 - 10 / 17 - 22) K FT.LB. No dynamic losses. Last ECD Value: 11.79 ppg. CHC 2x cycles. Flow check, well
Observed no downhole losses while drilling & circulation. Observed dry and free flowing cuttings on shakers. static.
CHC @ 11,360 ft TD, observed shakers cleaned after 2 x cycles. No HVP pumped. CBU @ below CSG shoe, only small amount of fine
cuttings on shakers. POOH 12-1/4" RSS Assy on elevator from 11,360 ft to 5,735 ft (Had tight spot @ 10,982 FT (TH-III J BS). CBU (1,050
Cleaning Pit #2 & Pit #6 for cementing job is in progress.
GPM / 2,900 psi). Cont. POOH onn elevator from 5,735 ft to 13 3/8'' CSG Shoe 5,500 ft. Flow check, well static. Cont
Note: MW is 11.5 ppg due to measured at lower temperature compared to temperature while drilling.
POOH 12-1/4' RSS Assy f/ 5,735 ft to surface . L/D 12 1/4" BHA. Housekeeping on Rig floor is in progress as on reporting
time.
Mixing Pump-2 is non functional as mechanicals packing seal leaking (inventory is zero on rig, waiting for parts) - mixing pump is required
for cementing job.

VH Simulation: HCI is Good to Very Good w/ ROP 100 FPH.

Surface Volume:
Active Pit + Sand Trap = 399 bbls @ 11.4 ppg Versaclean NAF
Reserve Volume = 680 bbls @ 11.0 - 11.4 ppg Versaclean NAF.

SCE:
Keep running 1 x centirfuge while drilling & circulating to control solid/MW in Active. Checked all screens condition, all in good shape.
Screen consumption is high due to non availability of rubber cushions for screens on shale shakers, leading to frequent damage of screens.
Shale shakers screens rubber cushions inventory is low - order placed by Rig. Shaker screen inventory is low for API 200 & API 230. Told
rig for availability before next section.

DWM:
Unit up & running. Line-up vacuum to pit room to clean Pit #2 & Pit #6.

Total Skips:
Onboard: Empty = x, Full = x.
Vessel (MV Adnoc 225) : Empty = xx, Full = xx

NAF Vessel:
MV ADNOC 225 (currently @ location) : Bentonite - 37 MT. Base Oil - NIL. NAF - NIL. CaCl2 Brine = 1,300 bbls.

Bulk Items: Barite- 176 MT, Bentonite- 56 MT, Adnoc Bio-Polymer- 97 Sacks, Duo-Vis - 25 sks.
Spike Brine: 890 bbls CaCl2 Brine @ 11.4 ppg.
Base Oil: 270 bbls

TIME DISTRIBUTION Last 24 hrs MUD VOL ACCTG (bbl) SOLIDS ANALYSIS RHEOLOGY & HYDRAULICS
Drilling 7 Base Oil Added Salt Wt %wt 30.09 n
Circulating / Hole Cleaning (Programmed)
4 Water Added Salt Conc lb/bbl 30.1 k
Trip (Programmed) 13 Mud Received Adjusted Solids %vol 20.73 Tauy
Mud Returned Oil/Water Ratio 74/26 Bit loss/%, psi/%
Shakers - Mud On Cuttings 30 Average SG Solids 3.65 Bit HHP/HIS
Centrifuge - Lower LGS 20 Low Gravity % 7.19 Jet Velocity, ft/s
Evaporation 22 Low Gravity Wt. lb/bbl 65.5 Va Pipe, ft/min
High Gravity % 13.54 Va Collars, ft/min
High Gravity Wt. lb/bbl 199.30 CVa Pipe, ft/min
CVa Collars, ft/min
ECD at Shoe, lb/gal
ECD at TD, lb/gal

M-I Engineer Phone email Whse Phone Rig Phone Daily cost Cumulative Cost
Shailesh Walkunde swalkunde@slb.com
Mohamed Ezzaham Mohd Mahayuddin MMahayuddin@miswaco.slb.com

# Schlumberger-Private