MEASUREMENT SHEET

NAME OF THE PROJECT:- BAUXITE GRINDING PACKAGE OWNER:- NATIONAL ALUMINIUM COMPANY LIMITED

EPCM CONSULTANT:-THYSSENKRUPP NAME OF CONTRACTOR:-FURNACE FABRICA (INDIA)LIM

TYPE OF STRUCTURE:- COLUMN FOUNDATION FOR BALL MILL BUILDING Drawing No. 202105-CIV-106 R-1 & 202105-CVI-205 R-2
DATE:-
SL no Description Unit No Length Width
1 Excavation work (Approximately)
Silo-1 & Silo-2 Cum 2 51.862 5.325
Silo-1 & Silo-2 with footing F2 (4nos) Cum 1 18.000 9.350
Total Quantity =
2 PCC work
Silo-1&2 (Inner side) 16.506M Dia Cum 2 30.352 9.660
Deduction Cum -2 18.538 5.900
Footing F2 (1 no) Cum 1 6.900 1.900
Footing F3 (1 no) Cum 1 6.900 1.700
Elv pit raft Cum 1 3.825 2.500
Total Quantity =
3 RCC Concete work
Silo-1&2 (Inner side) 16.506M Dia Cum 2 29.880 9.510
Deduction Cum -2 18.852 6.000
Column C1 & C2 up to final level RL(+)928.500 (TOC)
Column C1 (8 nos) Cum 16 1.700 2.200
Column C2 (1 nos) Cum 2 1.500 1.000
Tie beam TB-1 at EL (+) 927.500 M Cum 16 4.917 0.400
Footing F2 (1 no) Cum 1 6.700 1.700
Column C2 (2 nos) Cum 2 1.500 1.000
Tie beam TB-1a (Longer) Cum 2 3.392 0.400
Tie beam TB-1a (Shoter) Cum 1 2.925 0.400
Tie beam TB-1a (Shoter) Cum 1 1.725 0.400
Footing F3 (1 no) Cum 1 6.700 1.500
Column C3 (2 nos) Cum 2 1.500 1.000
Tie beam TB-1b (Longer) Cum 2 3.200 0.400
Tie beam TB-2 (Shoter) Cum 2 2.000 0.600
Elv pit raft Cum 1 3.625 2.300
Less Column C2 Cum -4 0.450 0.350
Elv pit wall up to final level RL (+) 928.500 M Cum 2 2.725 0.300
Cum 2 1.600 0.300
Total Quantity =
4 Shuttering (Formwork)
For PCC
For Footing F1 Sqm 6 3.200 2.950
For Footing F2 Sqm 4 1.950 3.200
For Footing F3 Sqm 12 2.450 3.450
For RCC
For Footing F1 Sqm 6 3.000 2.750
For Footing F2 Sqm 4 1.750 3.000
For Footing F3 Sqm 12 2.250 3.250
Pedestal to final level RL(+)928.700 (TOC)
Pedestal PD-1 for F1 Sqm 6 0.750 0.650
Pedestal PD-2 for F2 Sqm 8 0.750 0.550
Pedestal PD-3 for F3 Sqm 24 0.750 0.550

Total Quantity =
ALUMINIUM COMPANY LIMITED

OR:-FURNACE FABRICA (INDIA)LIMITED.

CIV-106 R-1 & 202105-CVI-205 R-2

Hight Total Remarks

4.205 1625.784
4.205 707.701
Total Quantity = 2333.486 Cum 876000

0.100 58.640 2 397.8279


0.100 -21.875 9.51 -2 203.9992
0.100 1.311
0.100 1.173
0.100 0.956
Total Quantity = 40.205 Cum 6.81

1.400 795.656
1.400 -316.714 478.942 239.4711

3.100 185.504
3.100 9.300
0.800 25.175 219.979 109.9895
1.400 15.946
2.100 6.300 927.5 924 1.4 2.1
0.800 2.171 4.692 1.3 3.392
0.800 0.936 3.925 1 2.925
0.800 0.552 3.925 2.2 1.725
1.400 14.070
3.100 9.300 928.5 924 1.4 3.1
0.800 2.048 4.7 1.5 3.2
1.300 3.120 3 1 2
0.500 4.169
0.500 -0.315
1.550 2.534
1.550 1.488 62.319 31.15944
Total Quantity = 761.240 Cum 593.935 167.305 83.65257

0.075 5.535
0.075 3.090
0.075 10.620 19.245

0.800 55.200
0.500 19.000
0.700 92.400 166.600

2.900 48.720 928.7 925 0.8 2.9


3.200 66.560 928.7 925 0.5 3.2
3.000 187.200 302.480 928.7 925 0.7 3

Total Quantity = 488.325 Cum


795.6558
-407.9984

387.6574

19.02
29.880 9.510 1.400
21.397 6.810 1.400

928.7 925 0.8 2.9

928.7 925 0.8 2.9

928.7 925 0.8 2.9


928.7 925 0.5 3.2
928.7 925 0.7 3
PROPOSED_BAR BENDING SCHEDULE
NAME OF THE PROJECT:- BAUXITE GRINDING PACKAGE OWNER:- NATIONAL ALUMINIUM COMPANY LIMITED
EPCM CONSULTANT:-THYSSENKRUPP NAME OF CONTRACTOR:-ZETWERK MANUFACTURING BUSINEES Pvt Ltd.
ELEVATION : EL : Drawing No. ZT2023-01-502-RCC-001 R3
TYPE OF STRUCTURE:- BAUXITE SILO BUILDING ALONG WITH STAIRCASE & ELEVATOR SUPPORTING FOUNDATION
No Of Total No Total length in
Sl No BAR MKD Description Shape of bar Dia of bar No of Bar A B C D E Deduction Addition Cutting Length 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø
Member of Bar Mtr.
Silo-1 & 2 Footing F1

Bottom main (Radial) bar A B C


1 Column location @ 150 C/C 36 2 173 346 0.600 2.600 0.600 0.216 3.584 1240.064 - - - - - - - -

Bottom main (Radial) bar Span A B C


@ 200 C/C 25 2 167 334 0.600 2.600 0.600 0.150 3.650 1219.100 - - - - - 1,219.100 - -

Proposed_Bottom main A B C
(Radial) bar Span @ 200 C/C 25 2 167 334 0.600 3.400 0.600 0.150 4.450 1486.300 - - - - - 1,486.300 - -

Bottam distribution
(Circumferentail) bar Average A 36 2 15 30 51.862 51.862 1555.856 - - - - - - - -

Over lap A 36 10 15 150 1.800 1.800 270.000 - - - - - - - -

Proposed_Bottam distribution A
(Circumferentail) bar Average 36 2 5 10 40.249 40.249 402.490 - - - - - - - -

Over lap A 36 6 5 30 1.800 1.800 54.000 - - - - - - - -

Proposed_Bottam distribution
extra 2nd A
lear(Circumferentail) bar 36 2 20 40 48.732 48.732 1949.297 - - - - - - - -
Average

Over lap A 36 6 4 24 1.800 1.800 43.200 - - - - - - - -

Top main (Radial) bar Column A B C


location @ 200 C/C 25 2 297 594 0.600 2.600 0.600 0.150 3.650 2168.100 - - - - - 2,168.100 - -

Top main (Radial) bar Column A B C


location @ 200 C/C 36 2 297 594 0.600 3.400 0.600 0.216 4.384 2604.096 - - - - - - - -

Top distribution
(Circumferentail) bar Average A 36 2 15 30 51.862 51.862 1555.856 - - - - - - - -

Over lap A 36 10 15 150 1.800 1.800 270.000 - - - - - - - -

Proposed_Bottam distribution A
(Circumferentail) bar Average 36 2 5 10 40.249 40.249 402.490 - - - - - - - -

Over lap A 36 6 5 30 1.800 1.800 54.000 - - - - - - - -

Top extra distribution


For 13° (Circumferentail) bar for span
span
A 36 2 15 30 1.873 1.873 56.190 - - - - - - - -
area Average

Page 6 of 22
No Of Total No Total length in
Sl No BAR MKD Description Shape of bar Dia of bar No of Bar A B C D E Deduction Addition Cutting Length 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø
Member of Bar Mtr.

Proposed_Top extra
distribution (Circumferentail) A 36 2 5 10 1.873 1.873 18.730 - - - - - - - -
bar for span area Average

Top extra distribution


For 20° (Circumferentail) bar for span
span
A 36 2 15 30 2.881 2.881 86.430 - - - - - - - -
area Average

Proposed_Top extra
distribution (Circumferentail) A 36 2 5 10 2.881 2.881 28.810 - - - - - - - -
bar for span area Average

Top extra distribution


For 20° (Circumferentail) bar for span
span
A 36 2 15 30 2.881 2.881 86.430 - - - - - - - -
area Average

Proposed_Top extra
A
distribution (Circumferentail) 36 2 5 10 2.881 2.881 28.810 - - - - - - - -
bar for span area Average

Top extra distribution


For 20° (Circumferentail) bar for span
span
A 36 2 15 30 2.881 2.881 86.430 - - - - - - - -
area Average

Proposed_Top extra
distribution (Circumferentail) A 36 2 5 10 2.881 2.881 28.810 - - - - - - - -
bar for span area Average

Top extra distribution


For 20° (Circumferentail) bar for span
span
A 36 2 15 30 2.881 2.881 86.430 - - - - - - - -
area Average

Proposed_Top extra
distribution (Circumferentail) A 36 2 5 10 2.881 2.881 28.810 - - - - - - - -
bar for span area Average

Top extra distribution


For 20° (Circumferentail) bar for span
span
A 36 2 15 30 2.881 2.881 86.430 - - - - - - - -
area Average

Proposed_Top extra
distribution (Circumferentail) A
36 2 5 10 2.881 2.881 28.810 - - - - - - - -
bar for span area Average

Top extra distribution


For 20° (Circumferentail) bar for span
span
A 36 2 15 30 2.881 2.881 86.430 - - - - - - - -
area Average

Proposed_Top extra
distribution (Circumferentail) A 36 2 5 10 2.881 2.881 28.810 - - - - - - - -
bar for span area Average

Top extra distribution


For 20° (Circumferentail) bar for span
span
A 36 2 15 30 2.881 2.881 86.430 - - - - - - - -
area Average

Proposed_Top extra A
distribution (Circumferentail) 36 2 5 10 2.881 2.881 28.810 - - - - - - - -
bar for span area Average

A
Proposed_Extra inside U-bar C
@ 200 c/c C 36 2 190 380 2.600 1.300 2.600 6.500 2470.000 - - - - - - - -

Face bar (Inner side) A 25 2 4 8 43.334 43.334 346.672 - - - - - 346.672 - -

Face bar (Outer side) A 25 2 4 8 59.220 59.220 473.760 - - - - - 473.760 - -

Page 7 of 22
No Of Total No Total length in
Sl No BAR MKD Description Shape of bar Dia of bar No of Bar A B C D E Deduction Addition Cutting Length 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø
Member of Bar Mtr.

Over lap A 25 16 8 128 1.250 1.250 160.000 - - - - - 160.000 - -

Proposed_Extra inside Face


bar (Inner side) A 25 2 4 8 38.018 38.018 304.146 - - - - - 304.146 - -

Over lap A 25 8 4 32 1.250 1.250 40.000 - - - - - 40.000 - -

A
Extra face bar for column C2 B 25 2 6 12 2.300 1.975 0.075 4.200 50.400 - - - - - 50.400 - -

Proposed_Extra face bar for A


column C1 B 25 16 6 96 1.500 1.500 0.075 2.925 280.800 - - - - - 280.800 - -

A C
Stirrups bar @ 150 c/c & 200
c/c 03 Set 10 6 267 1602 1.239 1.122 1.239 1.122 0.100 0.2 4.822 7724.844 - 7,724.844 - - - - - -
D

Stirrups bar @ 150 c/c & 200 B


c/c 02 Set 10 4 267 1068 0.100 1.239 0.100 0.040 1.399 1494.132 - 1,494.132 - - - - - -

A C
Proposed_Stirrups bar @ 150
c/c & 200 c/c 01 Set 10 2 267 534 1.239 1.122 1.239 1.122 0.100 0.2 4.822 2574.948 - 2,574.948 - - - - - -
D

Proposed_Stirrups bar @ 150 B


c/c & 200 c/c 02 Set 10 4 267 1068 0.100 1.239 0.100 0.040 1.399 1494.132 - 1,494.132 - - - - - -

A
B
"Z" Bar for chair 32 189 2 378 0.300 1.086 0.300 0.216 1.470 555.660 - - - - - - - 555.660
C

A
B
Proposed_"Z" Bar for chair 32 45 2 90 0.300 1.086 0.300 0.216 1.470 132.300 - - - - - - - 132.300
C

Lear (pin) bar A 32 45 2 90 2.400 2.400 216.000 - - - - - - - 216.000

Proposed_Lear (pin) bar A 25 50 2 100 3.300 3.300 330.000 - - - - - 330.000 - -

Proposed_Column C1 (Size 1700x2200) 08 Nos

A
B
Column C1 virtical 36 16 24 384 0.300 4.328 0.300 0.216 4.712 1809.408 - - - - - - - -
C

Page 8 of 22
No Of Total No Total length in
Sl No BAR MKD Description Shape of bar Dia of bar No of Bar A B C D E Deduction Addition Cutting Length 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø
Member of Bar Mtr.
A
B
Proposed_Column C1 virtical 36 16 4 64 0.300 4.328 0.300 0.216 4.712 301.568 - - - - - - - -
C

A
B
Proposed_Column C1 virtical 16 16 28 448 0.300 4.328 0.300 0.096 4.832 2164.736 - - - 2,164.736 - - - -
C

Stirrups bar @ 250 c/c 03 set A C 8 48 18 864 0.471 1.910 0.471 1.910 0.080 0.160 4.842 4183.488 4,183.488 - - - - - - -

A C
Links bar @ 250 c/c 03 set 8 48 18 864 0.080 1.910 0.080 0.032 2.038 1760.832 1,760.832 - - - - - - -
B

Stirrups bar @ 250 c/c 03 set A C 8 48 18 864 0.671 1.310 0.671 1.310 0.080 0.160 4.042 3492.288 3,492.288 - - - - - - -

A C
Links bar @ 250 c/c 03 set 8 48 18 864 0.080 1.310 0.080 0.032 1.438 1242.432 1,242.432 - - - - - - -
B

A
Proposed_Stirrups bar U C
shapes both side @ 250 c/c C 8 32 18 576 1.250 1.610 1.250 0.032 4.078 2348.928 2,348.928 - - - - - - -

Proposed_Links bar @ 250 c/c A C


07 set 8 112 18 2016 0.080 2.110 0.080 0.032 2.238 4511.808 4,511.808 - - - - - - -
B

Proposed_Links bar @ 250 c/c A C


07 set 8 112 18 2016 0.080 1.670 0.080 0.032 1.798 3624.768 3,624.768 - - - - - - -
B

Proposed_Column C2 (Size 1500x1000) 01 Nos

A
B
Column C2 virtical 36 2 20 40 0.300 4.328 0.300 0.150 4.778 191.120 - - - - - - - -
C

A
B
Proposed_Column C2 virtical 36 2 12 24 0.300 4.328 0.300 0.216 4.712 113.088 - - - - - - - -
C

A
Proposed_Stirrups bar U C
shapes both side @ 250 c/c C 8 4 18 72 0.950 0.910 0.950 0.032 2.778 200.016 200.016 - - - - - - -

Stirrups bar @ 250 c/c 02 set A C 8 4 18 72 0.687 0.910 0.687 0.910 0.080 0.160 3.274 235.728 235.728 - - - - - - -

A C
Links bar @ 250 c/c 02 set 8 4 18 72 0.080 0.910 0.080 0.032 1.038 74.736 74.736 - - - - - - -
B

Page 9 of 22
No Of Total No Total length in
Sl No BAR MKD Description Shape of bar Dia of bar No of Bar A B C D E Deduction Addition Cutting Length 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø
Member of Bar Mtr.
B

Stirrups bar @ 250 c/c 02 set A C 8 4 18 72 0.567 1.110 0.567 1.110 0.080 0.160 3.434 247.248 247.248 - - - - - - -

A C
Links bar @ 250 c/c 02 set 8 4 18 72 0.080 1.110 0.080 0.032 1.238 89.136 89.136 - - - - - - -
B

Proposed_Links bar @ 250 c/c A C


04 set 8 8 18 144 0.080 1.410 0.080 0.032 1.538 221.472 221.472 - - - - - - -
B

Tai beam TB1 08 nos (Size = 400x800)

A B C
1 Top & battom main bar 25 16 8 128 0.300 7.517 0.300 0.216 7.901 1011.328 - - - - - 1,011.328 - -

Stirrups bar @ 250 c/c A C 8 32 23 736 0.220 0.710 0.220 0.710 0.080 0.160 1.940 1427.840 1,427.840 - - - - - - -

Face bar A 10 16 4 64 7.517 7.517 481.088 - 481.088 - - - - - -

Footing F2 04 nos - - - - - - - -

Size = 2000X1500X1400H

A B C
16 8 12 96 0.800 1.900 0.800 0.064 3.436 329.856 - - - 329.856 - - - -
Proposed_Top & bottom main
(Longer direction) bar 125 C/C

A B C
Proposed_Top & bottom 16 8 16 128 0.800 1.400 0.800 0.064 2.936 375.808 - - - 375.808 - - - -
distribution (shorterdirection)
bar 125 C/C
B

Proposed_face bar A C 16 4 3 12 1.932 1.432 1.932 1.432 0.128 0.32 6.920 83.040 - - - 83.040 - - - -

C
D
Chair A B E 16 8 4 32 0.300 1.252 0.800 0.352 0.300 0.128 2.876 92.032 - - - 92.032 - - - -

Proposed_Column C2 (Size 1500x1000) 04 Nos - - - - - - - -

A
B
Column C2 virtical 36 4 20 80 0.300 4.328 0.300 0.150 4.778 382.240 - - - - - - - -
C

A
B
Proposed_Column C2 virtical 36 4 12 48 0.300 4.328 0.300 0.216 4.712 226.176 - - - - - - - -
C

A
Proposed_Stirrups bar U C
shapes both side @ 250 c/c 8 8 18 144 0.950 0.910 0.950 0.032 2.778 400.032 400.032 - - - - - - -

Stirrups bar @ 250 c/c 02 set A C 8 8 18 144 0.687 0.910 0.687 0.910 0.080 0.160 3.274 471.456 471.456 - - - - - - -

Page 10 of 22
No Of Total No Total length in
Sl No BAR MKD Description ShapeDof bar Dia of bar No of Bar A B C D E Deduction Addition Cutting Length 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø
Member of Bar Mtr.

A C
Links bar @ 250 c/c 02 set 8 8 18 144 0.080 0.910 0.080 0.032 1.038 149.472 149.472 - - - - - - -
B

Stirrups bar @ 250 c/c 02 set A C 8 8 18 144 0.567 1.110 0.567 1.110 0.080 0.160 3.434 494.496 494.496 - - - - - - -

A C
Links bar @ 250 c/c 02 set 8 8 18 144 0.080 1.110 0.080 0.032 1.238 178.272 178.272 - - - - - - -
B

Proposed_Links bar @ 250 c/c A C


04 set 8 16 18 288 0.080 1.410 0.080 0.032 1.538 442.944 442.944 - - - - - - -
B

C
Tai beam TB2 02 nos (Size = 300x500) Longer span

A B C
1 Top & battom main bar 25 2 8 16 0.200 4.925 0.200 0.216 5.109 81.744 - - - - - 81.744 - -

Stirrups bar @ 250 c/c A C 8 2 28 56 0.154 0.410 0.154 0.410 0.080 0.160 1.208 67.648 67.648 - - - - - - -

Tai beam TB2 02 nos (Size = 300x500) Shtoer span

A B C
1 Top & battom main bar 25 2 8 16 0.200 3.400 0.200 0.216 3.584 57.344 - - - - - 57.344 - -

Stirrups bar @ 250 c/c A C 8 2 16 32 0.154 0.410 0.154 0.410 0.080 0.160 1.208 38.656 38.656 - - - - - - -

Tai beam TB2 03 nos (Size = 300x500)

A B C
1 Top & battom main bar 25 1 8 8 0.200 4.925 0.200 0.216 5.109 40.872 - - - - - 40.872 - -

Stirrups bar @ 250 c/c A C 8 1 28 28 0.154 0.410 0.154 0.410 0.080 0.160 1.208 33.824 33.824 - - - - - - -

D
Lift pit foundation 18 - - - - - - - -

A E
Bottom main & dist. bar B
D 12 1 44 44 0.100 1.900 3.100 1.900 0.100 0.096 7.004 308.176 - - 308.176 - - - - -
C

Top & battom main bar A B C 12 1 44 44 0.300 3.052 0.300 0.048 3.604 158.576 - - 158.576 - - - - -

A
B
Wall virtical 12 1 76 76 0.100 1.876 0.300 0.150 2.126 161.576 - - 161.576 - - - - -
C

Wall binder A B C 12 1 88 88 0.300 3.052 0.300 0.048 3.604 317.152 - - 317.152 - - - - -

Total Length in Mtr = 25937.520 13769.144 945.480 3045.472 0.000 8050.566 0.000 903.960
Unit Weight in Mtr = 0.395 0.617 0.888 1.580 2.470 3.580 4.830 6.320
Weigth in Bar Wise = 10.245 8.499 0.840 4.813 0.000 28.821 0.000 5.713
Total weight in MT = 193.143

Page 11 of 22
No Of Total No Total length in
Sl No BAR MKD Description Shape of bar Dia of bar No of Bar A B C D E Deduction Addition Cutting Length 8Ø 10Ø 12Ø 16Ø 20Ø 25Ø 28Ø 32Ø
Member of Bar Mtr.

As pre FFIL drawing quantity = 5.604 5.988 0.840 0.861 0.000 20.081 0.000 4.877
Additional required steel = 4.641 2.512 0.000 3.952 0.000 8.740 0.000 0.836

SILO FOUNDATION ADDITIONAL (PROPOSED) REQUIRED STEEL QUANTITY


Dia of bar Quantity Add 5% Required quantity
36 mm 70.248 0.05 3.5124 73.760
32 mm 0.836 0.05 0.0418 0.878
25 mm 8.74 0.05 0.437 9.177
16 mm 3.952 0.05 0.1976 4.150
12 mm 0 0.05 0 0.000
10 mm 2.512 0.05 0.1256 2.638
8 mm 4.641 0.05 0.23205 4.873
95.475

Page 12 of 22
36Ø Remarks

1,240.064

1,555.856

270.000

402.490

54.000

1,949.297

43.200

2,604.096

1,555.856

270.000

402.490

54.000

56.190

Page 13 of 22
36Ø Remarks

18.730

86.430

28.810

86.430

28.810

86.430

28.810

86.430

28.810

86.430

28.810

86.430

28.810

86.430

28.810

2,470.000

Page 14 of 22
36Ø Remarks

1,809.408

Page 15 of 22
36Ø Remarks

301.568

191.120

113.088

Page 16 of 22
36Ø Remarks

382.240

226.176

Page 17 of 22
36Ø Remarks

16776.548
8.000
134.212

Page 18 of 22
36Ø Remarks

63.689 101.940
70.524 91.204

Page 19 of 22
Sub-station

Footing F10 8 2.25 2.75


Column C4 8 0.4 0.7
Plinth Beam 14 3.1 0.65
Less existing plinth Beam -14 3.1 0.35

Footing F01 6 3 3
Pedestal P01 6 0.8 0.6
Footing F02 16 2.4 3.2
Pedestal P02 32 0.5 0.65
Footing F03 2 1.5 1.5
Pedestal P03 2 0.5 0.5
Plinth beam PB1 4 39.45 0.3
Plinth beam PB2 1 27.1 0.3
Plinth beam PB3 1 27.1 0.3
0.6 29.7
2.5 5.6 928.1 925 0.6 2.5
1.8 50.778
0.8 -12.152
73.926

0.5 27 928.7 925 0.5 3.2


3.2 9.216
0.4 49.152
3.3 34.32
0.35 1.575
3.35 1.675
0.6 28.404 12.5 31.5 44 4.55 39.45
0.6 4.878 30.4 1.8 1.5 27.1
0.6 4.878
161.098
Bauxite Grinding Package
Concrete Summery

Sl no Name Structure Unit Quantity


1 Silo 1 & 2 Cum 761.240
2 Sub-station Building Cum 73.926
3 Column foundation for Ball mill shed Cum 161.098