Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SC03

FF-ZZ-DWG-AR-30001

EL04 SC02
FF-ZZ-DWG-AR-20001 8 9
1 FF-ZZ-DWG-AR-30001

2 7
3
4
5 6

4620
4840
3950

WS02 5610 2360


2180 6810
WS03
G FF-ZZ-DWG-AR-32001
WS04
FF-ZZ-DWG-AR-32002
FF-ZZ-DWG-AR-32002 P
CLIENT
VOID CANOPY ABOVE
VOID VOID

3500
WS05
VOID
FF-ZZ-DWG-AR-32003
WS07
FF-ZZ-DWG-AR-32004
F AMAALA Poject Permitting Support and Coordination Office (APPSCO)
VA
LL EY

2080
SLO
VOID 3544
PE
1%
VAL
LEY N
1% 10489

2500
E
EY SLOP

1658
L L 8234
E VA 22 14 26

2500
CUTOUT C45 10 73 16.13
1% VA
SL
O PE 7133 LLE
Y Y E1
LE

12162
IE
2100

SLO L STAMP SIGNATURE


PE VA
1 % %
22 14 26 E1 2500
OP
SL

%
07 71 23

E1
D

OP
LEY I E2

SL
EL03

SL
VAL 22 14 26

OP
EY
7133

E1
FF-ZZ-DWG-AR-20001 07 76 13 LEAD CONSULTANT

LL

%
SL
OP

VA

2292
1% E

2499
E 1%
LOP

VA
10 73 16.13 S
2775 3476

LL
SL
OP

EY
VA C90

1%
1%
07 71 23 LLE

E
C90 Y

OP
C45

SL
C90

VA
5070

07 76 13

LL

Y
E

E
Y

LL
SC01 ROF-02

VA
CUTOUT
M STAMP SIGNATURE

2500
FF-ZZ-DWG-AR-30001
2500 CUTOUT
23730

2791
2500
4321

2791
VA
LL
C EY
S 2476
RIDGE
AOR
LO
PE RIDGE
1% 2476 1115
2500
Y EL01
L LE
VA VOID FF-ZZ-DWG-AR-20001

VAL
%
E1
OP

LEY
SL
HORIZONTAL LIFELINE SYSTEM (HLL) Consolidated Consultants for Engineering and Environment
8mm DIAMETER STAINLESS STEEL 2500 C90 22 14 26 C45 WS08

SLO
Y STAMP SIGNATURE
6125 L LE

PE 1
WIRE 92 M, SUPPLIED WITH COMPATIBLE VA FF-ZZ-DWG-AR-32004

11700
2500

2570
MOBILE TRAVELLER. 6125 2020 L
SLO
7290

1 %
PE
PE

SYSTEM SECURED WITH STANDARD SL


O
1%

GALVANIZED STEEL POST FIXED CUTOUT


SIGNATURE / DESIGN ARCHITECT
INTO CONCRETE SLAB WITH FISCHER Y 22 14 26
VOID VA LLE
CHEMICAL ANCHOR BOLT 1% 892
PE 0
SLO
SL
IP OP
E1
%
VA

Y
LL

VALLE
22 14 26 EY
EY VOID CONSULTANT
LL
VA
B SLO WS09

E 1%
PE 1
%
VOID

SLOP
VOID VAL FF-ZZ-DWG-AR-32005 VOID
L EY
727
VOID 7 C45 C90
CONSTRUCTION
3690

VOID

19186
5568
K
VOID

2500
12483
A TOW
+4.270 KEY PLAN

VOID
4500

VOID
VOID
VOID VOID VOID N
J
VOID VOID
VOID

11740
Q

GENERAL NOTES
3191

1. ALL STRUCTURAL, MEP, CIVIL AND LANDSCAPING QUERIES ARE TO BE REFERRED


TO THE RELEVANT CONSULTANT DRAWINGS, SPECIFICATIONS AND DETAILS.
VOID 2. ALL DESIGN AND CONSTRUCTION TO COMPLY WITH APPLICABLE REGULATIONS AND
VOID LOCAL AUTHORITY REQUIREMENTS
3. CONTRACTORS AND SUBCONTRACTORS ARE TO CHECK ALL DIMENSIONS AND
LEVELS ON THE BUILDING SITE BEFORE COMMENCING WITH ANY WORK
4. ANY DISCREPANCY IN THE DRAWINGS, DIMENSIONS & SPECIFICATIONS ARE TO BE
18693 BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO ANY WORK
H 5.
BEING PUT IN HAND
ONLY FIGURED DIMENSIONS TO BE FOLLOWED - SCALED DIMENSIONS OF
DRAWINGS WILL NOT BE PERMITTED

1.) Conditionally accepted subject to Design


Calculation submission/approval.
EL02 2.) Ensure to coordinate with other contractors i.e. C0 07-03-2024 ISSUED FOR APPROVAL MZ

ROOF LEVEL (R1)


FF-ZZ-DWG-AR-20001
steel post, floor drains/plinths locations/etc. REV. DATE REASON FOR ISSUE CHK
PROJECT
1 3.) Correction or comments made relative to ROSEWOOD RESORT
1 : 100 submittals during this review does not relieve the TRIPLE BAY, SAUDI ARABIA
contractor from compliance with the requirements of
the drawings, specifications and reports. This check
KEELINE LEGEND:- is only for review of general conformance with the
BUILDING NAME
design concept of the project and general VILLA CLUSTER FAMILY TYPE F
EXTREMITY- compliance with the information given in the contract
E1-P EXTREMITY-TENSIONER IP INTERMEDIATE BRACKET C90-P CORNER 90° E2-P SWAGE END WIRE ROPE -316GR. BUILDING NUMBER
documents. The contractor is responsible for FF
complying and correlating all related standards of PLOT NUMBER
the products, all quantities, dimensions, selection, TB-08
manufacturing, construction and coordinating his DRAWING TITLE
work with that of other trades and performing his FALL ARREST SYSTEM -
work as per the project requirements in a safe and KEELINE
satisfactory manner. ROOF PLAN - LAYOUT

MODEL FILE REFERENCE

1TB02011-011D06-DSA-FF-ZZ-MOD-AR-90001
DRAWN BY CHECKED BY APPROVED BY

DRAWING REFERENCE DETAILS VN MZ MZ


PART NO. EXT-TEN PART NO. INT-STD PART NO. CNR90 PART NO. EXT-SW PART NO. ROPE8SS7X7 PROJECT NO. ISSUE DATE SCALE @ A1
FIXATION DETAIL 1TB02011-011C44-AMP-FF-R1-SDW-AR-30001 1TB02011 07-03-2024 AS SHOWN

DRAWING NUMBER REVISION


1TB02011-011C44-AMP-FF-R1-SDW-AR-10001 C0

You might also like