Canterbury Apartment

Complex
PROJECT NAME: CLIENT: PROJECT MANAGEMENT DATE OF COMMENCEMENT:
CANTERBURY APARTMENT HOME LANDS SKYLINE CONSULTANT: 23RD OF JANUARY 2020
COMPLEX (PVT)LTD LOTUS CONSTRUCTION
MANAGEMENT
CONSULTANTS
➢ Located at Gonapola , Kahathuduwa

➢ Ruwanpura Highway project is ongoing near the site.

➢ Extended from 30 acre to 64 acre


Canterbury Golf Villas

Canterbury
Residencies

Lexus Golf Apartments


Garden Apartments

Golf Apartments
Unit Type Floor Area
6P 3BR Villa 1800ft2
6P Signature 3BR Villa 2125ft2
6P Signature 4BR Villa 2270ft2
8P 3BR Villa 2262ft2
8P Signature 4BR Villa 2710ft2
10P Signature 4BR Villa 3185ft2
➢ 6P Signature Villa house
➢ 6P Villa
➢ 8P Signature villa house
➢ 8P Villa
➢ 10P Signature Villa house
➢ 10P Paddy field Villa house
Structural drawing Architectural drawing
Figure 1 : Excavation works Figure 2 : Footing concreting works Figure 3: RRM Works

Figure 4: Tie beam reinforcement works Figure 5: Masonry works


Figure 6: Staircase reinforcement works Figure 7: Lintel formworks

Figure 8: Putty works Figure 9: Slab formwork works


Type Floor Area Construction cost ( Excluding
Provisional Sums)

3BR 1218𝑓𝑡 2 7.6M

4BR 1506𝑓𝑡 2 9.6M


Structural Engineer : Civil and Structural Engineering Consultants(Pvt)Ltd

Architect : Team Work Association

Contractor : Home Lands Construction (Pvt)Ltd.

MEP Consultant : Home Lands Construction (Pvt)Ltd.

5 Blocks : Block A,B,C,D & E - 6 stories (G+5)

Number of units per floor : 8

Total Units : 248 Units

Type Floor area


2BR 702𝑓𝑡 2
3BR 1040𝑓𝑡 2
Block A Block B Block C

Block D Block E
Ground Floor Plan of A & E Ground Floor Plan of B , C & D
Structural Engineer : Saro Weerasooriya Association

Architect : Team Work Association

Contractor : Home Lands Construction (Pvt)Ltd.

MEP Consultant : Noel Joseph Consultant

4 Towers : Tower F,G,H & I -11 stories (G+10)

Number of units per floor : 6

Total Units : 262 Units

Type Floor Area


2BR 670 ft2
3BR 1214 ft2
Tower F Tower G Tower H Tower I
Ground Floor Plan
• Plumb bob
• 2” x 4” Planks
• GI pipes
• GI jack
• T jack
• P cone
• Ties
• Turn buckle
Drill 1.5 ft in gaps Mix in 1:200 Inject the solution Spray the solution
of 3ft Bifenthrin : water into the hole over the surface
Drilling upto Cleaning the holes Mixing the chemical Pouring the chemical
required depth using air blower with water mix into holes
Tile code – 4PM.MT Tile code – 4PM.MT
Cleaning and washing the
Chipping the floor Level peg installation Tile bed laying Tile setting out
floor

Mixing tile adhessive in


proper ratio
Applying tile adhessive Fixing the tiles Grouting the gaps Skirting height
Steps Layers Product Application
Step Dulux Exterior / Primer
1st Coat
01 Interior Sealer Application
Nippon crack
2nd Coat
Step bridging wall primer Intermediate
02 Nippon crack Application
3rd Coat
bridging wall primer
Multilac weather
4th Coat
Step guard Top
03 Multilac weather Application
5th Coat
guard
Drilling Clean by blower Injecting the resin Pushed the bar inside
RRM Retaining wall
• Constructed by using rubbles and mortar together.
• Purpose is to maintain the gap between two land areas and
resist the earth pressure.
• Weep holes are provided to prevent from hydrostatic pressure.

35
Retaining wall construction cont.

2/6/2023 36
Figure 1 : gloves Figure 2 : Helmet

38

Figure 2 : Boots