Professional Documents
Culture Documents
Fiber
Fiber
Document History
Revision Date Description of Changes Author
(dd-mm-yyyy)
Table of Contents
1 LIST OF MATERIALS .......................................................................................................................... 6
List of Tables
TABLE 1: LIST OF COMMUNICATION NETWORK SYSTEM EQUIPMENT .................................................................. 6
TABLE 2: COMPLIANCE TABLE OF COMMUNICATION NETWORK SYSTEM ............................................................. 7
List of Figures
N/A
1 List of Materials
Table 1: List of Communication Network System Equipment
Item Material / Equipment Product Name Brand Model Reference
Appendix A – Optical Fiber Cable
1 Optical Fiber Cable Single Mode Optical Fiber Cable FUTONG ADSS(SJ)
(FUTONG ADSS(SJ))
e) The Private Party shall coordinate with Proposed as mentioned. Fully Comply -
DOH’s other contracting parties to agree on
fixation and/ or anchor bolt drilling to suspend
cable conduit or containment on elevated
structures and associated structural
components.
f) The Private Party shall be responsible for Proposed as mentioned. Fully Comply -
provision and installation of additional duct
banks or handholes, where appropriate, for
cabling works of Communication Network
System. Should the Private Party decide to
use any of the duct banks and handholes
provided by DOH’s other contracting parties,
it shall do so at its own risk. Any required
modification to existing duct banks/handholes
provided by DOH’s other contracting parties
shall be under the Private Party’s
responsibility.
g) Indelible labelling, marking and Proposed as mentioned. Fully Comply -
documentation for any OFC installation shall
be implemented.
h) Pathway, conduit for OFC installation in Proposed as mentioned. Fully Comply -
addition to duct bank system shall be under
the Private party’s responsibility.
i) OFC of network lines among Toll Control Proposed as mentioned. Fully Comply -
Buildings shall be designed and installed as
redundant with separate installation path.
OFC for Backbone Network shall be
separated from access and roadside
network.
No. FT-S22104
Version: A
Issued: Nov. 08, 2022
1. General
1.1 The specification covers the construction and properties of optical fiber cable.
5.2.4 a), 5.2.4 b)
1.2 The cable could be used for aerial or duct installed with span length 40meters.
1.3 The optical fiber which is used in the cable is also in compliance with ITU-T Rec. G.652D.
1.4 The cable generally meets any latest relevant ITU-T Recommendation or better.
1.5 The fiber shall operate in 1310nm and 1550nm.
1.6 The cable could serve for 25 years without any significant deterioration.
. Cross Section of Cable
Optical Cable
4.1 Construction
Cable Type ADSS(SJ)
5.2.4 d)
Number of Fibers 12,24
Fiber Construction Consult 3.1
Central Strength
Material FRP
Member
Water Blocking Water Blocking Tape and
Material
Member Water Blocking Yarn
Material PBT
Loose Tube
Filling Compound Fiber Jelly
Filler Rod Material Polypropylene (PP)
Additional
Material Aramid Yarn
Strength Member
Rip Cord No. 1
Material UV-Proof HDPE(Black)
Outer Sheath
Thickness Min. 1.5mm
4.3 Identification
Color Code for fiber and loose tube.
No. 1 2 3 4 5 6
Color Blue Orange Green Brown Grey White
No. 7 8 9 10 11 12
Color Red Black Yellow Violet Pink Aqua
※ When laying in the duct environment, the optical cable application should be consistent
with the above performance