4 3 2 1
Displays a clear Has a fairly clear Has brainstormed Little effort has
Rubrics for the Performance Task
picture of what the picture of what they their concept, but no been spent on
students are trying are trying to clear focus has brainstorming and
to achieve. achieve. It is closely emerged. refining a concept.
related to the
It is centered around concept and shows Goals/final Unclear on the
a concept that shows developed product not clearly goals and how the
highly developed awareness and defined. project objective
awareness and preparedness will be met.
preparedness during during geological
CONCEPT geological events. events.
Adequate
description of what Can describe what
they are trying to do they are trying to do
and generally how overall but has
his/her work will trouble describing
contribute to the how his/her work
final project. will contribute to
the final project.
Students met Students met Only a couple of team Meetings were not
virtually and had virtually and had meetings were held held and/or some
regular discussions. regular discussions. virtually. Most of the of the team
All students on the All students on the students on the team members did not
team contributed to team contributed to contributed at some contribute at all to
the discussion and the discussion and level, but a majority of the project. Low
were part of the final were part of the the work was done by levels of
TEAMWORK project. Team final project. Team one or two. Several respect were
members showed members showed conflicts arose that evident within the
respect with each respect with each required adult team. A
other. No adult other. A little adult supervision. considerable adult
supervision is supervision is intervention is
required. required. required to settle
issues among team
members.
All project deadlines Most project Many project Deadlines were
were met. deadlines were met. deadlines were not regularly missed,
Those that were met, resulting in some having a significant
TIMELINESS late did not have impact on the finished impact on the final
significant impact project. project.
on the finished
project.