Ref:A.F.P.L./L.I.P.L. NO. 17
442 bc 28 erection
Sl Basic Job Steps Potential Hazard Consequence Current control measure Risk rating Additional Risk rating
Residu
al risk
Proba
Proba
bility
bility
N. Initial control
P E A R Risk measure P E A R
DISTRUPTION IN
MOVEMENT STOP THE VECHILE & CHANGE THE TYRE. CHECK THE
1 MARCH THE CRANE TYRE BUST 2 0 2 2 2 4
PASSER BY CAN TYRE CONDITION EVERYDAY
GET INJURED
FAILURE OF JACK
ALL FOUR JACK SHOULD BE PLACED PROPERLY &
JACK UP THE CRANE DUE ITS CRANE WILL BE
3 CHECK THE SOIL CONDITION. CRANE OUT RIGGER 2 0 2 2 2 4
&VERIFY ITS RIGIDITY HYDRAULICK UNBALANCED
FULLY EXTENDED
SYSTEM FAILURE
Nil
FALL FROM
START SHIFTING INJURY TO
4 HEIGHT & INJURY SILING USED AS PER LOAD TESTED & COLOUR CODED 2 0 2 2 1 4
OPERATION WORKMAN
THE PERSON
CLIT TO BE
PLACING OF STRUCTUE LOOSED FROM INJURY TO CLIT WELDING TO BE ENSURED WITH THE INSERT
5 2 1 1 2 2 4
ON THE REST CLIT THE INSERT WORKMAN PLATE.
PLATE
8 GAS CUTTING BACKFIRE BURN INJURY USE FLASH BACK ARRESTER USE FIRE EXTINGUISHER. 2 2 2 2 2 4
FALL FROM
INJURY TO MUST CHECK THE WAH PPE EQUIPMENTS BEFORE TO
9 WAH HEIGHT & INJURY 2 0 0 1 2 4
WORKMAN USE IT & FILL OUT A SAFETY HARNESS REGISTERS.
THE PERSON
Enclosure:
1.Method statement.