Proposal process

Outputs from
Deliverable
deliverable

Number of panels
Shading analysis
without shading

Number of panels that


Number of panels without shading can fit on the roof

Number of panels that can fit


Number of inverters
Layout Cable route
Substation location
Inverter location

Number of panels (that fit and without shading)


Number of inverters

Number of panels per MPPT


Number of strings per inverter
Stringing `
Maximum and minimum string length
Maximum and minimum string voltage

Energy generated hourly


Energy generated per month
Energy generated per year
Yield report ` DC losses
AC losses
Performance ratio
P90 Specific yield (kWh/kWp)

Tie in point
Metering point
Single line diagram Cable sizes
Switchgear sizes (fuses, breakers)
Voltages

EPC Cost of project

All deliverables + cost


of project to be
included in the
proposal