Professional Documents
Culture Documents
A - I Scsei DRWG Ebr-Pp-002 0
A - I Scsei DRWG Ebr-Pp-002 0
A - I Scsei DRWG Ebr-Pp-002 0
95 -2.98% 2.98%
S = 0.002
Q25 = 29.60 m3/s
V = 2.70 m/s
Size = 2-2.40m x 2.40m
x 21.219m RCBC
HEADWALL HEADWALL
(See DR-SD2-01) (See DR-SD2-01)
90
GROUTED STEPPED
CHUTE (SEE DR-SD8-01)
85
OIE = 86.802 m. CIE = 86.823 m. IIE = 86.845 m.
EG=88.615
FG=94.702
80
-25
-30 -20 -15 -10 -5 0 5 10 15 20 25
94.611
94.761
94.244
94.626
94.775
94.394
FINISHED GRADE ELEV
-3.611
-3.060
-2.559
3.501
2.449
2.949
OFFSET FROM CL
STA. 0+596.42
PREPARED BY: REVIEW AND RECOMMENDING APPROVAL: PROJECT TITLE: SHEET CONTENT: REVISION: SHEET NO:
EPC CONTRACTOR: OEPM CONSULTANT:
SANTA CRUZ SOLAR ENERGY INC. SHOP DRAWING REV: DATE: DESCRIPTION: 3 OF 12
TERP ASIA Construction Corporation FILIPINAS DRAVO CORPORATION A 08/11/23 - SCALE: AS SHOWN
The Burgundy Place Condominium Unit 306, 174 B. Gonzales Consulting Engineering & Architectural Services CROSS SECTION
St. Loyola Heights,Quezon City, Philippine
ACCESS AND INFRASTRUCTURE - - - DRAWING NO.:
Tel: +63 2 929 7661, +63 2 426 5618 REINFORCEMENT CONCRETE BOX
- - - A&I.SCSEI.DRWG.EBR-PP-002.0
PROJECT CULVERT (RCBC)
- - -
ENGR. RYAN Z. LEGASPI ENGR. PABLITO BULACLAC 2 BARREL - 2.40m x 2.40m DRAWN BY: ELAOG, RONELL P.
- - -
TACC - PROJECT MANAGER OE (FDC) - HEAD LOCATION: San Marcelino, Zambales STA. 0+596.42 - - - DATE: AUGUST 11, 2023