Professional Documents
Culture Documents
2 Kickoff Meeting For Reference 08 - PRV RDD e 020 - Tenant Contractor Design Snag List
2 Kickoff Meeting For Reference 08 - PRV RDD e 020 - Tenant Contractor Design Snag List
: PRV-RDD-E-020
Tenant Name: Click or tap here to enter text. Contractor Click or tap here to enter text.
General
1 Shopfront transition joint with Landlord finishes Click or tap here to enter text.
2 Signage final finishes Click or tap here to enter text.
3 Sprinkler bulb protector is removed & no paint on sprinkler heads. Click or tap here to enter text.
4 All gaps are sealed neatly such as all outlet socket, AC diffusers/grills & any
ceiling or wall element Click or tap here to enter text.
5 All transition joints are sealed neatly and have consistent finish Click or tap here to enter text.
6 No scratches or damages to final finishes Click or tap here to enter text.
7 Paint to be consistent, no paint patches visible Click or tap here to enter text.
8 anti-slip strip/stair nosing installed for stairs Click or tap here to enter text.
9 Grouting between tiles and termination joints consistent and neatly finished Click or tap here to enter text.
10 All final finish supporting installation (tapes,blocks,channels and wiring
removed) Click or tap here to enter text.
11 No leftover marks on glass façade or mirrors Click or tap here to enter text.
12 Deep cleaning Click or tap here to enter text.
Others
1 Click or tap here to enter text. Click or tap here to enter text.
2 Click or tap here to enter text. Click or tap here to enter text.
3 Click or tap here to enter text. Click or tap here to enter text.
4 Click or tap here to enter text. Click or tap here to enter text.
5 Click or tap here to enter text. Click or tap here to enter text.
6 Click or tap here to enter text. Click or tap here to enter text.
7 Click or tap here to enter text. Click or tap here to enter text.
8 Click or tap here to enter text. Click or tap here to enter text.
A – Approved
B – Must be completed as per mentioned date
C – Must be completed before opening (re-inspection required/ deferred opening)
APPROVAL