GENERAL CHECK
CT DETAILS:
CT RATIO 75/1A
CBCT RATIO 70/1A
INJECTED VALUES
MEASURED VALUES
REF (Secondary Values)
(In terms of Primary Values)
A B C
PH CT
From 1A 1A 1A
P-N IA-1: 75.00 IB-1: 75.04 IC-1: 75.10
MEASUR 0˚ -120˚ 120˚
EMENT-1
PH CT
From 5A 5A 5A
P-N IA-1: 375.0 IB-1: 376.4 IC-1: 376.2
MEASUR 0˚ -120˚ 120˚
EMENT-1
CBCT
From
1A N IN: 70.02
MEASUR
EMENT-1
CBCT
From
2A N IN: 140.5
MEASUR
EMENT-1
I>2 Function DT
I>2 Current Set 5.80 A
I>2 Time Delay 40.00 mS
PICKUP TEST
FUNCTION PICK UP CURRENT (Amp)
Set Current (Amp)
R Y B RYB
I>2 5.80 5.782 5.778 5.778 5.778
TIMING TEST
Expected Time Actual Operating time (mSec)
Injected
FUNCTION (Sec) RYB
Current (Amp) R Y B
I>2 8 0.04 63.7 67.2 65.6 61.0
ISEF>1 Function DT
ISEF>1 Direction Non Directional
ISEF>1 Current 60.0 mA
ISEF>1 T. Delay 100.0 mS
PICKUP TEST
PICK UP CURRENT
FUNCTION
Set Current (Amp) (Amp)
N
IN>1 0.06 0.061
TIMING TEST
Expected Time Actual Operating time
Injected
FUNCTION (Sec) (m Sec)
Current (Amp)
N
IN>1 0.2 0.1 111.0
I2>1 Status DT
I2>1 Current Set 100.0 mA
I2>1 Time Delay 10.00 s
I2>2 Status IDMT
I2>2 Current Set 200.0 mA
I2>2 TMS 2.000
PICKUP TEST
Site: KHAPERKHEDA TPS
Page 3 of 8
PICK UP CURRENT
FUNCTION
Set Current (Amp) (Amp)
I2
I2>1 0.1 0.1
TIMING TEST
Expected Time Actual Operating time
Injected
FUNCTION (Sec) (Sec)
Current (Amp)
I2
I2>1 0.2 10 10.03
TIMING TEST
Expected Time Actual Operating
Injected
FUNCTION Times of I2setting (Sec) time (Sec)
Current (Amp)
I2
I2>2 0.4 2 times 1.2 1.221
I2>2 0.3 1.5 TIMES 1.6 1.558
I>1 Function DT
I>1 Current Set 1.500 A
I>1 Time Delay 3.000 s
52A CONTACT REMOVED
Injected Current Expected Time (Sec) Actual Operating time
FUNCTION
(Amp) (Sec)
LOCKED ROTOR
1.5
WITHOUT 52A 3 3.023
FUNCTION LED’s:
Actual
Expected
FUNCTION Operated Expected LED’s Operated LED Status
Relays
Relay’s
FN
START IN FN
--- --- LED1(ORANGE) Verified Ok
PROGRESS LED1(ORANGE)
Non Latch
START FN FN LED2(GREEN)
--- --- Verified Ok
SUCCESS LED2(GREEN) Non Latch
FN FN LED3(GREEN)-
LED3(GREEN)- BREAKER ON
BREAKER
--- --- BREAKER ON FN LED3(RED)- Verified Ok
STATUS
FN LED3(RED)- BREAKER ON
BREAKER ON Non Latch
LOCKED
R1, R2, R1, R2, R3, FN LED4(RED)
ROTOR FN LED4(RED) Verified Ok
R3, R8 R8 Non Latch
WITHOUT 52A
HOT START R1, R2, R1, R2, R3, FN LED6(RED)
FN LED6(RED) Verified Ok
INHIBIT R3, R8 R8 Latch
COLD START R1, R2, R1, R2, R3, FN LED7(RED)
FN LED7(RED) Verified Ok
INHIBIT R3, R8 R8 Latch
FN
THERMAL FN
--- --- LED8(ORANGE) Verified Ok
RESET LED8(ORANGE)
Non Latch
FN
FN
DR TRIGGER --- --- LED9(ORANGE) Verified Ok
LED9(ORANGE)
Non Latch
MODEL NO P242916D6M0600K
SL NO 34317431/02/21
PANEL CE PUMP B
RESULT PASS - RELAY FOUND HEALTHY ON ALL ASPECTS.
REMARKS NO
Witnessed By Tested By
For M/s. KPKD For M/s. Super Spares
1)
2)
Name: Name:
1) 1) Sandeep Ghorpade
2)