9mm 344mm

770mm 770mm 0.30m

SECTION

10.00 m.

0.60m

0.30m

0.60m
FOUNDATION DETAIL

TYPICAL SECTION OF SHEET PILES

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION XI GARYLUV A. MUYA
Construction of Road Slope Protection Structure - ENGINEER II
DAVAO ORIENTAL 2ND DEO Mati-Maragusan Rd - K1499 + (-690) - K1499 + (-606) PREPARED: 7
TYPICAL SECTION OF SHEET PILES
BRGY. MATIAO, MATI CITY, DAVAO ORIENTAL MIRASOL S. POLANCOS BEVERLY M. MAGLANGIT FIDELA M. BISEN JANE D. CAINGHOG 21
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
EDWIN A. MATIAS, JR.
ENGINEER II DATE: DATE: DATE: DATE:
TYPICAL JOINT DETAIL

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION XI GARYLUV A. MUYA
Construction of Road Slope Protection Structure - ENGINEER II
DAVAO ORIENTAL 2ND DEO Mati-Maragusan Rd - K1499 + (-690) - K1499 + (-606) TYPICAL JOINT DETAIL PREPARED: 8
BRGY. MATIAO, MATI CITY, DAVAO ORIENTAL MIRASOL S. POLANCOS BEVERLY M. MAGLANGIT FIDELA M. BISEN JANE D. CAINGHOG 21
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
EDWIN A. MATIAS, JR.
ENGINEER II DATE: DATE: DATE: DATE:
NOTE:
1. MATERIALS AND WORKMANSHIP SHALL CONFORM WITH THE "DPWH STANDARD
SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS, 2013".
2. CONSTRUCTION (CONTACT) JOINTS ARE FORMED WHEN CONCRETE ON ONE SIDE OF THE
JOINT IS POURED AHEAD AND ALLOWED TO SET BEFORE POURING ON THE OTHER SIDE. NO
CONSTRUCTION JOINT SHALL BE PLACED WITHIN 1.50M. FROM THE WEAKENED PLANE
JOINT.
3. TRANSVERSE CONSTRUCTION (CONTACT JOINT) SHALL BE PROVIDED AT THE END OF ANY
RUN WHERE LAYING OF CONCRETE HAS BEEN STOPPED FOR THIRTY (30) MINUTES OR
LONGER.
4. TRANSVERSE CONSTRUCTION JOINTS WHICH OCCUR AT LOCATION OF WEAKENED PLANE
JOINTS SHOULD BE BUTT JOINTS WITH DOWELS IF THE JOINT OCCURS IN THE MIDDLE
THIRD OF THE WEAKENED JOINT INTERVALS (1.50 TO 3.00 m) IT SHOULD BE KEY - JOINT

3.05m
WITH THE BARS.
5. AT CONSTRUCTION JOINTS (LONGITUDINAL OR TRANSVERSE), CARE SHOULD BE TAKEN SO
THAT NO CONCRETE FROM THE LAST SLAB PLACED OVERHANGS ANY PORTION OF THE
FIRST SLAB.
6. TIE BARS SHOULD BE DEFORMED STEEL BARS. ALL DOWEL BARS SHALL BE SMOOTH
ROUND STEEL BAR FREE FROM RUST AND OTHER DEFECTS (REFER TO CLAUSE 3:1,3,12.
THE STANDARD SPECIFICATION FOR ROADS AND BRIDGES 2013.
7. TYPE OF WEAKENED PLANE JOINT TO BE USED SHALL BE AS SPECIFIED IN THE PLANS AND
ONLY ONE TYPE SHALL BE USED FOR THE WHOLE PROJECT.
8. MATERIAL FOR THE METAL SIDE FORM SHALL BE BRAND NEW SHEET METAL GAUGE NO.18
OF BLACK IRON FREE FROM RUST AND LINKS.

3.05m
9. AT LEAST SIX (6) SUCCESSIVE DOWELED BUTT JOINTS AT NORMAL JOINT SPACING SHALL
BE PROVIDED BEFORE OR AFTER AN EXPANSION JOINT.
10. THE GROOVE OR CRACK ABOVE JOINTS (LONGITUDINAL OR TRANSVERSE) SHALL BE
SEALED WITH 30-60 PENETRATION ASPHALT SEAL OR COLD APPLIED LIQUID RUBBER
COMPOUND AFTER THE CONCRETE HARDENS AND BEFORE OPENING THE PAVEMENT TO
TRAFFIC. PENETRATION ASPHALT SEAL ON CONCRETE PAVEMENT, JOINTS SHALL BE
POURED IN SUCH MANNER THAT SPILLING WILL BE ELIMINATED /PREVENTED. THUS,
PROVIDING A SMOOTH LEVELING/ RIDING SURFACE.
11. ALL TRANSVERSE JOINTS EXCEPT CONSTRUCTION JOINT SHALL BE CONTINUOUS FROM
EDGE TO EDGE.
12. ALL LONGITUDINAL JOINTS SHALL MEET AT INTERSECTIONS WITH NO GAPS OR OFFSET.
13. AVOID STOPPAGE OF FORMWORKS ALONG CURVES.

4.50 4.50 4.50

PAVEMENT PLAN

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION XI GARYLUV A. MUYA
Construction of Road Slope Protection Structure - ENGINEER II
DAVAO ORIENTAL 2ND DEO Mati-Maragusan Rd - K1499 + (-690) - K1499 + (-606) PAVEMENT PLAN PREPARED: 9
BRGY. MATIAO, MATI CITY, DAVAO ORIENTAL DOWEL BAR SCHEDULE MIRASOL S. POLANCOS BEVERLY M. MAGLANGIT FIDELA M. BISEN JANE D. CAINGHOG 21
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
EDWIN A. MATIAS, JR.
ENGINEER II DATE: DATE: DATE: DATE:
GUARDRAIL SCHEDULE
STATION LENGTH (m) REMARKS

K1702+728 TO K1703+004.5 276.5 RIGHT

Total: 276.5 2.00 pcs. END PIECE

SIDE VIEW

ISOMETRIC VIEW PLAN VIEW


W-BEAM GUARDRAIL ASSEMBLY

Z-POST & CARRIAGE ASSEMBLY

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION XI GARYLUV A. MUYA
Construction of Road Slope Protection Structure - ENGINEER II
DAVAO ORIENTAL 2ND DEO Mati-Maragusan Rd - K1499 + (-690) - K1499 + (-606) METAL GUARDRAILS (METAL BEAM) DETAIL PREPARED: 10
BRGY. MATIAO, MATI CITY, DAVAO ORIENTAL MIRASOL S. POLANCOS BEVERLY M. MAGLANGIT FIDELA M. BISEN JANE D. CAINGHOG 21
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
EDWIN A. MATIAS, JR.
ENGINEER II DATE: DATE: DATE: DATE:
END OF PROJECT POSITION

1000

1000
GABIONS

1000
1000
POSITION

1000
1000 1000
5000

1000
1000

2000 EXISTING PCC PAVEMENT


TOP

1000
FRONT CAPPING BEAM

GROUND SIDE
RIVER SIDE

VARIES
TOP VIEW 600 ITEM 200(1) AGGREGATE SUBBASE COURSE
STEEL SHEET PILES
(0.20m thk. FOR COMMON/RIPPABLE)
2000

600
SIDE
GABION POSITIONING ITEM 311(1)b1 PCC PAVEMENT
(UNREINFORCED) 0.20m thk.

PLEASE REFER TO CONNECTION DETAIL VARIES 1000


EL. 1068.595 TOP OF GABION

1000

1000
GEOTEXTILE FABRIC

1000
500

1000
500

GABIONS

1000
500

8000
1000
500
1000

500
1000

500

EL. 1061.195 TOP OF S.S.P.


1000
600

DOUBLE WIRE FABRIC CONFORMING


BOT. OF GABION
COUPING BEAM
EL. 1060.595
TO ITEM 1714(2)a2
A1 ISOMETRIC VIEW
03 S-1 SCALE AS SHOWN
2000
STEEL SHEET PILES

FRONT ELEVATION SIDE ELEVATION PVC COATED MESH WIRE


X

X Y
MESH TYPE TOLERANCE
(mm.) (mm.)

Y
8 X 10 83 114 ± 10 %

DOUBLE WIRE FABRIC CONFORMING TO ITEM 1714(2)a2


CONTINUOUS PIECE OF CONNECTING WIRE STITCHED
A1 GABION SECTION & POSITION AROUND THE
VERTICAL EDGES WITH A COIL EVERY 102mm.
03 S-1 SCALE AS SHOWN

A1 CONNECTION DETAIL
03 S-1 SCALE AS SHOWN

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION XI GARYLUV A. MUYA
Construction of Road Slope Protection Structure - ENGINEER II
DAVAO ORIENTAL 2ND DEO Mati-Maragusan Rd - K1499 + (-690) - K1499 + (-606) METAL GUARDRAILS (METAL BEAM) DETAIL PREPARED: 11
BRGY. MATIAO, MATI CITY, DAVAO ORIENTAL MIRASOL S. POLANCOS BEVERLY M. MAGLANGIT FIDELA M. BISEN JANE D. CAINGHOG 21
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
EDWIN A. MATIAS, JR.
ENGINEER II DATE: DATE: DATE: DATE:
GENERAL NOTE :
SHEET PILE :
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH ALL PROVISIONS IN ITEM 1716-PILING AND ITEM 1717-SHEET PILES OF DPWH STANDARD SPECIFICATIONS
2. BEFORE ANY WORKS BEGINS IN ENVIRONMENTALLY SENSITIVE AREAS, TEMPORARY EROSION CONTROL MEASURES AND PROPER MANAGEMENT PRACTICES SHALL BE IN PLACE. MHZ HOT ROLLED Z-TYPE
3. ALL TEMPORARY FENCING FOR PROTECTED AREAS SHALL BE INSTALLED PRIOR TO COMMENCEMENT OF WORK. SHEET PILES
(770mm WIDTH X 344mm
4. LOW GROUND DISTURBING EQUIPMENT SHALL BE UTILIZED IN ENVIRONMENTALLY SENSITVE AREAS AS APPROVED BY THE CIVIL ENGINEER-IN-CHARGE.
HEIGHT X 9.1/9mm THICK X
5. STEEL SHEET PILES SHALL MEET THE REQUIREMENTS OF AASHTO M 202 (ASTM A328). OR AASHTO M 223. THE JOINTS SHALL BE PRACTICALLY WATER-TIGHT WHEN THE PILES ARE IN PLACE. 76.2 kg/m X 1304cm³
6. SHEET PILES SHALL BE DRIVEN TO ELEVATION SHOWN IN THE PLAN OR AS DIRECTED BY ENGINEER-IN-CHARGE.
7. THE REQUIREMENTS GOVERNING THE INSTALLATION OF SHEET PILING SHALL CONFORM IN GENERAL TO
THOSE GOVERNING BEARING PILES AS SET FORTH UNDER ITEM 400 - PILING OF DPWH STANDARD SPECIFICATION
8. THE LENGTH AND SECTION MODULUS OF STEEL SHEET PILES SHALL BE BASED ON THE RESULT OF THE GEOTECHNICAL INVESTIGATION AND STABILITY ANALYSIS

NOTES:
A. GENERAL:
INDICATE DIMENSIONS SHALL GOVERN AND DISTANCES OR SIZES SHALL NOT BE SCALED
FOR CONSTRUCTION PURPOSES

B. MATERIALS:
1. MINIMUM COMPRESSIVE STRENGTH OF CONCRETE @ 28 DAYS SHALL BE, fc' = 21 MPa
A TOP VIEW
2. ALL REBAR SHALL BE GRADE 40. fy = 276 MPa.
03 S-1 SCALE AS SHOWN

C. SPLICING :
1. SPLICING OF MAIN BAR SHALL BE STAGGERED ALTERNATELY BETWEEN ADJACENT BARS
SO AS NOT TO OCCUR AT THE SAME HORIZONTAL PLANE IN ACCORDANCE TO AASHTO MAIN BAR:
ART. 4,6,6.2.2. 7-16mmØ RSB
TIE BAR:
12mmØ RSB
NOTES: SPACE @ 400mm
O.C. VARIES
600
1. ALL SURFACE TO BE WELDED SHOULD BE FREE OF PAINT, SLAG, LOOSE SCALE, RUST 2

AND OTHER FOREIGN MATERIALS.


1
WELDING (SMAIN PROCESS)

600
CAPACITY OF WELDING = .7071+0.3FU
ALLOWABLE SHEARING STRESS = 0.30FU
MILD STEEL ELECTRODE LOW HYDROGEN AWS/ASME 5.1: E7016
TENSILE STRENGTH = 595 MPA
YIELDING STRENGTH = 450 MPA
FU = 483 MPA

SHEET PILE SCHEDULE

SECTION DESIGNATION SKETCH OF SECTION SECTION MODULOS MOMENT OF INERTIA


cu.m./m of wall m^4/m of wall

MHZ HOT ROLLED


Z-TYPE SHEET PILES 344mm

770mm A CROSS SECTION


03 S-1 SCALE AS SHOWN

INSTALLATION OF SHEET PILES

STATION LOCATION LENGTH

STA. 0+000.00 - STA. 0+424.00 LEFT SIDE 424 m


A FRONT VIEW
03 S-1 SCALE AS SHOWN

A SCHEDULE OF SHEET PILE


03 S-1 SCALE AS SHOWN

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION XI GARYLUV A. MUYA
Construction of Road Slope Protection Structure - ENGINEER II
DAVAO ORIENTAL 2ND DEO Mati-Maragusan Rd - K1499 + (-690) - K1499 + (-606) METAL GUARDRAILS (METAL BEAM) DETAIL PREPARED: 12
BRGY. MATIAO, MATI CITY, DAVAO ORIENTAL MIRASOL S. POLANCOS BEVERLY M. MAGLANGIT FIDELA M. BISEN JANE D. CAINGHOG 21
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
EDWIN A. MATIAS, JR.
ENGINEER II DATE: DATE: DATE: DATE:
600
2

GENERAL NOTE : 2 1
1

600
478 478
65

300
237
A. MATTRESS & GABIONS

478
1. MATTRESS AND GABIONS MATERIALS AND CONSTRUCTION REQUIREMENTS SHALL BE IN ACCORDANCE WITH THE ITEM 511 OF THE DPWH STANDARD SPECIFICATIONS.

74
12mmØ SPACE
AT 400mm O.C.
2. MATTRESSES AND GABIONS SHALL BE CONSTRUCTED OF WIRE MESH AND SHALL BE VARIOUS LENGTHS AND HEIGHTS. A DOUBLE TWISTED WIRE MESH CONTAINER OF 12mmØ SPACE
AT 400mm O.C.
VARIABLE SIZES, UNITS, AND FILLED WITH STONES AT THE PROJECT SITE TO FORM FLEXIBLE, PERMEABLE, MONOLITHIC STRUCTURES SUCH AS RETAINING WALL, SEA

WALLS, CHANNEL LININGS, REVETMENT AND WEIRS FOR EROSION CONTROL. LENGTHS SHALL BE MULTIPLES OF 2, 3 OR 4 TIMES THE WIDTH OF THE GABION AND
HEIGHT SHALL BE 0.50m. TO 1.0m. OR AS SHOWN ON THE PLANS. THE HORIZONTAL SHALL NOT BE LESS THAN ONE METER. GABION FURNISHED SHALL BE OF UNIFORM A REBARS DETAIL
WIDTH. 03 S-1 SCALE AS SHOWN
A CROSS SECTION
3. THE WIDTH, HEIGHT AND LENGTH OF THE GABION AS MANUFACTURED SHALL NOT DIFFER MORE THAN ±5% FROM THE ORDERED SIZE PRIOR TO FILLING. 03 S-1 SCALE AS SHOWN
MHZ HOT ROLLED Z-TYPE
4. THE WIRE IN THE MANUFACTURING OF DOUBLE-TWISTED MESH FOR USE IN MATTRESSES AND GABIONS SHALL CONFORM TO ITEM 511.2.2.1. MAIN BAR: SHEET PILES
7-16mmØ RSB (770mm WIDTH X 344mm
TIE BAR: HEIGHT X 9.1/9mm THICK X
5. THE MINIMUM SIZE OF THE PVC COATED WIRE TO BE USED IN THE FABRICATION OF THE MATTRESSES AND GABIONS SHALL BE AS FOLLOWS:
12mmØ RSB 76.2 kg/m X 1304cm³
SPACE @ 400mm
O.C.
VARIES

MATTRESS GABIONS TOP VIEW


A
BODY WIRE = 2.20 mmØ BODY WIRE = 2.70 mmØ 03 S-1 SCALE AS SHOWN
SELVEDGE OR PERIMETER WIRE = 2.70 mmØ SELVEDGE OR PERIMETER WIRE = 3.40 mmØ

600
TYING AND CONNECTING = 2.20 mmØ TYING AND CONNECTING = 2.20 mmØ

770 770
6. THE NOMINAL AND THE MINIMUM THICKNESS OF PVC COATING SHALL BE 0.50mm AND 0.38mm RESPECTIVELY
VARIES

7. ROCK USED IN THE MATTRESSES SHALL CONSIST OF HARD, DURABLE ROCK PIECES THAT WILL NOT DETERIORATE WHEN SUBMERGED IN WATER OR EXPOSED TO SEVERE EL. 1068.595 TOP OF GABION

WEATHER CONDITIONS. ROCK PIECES SHALL BE GENERALLY UNIFORMLY GRADED IN SIZES RANGING FROM 100mm Ø TO 200mmØ. FILLED GABIONS SHALL HAVE A
MINIMUM DENSITY OF 1,400 kgs./m³.
8. NO ROCK SHALL EXCEED 23 THE MATTRESS DEPTH AND AT LEAST 85% BY WEIGHT OF THE STONE SHALL HAVE A SIZE GREATER THAN 80mm. NO STONES SHALL BE ABLE
TO PASS THROUGH THE MESH.
9. THE ROCK SHALL MEET THE REQUIREMENTS OF AASHTO M 63 EXCEPT THAT THE SODIUM SULPHATE SOUNDNESS LOSS SHALL NOT EXCEED 9% AFTER 5 CYCLES.

10. FILTER CLOTH SHALL CONSIST OF 70% POLYPROPYLENE AND 30% POLYETHELYNE.

11. FABRICATION OF MATTRESSES AND GABION MUST BE BASED ON ITEM 511.3.1.1 MATTRESSES AND GABION SHALL BE IN THE FORM OF RECTANGULAR BASKETS OF THE
REQUIRED DIMENSIONS AND SHALL BE MANUFACTURED FROM WIRE AS SPECIFIED IN ITEM 511.2.2. GABION SHALL BE MADE OF STEEL WIRE DOUBLE TWISTED FORMING C
SL
A UNIFORM HEXAGONAL MESH TYPE 8 x 10 HAVING A NOMINAL MESH OPENING OF 83 x 114 MIN. MATTRESSES SHALL BE MADE OF A NOMINAL MESH OPENINGS OF 83mm

TO
P
BY 114mm. TOLERANCES ON THE HEXAGONAL, DOUBLE-TWISTED WIRE MESH OPENING SHALL NOT EXCEED ±10% ON THE NOMINAL DIMENSION D VALUES. 83mm FOR

O
F
C
AP
PI
N
G
TOP OF CAPPING BEAM
ABIONS. EDGES SHALL BE FORMED INTO A SECURELY CONNECTED SELVEDGE ADEQUATE TO PREVENT RAVELING.

BE
EL. 1061.195

AM
EL. 1060.595 BOT. OF GABION
12. ASSEMBLY AND CONSTRUCTION OF MATTRESSES MUST BE IN ACCORDANCE WITH ITEM 511.3.2.

HYDRAULIC DESIGN PARAMETERS

10000
DRAINAGE AREA DISCHARGE

( SQ. KM. ) ( CU. M / SEC )

DESIGN FLOOD DISCHARGE ( cu.m./s ) FREEBOARD (m)

LESS THAN 200 0.6

200 AND UP TO 500 0.8

500 AND UP TO 2,000 1.0

2,000 AND UP TO 5,000 1.2

5,000 AND UP TO 10,000 1.5

10,000 AND OVER 2.0

FRONT SECTION CROSS SECTION

A HYDRAULIC DESIGN PARAMETER


03 S-1 SCALE AS SHOWN

A1 CAPPING BEAM SECTIONS & DETAILS


03 S-1 SCALE AS SHOWN

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION XI GARYLUV A. MUYA
Construction of Road Slope Protection Structure - ENGINEER II
DAVAO ORIENTAL 2ND DEO Mati-Maragusan Rd - K1499 + (-690) - K1499 + (-606) METAL GUARDRAILS (METAL BEAM) DETAIL PREPARED: 13
BRGY. MATIAO, MATI CITY, DAVAO ORIENTAL MIRASOL S. POLANCOS BEVERLY M. MAGLANGIT FIDELA M. BISEN JANE D. CAINGHOG 21
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
EDWIN A. MATIAS, JR.
ENGINEER II DATE: DATE: DATE: DATE:
250W SOLAR LED STREET LIGHTS DESCRIPTION
1.00m
Solar Panels : 18V 150W Mono
Battery : LiFePO4 768WH
Power Input : DC/ 220V AC
Lumens : 170LM/W
Life Time : 80,000 Hours
CCT: 6000K - 6500K
Lamp Material: Aluminum Alloy
Working Mode : Time Control / Light

1.00m
Sensor :
Charging Time : 6-7 Hours
Discharge Time : 15 Hours at full power / 30 Hours at half-power
Certificates : CE, ROHS, IP65
Size : 880x360x145mm

HDG POST:
Single Arm
Tampered
Standard 20 Pipe
Height : 9 Meters
Finishing : Primer and Paint 1500mm FOOTING DETAILS
Top - 5" / Bottom - 2"
Thickness - 3.2mm

1200mm

75mm

75mm

0.40m
0.40m

0.40m
9000mm

STREET LIGHT DETAIL

0.40m
NGL

0.20m
NGL

1.40m

0.30m
1.00m

STREET LIGHTS PEDESTAL

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION XI GARYLUV A. MUYA
Construction of Road Slope Protection Structure - ENGINEER II
DAVAO ORIENTAL 2ND DEO Mati-Maragusan Rd - K1499 + (-690) - K1499 + (-606) PREPARED: 14
SOLAR STREET LIGHT DETAILS
BRGY. MATIAO, MATI CITY, DAVAO ORIENTAL MIRASOL S. POLANCOS BEVERLY M. MAGLANGIT FIDELA M. BISEN JANE D. CAINGHOG 21
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
EDWIN A. MATIAS, JR.
ENGINEER II DATE: DATE: DATE: DATE: