TIME SHEET COAL HAULER

Site Insani Bara Perkasa

Tanggal Shift Jam Operasional HM Unit KM Unit HM Isi Solar Jumlah Isi Solar (Ltr)
Nama Tipe Unit Awal Akhir Awal Akhir Awal Akhir
NRP CN Unit
Time (Waktu) Time
Area Loading Area Dumping (Port) Start
Trip Alat Loading PIT Seam Start Timbang (001) P5M
Start Antrian Start Loading Stop Loading T. Batuah T. IP T. Bakungan Dumping (002) P2H
Muatan Kosong Muatan Kosong Muatan Kosong (003) Change Shift
1 (004) Isi Solar
2 (005) No Coal
3 (006) Wait Fuel
4 (007) Wait Exca
5 (008) Maintance Jalan
6 (009) Istirahat
7 (101) Hujan
8 (102) Slippery
9 (103) Kabut
10 (104) Demo
11 (105) Survey di Rom
12
13
14
15
No Jenis BD Lokasi BD Start BD Stop BD HM BD HM RFU Keterangan BD
1 BS/ BUS/ Tyre
2 BS/ BUS/ Tyre
3 BS/ BUS/ Tyre
4 BS/ BUS/ Tyre
KETERANGAN :

Dilaporkan Oleh Driver DT, Diperiksa Oleh Group Leader Produksi,

(................................) (................................) (................................)


Mekanik Pengawas
Jumlah Isi Solar (Ltr)