AnnexureIDRAWINGS KaranjaEPC70

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 90

PUBLIC WORKS DEPARTMENT GOVERNMENT OF

MAHARASHTRA
PUBLIC WORK DIVISION AARVI
DRAFT DETAILED PROJECT REPORT
APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND
PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE
STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE)
PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI
ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH
292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM)
TALUKA-KARANJA DISTRICT - WARDHA. (PART - ASHTI TO NARA GODHANI)
VOLUME-X
DRAWINGS
JANUARY - 2024
SUBMITTED BY
AICONS ENGINEERING PVT.LTD.

A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE


KOLAR ROAD, BHOPAL - 462042(M.P)
Email Id:- info@aicons.in & aiconsgroup@gmail.com
PLAN AND PROFILE
PLAN EXISTING DETAILS PLAN PROPOSED DETAILS
EXISTING ROAD DIVIDER TREE
PROPOSED CENTRE LINE

EXISTING CENTRE LINE COCONUT TREE PROPOSED CARRIAGEWAY

EXISTING EARTHEN SHOULDER P REF BM PILLAR PROPOSED EARTHEN SHOULDER

EXISTING E- ROW NAME BOARD PROPOSED PAVED SHOULDER

TELEPHONE LINE ELECTRIC BOX PROPOSED PAVER BLOCK


EB

WIRE FENCE HIGH MAST PROPOSED DRAIN

O
TF
F OPTICAL FIBRE CABLE STONE TRANSFORMER PROPOSED MEDIAN
C

SIGN BOARD WATER TAP PROPOSED FOOTPATH

MATCH LINE
ELECTRIC POLE P
B
POST BOX MATCHLINE
00.000 KM CH.00+000

ELECTRIC POLE LINE TELECOM TOWER TOE LINE

ROAD SIDE DRAIN TBM TBM STONE PROW PROW PROPOSED ROW

TREE TELEPHONE BOX BUS SHELTER


TB
Cable
Pole

TELEPHONE POLE CABLE POLE


M

BUILDING, HOUSE, SHOP N


G
L MNGL GAS STONE

ADVERTISING BOARD HECTOMETER STONE

STREET LIGHT C.C.TV.CAMERA


PROFILE DETAILS
FLAG POST CART TRACK
PROPOSED ROAD LEVEL
OVER HEAD WATER TANK RAILWAY LINE
EXISTING ROAD LEVEL
GATE TRAFFIC SIGNAL
HTT
EXISTING GROUND AT-8m FROM PCL (m)
HIGH TENSTION WATER VALVE
EXISTING GROUND AT +8m FROM PCL (m)
STATUE
COMPOUND WALL
R
W WELL O
W
ROW PILLAR

NALA, CANAL

BRIDGE

CULVERT

WATER TANK

B
S
N
BSNL STONE
L

KM KM STONE

FURLONG STONE

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /Legends-01 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI LEGENDS
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
JAMMU AND KASHMIR
District Index
Nandurbar
HIMACHAL
PRADESH
Bhandara
PUNJAB Dhule Amravati Nagpur Gondiya
Jalgaon
SH
HARYANAA
PR
AD
E
Akola Wardha
DELHI AL
UN
AC
H
Buldana
SIKKIM AR

RAJASTHAN
UTTAR PRADESH
Nashik Washim Chandrapur
ASSAM
NAGALAND Yavatmal
BIHAR
MEGHALAYA
MANIPUR Palghar Aurangabad
BANGLADESH
TRIPURA
Jalna Hingoli Gadchiroli
JHARKHAND MIZORAM
GUJARAT
MADHYA PRADESH WEST BENGAL Thane Ahmednagar Parbhani
Mumbai Suburban Nanded

H
Bid

AR
Mumbai

SG
TI
DAMAN

T
HA
DADARA & ORISS A
NAGAR HAVELI

CH
Raigarh Pune
MAHARASHTRA
Latur Bidar

S E A
B A Y O F B A N G A L Osmanabad
ANDHARA PRADESH

Satara Solapur
A B I A N
GOA

Ratnagiri
Sangli
KARANATA KA

Maharashtra State
KE
RA
LA
TAMIL NADU Kolhapur
A R

Sindhudurg
Dharwad
I N D I A N O C E A N

PROJECT START POINT


@238+000 OF SH-292
(AT ASHTI)
THAR VILLAGE BORKHEDI VILLAGE
TOWARDS JALALKHEDA
NARA VILLAGE
PROJECT END POINT
BOTONA VILLAGE @258+567 OF SH-292
(NEAR GONDNI VILLAGE)

PARDI HETI VILLAGE


GONDNI VILLAGE
TOWARDS KARANJA

PROJECT ROAD: ASHTI TO PARDI ROAD

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) 01 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR , SURVEY AND SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE
GOVERNMENT OF MAHARASHTRA STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) TITLE:
PACKAGE NO DPR - 3A (6) (LENGTH-21.000 Km) IMPROVEMENT AND WIDENING TO LOCATION PLAN
MORSHI-ASHTI-THAR-PARDI ROAD SH-292 Km 238 / 00 TO 245 / 00 TALUKA -ASHTI (PART-1) & MORSHI -
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P) ASHTI - THAR - PARDI ROAD SH-292 Km 245 / 00 TO 259 / 00 & SH-323 MISSING LENGTH 3.00 Km TALUKA- R0 DRAFT DETAILED PROJECT REPORT AKP MKH
ADM
Email Id:- info@aicons.in & aiconsgroup@gmail.com KARANJA,DISTRICT-WARDHA (PART-2). REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
238+00 Km

239+00 Km

0 Km

00 Km

0 Km
242+00K

Km
240+0

243+0

244+00
241+

Km
NARA VILLAGE

+00

256+00Km
Km m
245

255+00Km
+00 0 K

254+00Km
THAR VILLAGE

247 46+0
PARDI HETI VILLAGE

253+00 Km
BORKHEDI VILLAGE

252+00Km

Km
251+00 Km
00 Km
2

249+00 Km

258 0 Km
250+00 Km

7Km
00
BOTONA VILLAGE

7+

0
+56
248+

25

+
258
PROJECT START POINT GONDNI VILLAGE

@238+000 OF SH-292
(AT ASHTI)

PROJECT END POINT


@258+567 OF SH-292
(NEAR GONDNI VILLAGE)

55K/4 55K/8
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) 01 R 0
AICONS ENGINEERING PVT.LTD. SCALE NTS DATE: FEBRUARY-2024
APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR , SURVEY AND PREPARATION
PUBLIC WORKS DEPARTMENT
GOVERNMENT OF MAHARASHTRA OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF TITLE:
MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO DPR - KEY PLAN
3A (6) (LENGTH-21.000 Km) IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA -
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL
KOLAR ROAD, BHOPAL - 462042(M.P) R0 DRAFT DETAILED PROJECT REPORT AKP ADM MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT - WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /HGR-01 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI HORIZONTAL GEOMETRIC REPORT
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /HGR-02 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI HORIZONTAL GEOMETRIC REPORT
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /HGR-03 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI HORIZONTAL GEOMETRIC REPORT
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /HGR-04 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI HORIZONTAL GEOMETRIC REPORT
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /HGR-05 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI HORIZONTAL GEOMETRIC REPORT
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /HGR-06 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI HORIZONTAL GEOMETRIC REPORT
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /HGR-07 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI HORIZONTAL GEOMETRIC REPORT
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /HGR-08 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI HORIZONTAL GEOMETRIC REPORT
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /VGR-01 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI VERTICAL GEOMETRIC REPORT
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CL
ROW

Proposed Roadway

Utility Earthen Toe Granular/Hard Granular/Hard Toe Earthen Utility


Corridor Drain Berm Shoulder Carriageway Shoulder Berm Drain Corridor

Selected Soil (CBR Not less than 30%)


Slope Protection
Works Slope Protection Works

Existing Carriageway
GL GL
Embakment fill The Existing BT PQC (M-40 Grade with fiber reinforcement ) - Minimum 260mm Thk.
shall be removal DLC (M-15 Grade) - Minimum 150mm Thk.
Unlined Drain Unlined Drain
Granular Sub Base - Minimum 100mm Thk. (Drainage Layer, Gr.III)
Granular Sub Base - Minimum 100mm Thk. (filter/separation layer Gr.II )

TCS - 1 Subgrade - Minimum 500mm Thk. (CBR Minimum 8%)

RECONSTRUCTION OF EXISTING CARRIAGEWAY TO INTERMEDIATE


LANE CARRIAGEWAY (5.50M WIDE) WITH EARTHEN SHOULDER IN OPEN COUNTRY

CL
ROW

Proposed Roadway

Utility Earthen Toe Granular/Hard Granular/Hard Toe Earthen Utility


Corridor Drain Berm Shoulder Carriageway Shoulder Berm Drain Corridor

Selected Soil (CBR Not less than 30%)


Slope Protection
Works Slope Protection Works

Existing Carriageway
GL GL

Unlined Drain Unlined Drain


Minimum1000mm The Existing Crust & PQC (M-40 Grade with fiber reinforcement ) - Minimum 260mm Thk.
Minimum 700mm Thk. Embankment
Excavation in BC Embankment shall be DLC (M-15 Grade) - Minimum 150mm Thk.
Min. 300mm Thk. Lime Fly ash Stabilsiation removal and for use in
Soil Portion & Replace Granular Sub Base - Minimum 100mm Thk. (Drainage Layer, Gr.III)
Embankment portion as per FRL
with 300mm Stabilisation
Granular Sub Base - Minimum 100mm Thk. (filter/separation layer Gr.II )
and 700mm Embankment (CBR Minimum 8%)
TCS - 1A Subgrade - Minimum 500mm Thk. (CBR Minimum 8%)

UP GRADATION AND RECONSTRUCTION OF EXISTING CARRIAGEWAY


TO INTERMEDIATE LANE CARRIAGEWAY (5.50M WIDE) WITH EARTHEN SHOULDER IN OPEN COUNTRY

CLIENT - NAME OF WORK - DRG. NO. Package No. EPC- 70 /TCS-01 R 0

PACKAGE NO EPC - 70 IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM
GOVERNMENT OF MAHARASHTRA (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) TITLE: TYPICAL CROSS SECTION
TCS-1 & TCS-1A
CL
ROW

Proposed Roadway
Utility
Corridor
RCC Paver Granular/Hard Toe Earthen
Drain Block Carriageway Shoulder Berm Drain

ROW LINE
600mm dia NP3
Longitudinal Utility
Duct (Both side) Selected Soil (CBR Not less than 30%)

Slope Protection
Works
Existing Carriageway GL
The Existing Crust & PQC (M-40 Grade with fiber reinforcement )
Precast Interlocking CC
Embankment shall be Minimum 260mm Thk.
Paving blocks M-40 (100mm) removal and for use in
over sand bedding Embankment portion as per FRL DLC (M-15 Grade) - Minimum 150mm Thk. Unlined Drain
WMM (Mini. 260mm Thk.) to match PQC level Granular Sub Base - Minimum 100mm Thk. (Drainage Layer, Gr.III)
Utility Chamber @ 25m C/C on LHS Granular Sub Base - Minimum 100mm Thk. (filter/separation layer Gr.II )
Subgrade - Minimum 500mm Thk. (CBR Minimum 8%)
TCS - 2
UP GRADATION AND RECONSTRUCTION TO INTERMEDIATE LANE CARRIAGEWAY INCLUDING
PAVER BLOCK FLOORING AND RCC DRAIN ON LHS IN BUILT-UP AREA

CL
ROW

Proposed Roadway
Utility
Corridor
Earthen Toe Granular/Hard Paver RCC
Drain Berm Shoulder Carriageway Block Drain

ROW LINE
600mm dia NP3
Longitudinal Utility
Selected Soil (CBR Not less than 30%) Duct (Both side)

GL Existing Carriageway

PQC (M-40 Grade with fiber reinforcement ) The Existing Crust &
Embankment shall be Precast Interlocking CC
Minimum 260mm Thk. removal and for use in Paving blocks M-40 (100mm)
Unlined Drain DLC (M-15 Grade) - Minimum 150mm Thk. Embankment portion as per FRL over sand bedding
Granular Sub Base - Minimum 100mm Thk. (Drainage Layer, Gr.III) WMM (Mini. 260mm Thk.) to match PQC level
Granular Sub Base - Minimum 100mm Thk. (filter/separation layer Gr.II )
Utility Chamber @ 25m C/C on RHS
Subgrade - Minimum 500mm Thk. (CBR Minimum 8%)
TCS - 2A

UP GRADATION AND RECONSTRUCTION TO INTERMEDIATE LANE CARRIAGEWAY INCLUDING


PAVER BLOCK FLOORING AND RCC DRAIN ON RHS IN BUILT-UP AREA

CLIENT - NAME OF WORK - DRG. NO. Package No. EPC- 70 /TCS-02 R 0

PACKAGE NO EPC - 70 IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM
GOVERNMENT OF MAHARASHTRA (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) TITLE: TYPICAL CROSS SECTION
TCS23 & TCS-2A
CL
ROW

Proposed Roadway

Existing Existing
Paver Paver
Block Carriageway Block

ROW LINE

ROW LINE
Existing Drain
On Both Side

Existing 3.75m CC Pavement

PQC (M-40 Grade with fiber reinforcement )


- Minimum 260mm Thk.
DLC (M-15 Grade) - Minimum 150mm Thk.
Granular Sub Base - Minimum 100mm Thk. (Drainage Layer, Gr.III)
Granular Sub Base - Minimum 100mm Thk. (filter/separation layer Gr.II )
TCS - 3 Subgrade - Minimum 500mm Thk. (CBR Minimum 8%)

UP GRADATION AND RECONSTRUCTION TO 2- LANE CARRIAGEWAY

CL
ROW

RCC RCC
Drain Carriageway Drain
ROW LINE

ROW LINE
RCC Drain

Existing CC Pavement

White Toping - 200mm


Existing CC pavement treat as DLC

TCS - 3A
RESURFACING / STRENGTHENING TO EXISTING CC PAVEMENT
WITH WHITE TOPING AND RCC DRAIN IN BUILT-UP

CL
CLIENT - NAME OF WORK - DRG. NO. Package No. EPC- 70 /TCS-03 R 0

PACKAGE NO EPC - 70 IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM
GOVERNMENT OF MAHARASHTRA (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) TITLE: TYPICAL CROSS SECTION
TCS-3 & TCS-3A
WITH WHITE TOPING AND RCC DRAIN IN BUILT-UP

CL
Proposed Roadway

Earthen Toe Granular/Hard Granular/Hard Toe Earthen


Drain Berm Shoulder Carriageway Shoulder Berm Drain

5.50m Existing Carriageway


GL GL

Unlined Drain BC - 40mm Unlined Drain


DBM - 60mm
WMM - 125 mm

TCS - 4
STRENGTHENING TO EXISTING CARRIAGEWAY WITH EARTHEN SHOULDER IN FOREST PORTION

CL
Proposed Roadway

Earthen Toe Granular/Hard Granular/Hard Toe Earthen


Drain Berm Shoulder Carriageway Shoulder Berm Drain

3.75m Existing Carriageway


GL GL

BC - 40mm
Unlined Drain DBM - 60mm Unlined Drain
WMM - 125 mm
TCS - 5
STRENGTHENING TO EXISTING CARRIAGEWAY WITH EARTHEN SHOULDER IN FOREST PORTION

CLIENT - NAME OF WORK - DRG. NO. Package No. EPC- 70 /TCS-03 R 0

PACKAGE NO EPC - 70 IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM
GOVERNMENT OF MAHARASHTRA (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) TITLE: TYPICAL CROSS SECTION
TCS-4 & TCS-5
CL
Proposed Roadway

Carriageway

3.75m Existing Carriageway


GL GL

BC - 40mm
DBM - 60mm
TCS - 6 WMM - 125 mm

STRENGTHENING TO EXISTING CARRIAGEWAY IN FOREST PORTION

CL
ROW

Proposed Roadway

Utility Earthen Toe Granular/Hard Granular/Hard Toe Earthen Utility


Corridor Drain Berm Shoulder Carriageway Shoulder Berm Drain Corridor

Selected Soil (CBR Not less than 30%)


Slope Protection
Works Slope Protection Works

GL GL
Embakment fill
PQC (M-40 Grade with fiber reinforcement ) - Minimum 260mm Thk.
DLC (M-15 Grade) - Minimum 150mm Thk.
Unlined Drain Unlined Drain
Granular Sub Base - Minimum 100mm Thk. (Drainage Layer, Gr.III)
Granular Sub Base - Minimum 100mm Thk. (filter/separation layer Gr.II )

TCS - 7 Subgrade - Minimum 500mm Thk. (CBR Minimum 8%)

NEW CONSTRUCTION TO INTERMEDIATE LANE CARRIAGEWAY (5.50M WIDE)


WITH EARTHEN SHOULDER IN OPEN COUNTRY

CLIENT - NAME OF WORK - DRG. NO. Package No. EPC- 70 /TCS-03 R 0

PACKAGE NO EPC - 70 IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM
GOVERNMENT OF MAHARASHTRA (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) TITLE: TYPICAL CROSS SECTION
TCS-6 & TCS-7
MORSHI A THARPARDI DATA
T DAT ETOUT S 73
SETOUT SETOU 238+903 .616 = 238+9 8.0
DATA = 47460 HIP CH - 234747
HIP CH = HIP CH 14.644,N - 23 8 2 .81 3 ,N
23
E - 21098 8+159 T DATA 7 E - 2117
SETOU 238+788 E - 211 5 9
4.578,N - SETOUT DATA SETOUT DATA 79 2 D = 3.48 0m
D = 6.069 2347343.9 SETOUT DATA = 7417.5 D= 7 .7 0
R = 700.0
71 HIP CH = 238+396 HIP CH = 238+563 HIP CH = 238+684 HIP CH 8.418,N - 234 4 0 0 .000m R = 80 0 .0
60 R= 67m
00m E - 211221.115,N - 2347358.563 E - 211506.464,N - 2347394.160 E - 211 .0 00m Ts = 2 4 .3
KM Ls = 35.0
00m
E - 211385.982,N - 2347386.146
9 .1 19 Ls = 20 08 M .3 7 1m
D= K Es = 0

IRE
D = 5.968 D = 9.131 .000m 7 .0
238 Ts = 54.6
13
D = 5.693
4 0 0 Ts = 3 239 8 .7 20m km/h
R = 900.000m R = 400.000m R= 0.042 Lc = 4 ED = 50
.000m

W
shift = 0.0 R = 700.000m shif t = P E
73 Ls = 30.000m Ls = 30.000m Ls = 30 05 .952 DESIG N S
Es = 1.05 Ls = 20.000m Es = 0 29m

TRIC
.9
6 Ts = 46 94 .9 km/h
Lc = 39.1
50m
Ts = 61.915 Ts = 44.805 Ts = 46.949
shift =
0.0 Lc = 33 SPEED = 50
shift = 0.042 shift = 0.094 N
DESIG

ELEC
DESIGN shift = 0.024 64
SPEED =
65 km/h Es = 1.264 Es = 0.889 Es = 1.367 Es = 1.3 61m
3 .6 40 km/h
GPS

Lc = 63.740m Lc = 49.550m Lc = 33.749m Lc = 3 P EED =


N S
DESIG

+000
+000

DESIGN SPEED = 50 km/h DESIGN SPEED = 50 km/h DESIGN SPEED = 40 km/h


0

0
D/S

9
238+00

239+00
CH.238

CH.23
0
U/S

238+90
0
238+10

238+200

0
CTION

238+300

238+80
NSTRU
RECO

238+500

238+600
OSED

238+400
PROP 8+825

238+700
C H .2 3
: HPC
TYPE X1200mm
S I Z E :1
EXISTING CENTRE LINE ING
EXIST 8+825
PROPOSED CENTRE LINE C H .2 3
PROPOSED CARRIAGEWAY
PLAN Z E :
:HPC
TYPE 1X1000mm
S I

RECONSTRUCTION
CHAINAGE 238+825
PROPOSED ROAD LEVEL SIZE 1 X 1200mm
EXISTING GROUND AT-8m FROM PCL TYPE HPC
EXISTING ROAD LEVEL EXISTING GROUND AT +8m FROM PCL
430

CH=238+550.000

VIP CH=:238+590.00
CH=238+540.000
VIP CH=:238+500.00

VIP LVL=:423.442
VIP LVL=:423.061

LVL=423.273
LVL=423.230

VIP CH=:238+960.00
VIP CH=:238+380.00
428

VIP CH=:238+685.00
CH=238+460.000

CH=238+630.000

CH=238+665.000

VIP LVL=:421.390
CH=238+420.000
VIP LVL=:421.337

VIP LVL=:421.172

CH=238+980.000
LVL=422.486

LVL=422.486

VIP CH=:238+855.00
LVL=421.650

CH=238+940.000
CH=238+705.000
LVL=421.912

LVL=421.784
426

VIP LVL=:419.959
CH=238+875.000
CH=238+835.000

LVL=421.117
LVL=421.029
CH=238+340.000

LVL=420.232
LVL=420.102
CH=238+305.000
424

LVL=419.643
VIP CH=:238+275.00

LVL=418.161
VIP LVL=:416.891
422

CH=238+245.000
LVL=415.999
420
VIP CH=:238+140.00

CH=238+170.000
VIP LVL=:412.878

LVL=413.769
418
CH=238+110.000
LVL=411.878

416

414

412

410

408

406
238000 408.711 407.789 408.801 408.211

238060 411.738 410.034 410.162 410.211

238140 412.140 411.971 412.695 412.851

238200 413.657 413.994 414.334 414.661

238580 422.606 422.138 422.901 423.241

238800 420.895 419.494 419.842 420.351


238340 419.446 419.213 419.349 419.643

238840 419.416 418.753 419.441 420.073


238020 408.711 408.331 408.801 408.878

238080 410.539 410.849 410.882 410.878

238120 411.872 411.500 412.116 412.208

238260 416.058 417.773 416.207 416.468


238280 416.669 420.278 416.882 417.168

238600 422.827 421.823 422.684 423.045

238680 421.660 419.676 421.015 421.338

238920 420.499 420.882 420.599 420.845

239000 422.222 421.822 421.910 422.178


238160 412.483 412.574 413.248 413.469
238180 412.996 413.263 413.797 414.067

238380 421.855 420.232 420.809 421.057

238440 421.798 421.513 421.960 422.199

238480 422.452 422.059 422.529 422.749

238560 423.942 422.290 423.009 423.297

238620 422.721 422.184 422.437 422.707


422.699 422.119 422.049 422.247

238660 422.122 421.044 421.543 421.769

238740 421.393 420.472 420.613 420.779


238760 420.373 420.501 420.410 420.637

238820 419.117 418.574 419.074 420.209

238940 420.649 420.840 420.885 421.117


238040 410.830 409.236 409.461 409.544

238100 410.997 411.195 411.548 411.544

238220 414.591 414.483 414.988 415.256


238240 415.399 415.106 415.598 415.850

238300 417.349 417.698 417.651 417.952


238320 418.317 418.308 418.492 418.796

238360 421.311 419.960 420.158 420.420

238400 421.408 420.628 421.124 421.554


238420 421.852 421.079 421.552 421.912

238460 422.039 421.812 422.268 422.486

238500 422.961 422.240 422.789 422.960


238520 425.145 422.540 422.907 423.120
238540 424.841 422.621 423.003 423.230

238700 421.397 419.623 420.837 421.070


238720 422.562 420.565 420.709 420.922

238780 420.572 420.221 420.114 420.494

238860 420.094 419.221 419.961 420.086


238880 420.438 419.995 420.133 420.300
238900 420.377 420.966 420.310 420.572

238960 421.033 420.891 421.178 421.420


238980 421.489 421.188 421.534 421.784
PROPOSED ROAD LEVEL(m)
______________________

EXISTING LEVEL BELOW


CENTER LINE (m)
____________________

EXISTING GROUND LEVEL


AT-8m FROM PCL (m)
------------------------------------

EXISTING GROUND LEVEL


AT +8m FROM PCL (m)
------------------------------------

238640
CHAINAGE
238305.000

238340.000

238550.000

238665.000

239020.000
238000.000

238110.000

238170.000

238245.000

238420.000

238460.000

238540.000

238630.000

238705.000

238835.000

238875.000

238940.000

238980.000
3.333% K:166.331 2.973% K:47.541 4.235% K:28.595 1.437% K:78.868 0.423% K:28.450 -2.389% K:23.865 -0.713% K:19.271 1.362% K:65.755 1.971%
VERTICAL ALIGNMENT
LVC:60.00 LVC:60.00 LVC:80.00 LVC:80.00 LVC:80.00 LVC:40.00 LVC:40.00 LVC:40.00

HORIZONTAL ALIGNMENT L =104.590 35.000 D: 3.2045 35.000 L =120.459 30.000 D: 4.0578 30.000 L =60.439 20.000 D: 4.0557 20.000 L =28.995 30.000 D: 4.8342 30.000L =10.75530.000 D: 4.8216 30.000 L =30.701 20.000 D: 4.8599 20.000
L =8.983 D: 3.4893
R: 700.000 R: 900.000 R: 700.000 R: 400.000 R: 400.000 R: 400.000 R: 800.000
VCL: 39.150 VCL: 63.740 VCL: 49.550 VCL: 33.749 VCL: 33.661 VCL: 33.929 VCL: 48.720

SUPERELEVATION
e:-4.06% e:-4.06% e:-3.16% e:-3.16% e:2.68% e:2.68% e:-4.69% e:-4.69% e:-4.69% e:-4.69% e:4.69% e:4.69% e:-2.35% e:-2.35%
e:4.06% e:4.06% e:3.16% e:3.16% e:-2.68% e:-2.68% e:4.69% e:4.69% e:4.69% e:4.69% e:-4.69% e:-4.69% e:2.35% e:2.35%

PROFILE
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-01 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km 238+000 to Km 239+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
EE
474

D=
60.

50
616

k
m/h
ELECTRIC WIRE

CLIENT -
23
E

SUPERELEVATION
-
TO

CHAINAGE
Ts
T

L
s=

CENTER LINE (m)


0
8
HIP 21178

DE
9
2

0
+00 0
.
U 238
TA

AT-8m FROM PCL (m)


SIG
239 39+00

____________________
6
2

AT +8m FROM PCL (m)


. = 371
SE CH = .813,

CH
.72
3.4 00m
R = 24.3 m
D = 800.0 7m

0
DA +973
MORSHI

------------------------------------
------------------------------------
EXISTING LEVEL BELOW
N-

______________________
m

EXISTING GROUND LEVEL


EXISTING GROUND LEVEL

VERTICAL ALIGNMENT
KM9 E c = 48 N SPE
2

HORIZONTAL ALIGNMENT
ED

420
424
426
430
434

422
432

428

PROPOSED ROAD LEVEL(m)


347

238980.000
=
47

239000 422.222 421.822 421.910 422.178


0
8.0

km

CH=239+020.000
31

1.971%
/h

239020.000 239020 422.156 421.961 422.332 422.572 LVL=422.572

239040 422.678 422.176 422.660 422.932

PUBLIC WORKS DEPARTMENT


VIP CH=:239+050.00
0

GOVERNMENT OF MAHARASHTRA
VIP LVL=:423.163 +10

K:57.928
239060 424.127 422.522 422.956 423.222 239

LVC:60.00

L =122.392
CH=239+080.000
239080.000
239080 425.507 422.951 423.208 423.444 LVL=423.444

239100 424.522 423.700 423.381 423.631

CONSULTANT -
239120 423.745 423.199 423.504 423.818
239140 425.418 423.613 423.731 424.005 200
239+

0.935%
239160 424.030 424.259 423.947 424.192

75.000
Ts = 1
shift =
TBM

Ls = 75

Es = 1
E - 2120
SETOUT

R = 350

4
HIP CH =

7
0
6
D = 35.16

8
.0
.0
4

239180 424.217 425.329 424.118 424.379


DESIGN
5

.8
.6
.6

5
7
.0

Lc = 139.8
4
0
0

05
0m
00m

239200.000
DATA

CH=239+200.000

e:5.00%
08m

e:-5.00%
,N

239200 424.260 426.431 424.258 424.566 LVL=424.566


239+268

KOLAR ROAD, BHOPAL - 462042(M.P)


AICONS ENGINEERING PVT.LTD.
SPEED =

VIP CH=:239+220.00
239220 425.195 424.345 424.491 424.802 VIP LVL=:424.753

Email Id:- info@aicons.in & aiconsgroup@gmail.com


239+300

K:40.554

A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE


LVC:40.00
- 2347568

CH=239+240.000
239250.000
40 km/h

239240 425.879 424.285 424.863 425.137 LVL=425.137


.420
T - MIN

239240.000 CH=239+250.000

1.921%
LVL=425.329
SIGN C

239260 426.618 424.601 425.183 425.499


EXISTING ROAD LEVEL
PROPOSED ROAD LEVEL
HAIN

D: 22.8869
VIP CH=:239+280.00
AT DE OR JUNCTIO

R: 350.000
VCL: 139.808
239280 428.967 425.266 425.329 425.702 VIP LVL=:425.905
N DEV

K:22.148
LVC:60.00
239+40
0

239300 427.313 425.088 425.449 425.725 CH=239+310.000


AGE - ELOPMENT

239310.000 LVL=425.669 239+40


239320 426.342 424.838 425.341 425.590 0
239330.000 CH=239+330.000

-0.788%
LVL=425.512

NAME OF WORK -
e:5.00%
TOW

e:-5.00%
239340 424.830 424.976 425.209 425.439 ARD
FIELD S
RECON

239360 425.595 425.400 425.077 425.330


CH.239ING
SIZE: 1:HPC
STR

VIP CH=:239+370.00
TYPE +474
X600m
SIZE:2 : HPC
TYPE +474
CH.239OSED

VIP LVL=:425.196
m

75.000
EXIST 1200mm

K:82.531
PROP UCTION

239380 425.703 425.543 425.004 425.269

LVC:80.00
U/S
239400 424.857 425.664 425.019 425.257 D/S
CH=239+410.000
239410.000 LVL=425.269 239+50
239420 425.597 425.601 425.015 425.287 0

0.182%
239440 425.627 425.778 425.108 425.324
239460.000 CH=239+460.000
EXISTING GROUND AT-8m FROM PCL
EXISTING GROUND AT +8m FROM PCL

239460 424.970 425.580 425.153 425.360 LVL=425.360


PLAN

VIP CH=:239+480.00

PROFILE
SIZE

239480 424.028 424.888 425.161 425.478


TYPE

VIP LVL=:425.396

K:24.391
LVC:40.00
CH=239+500.000
239500.000
239500 424.804 425.830 425.429 425.760 LVL=425.760
HPC

239520.000 CH=239+520.000 239+60


0
1.821%
RECONSTRUCTION
CHAINAGE 239+474

239520 426.702 426.221 425.825 426.125 LVL=426.125


2 X 1200mm

VIP CH=:239+540.00
L =243.446 239540 426.803 426.477 426.143 426.414 VIP LVL=:426.489
K:26.588
LVC:40.00

CH=239+560.000
239560 426.045 426.558 426.317 426.552

21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI)


239560.000 LVL=426.552
239580.000 CH=239+580.000
0.317%

239580 426.113 426.745 426.365 426.616 LVL=426.616

APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND

PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
VIP CH=:239+600.00

MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
239600 427.021 427.664 426.432 426.739 VIP LVL=:426.679

THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC
K:33.646

PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
LVC:40.00

CH=239+620.000
239+700
239620.000
239620 426.483 428.089 426.677 426.980 LVL=426.980

239640 426.890 430.119 426.975 427.282


1.506%

239665.000 239660 428.016 429.556 427.299 427.583 CH=239+665.000


LVL=427.658
239680 429.164 428.117 427.607 427.870
VIP CH=:239+695.00
REV DETAILS OF REVISION

239700 427.737 427.909 427.909 428.108 VIP LVL=:428.110


K:79.489
LVC:60.00

239+800
239720 427.844 428.029 428.007 428.296 CH=239+725.000
239725.000 LVL=428.335
R0 DRAFT DETAILED PROJECT REPORT

239740 427.933 428.888 428.176 428.448


239760 428.216 429.173 428.353 428.598
AKP
0.751%

239780 428.696 428.571 428.520 428.748


EXISTING CENTRE LINE

SSS
PROPOSED CENTRE LINE
D = 9.303

Lc = 405.93
DESIGN SP
Ts = 203.41

239800.000
Es = 8.262m
HIP CH = 2

R = 2500.00

CH=239+800.000
PROPOSED CARRIAGEWAY
SETOUT D

E - 212632.3

1m

239800 429.017 428.621 428.720 428.898


3m

LVL=428.898
0m
ATA

239+900
39+856

MKH

239820 428.903 429.198 428.740 429.030


EED = 40 km
94,N - 2347

/h

239840 428.823 430.719 428.762 429.124


DESIGN DRAWN CHECKED APPROVED
390.901

239860 429.512 429.937 428.786 429.181


D: 9.3033
R: 2500.000
VCL: 405.931

239880 430.405 428.704 428.781 429.200


SCALE

TITLE:

VIP CH=:239+890.00
VIP LVL=:429.574
K:107.058

239900 429.170 428.651 428.721 429.183


LVC:180.00

240+000
239920 428.836 428.534 428.542 429.127
KM
240

CH.240+000
H-1:2000 V-1:200

239940 428.763 428.507 428.354 429.035


239960 428.771 428.330 428.164 428.905
DRG. NO. Package No. DPR- 3A (6) /P&P-02

CH=239+980.000
THARPARDI

PLAN & PROFILE

239980.000 239980 428.557 428.941 427.951 428.737 LVL=428.737


Km239+000 to Km 240+000

240090.000
-0.930%

240000 428.665 431.327 427.756 428.551


R
0

240+100
DATE: FEBRUARY-2024
MORSHI THARPARDI

SETOUT DATA
SETOUT DATA
SETOUT DATA HIP CH = 240+737 SETOUT DATA
HIP CH = 240+543
HIP CH = 240+161 E - 213480.224,N - 2347161.284 HIP CH = 240+949
2347348.139 E - 213294.307,N - 2347218.590
E - 212935.070,N - D = 1.675 E - 213680.694,N - 2347093.015
D = 2.700
D = 11.789 R = 2000.000m D = 1.018
R = 1500.000m
R = 300.000m Ls = 30.000m R = 2000.000m
Ls = 30.000m
Ls = 40.000m Ts = 44.238 Ls = 30.000m
Ts = 50.344

WIRE
Ts = 50.993 shift = 0.019 Ts = 32.770
shift = 0.025
shift = 0.222 Es = 0.232 shift = 0.019

TOWARDS THAR
IC WIRE
Es = 0.441

IRE
Es = 1.818 Lc = 28.472m Es = 0.098

ELECTRIC

IRE

E
Lc = 40.675m
Lc = 21.727m

WIR
DESIGN SPEED = 80 km/h Lc = 5.539m

RIC W
65 km/h DESIGN SPEED = 80 km/h KM

RIC W
KM DESIGN SPEED =

TOWARDS
BUILDING DESIGN SPEED = 80 km/h 241 X- MINOR JUNCTION DEVELO
240 BUILDING

ELECTR
AT DESIGN CHAINAGE - 241+0

TRIC
THAR
WIRE PROPOSED T - MINOR JUNCTION DEVELOPMENT

ELECT
ELECTRIC
AT DESIGN CHAINAGE - 241+000
HUT BUS SHELTER

T
HUT

ELEC

ELEC
HUT
TBM

HUT

D/S
HUT

D/S
TBM
000

U/S

TOWARDS CHAMLA
240+200

BUS STAND

CH.241+000
TOWARDS THAR
240+300

241+000
T - MINOR JU

U/S
240+100

RECONSTRUCTION
CH.240+

NC
240+000

AT DESIGN CH TION DEVELOPMENT

240+400
HUT

240+500
AINAGE - 24 PROPOSED

240+700
240+600
0+500

240+800

240+900
CH.240+608

241+100
RECONSTRUCTION
TYPE : HPC
SIZE:2X1200mm PROPOSED
EXISTING THAR VILLAGE CH.241+009
CH.240+608 TYPE : HPC
EXISTING CENTRE LINE FROM KM 240+500 TO KM 240+800 SIZE:2X1200mm
TYPE :HPC
PROPOSED CENTRE LINE SIZE: 2X600mm EXISTING
CH.241+020
PROPOSED CARRIAGEWAY TYPE :HPC
SIZE: 2X600mm

PLAN
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-03(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km240+000 to Km 241+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT -
SUPERELEVATION
CHAINAGE
CENTER LINE (m)

AT-8m FROM PCL (m)


____________________

AT +8m FROM PCL (m)


MORSHI

------------------------------------
------------------------------------
EXISTING LEVEL BELOW
______________________

EXISTING GROUND LEVEL


EXISTING GROUND LEVEL

VERTICAL ALIGNMENT

HORIZONTAL ALIGNMENT
410
414
420
424
430
434

406
412
416
422
426
432
436

408
418
428
438

405

PROPOSED ROAD LEVEL(m)


239980.000 240000 428.665 431.327 427.756 428.551
240020 428.030 428.588 427.629 428.365

PUBLIC WORKS DEPARTMENT


240040 427.803 427.158 427.498 428.179

GOVERNMENT OF MAHARASHTRA
-0.930%
240060 427.817 427.786 427.274 427.993
240090.000 240080 428.066 428.745 427.067 427.807 CH=240+090.000
LVL=427.714

L =51.276
240100 429.080 427.699 426.941 427.632
VIP CH=:240+120.00

CONSULTANT -
240120 428.223 428.082 426.868 427.530 VIP LVL=:427.435

K:47.227
LVC:60.00
240140 427.474 427.321 426.863 427.514 CH=240+150.000
240150.000 LVL=427.537
240160 427.537 426.934 426.881 427.571

R: 300.000
VCL: 21.727
0.340%

e:5.00% e:5.00%
e:-5.00% e:-5.00%
240190.000 240180 427.582 427.380 426.898 427.639 CH=240+190.000
LVL=427.673

40.000 D: 4.1496 40.000


240200 427.058 427.134 426.874 427.697

KOLAR ROAD, BHOPAL - 462042(M.P)


AICONS ENGINEERING PVT.LTD.
240220 426.786 426.832 426.903 427.689

Email Id:- info@aicons.in & aiconsgroup@gmail.com


A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
240240 426.732 426.656 426.794 427.604 VIP CH=:240+250.00
VIP LVL=:427.877

K:52.218
240260 426.773 426.833 426.611 427.442

LVC:120.00
240280 426.686 426.913 426.407 427.204
240300 426.256 426.265 426.219 426.889 CH=240+310.000
240310.000 LVL=426.702
240320 425.842 425.662 425.863 426.507
EXISTING ROAD LEVEL
PROPOSED ROAD LEVEL

NAME OF WORK -
240340 425.830 425.223 425.525 426.115
240360 425.626 424.910 425.128 425.724

L =280.545
-1.958%
240380 424.846 424.972 424.678 425.332
240400 424.418 424.764 424.296 424.940
240420.000 CH=240+420.000
240420 423.965 423.850 423.736 424.549 LVL=424.549

240440 423.557 423.160 423.208 424.056


240460 422.928 422.467 422.575 423.363 VIP CH=:240+470.00
VIP LVL=:423.570

PROFILE
K:19.845
240480 421.832 421.702 421.720 422.467
LVC:100.00 240500 420.444 421.036 420.503 421.370

30.000
CH=240+520.000
EXISTING GROUND AT-8m FROM PCL

240520.000
EXISTING GROUND AT +8m FROM PCL

240520 419.321 419.741 419.359 420.071 LVL=420.071

240540 418.373 418.595 418.051 418.672


-6.997%

CH=240+550.000
240550.000
D: 1.5537

LVL=417.972
R: 1500.000
VCL: 40.675

21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI)


240560 417.106 417.177 416.607 417.311
240580 415.554 415.546 415.208 416.220
SIZE

30.000
TYPE

VIP CH=:240+590.00

APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND

PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
VIP LVL=:415.174

MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
K:12.977

240600 414.060 414.207 414.258 415.437


LVC:80.00

THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC
PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
HPC
RECONSTRUCTION

240620 413.242 413.915 413.880 414.962


CHAINAGE 240+608

CH=240+630.000
240630.000
2 X 1200mm

LVL=414.841
240640 413.427 413.722 413.844 414.757
L =99.966
-0.832%

240670.000 240660 413.495 413.742 413.907 414.591 CH=240+670.000


LVL=414.508
240680 413.173 413.847 413.847 414.419
VIP CH=:240+700.00
REV DETAILS OF REVISION

240700 413.886 413.331 413.517 414.208 VIP LVL=:414.258


K:90.115
LVC:60.00

240720 412.666 412.757 413.220 413.953 CH=240+730.000


240730.000 LVL=413.809
R0 DRAFT DETAILED PROJECT REPORT
THAR VILLAGE

240740 412.018 412.533 412.889 413.659


R: 2000.000
VCL: 28.472

AKP

240760 411.484 412.671 412.514 413.359


30.000 D: 0.8157 30.000
FROM KM 240+500 TO KM 240+800

240780 411.346 412.876 412.115 413.060


SSS
-1.498%

240800 411.682 412.149 411.938 412.760


MKH

240820 411.207 411.619 411.713 412.461


240840 410.849 411.531 411.554 412.161
240855.000 CH=240+855.000
DESIGN DRAWN CHECKED APPROVED

LVL=411.936
L =134.767

240860 410.724 411.564 411.314 411.856


SCALE

TITLE:

240880 410.572 411.263 410.862 411.439


VIP CH=:240+895.00
240900 410.565 410.884 410.203 410.866 VIP LVL=:411.337
K:25.565
LVC:80.00

240920 409.267 409.729 409.434 410.136


CH=240+935.000
30.000

240935.000
H-1:2000 V-1:200

240940 409.558 409.055 408.632 409.255 LVL=409.486


D: 0.1587

VCL: 5.539

240960 409.260 408.533 407.722 408.329


R: 2000.000

VIP CH=:241+020.00
-4.627%

30.000
THARPARDI

VIP LVL=:405.553
PLAN & PROFILE
DRG. NO. Package No. DPR- 3A (6) /P&P-03(ii)

240990.000 240980 407.573 407.552 406.604 407.404


Km240+000 to Km 241+000

CH=240+990.000
LVL=406.941
R

241000 405.738 405.908 405.410 406.517


K:12.967

0
LVC:60.00

DATE: FEBRUARY-2024
Lc = E - 21
46
DES 5.539m D = 12 75.183,N -
.8 23
IGN R = 30 19
T-
MIN
SPE
ED
MORSHI 934 THARPARDI Ls = 2
0.000m
AT
DES OR JU = ATA 528 0 51. 5.
80 k 7 Ts = 4 000m
IGN NC D
CH TION
UT 241+ 4
AIN
AG DEVEL
m/h
TO - 23 6.210
SE CH = .705,N

IRE
E-
241 OPME KM KM shift =
0
Es = 1 .087

R
+00 NT
241 0
HIP 1423
0
242

TH A
RIC W
- 2 2 .974
SETOUT DATA E 2.0
7 Lc = 4
2.
HIP CH = 241+346 D = ???m DESIG 121m

S
ARD
N SPE
E - 214058.653,N - 2346971.754 R = ???m
X- M

ELECT
AT INOR
m/h
TBM
ED = 3
= 0k 0 km
??m
DES J
IGN UNCTI Ts
D = 42.774 3

TO W
CHA ON D ? =

D/S
=
Es ???m PEED
INA E
GE VELOP
- 24
1+0 MENT PRO R = 220.000m =
50 L c NS
KM POSED
TBM

REC
ONS Ls = 30.000m SIG
DE

241+900 D
PRO TRUCT 241+ R RECONSTRUC

0
020 E WAL Ts = 101.224 TION
TOW CH 41+000

241+800

FIEL
CH. POSE ION

241+70
S TH 0 0 0
PROPOSED
AR

0
00
TYP 241+0 D TO
241+ L FRO shift = 0.170 ELECTRIC W
U/S

42+00
CH.241+874
SIZE E : HP09 IRE

D/S
ARD.241+

2 42+ 0
140 M TYPE : HPC

LA
EXI :2X12 C Es = 16.453

TOWARDS
T - MINOR
BHS SIZE:1X1200m JU
AT DESIGN NCTION DEVELOPM
2

CH. STING 00mm Lc = 134.241m

AM
m CHAINAG
EXISTING E - 241+90 ENT

CH .2
TYP 241+0 0

241
SIZE E :HPC20 S CH DESIGN SPEED = 35 km/h CH.241+874
: 2X TYPE :HPC

+60
U/S
600m SIZE: 1X600m
DATA m
SETOUT 41+707
m
ARD
TBM

00
0
.911

D/S
+10
=2 2347121
HIP CH
REC

1
ON
7 ,N -

242+
PRO STRUCT 96.2 4
TOW

E - 2143
241
CH. POSE ION
TBM

241
TYP 241+1 D 5 .8 68
SPA E : BO20 D=2

+50
.0 00m

U/S
EXI N:1X3 X CUL R=1 7 0

0
CH. STING .0m VER 00m

+20

0
Ls = 30.0 8
T N
TIO
TYP 241+1 UC E
1 STR
IDG EXISTING CENTRE LINE Ts = 54.08

241
E
SIZE :HPC 1 ON ED
: 1X RE
C OS 2 BR 21
OP 41+42 NOR PROPOSED CENTRE LINE shift = 0.2

400
1000 R
P .2 MI
mm
CH PE : X8.0m 52
PROPOSED CARRIAGEWAYEs = 4.6 52m

241+300

241+
TY AN:1 G
SP ISTIN+424 Lc = 46.7 EED = 30 km/h
EX .241 PC 0mm SP
CH PE :H 100 DESIGN
TY E: 3X
SIZ
PLAN
RECONSTRUCTION RECONSTRUCTION RECONSTRUCTION
CHAINAGE 241+422 RECONSTRUCTION
CHAINAGE 241+009 CHAINAGE 241+120

VIP CH=:241+920.00
SPAN 1 X 8.0m
PROPOSED ROAD LEVEL EXISTING GROUND AT-8m FROM PCL CHAINAGE 241+874
SIZE 2 X 1200mm

VIP LVL=:408.101
SIZE 1 X 3.0m SIZE 1 X 1200mm

CH=241+960.000
TYPE HPC TYPE BOX CULVERT TYPE MINOR BRIDGE EXISTING ROAD LEVEL EXISTING GROUND AT +8m FROM PCL TYPE HPC

CH=241+880.000
VIP CH=:241+580.00

LVL=408.851
VIP CH=:241+290.00

CH=241+660.000
VIP LVL=:406.958

LVL=407.967
412

CH=241+500.000
VIP LVL=:406.751
CH=241+240.000
VIP CH=:241+140.00

CH=241+470.000

LVL=407.227
CH=241+340.000

VIP CH=:241+430.00
CH=241+170.000
CH=241+050.000

CH=241+110.000

VIP LVL=:405.553

CH=241+390.000

LVL=405.900
LVL=406.352

VIP LVL=:404.975

LVL=405.504
LVL=406.117
LVL=405.793

410
LVL=405.553

LVL=405.553

LVL=405.483
408

406

404

402
241040 405.159 405.226 404.231 405.591

241580 405.495 406.107 406.214 406.761

241700 406.854 406.947 406.562 407.361

241780 408.873 408.134 407.011 407.631

241960 408.509 407.642 408.198 408.851


241060 405.267 405.141 404.143 405.553
241080 404.444 404.155 404.170 405.553
241100 405.827 404.970 404.159 405.553

241140 404.338 404.460 404.555 405.613

241360 405.087 404.584 404.609 405.863

241440 403.273 403.487 404.222 405.253

241560 405.325 406.131 406.077 406.583

241620 405.715 406.034 406.233 407.043

241760 407.687 408.653 406.830 407.563

241900 407.710 408.466 407.537 408.073


241820 407.815 407.174 407.097 407.765

241920 408.847 408.130 407.763 408.255


241940 408.877 407.569 407.975 408.515

241980 408.785 407.994 408.480 409.225


241420 403.315 403.058 404.063 405.248

241460 403.749 404.155 404.455 405.388

241800 407.799 407.418 407.079 407.698


241000 405.738 405.908 405.410 406.517

241160 405.077 404.830 404.975 405.719


241180 406.137 404.759 405.286 405.872
241200 405.732 405.744 405.341 406.032
241220 405.477 405.531 405.533 406.192
241240 405.758 405.762 405.692 406.352

241280 406.323 406.379 405.621 406.506


241300 405.742 405.560 405.389 406.459
241320 405.353 405.389 405.162 406.329
241340 405.064 404.843 404.915 406.117

405.054 404.986 404.337 405.609

241400 404.746 404.651 404.324 405.372

241480 404.132 403.890 404.443 405.636

241520 404.468 405.094 405.347 406.152

241640 405.877 405.722 406.251 407.147


241660 406.343 406.067 406.279 407.227

241720 406.929 408.506 406.578 407.429


241740 406.772 408.572 406.667 407.496

241840 407.277 408.338 407.160 407.832

241880 407.686 408.765 407.376 407.967


241020 404.780 405.119 404.629 405.900

241120 404.670 404.123 404.234 405.560

241260 406.304 406.533 405.720 406.470

241500 404.341 404.845 404.912 405.900

241540 404.891 405.723 405.770 406.380

241600 405.908 406.975 406.230 406.914

241680 406.856 406.842 406.418 407.294

241860 407.161 408.482 407.231 407.900

242000 409.263 408.392 408.788 409.600


PROPOSED ROAD LEVEL(m)
______________________

EXISTING LEVEL BELOW


CENTER LINE (m)
____________________

EXISTING GROUND LEVEL


AT-8m FROM PCL (m)
------------------------------------

EXISTING GROUND LEVEL


AT +8m FROM PCL (m)
------------------------------------
241380

CHAINAGE

241500.000
241050.000

241110.000

241170.000

241240.000

241340.000

241390.000

241470.000

241660.000

241880.000

241960.000

242090.000
K:12.967 0.000% K:75.113 0.799% K:48.373 -1.268% K:30.885 1.322% K:162.381 0.336% K:52.062 1.873%
VERTICAL ALIGNMENT
LVC:60.00 LVC:60.00 LVC:100.00 LVC:80.00 LVC:160.00 LVC:80.00

HORIZONTAL ALIGNMENT L =262.940 30.000 D: 34.9611 30.000 L =88.594 L =125.636 30.000 D: 15.7570 30.000 L =179.009 25.000 D: 8.0445
R: 220.000 R: 170.000 R: 300.000
VCL: 134.241 VCL: 46.752 VCL: 42.121

SUPERELEVATION
e:-5.00% e:-5.00% e:5.00% e:5.00% e:5.00%
e:5.00% e:5.00% e:-5.00% e:-5.00% e:-5.00%

PROFILE
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-04 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km241+000 to Km 242+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
MORSHI ATA THARPARDI
SETOUT D +608
= 2 42 28.871
SETOUT DATA HIP CH 3 ,N - 23470
SETOUT DAT 5 2 8 4 .5 3
HIP CH = 241+985 A ATA E - 21
HIP CH = 242+ SETOUT D D = 18.300
E - 214675.183,N - 2347107.520 195 2 42+416
E - 214877.643 HIP CH = 47005.930 R = 100.00
0m
D = 12.819 ,N - 2347050. .090,N - 23
D = 4.179 334 E - 215094 Ls = 2 5 .0 0 0 m
R = 300.000m R = 2000.000
m D = 18.462 Ts = 2 8 .64 2
Ls = 25.000m 0m
Ls = 30.000m R = 100.00 shift = 0.26
0
Ts = 46.210 .0 0 0 m
Ts = 87.975 Ls = 25 Es = 1 .5 5 3
shift = 0.087 8 .7 8 8 m
shift = 0.019 Ts = 2 Lc = 6.939 0 km/h
KM Es = 1.974 Es = 1.350 shift = 0.26
0
S IG N S PEED = 3 KM
242 Lc = 42.121m 6 DE 243
Lc = 115.885m Es = 1 .5 7
DESIGN SPEED = 30 km/h m
DESIGN SPE Lc = 7.222 km/h
ED = 30 km/h N S PEED = 30
DESIG

D/S
E
IR

D/S
W
IC

D/S
TR
TBM

IRE
TRIC W EC
TBM

U/S
ELEC EL

U/S
CH.242+000

CH.243+000
TBM

0
242+000

243+000
N ION

242+700
CTIO STRUCT

242+60
RECONSTRUC

U/S
RECON
GPS

TRU TION

242+800
ONS SED PROPOSED
EL REC ED GE PROPO+561

242+900
EC POS 2 RID 2 CH.242+760
TR PRO.242+51 NOR B C H .24
HPC TYPE : HPC

243+100
DEVELOPMENT IC CH E : MI 0.0m TYPE : 1200mm

500
MINOR JUNCTION - 241+900 TYP N: 3X1 SIZE:1X G
SIZE:1X1200mm
242 +100

N CHAIN AG E W EXISTING
DESIG
IR SPA TING 0 IDG
E EXISTIN+561

242+
E EXIS.242+50 OR BR

242+200
CH.242 PC CH.242+800
N
CH E :MI 0m TYPE :HPC
TYPE :HX600mm

242+300
TYPE: 3X5. EXISTING CENTRE LINE

242+400
SIZE: 1 SIZE: 1X600mm
SIZ PROPOSED CENTRE LINE
PROPOSED CARRIAGEWAY
PLAN
EXISTING ROAD LEVEL EXISTING GROUND AT +8m FROM PCL

VIP CH=:242+190.00
RECONSTRUCTION RECONSTRUCTION RECONSTRUCTION

VIP LVL=:413.159
CHAINAGE 242+512 CHAINAGE 241+561 CHAINAGE 242+760

CH=242+290.000
SPAN 3 X 10.0m SIZE 1 X 1200mm SIZE 1 X 1200mm
CH=242+090.000

LVL=412.038

CH=242+890.000
TYPE MINOR BRIDGE TYPE HPC TYPE HPC

VIP CH=:242+850.00
LVL=411.286

VIP CH=:242+570.00

CH=242+810.000

VIP LVL=:409.833

LVL=410.532
CH=242+525.000

CH=242+615.000
VIP LVL=:408.899

LVL=409.699
414

LVL=409.404

LVL=409.049
412

410

408

406

404
242240 411.639 411.202 411.780 412.411

242420 410.050 409.461 409.744 410.581


242360 411.944 410.932 410.657 411.253

242640 411.255 412.921 408.955 409.133

242700 410.120 410.746 408.341 409.333

242760 408.842 407.741 407.949 409.533

243000 413.369 412.516 411.711 412.453


242020 412.499 409.287 409.195 409.975

242100 410.599 410.641 410.595 411.465

242140 411.132 411.337 411.116 412.035

242180 411.936 411.186 411.318 412.365

242400 410.895 410.441 410.113 410.805

242940 412.870 410.464 410.723 411.405


242080 409.807 412.673 410.349 411.098

242480 407.647 409.212 408.601 409.908

242600 408.375 408.429 408.560 409.018


242040 411.853 409.632 409.629 410.349

242260 411.536 411.235 411.697 412.307

242340 413.421 411.044 410.845 411.477

242380 410.966 409.998 410.418 411.029

242660 408.983 410.426 408.616 409.199

242720 408.756 409.743 408.223 409.399

242780 407.628 408.083 408.113 409.599

242840 408.855 408.715 408.709 409.879


242860 409.819 409.231 409.228 410.087
242000 409.263 408.392 408.788 409.600

242060 409.902 410.674 410.022 410.724

242120 410.567 410.822 410.900 411.780

242160 411.807 411.540 411.243 412.230

242200 412.254 411.162 411.556 412.440


242220 411.990 411.028 411.718 412.456

242280 411.707 411.089 411.488 412.142


242300 411.973 411.605 411.309 411.926
242320 412.903 410.944 411.064 411.702

408.911 409.992 409.411 410.356

242460 408.242 410.229 409.057 410.132

242500 405.721 408.132 407.926 409.684


242520 407.086 407.240 407.856 409.460
242540 407.591 407.363 407.962 409.254
242560 408.312 407.491 408.094 409.110
242580 410.465 407.182 408.189 409.032

242620 411.607 410.992 409.000 409.066

242680 407.948 408.768 408.367 409.266

242740 409.194 408.569 408.044 409.466

242800 407.534 408.067 408.254 409.666


242820 407.856 408.354 408.361 409.742

242880 409.506 410.230 409.774 410.366


242900 409.801 412.186 410.157 410.706
242920 411.855 410.970 410.476 411.056

242960 411.915 410.696 410.990 411.754


242980 410.593 411.067 411.392 412.104
PROPOSED ROAD LEVEL(m)
______________________

EXISTING LEVEL BELOW


CENTER LINE (m)
____________________

EXISTING GROUND LEVEL


AT-8m FROM PCL (m)
------------------------------------

EXISTING GROUND LEVEL


AT +8m FROM PCL (m)
------------------------------------

242440
CHAINAGE
241960.000

242090.000

242290.000

242525.000

242615.000

242810.000

242890.000

243110.000
1.873% K:66.803 -1.121% K:61.890 0.333% K:56.592 1.747%
VERTICAL ALIGNMENT
LVC:200.00 LVC:90.00 LVC:80.00

25.000 25.000 25.000 25.000


HORIZONTAL ALIGNMENT 25.000 L =76.196 30.000 D: 3.3198 30.000 L =104.192 D: 4.1381 L =134.389 D: 3.9760
R: 2000.000 R: 100.000 R: 100.000
VCL: 115.885 VCL: 7.222 VCL: 6.939
e:5.00% e:-2.09% e:-2.09% e:-7.00% e:-7.00% e:7.00% e:7.00%
SUPERELEVATION
e:-5.00% e:2.09% e:2.09% e:7.00% e:7.00% e:-7.00% e:-7.00%

PROFILE
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-05 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km242+000 to Km 243+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
MORSHI THARPARDI

SETOUT DATA
HIP CH = 243+
429 TA SETOUT
E - 216089.456
,N - 2346866.11 SETOUT DATA SETOUT DA DATA
3+835 HIP CH =
D = 3.787 3
HIP CH = 243+667 HIP CH = 24 789.809 244+027
49,N - 2346 E - 21667
R = 1000.000m E - 216319.075,N - 2346803.648 E - 216487.2 9.446,N -
D = 29.08 23467
KM
Ls = 30.000m D = 10.514 D = 2.927 2
0m R = 150.0
243 Ts = 48.062 R = 400.000m R = 2000.00 00
m Ls = 30.0 m
shift = 0.038 Ls = 30.000m Ls = 30.000 KM 00m
Es = 0.584 6 6 .1 0 0 244 Ts = 53.9
BORKHEDI

=
TOWARDS

Ts = 51.813 Ts 67
shift = 0.2
Lc = 36.097m shift = 0.094 shift = 0.019 50
Es = 5.22
DESIGN SPEE
D = 80 km/h Es = 1.784 Es = 0.671 2
m Lc = 46.1
Lc = 43.403m Lc = 72.177 /h 36m
EED = 80 km
TBM

P DESIGN
DESIGN SPEED = 65 km/h DESIGN S SPEED =
40 km/h
CH.243+000
243+000

ELEC
TBM

TRIC TBM

CH.244+000
T - MINOR JUNCTION DEVELOPM WIR

244+000
ENT
E
243+100

AT DESIGN CHAINAGE -243+


220
243+200

243+300

243+400

243+900
243+500

243+800

0
243+600

+10
RE

243+700
CO
PR NSTR

244
EXISTING CENTRE LINE CH OPO UC
TY .244 SED
PROPOSED CENTRE LINE SIZ PE : +173
EX E:1X HPC
PROPOSED CARRIAGEWAY CH ISTIN 1200
TY .244 G mm
SIZ PE :H +174
E: 1 PC
X4
50m
m

PLAN
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-06(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km243+000 to Km 244+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
SUPERELEVATION
CHAINAGE

CLIENT -
CENTER LINE (m)

AT-8m FROM PCL (m)


____________________

AT +8m FROM PCL (m)


------------------------------------
------------------------------------
EXISTING LEVEL BELOW
______________________

EXISTING GROUND LEVEL


EXISTING GROUND LEVEL

VERTICAL ALIGNMENT
410
414
420
424
430
434
440

412
416
422
426
432
436

418
428
438

PROPOSED ROAD LEVEL(m)


MORSHI

242890.000
243000 413.369 412.516 411.711 412.453

HORIZONTAL ALIGNMENTL =744.510


243020 412.558 413.308 412.175 412.803
243040 412.085 412.823 412.518 413.152

1.747%
243060 412.077 413.449 412.795 413.501

PUBLIC WORKS DEPARTMENT


GOVERNMENT OF MAHARASHTRA
243080 412.361 416.785 413.173 413.851
243110.000 243100 413.552 413.511 413.443 414.200 CH=243+110.000
LVL=414.375
243120 413.040 412.798 413.791 414.561

CONSULTANT -
243140 413.534 414.061 414.284 415.000 VIP CH=:243+150.00
VIP LVL=:415.074

K:44.423
243160 414.500 415.021 414.814 415.530

LVC:80.00
243180 414.634 414.895 415.310 416.149 CH=243+190.000
243190.000 LVL=416.493
243200 416.652 415.062 416.015 416.848
243220 418.688 415.559 416.748 417.557

KOLAR ROAD, BHOPAL - 462042(M.P)


AICONS ENGINEERING PVT.LTD.
243240 418.580 416.174 417.437 418.267

Email Id:- info@aicons.in & aiconsgroup@gmail.com


A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
243260 417.467 417.022 418.072 418.976
243280 417.828 417.980 418.725 419.686
243300 418.538 418.432 419.498 420.395

3.548%
243320 419.679 419.767 420.259 421.105
243340 420.505 420.055 421.004 421.815

NAME OF WORK -
243360 420.976 420.465 421.708 422.524
243380 421.744 421.376 422.380 423.234

30.000
243400 423.906 422.178 423.130 423.943
EXISTING ROAD LEVEL
PROPOSED ROAD LEVEL

e:2.84%
e:-2.84%
243420 423.322 422.803 423.788 424.653
243440.000 CH=243+440.000

D: 2.0682
R: 1000.000
VCL: 36.097
243440 424.313 423.563 424.423 425.362 LVL=425.362

e:2.84%
e:-2.84%
243460 425.161 424.613 425.109 426.042

30.000
243480 424.896 426.442 425.906 426.664
VIP CH=:243+500.00

PROFILE
243500 426.396 426.020 426.638 427.226 VIP LVL=:427.491
K:67.800
LVC:120.00

243520 427.777 427.783 427.202 427.729


243540 428.222 427.846 427.560 428.173
CH=243+560.000
L =138.088

243560.000
243560 428.014 427.016 427.778 428.558 LVL=428.558

243580 427.738 427.749 428.046 428.913

21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI)


EXISTING GROUND AT-8m FROM PCL
EXISTING GROUND AT +8m FROM PCL

243600 429.447 430.326 428.330 429.269

APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND

PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
243620 429.348 429.495 428.703 429.625

THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC
PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
1.778%

30.000

243640 430.186 429.317 429.214 429.980


e:4.69%
e:-4.69%

243660 431.508 429.184 429.783 430.336


D: 6.2170
R: 400.000
VCL: 43.403

243690.000 243680 432.155 429.984 430.172 430.691 CH=243+690.000


e:4.69%

LVL=430.869
e:-4.69%

243700 432.077 430.062 430.389 431.044


30.000

REV DETAILS OF REVISION

243720 430.818 429.740 430.678 431.373


243740 430.732 430.192 431.016 431.676
L =50.830

R0 DRAFT DETAILED PROJECT REPORT

243760 431.420 430.535 431.337 431.953


243780 431.740 430.449 431.527 432.204
AKP
30.000

VIP CH=:243+800.00
243800 432.679 430.813 431.707 432.429 VIP LVL=:432.825
SSS
K:152.701
LVC:220.00

243820 432.445 431.518 432.048 432.627


MKH

243840 431.924 432.166 432.332 432.799


D: 2.0677
R: 2000.000
VCL: 72.177

243860 431.712 432.410 432.494 432.945


DESIGN DRAWN CHECKED APPROVED

243880 431.673 431.955 432.536 433.065


30.000

SCALE

243900 431.628 431.721 432.513 433.159


TITLE:

CH=243+910.000
243910.000 LVL=433.196
243920 432.752 431.938 432.524 433.230
243940 433.078 433.144 432.564 433.297
0.337%

L =72.222

H-1:2000 V-1:200

243970.000 243960 433.168 434.177 432.654 433.364 CH=243+970.000


LVL=433.398
243980 432.501 432.909 432.684 433.421 VIP CH=:244+010.00
VIP LVL=:433.533
30.000
K:45.634
LVC:80.00
THARPARDI

PLAN & PROFILE

244000 431.809 432.705 432.703 433.401


DRG. NO. Package No. DPR- 3A (6) /P&P-06(ii)

Km243+000 to Km 244+000
R
0
DATE: FEBRUARY-2024
MORSHI SETOUT
DATA THARPARDI
TA SETOUT DATA
SETOUT DA TA
HIP CH =
24
4 4 +027 SETOUT DA HIP CH = 244+882 E - 21752 4+954
HIP CH = 2 3.846 4 4 +691 9.431,N -
.4 4 6,N - 234678 HIP C H = 2
27.034 E - 217466.983,N - 2346 D = 2.073 2346430.0
E - 2 1 6 6 7 9 28,N - 23465 465.562 66
E - 217286.1 D = 10.842 R = 1000.0
D = 29.082 00m
D = 4.967 R = 250.000m
R = 150.000m SETOUT DATA m
Ls = 30.0
00m
R = 600.000 Ls = 30.000m
Ls = 30.000m HIP CH = 244+382
3 5 .0 0 0 m
Ts = 33.0
91
Ls = Ts = 38.737 shift = 0.0
Ts = 53.967 E - 216985.701,N - 2346600.854 38
Ts = 43.529 shift = 0.150 Es = 0.20
KM shift = 0.250 D = 17.054 1
244 shift = 0.085 Es = 1.274 Lc = 6.17
Es = 5.222 R = 100.000m 7m KM
Es = 0.649 Lc = 17.307m DESIGN
Lc = 46.136m Ls = 25.000m RECONSTRUC
TION SPEED = 245
ED = 40 km/h Lc = 17.019m DESIGN SPEED = 50 km 80 km/h
DESIGN SPE Ts = 27.526 PROPOSED EED = 80 km
/h /h
shift = 0.260 CH.244+450 DESIGN SP
TYPE : HPC mm
Es = 1.381 SIZE:2X1200
EXISTING

D/S
Lc = 4.765m
CH.244+447
DESIGN SPEED = 40 km/h TYPE :HPC m TBM

SIZE: 2X600m
00

TBM
000
44+0

D/S
TBM

RDS
244+

245+000
CH.245+000
U/S

244+900
244+800
CH.2

244+100
TBM

FIELD
RECO T - MINOR

244+700
NS JUNCTION

TOWA
PRO TRUCTION AT DESIGN
CHAINAGE
DEVELOPM
ENT
CH.2 POSED - 244+900
TYPE44+173

244+600
244+200

U/S
SIZE: : HPC
EXIS 1X1200m EXISTING CENTRE LINE
0

244+500
+90

CH.2 TING m

244+300
PROPOSED CENTRE LINE
TYPE 44+174
243

244+400
SIZE: :HPC PROPOSED CARRIAGEWAY
1X45
0mm

PLAN
RECONSTRUCTION RECONSTRUCTION
CHAINAGE 244+173 CHAINAGE 244+450

VIP CH=:244+830.00
VIP CH=:244+670.00

CH=244+860.000
CH=244+800.000

VIP LVL=:435.473
PROPOSED ROAD LEVEL SIZE 1 X 1200mm SIZE 2 X 1200mm

CH=244+740.000
VIP LVL=:434.939
EXISTING GROUND AT-8m FROM PCL

LVL=435.761
TYPE HPC TYPE HPC

LVL=435.373
LVL=435.173
EXISTING ROAD LEVEL EXISTING GROUND AT +8m FROM PCL

CH=244+600.000
CH=244+050.000

VIP CH=:244+290.00
438
VIP CH=:244+155.00

LVL=433.403
VIP LVL=:432.325
CH=244+115.000

CH=244+240.000
LVL=432.967

CH=244+195.000
VIP LVL=:431.480

CH=244+340.000

VIP CH=:244+440.00

CH=244+490.000
LVL=432.046

LVL=432.012

CH=244+390.000
436 LVL=431.730

LVL=431.514

VIP LVL=:429.892

LVL=430.989
LVL=430.703
434

432

430

428
244000 431.809 432.705 432.703 433.401

244200 430.216 430.435 431.058 431.761

244660 433.898 432.684 433.701 434.481

244860 434.808 434.683 434.872 435.761

244940 436.210 435.128 435.953 436.531


244020 433.864 432.619 432.609 433.293

244300 430.752 431.153 431.688 431.983


244320 430.661 431.524 431.614 431.793

244460 429.120 429.475 430.028 430.503

244600 431.474 431.533 432.564 433.403

244680 433.373 433.119 433.890 434.733


244700 433.739 433.557 434.213 434.933

244740 436.540 435.656 434.383 435.173

244800 434.197 435.046 434.585 435.373

244960 435.892 435.525 436.064 436.723


244060 431.344 432.223 432.131 432.825

244180 430.798 430.416 430.907 431.665

244380 430.055 429.776 430.746 430.865

244560 430.731 432.151 431.743 432.525

244620 432.015 432.324 433.091 433.815


244640 433.085 432.669 433.471 434.175

244980 435.837 436.970 436.217 436.915


244160 431.370 430.226 430.878 431.668

244420 429.268 429.572 430.100 430.388

244520 430.128 431.589 430.995 431.648

244920 436.184 435.134 435.682 436.338

245000 437.658 438.124 436.335 437.108


244040 432.860 432.523 432.431 433.097

244080 431.517 431.252 431.859 432.542


244100 430.778 431.109 431.579 432.259
430.404 430.776 431.250 431.979

244140 430.918 430.395 430.993 431.772

244220 430.834 430.719 431.190 431.887


244240 430.765 430.871 431.311 432.012
244260 430.583 431.391 431.423 432.092
244280 430.930 431.119 431.534 432.082

244360 430.219 433.697 431.064 431.189

244440 429.118 429.143 429.899 430.369

244480 429.640 430.525 430.576 430.789


244500 430.004 430.567 430.696 431.209

244720 433.986 435.688 434.298 435.079

244760 438.214 435.043 434.494 435.239


244340 430.469 433.555 431.398 431.514

244400 429.503 430.249 430.474 430.560

244540 430.368 432.312 431.377 432.086

244580 430.781 431.288 432.089 432.964

244780 434.088 435.808 434.525 435.306

244820 434.186 435.111 434.649 435.460


244840 434.083 435.020 434.719 435.590

244880 436.281 434.776 435.164 435.954


244900 436.462 434.506 435.311 436.146
PROPOSED ROAD LEVEL(m)
______________________

EXISTING LEVEL BELOW


CENTER LINE (m)
____________________

EXISTING GROUND LEVEL


AT-8m FROM PCL (m)
------------------------------------

EXISTING GROUND LEVEL


AT +8m FROM PCL (m)
------------------------------------
244120

CHAINAGE
244050.000

244115.000

244195.000

244240.000

244340.000

244390.000

244490.000

244600.000

244740.000

244800.000

244860.000

245270.000
K:45.634 -1.416% K:39.187 0.626% K:44.499 -1.622% K:26.204 2.194% K:75.222 0.333% K:95.465 0.962%
VERTICAL ALIGNMENT
LVC:80.00 LVC:80.00 LVC:100.00 LVC:100.00 LVC:140.00 LVC:60.00

25.000 25.000 30.000 30.000


D: 17.6228 L =275.268 D: 2.7299 L =238.309 L =108.751 L =0.003 D: 0.3539
HORIZONTAL ALIGNMENT 30.000 35.000 D: 1.6252 35.000 30.000 D: 3.9665 30.000
R: 150.000 R: 100.000 R: 600.000 R: 250.000 R: 1000.000
VCL: 46.136 VCL: 4.765 VCL: 17.019 VCL: 17.307 VCL: 6.177
e:5.00% e:5.00% e:-7.00% e:-7.00% e:4.74%e:4.74% e:5.00% e:5.00% e:-2.87% e:-2.87%
SUPERELEVATION
e:-5.00% e:-5.00% e:7.00% e:7.00% e:-4.74%
e:-4.74% e:-5.00% e:-5.00% e:2.87% e:2.87%

PROFILE
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-07 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km244+000 to Km 245+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
MORSHI THARPARDI

SETO
U
HIP C T DATA
H = 24
E - 21 5+756
82
D = 37 74.642,N -
.4 23461
R = 15 33 42.664
TA 0.000
UT DA 517 Ts = 5 m
SETO 9.599
= 5+
2 4 34622 0
Es = 8 .820m
HIP CH 52.458,N - 2 .375m
0
E - 218 9 Lc = 9
8.
D= 6 . 8 4 DESIG 000m
4 0 0 .000m N SPE
ED =
R= 20 km
0.000m /h
Ls = 3 942
8.
DATA Ts = 3 094
SETOUT

X TD
0.
245+233 shift =

- M ES
A
ETOUT DATA
HIP CH = 6300.918

RE

IN IGN
0,N - 234 .809
Es = 0 17m

OR C
P CH = 244+954 77 7 .0 8
E - 21 7 m/h

IC WI

JU HA
Lc = 1
7.8 = 65 k

N C IN
- 217529.431,N - 2346430.066 22 E E D
D = 13.0 NS P M

TI AG
TB

DESIG T

ON E
6 0 0 .0 00m HU
R=

DE 245
S

R
D/
00m

VE +9
-
= 1000.000m Ls = 35.0

ELECT
T

LO 00
87 HU

PM
= 30.000m Ts = 85.9

EN
85 P
= 33.091 shift = 0.0 BU ROP

T
245+700
D

FR
1 S S OS OL FIEL
ift = 0.038 Es = 3.98 5m HE ED

U/S
O

OM
KM .36 H DS

245+600
LT
Lc = 101 80 km/h SC

0
N
245 UCTIO ER
PEED = AR

+80
NSTR T

BO 245
SE

KM
= 6.177m IG N S RECO
HU
DE S OSED HI TO W L
PROP45+522

00
TO

TA +80
245
ESIGN SPEED = 80 km/h .2
CH : HPC E P C UT HOO

245+5

NI 0 T
TYPE X1200mm D - 21 H = DA SC
SIZE:1 ING T

VI O
R = 2 833 24 TA HU
EXIST45+521

LL KM
= 2

00
Ts 8 .4 0 .7 +85 S
CH.2 :HPC RD A HUT

AG 2 XA-T DESI
M

Es = 1 0.00 99 94, 60 E
TB

245+4

BO
TYPE 1X600mm A T IR
L N N HU

E 46+ MINOGN CH
EL SIZE: Lc = 1 5.9 0m OW TO 00

UN
-2 W
W = . 1 T O 5+9 HUT C
DE 3 56 2m 34 RI

D
00
B
SI 1.4 m 7 60 24

AR
CT

BU
CH.245+000
245+000

245+3
GN 1 49 E

24
M

Y
TB

5m . T
9 EL

ILD
EXISTING CENTRE LINE SP 39 HU

0
245+200

KM46
245+100

EE

AL
PROPOSED CENTRE LINE

2
T - MINOR JUNCTION DEVELOPMENT

IN
AT DESIGN CHAINAGE - 244+900 D

RJ
L
G
PROPOSED CARRIAGEWAY =

UN AINA
20

CT
km

IO E -
/h

N D 246
G
T
HU0

EV +00
EL

EL 0
D S 0HUT0 T ECT
0

OP
SE P CH 355
R +
6 0 U 0 RI

HI - 218 .147 0m
A
W NA 24 46+ H

ME
TO = .16
C

NT
TO OTO W

D
. 2
IRE

UT 24 4,N
IR

R = 20 .31
B CH

BU
E CW

Ls
I

=
15 .00 m
R

DA 6+0 - 2
CT

Ts ift = .048

ILD
ELE

10 00
sh = 1 437 PEE

TA 21 345
0
=
Es = 6. N S

IN
2
Lc SIG

.
3

G
DE

0
T

.16
HU

5
7
m

89
T
HU

0.6
D

53
0
+10

=2
246

5k
m/
h

BU
ILD
ING
S
PM
TB
G

HU
0

T
+20
246

ELECTRIC

T - DE
AT
M SIG
IN N
OR CH
JU AI
NC NA
TI GE
ON -
DE 246
VE +30
LO 0
PM
00 DS

EN
+3 AR A

T
6
24 OW TON
PLAN T O
B

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-08(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km245+000 to Km 246+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT -
SUPERELEVATION
CHAINAGE
CENTER LINE (m)
MORSHI

AT-8m FROM PCL (m)


____________________

AT +8m FROM PCL (m)


------------------------------------
------------------------------------
EXISTING LEVEL BELOW
______________________

EXISTING GROUND LEVEL


EXISTING GROUND LEVEL

VERTICAL ALIGNMENT

HORIZONTAL ALIGNMENT
440
444
450

436
442
446

438
448

435

PROPOSED ROAD LEVEL(m)


244860.000
245000 437.658 438.124 436.335 437.108
245020 437.101 438.264 436.474 437.300

PUBLIC WORKS DEPARTMENT


GOVERNMENT OF MAHARASHTRA
245040 437.154 437.804 436.659 437.492
245060 437.518 438.062 436.857 437.685

L =160.223
245080 436.427 438.584 437.004 437.877
245100 436.823 437.652 437.155 438.070

CONSULTANT -
245120 437.358 439.067 437.378 438.262

0.962%
245140 437.926 438.836 437.667 438.454
245160 437.617 438.084 437.917 438.647

35.000
245180 437.817 438.257 438.050 438.839

e:4.74%
e:-4.74%

KOLAR ROAD, BHOPAL - 462042(M.P)


AICONS ENGINEERING PVT.LTD.
245200 438.385 438.439 438.419 439.031

Email Id:- info@aicons.in & aiconsgroup@gmail.com


A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
245220 438.931 438.243 438.607 439.224

D: 9.6796
245240 438.842 439.118 438.865 439.416
EXISTING ROAD LEVEL

R: 600.000
VCL: 101.365
PROPOSED ROAD LEVEL

245270.000 245260 439.420 440.498 439.133 439.609 CH=245+270.000


LVL=439.705
245280 441.611 440.027 439.271 439.799

e:4.74%
e:-4.74%
245300 440.285 443.388 439.272 439.974 VIP CH=:245+310.00

35.000
VIP LVL=:440.089

K:231.522
245320 439.579 441.290 439.231 440.132

LVC:80.00

NAME OF WORK -
245340 439.646 438.774 439.262 440.272 CH=245+350.000
245350.000 LVL=440.336
245360 439.705 438.881 439.373 440.398

0.616%
245390.000 245380 440.032 441.090 439.575 440.521 CH=245+390.000
LVL=440.582
245400 440.354 441.397 439.893 440.641

L =159.535
245420 439.984 440.157 440.030 440.737
EXISTING GROUND AT-8m FROM PCL
EXISTING GROUND AT +8m FROM PCL

245440 440.116 439.299 440.069 440.806


VIP CH=:245+460.00
245460 440.290 440.249 440.111 440.848 VIP LVL=:441.014

PROFILE
K:147.426
LVC:140.00

245480 440.248 443.191 440.126 440.862


245500 440.525 440.426 440.175 440.850
245520 440.243 439.373 440.110 440.811 CH=245+530.000
R: 400.000
SIZE

VCL: 17.817
e:4.69%e:4.69%
TYPE

e:-4.69%e:-4.69%

245530.000 LVL=440.781
245540 440.040 439.145 440.037 440.747
30.000 D: 2.5520 30.000

21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI)


HPC

245560 440.058 439.341 439.987 440.681


-0.333%
RECONSTRUCTION
CHAINAGE 245+522

245580.000

APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND
CH=245+580.000

PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
1 X 1200mm

245580 439.464 439.706 439.953 440.614 LVL=440.614

MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC
PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
245600 440.219 439.516 440.075 440.611
VIP CH=:245+620.00
245620 440.460 439.751 440.382 440.737 VIP LVL=:440.481
K:31.238
LVC:80.00

245640 440.375 439.923 440.703 440.990


L =148.824

CH=245+660.000
245660.000
245660 440.504 440.524 440.987 441.372 LVL=441.372

245680 440.847 442.544 441.264 441.817


REV DETAILS OF REVISION

245700 441.409 442.083 441.583 442.263


245720 441.667 444.023 442.013 442.708
R0 DRAFT DETAILED PROJECT REPORT
e:5.00%
e:-5.00%

245740 442.091 446.185 442.469 443.154


2.228%

AKP

245760 442.487 446.327 442.946 443.599


D: 37.4331
R: 150.000
VCL: 98.000

SSS

245780 442.785 444.191 443.407 444.045


e:5.00%
e:-5.00%

245800 443.363 444.818 443.968 444.490


MKH

245820.000 CH=245+820.000
245820 444.119 444.418 444.476 444.936 LVL=444.936
L =41.669

245840 445.390 444.327 444.860 445.350


DESIGN DRAWN CHECKED APPROVED

245860 446.050 445.357 445.319 445.702


SCALE

TITLE:
R: 80.000
D: 22.4993

VCL: 31.415

VIP CH=:245+880.00
e:7.00% e:7.00%
e:-7.00% e:-7.00%

245880 444.630 447.596 445.837 445.991 VIP LVL=:446.273


K:64.009
LVC:120.00

245900 444.921 446.348 446.023 446.218


245950.000 245920 444.939 448.915 446.030 446.382
H-1:2000 V-1:200

CH=245+940.000
LVL=446.484
BOTANA VILLAGE

245940 444.718 448.579 446.101 446.484 CH=245+950.000


0.353%

L =121.913

245940.000 LVL=446.520
DRG. NO. Package No. DPR- 3A (6) /P&P-08

245960 444.571 445.642 446.236 446.540 VIP CH=:246+000.00


FROM KM 245+800 TO KM 246+240
THARPARDI

PLAN & PROFILE

VIP LVL=:446.696
Km245+000 to Km 246+000

245980 445.068 445.475 446.329 446.491


K:33.534
LVC:100.00

246000 447.322 446.153 446.242 446.323


0
DATE: FEBRUARY-2024
0
.71
48
50
34
-2
5,N 5
MORSHI THARPARDI

Ts = 10 085 .70 +01


R = 2. 869 247 A
00

D - 21 H = DAT
2

h
7+

m/
24

E P C UT

5k
Lc = 0 .19 00m
9
TA

H I TO

=6
DE = 3 .166 6m
DA 7+

0.0
SE

D
T 4

SI 6.3 m
OU = 2 .06

m
0

EE
GN 8 9
T

8
SE P CH 8911

SP
= 1
7
SET
O HI - 21 .42
HIP UT DA 9
E = 3 0.0

Es
CH T
E-2 = 24 A D = 14 5.
BOTA 1 8 33 6 +22 R =3
ROM D=
KM 24 NI VILLAG 16.9 1.847,N 9
4 0
5+800 E R= 12 .69 10 + Ls = 6
- 23 64
TO KM 2
Ls = 00.000 456 0
47 2 Ts ift
246+2 m 84.3 SETOU 45 sh
40 Ts = 35.000m 51
E

T 2 3
HIP CH DATA A
T 95 - 2
ELECTRIC WIR

4 DA 46+ ,N
X-
M
AT INOR shift 7.266 E - 218
= 246+
417

E
UT 2 62

24 M
Es = = 0.255
DES

DG
IGN JUNCT 36
D = 1.8 6.135,N - 234

7
O H = 7.1

K
KM CH I
AIN ON DE

I
Lc = 2.456 T

m BR
AG
E - VELOP
45 5498.6 3
246 SE IP C 186 71 0m

T .2 IN D
R = 120 85

CHXIST INE
DES 24.033m
246

5.0 OR
HUT

+00 MENT
S
0.000m

E: :M 005
SIZYPE 47+ G
8 D/
IRE
2 0. .00 m
0
Ls = 30 H -

2X IN
E TA
IGN /h
SPE .00
Ts = 34 0m E = 3 00 000 4

RE
W

BOUN ED
= 50 .319 D = 1 30. .70 5 km 00S
+0U/ 0
20
IC

DARY km/h shift = 0 R = 42 .37 7


.24 00
W .0 =
ALL Es = 0.1 31
TR

s = 0 1
TBM

L s 3 m D CH 247+
WIRE 87 T ift = 4.1 881 EE
EC

ELECTRIC Lc = 8.6
34m s s = 23 SP
h .
EL

DESIG E = IGN
N SPEE

ELECTRIC WIRE
246+00HUT

Lc ES
HUT

D = 50
CH.246 HUT

km/h

TBM
+000
0

DATA D
SETOUT
246+609 308.690
HIP CH = 2 ,N - 2345
BOTO DS

BUIL 3 9 4 .9 3
E - 218
NA

HUT

DIN
AR

G 3
D = 36.17
TOW

.0 0 0m
E R = 50
246 HUT

IR 0 0m

0
SET Ls = 2 0 .0

+90
O W
HIP UT DATA
0

C 6 .4 25
RI 2
+10

CH = Ts =

246
E-2 246+ T 0 .3 3 3
EC shift =
PSM

1 0 BUI
TB

D = 1 8355.164 21
G

LDI EL Es = 2 .9 5 0
5.14 ,N - 2 NG HU 67m
R=1 7 3458 T E Lc = 11.5 EED = 20 km/h
0 90.6 IR
Ls = 0.000m

LL
53 W SP
DESIGN

0
20.0 IC

WE

+80
Ts = 0 0m TR
200

2
shift 3.315 EC

246
EL
+

= 0.1

TBM
246

Es = 67

BOTON S
1
RD
Lc = .048

A
T-M
6 TOWA 0
I
AT D NOR JUN
DES .437m
246+30
ESIG C
N CH TION DE
IGN

0
AINA V
SPE GE - ELOPME

+70
246+400
246+3 NT
ED = 00
25 km

246
/h

0
246+50

246+600
EXISTING CENTRE LINE
PROPOSED CENTRE LINE
PROPOSED CARRIAGEWAY

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-09(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km246+000 to Km 247+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT -
SUPERELEVATION
CHAINAGE
CENTER LINE (m)

AT-8m FROM PCL (m)


____________________

AT +8m FROM PCL (m)


MORSHI

------------------------------------
------------------------------------
EXISTING LEVEL BELOW
______________________

EXISTING GROUND LEVEL


EXISTING GROUND LEVEL

VERTICAL ALIGNMENT

HORIZONTAL ALIGNMENT
430
434
436
440
444
446
450

432
442

438
448

PROPOSED ROAD LEVEL(m)


246000 447.322 446.153 446.242 446.323
246020 447.471 445.238 445.922 446.036

D: 3.6879
R: 100.000
VCL: 6.437
K:33.534
LVC:100.00

PUBLIC WORKS DEPARTMENT


20.000 20.000
246040 446.270 445.426 445.342 445.629

e:7.00% e:7.00%
e:-7.00%e:-7.00%
CH=246+050.000

GOVERNMENT OF MAHARASHTRA
246050.000 LVL=445.381
246060 444.414 444.023 444.690 445.119

-2.629%
246080.000 CH=246+080.000
246080 443.394 443.093 444.257 444.593 LVL=444.593

246100 443.543 442.436 443.970 444.134 VIP CH=:246+110.00


VIP LVL=:443.804

CONSULTANT -
K:29.759
246120 442.843 442.589 443.757 443.810

LVC:60.00

L =137.034
CH=246+140.000
246140.000 246140 442.381 442.858 443.527 443.620 LVL=443.620
BOTANA VILLAGE

246160 442.380 442.481 443.240 443.498


246180 442.584 441.862 442.965 443.375
FROM KM 245+800 TO KM 246+240

246200 445.441 441.731 442.811 443.252

KOLAR ROAD, BHOPAL - 462042(M.P)


AICONS ENGINEERING PVT.LTD.

Email Id:- info@aicons.in & aiconsgroup@gmail.com


246220 443.868 441.717 442.756 443.130

-0.613%

A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE


R: 200.000
VCL: 24.033
246240 443.226 441.648 442.708 443.007

e:5.00% e:5.00%
e:-5.00% e:-5.00%
246260 443.240 441.797 442.576 442.885

35.000 D: 6.8850 35.000


246290.000 246280 441.844 442.142 442.393 442.762 CH=246+290.000
LVL=442.701
246300 442.315 442.294 442.220 442.636
246320 442.495 442.241 442.054 442.490

NAME OF WORK -
VIP CH=:246+340.00

L =107.220
246340 442.437 442.018 441.854 442.320 VIP LVL=:442.394

K:169.374
LVC:100.00
246360 442.395 441.167 441.608 442.127
246380 441.286 440.536 441.302 441.910 CH=246+390.000
246390.000 LVL=441.792
246400 440.639 441.479 440.924 441.672

30.000
246420 440.266 442.215 440.578 441.431

D: 0.4122

VCL: 8.634
R: 1200.000

e:2.09% e:2.09%
e:-2.09% e:-2.09%
30.000
246440 439.848 440.835 440.293 441.191
246460 439.547 439.320 440.040 440.950

PROFILE
246480 439.414 439.198 439.811 440.709
246500 439.701 440.749 439.741 440.469
246520 439.722 440.845 439.492 440.228
EXISTING ROAD LEVEL
PROPOSED ROAD LEVEL

L =131.422

246540 439.242 439.797 439.205 439.987

21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI)


246560 438.632 438.497 438.929 439.747
-1.203%

246580 438.631 437.860 438.722 439.506

APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND

PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
20.000

246600 438.206 438.380 438.583 439.265

THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC
PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
R: 50.000
D: 13.2549

VCL: 11.567

246620 438.147 438.229 438.310 439.025


20.000

e:7.00% e:7.00%
e:-7.00% e:-7.00%

246640 437.680 437.414 437.998 438.784


246660 437.612 437.066 437.817 438.543
246680 438.102 437.998 437.948 438.303
REV DETAILS OF REVISION

246700 437.608 438.094 437.595 438.062


EXISTING GROUND AT-8m FROM PCL
EXISTING GROUND AT +8m FROM PCL

246730.000 246720 438.365 437.228 437.397 437.821 CH=246+730.000


R0 DRAFT DETAILED PROJECT REPORT

LVL=437.701
246740 438.050 437.658 436.977 437.577
AKP

246760 436.317 437.613 436.351 437.310 VIP CH=:246+770.00


VIP LVL=:437.220
SSS
K:151.697

246780 436.428 436.286 435.882 437.017


LVC:80.00

L =274.686

246800 437.148 436.059 436.087 436.697 CH=246+810.000


246810.000 LVL=436.527
MKH

246820 438.352 435.574 435.925 436.354


246840 437.558 435.501 435.755 436.008
-1.731%

DESIGN DRAWN CHECKED APPROVED

246860 435.568 435.936 435.670 435.662


246880.000 CH=246+880.000
SCALE

TITLE:

246880 436.136 436.014 435.608 435.316 LVL=435.316

246900 434.590 434.592 435.156 435.013


VIP CH=:246+920.00
246920 433.915 433.913 434.668 434.797 VIP LVL=:434.624
K:46.223
LVC:80.00

H-1:2000 V-1:200

246940 434.039 433.733 434.260 434.667


CH=246+960.000
246960 433.898 434.054 434.018 434.624
R: 100.000

LVL=434.624
VCL: 23.881

246960.000
e:7.00% e:7.00%
e:-7.00% e:-7.00%
THARPARDI

PLAN & PROFILE


DRG. NO. Package No. DPR- 3A (6) /P&P-09(ii)

246980 434.229 436.558 434.191 434.624


Km246+000 to Km 247+000
30.000 D: 13.6827 30.000
0.000%

247010.000
R

247000 434.757 433.337 434.536 434.624


L =3.653

0
DATE: FEBRUARY-2024
m/h
8 0k
1m E D=
.45 E
c = 4 N SP
L I G
S
MORSHI OUT
A
DAT 15
0 048.
710
2.0
25 DE THARPARDI
SET H = 247+ N - 2345 A TA 33 5 9
SETOUT DATA 5, D +9 44
C
HIP 8699.70 UT 7 - 23
TO = 24 66,N

RE
HIP CH = 246+952 1 E GE
E - 2 085 S CH 4.0 LA
VIL

WI
E - 218637.162,N - 2345064.694 .
D = 2 00.000m SETOUT DATA HIP 21942 ETI
D = 30.871
E - 1.473 000m IH

IC
0
R = 100.000m R = 1 8.196m HIP CH = 247+673
. R D G

CTR
= 1 E - 219159.115,N - 2344620.755 D = 1200 0m PA IN
Ls = 30.000m Ts
0.16
6m
km/h R = 30.0 26
0 ILD
Es = 6.389m D = 49.660 BU G

ELE
Ts = 42.704 D = 65 s = 0.4 G IN
3 E L IN ILD
E

Lc = SP E R = 100.000m =3 31
IR

shift = 0.375 IGN Ts t = 0.0 km


/h IL D G BU T
DES
W

Ls = 20.000m f 0 BU IN HU

D/S
Es = 4.131 shi 0.13 m 80 D
IC

Ts = 56.344 = 0 D = I L
Es 0.85 PEE BU
TR

Lc = 23.881m KM8 T
shift = 0.167 = S HU
EC

DESIGN SPEED = 20 km/h KM Lc IGN 24


247 E
EL

Es = 10.369 S M

DE AG
TB

ILL ING

U/S
Lc = 66.673m
T I V
I RE BUILD
DESIGN SPEED = 30 km/h HE W
R DI C DING
PA RI BUIL

10 0
247+200
D/S
CT

248+
E
EL

D/S
0

2 4 8 00 0
+30
0
SED

0
PO TER STRUCTI

247+ U0/S0

+00
247+1

8+
M

RECON
TB

247
INED R L SED

000
P
SETOUT DA SHE PROPO+115

47+0

.24
RETA NG TA
BUS

ELECTRIC WIRE
S
I CH.248 HPC

U/
S T GE HIP CH = 24
T DATA

CH
X I 5
E 47+00 BRID 7+235 TYPE : 120
CH.2 :MINOR SETOU 248+113
CH.2
900

E - 218911.0 N G 28 SIZE:1X G
P E
TY : 2X5.0m 63,N - 234498 DI HIP CH
= 44571.2 EXISTIN+10
6.417 IL 5,N - 23
246+

D = 39.427

0
SIZE 7
BU 3 .0 CH.248 LA

+40
6 0
R = 140.000m RE N G E - 219 2 TYPE :S X
TA
DI D = 31.2 0m
5

247
EX INED IL SPAN: 1
Ls = 35.000m

0
CH ISTI BU 0

+90
TY .247 NG R = 8 0.0
Ts = 67.786 00m
SIZ PE :M+390 1 0 .0

247
shift = 0.365 E: 2 IN Ls =
X5 OR G .389
Es = 9.103 .0m BR IN Ts = 27
LD

0
I DG 0 .052

+50
EXISTING CENTRE LINE Lc = 61.338m E B UI shift =
= 3 .1 24

247
DESIGN SP Es

00
PROPOSED CENTRE LINE EED = 30 km c = 3 3 .636m 10 km/h
PEED =

+8
/h L

EL
PROPOSED CARRIAGEWAY IG N S

247
DES

EC
PLAN

TR
0

VIP CH=:248+040.00
IC
+60

W
RETAINED RETAINED

VIP CH=:247+910.00

VIP LVL=:437.772
CH=247+970.000
247

IR

CH=248+000.000
CHAINAGE 247+005 CHAINAGE 247+390

VIP LVL=:438.205
E

VIP CH=:247+760.00

CH=247+850.000

LVL=438.005
SPAN 2 X 5.0m SPAN 2 X 5.0m

LVL=437.905
PROPOSED ROAD LEVEL

CH=247+810.000
VIP LVL=:436.632
EXISTING GROUND AT-8m FROM PCL

VIP CH=:247+200.00
TYPE MINOR BRIDGE TYPE MINOR BRIDGE

LVL=437.576
LVL=437.156
CH=247+110.000

VIP LVL=:436.800
EXISTING ROAD LEVEL EXISTING GROUND AT +8m FROM PCL
CH=247+090.000

CH=247+710.000
VIP CH=:247+050.00

LVL=435.494
LVL=435.204
CH=247+010.000

VIP LVL=:434.624

440

LVL=435.519
CH=247+290.000
LVL=434.624

CH=247+330.000
LVL=433.954

CH=247+585.000
438

LVL=432.690

VIP CH=:247+535.00
VIP CH=:247+380.00

LVL=432.737
CH=247+485.000

VIP LVL=:431.624
CH=247+430.000
VIP LVL=:431.109
436

LVL=431.457
LVL=431.275
434

432

430

247340 431.401 432.362 431.904 432.391

247480 430.290 430.451 430.977 431.441

247640 432.590 433.841 433.188 433.961

247680 433.648 433.952 434.210 434.851

247820 436.102 436.038 436.826 437.261


247840 436.242 436.371 436.996 437.471
247020 433.766 433.522 434.133 434.633

247940 437.052 438.034 437.678 438.053


247960 437.010 436.947 437.637 438.033
247040 433.323 434.104 433.878 434.705

247240 433.801 434.745 434.734 435.215

247380 431.095 430.169 430.887 431.545

247760 434.946 435.546 435.909 436.485

247860 436.463 436.518 437.187 437.675

248000 436.920 436.400 437.482 437.905


247080 433.872 436.995 433.959 435.068

247260 433.062 434.598 433.504 434.788


247280 433.698 432.307 432.995 434.258
247300 432.271 432.382 432.535 433.638

247360 431.351 431.304 431.536 431.898

247440 432.520 430.626 431.191 431.308

247580 431.832 431.438 431.969 432.628

247920 437.058 438.075 437.691 438.028


247540 431.170 431.206 431.209 431.927
247000 434.757 433.337 434.536 434.624

247060 433.820 434.745 433.978 434.850

247100 435.031 437.193 434.801 435.349


247120 434.423 435.347 434.933 435.626
247140 434.114 434.566 435.128 435.814
247160 434.908 435.558 435.523 435.899
247180 436.217 435.824 435.799 435.882
247200 435.770 435.742 435.751 435.762
247220 434.975 435.273 435.584 435.540

247320 431.942 432.651 432.194 433.006

247400 433.199 432.293 430.826 431.332


247420 433.517 431.085 431.088 431.259

247460 431.071 430.773 431.051 431.374

247500 431.034 430.781 430.911 431.529


247520 430.997 430.966 431.025 431.690

247560 431.670 431.492 431.566 432.239

247600 432.043 431.771 432.326 433.070


247620 431.813 433.328 432.703 433.516

247660 433.400 433.918 433.764 434.406

247700 434.274 434.911 434.655 435.296


247720 434.667 435.266 435.047 435.736
247740 434.877 435.447 435.489 436.134

247780 435.194 435.761 436.279 436.789


247800 435.923 435.609 436.621 437.046

247880 436.498 436.996 437.409 437.839


247900 436.976 436.812 437.618 437.956

247980 436.921 436.663 437.559 437.972


PROPOSED ROAD LEVEL(m)
______________________

EXISTING LEVEL BELOW


CENTER LINE (m)
____________________

EXISTING GROUND LEVEL


AT-8m FROM PCL (m)
------------------------------------

EXISTING GROUND LEVEL


AT +8m FROM PCL (m)
------------------------------------

CHAINAGE
247010.000

-0.333%
247110.000
247090.000

247290.000

247330.000

247430.000

247485.000

247585.000

247710.000

247810.000

247850.000
246960.000

247970.000

248000.000
0.000% 1.451% -3.162% 0.332% 2.226% 1.049%
K:55.133 K:39.020 K:28.619 K:52.806 K:84.936 K:86.834 K:54.703
VERTICAL ALIGNMENT
LVC:80.00 LVC:180.00 LVC:100.00 LVC:100.00 LVC:100.00 LVC:120.00 LVC:80.00

30.000 30.000 30.000


L =4.176
HORIZONTAL ALIGNMENT D: 2.0849 L =134.365 35.000 D: 25.1029 35.000 L =317.728 20.000 D: 38.2006 20.000 L =179.735 D: 0.0406 D: 0.2125
R: 1000.000 R: 140.000 R: 100.000 R: 1200.000 R: 1200.000
VCL: 36.389 VCL: 61.338 VCL: 66.673 VCL: 0.850 VCL: 4.451

SUPERELEVATION
e:2.09% e:2.09% e:7.00% e:7.00% e:-7.00% e:-7.00% e:2.39% e:2.39% e:-2.37%
e:-2.09% e:-2.09% e:-7.00% e:-7.00% e:7.00% e:7.00% e:-2.39% e:-2.39% e:2.37%
PROFILE
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-10 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km247+000 to Km 248+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
MORSHI THARPARDI

ATA 74
T O UT D 8+381 4 483.3
SE 2 4 3 4
H= ,N - 2
HIP C 852.206
1 9
E - 2 290
.
SETOUT DATA D 7 0.000m
=
TA 15 HIP CH = 248+192 1 0
U T DA +000 4 4 5 83.1 R = 0.000m
1
REC
O 8 ON
SET H = 24 8,N - 23 E - 219666.764,N - 2344522.765 Ls = 1.373 PRO STRUCTI
C 9 = 1 CH.2 POSED ON
HIP 9490.2 D = 26.630 Ts 42 TYP 48+66
2 1 f t = 0.0 SIZE E : HPC6
E - .645 R = 100.000m shi
1 m 0.244 km/h EXI :1X120
D = 200.000 Ls = 20.000m Es = .724m = 10 E CH.2STING 0mm
R = 1 0 0 m Ts = 33.703 Lc = 2
SPE E D PARDI HETI VILLAG TYP 48+68
30.0 IGN SPA E :SLAB0
Ls = 32.227 DES

TOWARDS PARDI
shift = 0.167 N: 1
X1.2 CUVER
Ts = 0.031 Es = 2.934 m T SETOUT DA
= TA
shift 0.155 km/h Lc = 26.478m HIP CH = 24
= 8+922
Es 4.451m ED = 80 DESIGN SPEED = 25 km/h E - 220296.0
26,N - 2344
Lc = GN SPE

DI
D = 32.760 214.828
I E
ILLAG

PAR
DES IV
I HET D ING R = 70.000m
PARD UIL Ls = 20.000 DATA

RDS
B m SETOUT

S
ARD
249+011

DI
Ts = 30.639 =
HIP CH

A
GE

PAR
shift = 0.238 3.937,N -
IRE

ILLA

TOW
E - 22038

RE

W
X-
IV ING
M
Es = 3.209
HET

D/S
AT INOR
D = 7.925

WI

O
ILD
W

DI
DES
IGN JUNCT
PAR

T
G BU CHA ION Lc = 20.024 00m
DIN m R = 100.0
RIC

INA DEV

RIC
G IL GE E
- 24 LOPM DESIGN SP
DIN BU DEVELOPMENT 8+7
00 ENT EED = 20 km Ls = 1 0 .0 0 0m
UIL DING
T - MINOR JUNCTION
LECT

/h

CT
B GE - 248+600 3 0
AT DESIGN CHAINA .9
ING BUIL 1

248+600
1

U/S
M
Ts =

ELE
TB

ILD

LD
G PROPOSED 0 .0 4 2
DIN shift =

00
BU KM
E

IL

FIE
G BUS SHELTER 8 1

248+5
KM8 DIN BU T 249 Es = 0 .2
L HU m
D/S

I Lc = 3.832

248+ RDS
24

DS
TOW MBA
BU

0
T PEED

+70
HU N S

AR
DE S IG

A
400
E

A
SETOUT

248
W
IR PME
NT

EK
W VELO DATA

TO
O N DE 48+400 HIP CH
C T I
JUNC NAGE - 2 = 248+6
RI
M
U/S

TB

BUILDING G INOR 13
DIN
AI E - 2200
T X - M SIGN CH

0
EC IL TA 77.493,N T

0
UT DA
248+30
E
HU
D
EL BU AT
D = 24.2 - 234443

+80
SETO = 248+509 .449

+000
77 4.382
D 44469
00

M
TB

POSE G H 2 3 R = 60.0 SET


PRO ELTER BUILDIN C -

248
HIP 16,N
248+1

00m
9979.8 HIP OUT D

0
248+ 00

248+200

SH Ls = 20.0

9
E - 21 22

249+00
BUS 00 E - CH = ATA
000

CH.24
Ts = 22.9 m
48+0

.5
D = 13 .000m 55 2 2
D = 20178 48+75
0 shift = 0.2
R = 25 000m

900
. 3
R = 2.032 815,N
CH.2

78
0. Es = 1.6
G Ls = 3 653 1 -

+
RECONSTRUCTION
TA 56 Ls = 200.0 234
DIN UT DA

248
4. Lc = 5.42 433
ING B UIL SETOUT DATA PROPOSED
SETO = 248+292 344504.21
7 Ts = 4 150 2m Ts = 30.00 00m 6.44
D CH.248+115 0. DESIGN
BU
IL HIP CH = 248+113 TYPE : HPC HIP C H
511, N - 2 shift = 02 SPEED shif 36.28 m
0 8
900

E - 219603.075,N - 234457
1.228 SIZE:1X1200mm 9765. Es = 1 .9 = 20 km/h t= 1
E - 21 79 8.999m D = 50 km/
h Es 0.03
247+

EXISTING 2 =
D = 31.252 CH.248+100
8
D = 2. .000m Lc = S P EE Lc = 0.220 1
N
R = 80.000m TYPE :SLAB CULVERT R = 600
m DESIG DES 12.55
SPAN: 1X1.2m 0.000 IGN 7m EXISTING CENTRE LINE
Ls = 10.000m Ls = 2 .080 SPE
5 PROPOSED CENTRE LINE
Ts = 27.389 Ts = 2 .028 ED
=2
= 0 0 km PROPOSED CARRIAGEWAY
shift = 0.052 shift
0 .217 /h
Es = 3.124 Es = m /h
0.153 ED = 65 km
Lc = 33.636m Lc = 1
N SPE
DESIGN SPEED = 10 km/h DESIG

PLAN
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-11(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km248+000 to Km 249+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT -
SUPERELEVATION
CHAINAGE
CENTER LINE (m)

AT-8m FROM PCL (m)


____________________

AT +8m FROM PCL (m)


------------------------------------
------------------------------------
EXISTING LEVEL BELOW
MORSHI

______________________

EXISTING GROUND LEVEL


EXISTING GROUND LEVEL

VERTICAL ALIGNMENT

HORIZONTAL ALIGNMENT
440
444
450
454
460

436
442
446
452
456

438
448
458

435

PROPOSED ROAD LEVEL(m)


248000.000
248000 436.920 436.400 437.482 437.905 CH=248+000.000

e:2.37%
e:-2.37%
LVL=437.905

-0.333%
248020 436.548 436.242 437.539 437.875

30.000
247970.000
VIP CH=:248+040.00
248040 436.640 436.296 437.626 437.918 VIP LVL=:437.772

PUBLIC WORKS DEPARTMENT


GOVERNMENT OF MAHARASHTRA
K:54.703
248060 436.790 436.414 437.691 438.034

LVC:80.00

L =53.785
CH=248+080.000
248080.000
248080 437.033 436.579 437.815 438.223 LVL=438.223

10.000

e:7.00%
e:-7.00%
248100 438.084 437.918 438.180 438.449

1.129%
248120 438.144 438.050 438.292 438.675

R: 80.000
SIZE

CONSULTANT -
TYPE

VCL: 33.636
e:7.00%
e:-7.00%
10.000
248150.000 248140 438.320 437.933 438.418 438.901 CH=248+150.000
HPC

LVL=439.014

D: 24.0897 L =18.940
RECONSTRUCTION

248160 438.656 438.130 438.664 439.123


CHAINAGE 248+115
1 X 1200mm

20.000
248180 438.537 438.392 438.984 439.322
248200 438.702 438.930 439.166 439.495

R: 100.000
VCL: 26.478
VIP CH=:248+210.00

e:7.00% e:7.00%
e:-7.00% e:-7.00%

KOLAR ROAD, BHOPAL - 462042(M.P)


VIP LVL=:439.691

AICONS ENGINEERING PVT.LTD.


D: 15.170720.000
K:150.799
248220 439.181 439.012 439.279 439.642

LVC:120.00

Email Id:- info@aicons.in & aiconsgroup@gmail.com


A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
248240 439.287 438.657 439.338 439.761

L =41.690
248260 439.062 438.248 439.375 439.854 CH=248+270.000
248270.000 LVL=439.891

20.000
248280 439.173 438.291 439.435 439.924

0.333%
248300.000 CH=248+300.000

D: 0.9696
248300 439.144 438.325 439.518 439.991

R: 600.000
LVL=439.991

VCL: 10.153
20.000

e:3.13% e:3.13%
e:-3.13% e:-3.13%
248320 439.361 438.674 439.578 440.083 VIP CH=:248+330.00
VIP LVL=:440.091

NAME OF WORK -
K:80.297
248340 439.514 439.018 439.706 440.224

LVC:60.00
CH=248+360.000
248360.000
248360 439.626 439.194 439.965 440.415 LVL=440.415

248380 440.119 439.268 440.398 440.631

L =52.712 D: 1.5609
R: 100.000
VCL: 2.724
10.000 10.000

e:7.00% e:7.00%
e:-7.00% e:-7.00%
248400 440.246 439.668 440.602 440.847
EXISTING ROAD LEVEL
PROPOSED ROAD LEVEL

248420 440.557 440.057 440.767 441.064

1.081%

L =72.342
248440 440.679 440.115 440.912 441.280
248460 440.594 440.421 441.080 441.496

PROFILE
248480 440.747 440.856 441.217 441.712
248500.000 CH=248+500.000

e:5.00%
e:-5.00%
248500 440.994 441.104 441.433 441.928 LVL=441.928
R: 250.000
VCL: 28.999 248520 441.219 441.329 441.710 442.209
e:5.00%
e:-5.00%
VIP CH=:248+540.00
248540 441.797 442.622 442.134 442.621 VIP LVL=:442.360
30.000 D: 6.6461 30.000
K:30.707
LVC:80.00

248560 442.361 444.650 442.664 443.163

21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI)


CH=248+580.000
248580 443.208 442.858 443.080 443.835
L =36.172

248580.000 LVL=443.835

APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND

PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
EXISTING GROUND AT-8m FROM PCL

MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI
EXISTING GROUND AT +8m FROM PCL

248600 444.375 443.684 443.833 444.572

THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
3.686%

THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC
PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
248620.000 CH=248+620.000
D: 5.1779

248620 444.600 444.428 444.979 445.309


R: 60.000

LVL=445.309
VCL: 5.422
e:7.00% e:7.00%
e:-7.00% e:-7.00%
20.000 20.000

248640 445.860 445.281 445.993 446.032


248660 446.195 446.264 446.553 446.729
SIZE
TYPE

248680 446.059 447.149 446.941 447.398


L =81.679

VIP CH=:248+700.00
REV DETAILS OF REVISION

248700 448.426 447.294 447.575 448.039


HPC

VIP LVL=:448.257
K:146.617
RECONSTRUCTION
CHAINAGE 248+666

LVC:160.00

248720 448.006 447.841 448.062 448.654


1 X 1200mm

30.000

R0 DRAFT DETAILED PROJECT REPORT

248740 447.871 448.264 448.493 449.241


248760 448.571 448.438 448.926 449.801
D: 0.5996

AKP
R: 1200.000
VCL: 12.557
e:2.09% e:2.09%
e:-2.09% e:-2.09%

CH=248+780.000
30.000

248780.000
248780 448.043 449.048 449.413 450.333 LVL=450.333
SSS

248800 448.473 449.216 449.810 450.852


2.595%

MKH

248830.000 248820 449.124 450.383 450.506 451.371 CH=248+830.000


LVL=451.630
248840 449.714 451.217 451.180 451.896
L =101.988

VIP CH=:248+860.00
DESIGN DRAWN CHECKED APPROVED

248860 450.423 451.473 451.761 452.465 VIP LVL=:452.409


K:80.187
LVC:60.00

248880 451.766 452.782 452.611 453.084


SCALE

TITLE:

CH=248+890.000
248890.000 LVL=453.412
248900 452.531 453.575 453.424 453.746
20.000
3.343%

248930.000 248920 453.028 453.869 453.889 454.414 CH=248+930.000


R: 70.000
D: 16.3897

LVL=454.749
VCL: 20.024

e:7.00% e:7.00%
e:-7.00% e:-7.00%

H-1:2000 V-1:200

248940 453.872 454.439 454.370 455.073


20.000

VIP CH=:248+960.00
248960 454.196 455.138 454.986 455.660 VIP LVL=:455.751
K:49.002
LVC:60.00
THARPARDI

249010.000 248980 454.306 455.431 455.420 456.165


PLAN & PROFILE
DRG. NO. Package No. DPR- 3A (6) /P&P-11(ii)

CH=248+990.000
L =47.765

Km248+000 to Km 249+000

LVL=456.387
249000 454.787 456.450 455.942 456.599
2.118%

248990.000
0
DATE: FEBRUARY-2024
SE
HIP TOUT
E - CH DAT
=
D = 2203 249 A SETOUT DATA
8 +
MORSHI KM R = 7.92 3.93 011
1 5 7,N SETO HIP CH = 249+609 THARPARDI
249 Ls 0
= 1 0.000 -2
344
U
HIP C T DATA E - 220959.826,N - 23 SETOUT
DATA
TBM

Ts 0.0 m 194 H=2 44237.951 HIP CH =


=
shi 11. 0m 0 E - 22 49+17 DATA D = 24.204 24 SETOUT DATA
ft = 930 .05 0 9 SETOUT E - 22108 9+738
Es 1 D = 3 540.696,N 249+506 66
R = 150.000m 9.148,N - HIP CH = 249+917
= 0. 0 4 4.233 - 2344 HIP CH = 2344207.4 Ls = 20.000m D = 16.11 2344222.3 E - 221266.638,N - 2344251.313
Lc 0
= .28
2 R=1
50 133.1
75 - 2 20 86 2.230,N - 0 98
DE 3.83 1 Ls = 4 .000m E Ts = 42.185 R = 400.0 D = 2.677
00m PROPOSED RE WALL FROM
SIG 2m
NS Ts = 6
0.000
m D = 4.336 shift = 0.111 Ls = 30.0 R = 3000.000m
00m 00m KM 249+880 TO 249+960 BHS
PE 6
shift = .318 R = 800.0 Es = 3.523 Ts = 71.6 Ls = 30.000m
8m 21

0
ED 0.444 Ts = 30 8 .2
+00
CH 000
=2 Es = Lc = 43.365m shift = 0.0 Ts = 85.086
0k 7 3 m 94
7.417 Es = 0.5 Es = 4.08
.249
m/h Lc = 4 DESIGN SPEED = 20 shift = 0.013
+

.5 4 7m km/h 1 KM
Lc = 60
249

9 0 km/h
DESI .622m

D/S
Lc = 82.4
GN S N S PEED = 2 71m Es = 0.831 250
PEED DESIG DESIGN Lc = 110.146m
= 20 k SPEED =
m/h 65 km/h DESIGN SPEED = 80 km/h

D/S

D/S
249+600 U/S

D/S
TBM

0
+10
RUCTION
RECONST
D
249
PROPOSE95

249+500

U/S

CH.250+000
CH.249+5PC
RECONSTRUCTION

U/S

250+000

U/S
TYPE : H 00mm

249+400

00
PROPOSED RECONSTRUCTION

TOWARDS
SIZE:1X12 CH.249+813

249+7
PROPOSED

249+300
RECONSTRUCTION

249+900
249+800
EXISTING95 TYPE : HPC

FIELD
CH.249+900

249+200
T - MINOR JUNCTION DEVELOPMENT PROPOSED
AT DESIGN CHAINAGE - 249+200 CH.249+5AB CUVERT SIZE:1X1200mm TYPE : HPC CH.250+077
TYPE :SL 1.2m EXISTING SIZE:2X1200mm TYPE : HPC
SPAN: 1X CH.249+815 EXISTING SIZE:3X1200mm
EXISTING CENTRE LINE TYPE :SLAB CULVERT CH.249+900 EXISTING
SIZE: 1X1.3m TYPE :HPC CH.250+084
PROPOSED CENTRE LINE SIZE: 1X600mm TYPE :CAUSEWAY
PLAN PROPOSED CARRIAGEWAY SIZE: -

RECONSTRUCTION
RECONSTRUCTION RECONSTRUCTION
CHAINAGE 249+595

VIP CH=:249+540.00
CHAINAGE 249+813 CHAINAGE 249+900

CH=249+470.000
VIP CH=:249+380.00

CH=249+450.000
SIZE 1 X 1200mm

VIP LVL=:467.968
PROPOSED ROAD LEVEL SIZE 1 X 1200mm SIZE 2 X 1200mm

VIP LVL=:466.568
EXISTING GROUND AT-8m FROM PCL TYPE HPC

LVL=467.356
LVL=467.181
TYPE HPC TYPE HPC

CH=249+610.000
CH=249+310.000
EXISTING GROUND AT +8m FROM PCL

CH=249+645.000
EXISTING ROAD LEVEL

CH=249+300.000

VIP CH=:249+725.00
VIP CH=:249+260.00
VIP CH=:249+150.00

LVL=466.184
LVL=465.298

LVL=465.293
CH=249+220.000

LVL=465.117
CH=249+200.000
470

VIP LVL=:463.255
VIP LVL=:464.391
VIP LVL=:464.038

CH=249+805.000
LVL=464.263
LVL=464.198

LVL=463.932
468
CH=249+100.000
CH=249+090.000

466
LVL=460.848
LVL=460.210
VIP CH=:249+050.00

464
VIP LVL=:457.658
CH=249+010.000

462
LVL=456.811

460

458

456
455 249280 463.271 463.755 464.050 464.791

249480 467.462 466.595 466.733 467.431

249680 463.645 462.771 463.678 464.531


249120 462.316 461.495 461.666 462.003

249180 463.758 463.404 463.742 464.013

249220 462.764 463.060 463.528 464.263

249560 466.432 465.751 466.529 467.153

249980 465.143 463.873 464.368 465.413


250000 465.537 464.406 464.955 465.583
249140 462.628 462.555 462.745 462.915
249160 463.004 463.076 463.388 463.585

249920 463.445 462.958 462.818 464.905


249940 463.855 462.326 463.191 465.075
249100 461.168 460.130 460.077 460.848

249200 463.050 463.361 463.624 464.198

249420 466.646 468.365 466.118 466.888

249460 468.006 468.002 466.476 467.268

249500 468.124 466.720 467.321 467.508

249840 463.893 462.817 463.582 464.228


249000 454.787 456.450 455.942 456.599
249020 455.553 456.528 456.317 457.049

249080 458.772 458.618 458.826 459.599

249300 463.684 464.080 464.420 465.117

249340 465.268 466.108 465.221 465.812


249360 465.378 467.125 465.492 466.122

249400 466.131 469.081 465.940 466.659

249520 468.085 466.652 467.444 467.487


249540 467.355 466.176 467.128 467.369

249580 465.805 465.546 466.059 466.839


249600 466.169 466.207 465.918 466.427

249700 462.288 462.677 462.688 464.212


249720 462.276 462.464 462.603 463.979

249800 463.474 463.191 463.350 463.892


249820 463.535 462.362 463.343 464.059

249860 464.423 464.397 463.880 464.397


249880 464.821 464.396 463.909 464.567
249040 456.327 456.671 456.911 457.686
249060 457.250 457.514 457.840 458.536

249240 462.948 463.216 463.598 464.364


249260 463.250 463.743 463.802 464.540

249320 464.670 464.906 464.856 465.476

249380 466.114 467.036 465.858 466.404

249440 467.350 467.634 466.296 467.090

249620 466.229 465.487 465.524 465.930


249640 465.320 464.189 464.912 465.420
249660 464.266 463.263 464.244 464.934

249740 463.119 462.752 463.166 463.830


249760 463.989 463.238 463.840 463.766
249780 463.841 462.906 463.686 463.786

249900 463.554 464.235 463.122 464.736

249960 464.310 463.257 463.889 465.244


PROPOSED ROAD LEVEL(m)
______________________

EXISTING LEVEL BELOW


CENTER LINE (m)
____________________

EXISTING GROUND LEVEL


AT-8m FROM PCL (m)
------------------------------------

EXISTING GROUND LEVEL


AT +8m FROM PCL (m)
------------------------------------

CHAINAGE

6.380% 0.321% 1.814% 0.875%

249645.000
249610.000

249805.000

250170.000
249010.000

248990.000

249200.000
249220.000

249300.000
249090.000

249450.000
249470.000
249100.000

249310.000

2.118% K:18.774 K:16.506 K:53.578 K:148.961 K:40.908 -2.548% K:47.138 0.847%


VERTICAL ALIGNMENT
LVC:80.00 LVC:100.00 LVC:80.00 LVC:140.00 LVC:140.00 LVC:160.00

10.000 10.000

HORIZONTAL ALIGNMENT D: 2.1958 L =89.916 40.000 D: 18.9541 40.000 L =233.398 D: 4.3364 L =29.773 20.000 L =16.44830.000
D: 16.5644 20.000 D: 11.8131 30.000 L =23.122 30.000 D: 2.1036 30.000
R: 100.000 R: 150.000 R: 800.000 R: 150.000 R: 400.000 R: 3000.000
VCL: 3.832 VCL: 49.622 VCL: 60.547 VCL: 43.365 VCL: 82.471 VCL: 110.146

SUPERELEVATION
e:7.00% e:7.00% e:-5.00% e:-5.00% e:-2.35% e:-2.35% e:5.00% e:5.00% e:-4.69% e:-4.69%
e:-7.00% e:-7.00% e:5.00% e:5.00% e:2.35% e:2.35% e:-5.00% e:-5.00% e:4.69% e:4.69%

PROFILE
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-12 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km249+000 to Km 250+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
ATA
SETOUT D
MORSHI 2 50+569 SETO
HIP CH = 411.262 UT DA THARPARDI
87,N - 2344 HIP C T
DATA E - 2 21 8 9 2.6 H = 25 A
SETOUT D = 16.929
E - 22 0+959
250+384 .603
22
D = 16 76.297,N - 2
- 2344251.31 SETOUT DATA HIP CH = 2 ,N - 2344326 R = 200.00
0m .6 34447
3 HIP CH = 250+152 E - 2217 2 7 .1 4
0 0 m R = 25 60 9.978 SET
6 Ls = 35.0 0.000m HIP UT D
O
PROPOSED R E - 221500.137,N -
2344278.232 D = 15.05 Ts = 47 .2 9 7 Ls = 3
0. CH
E WALL FRO D = 5.453 R = 250 .0 00m Ts = 5 000m E-2 = 25
KM 249+880
TO 249+960 B
M
.0 0 0m shift = 0.255 1.626 2
D = 2427.6
HS R = 1000.000m Ls = 50 Es = 2.461
shift = 4
8 .0 8 4 0
Es = 2 .150 R = .397
Ls = 30.000m Ts = 5 Lc = 24.094
m
m/h .817 900.
KM Ts = 62.623 shift = 0 .4 1 7
N S P EED = 50 k Lc = 4 Ls =
3
000m
DESIG 2. Ts = 0.000m
250 shift = 0.038 Es = 2 .5 9 4 DESIG 695m KM
3m N SPE 251 shift 49.556
Es = 1.171 Lc = 15.69 0 km/h ED = 5 =
PEED = 8 0 km/h Es = 0.042

D/S
Lc = 65.172m DESIG N S 0
Lc = .705
DESIGN SPEED = 3

D/S
80 km/h DES 9.075m
IGN
PROPOSED RE WALL FROM
TBM
SPE
D/S

ED =

U/S
T
MEN
KM 250+080 TO 250+160 BHS LOP
EVE +500

LD
D

250+600
ON 50 RECONSTRUCTION

U/S
CTI GE - 2

250+700
JUN

S FIE
A PROPOSED RECO
OR CHAIN
0

250+800
NSTR
250+000

IN
PROP UCTION
TBM
CH.250+00

T - M ESIGN CH.250+735

250+900

251+ 0
250+5

000
CH.25 OSED
U/S

00
AT TYPE : BOX CULBERT

ARD
RECONST TYPE 0+955

251+
RUCTIO SPAN:1X3.0m
SIZE:1 : HPC
N
PROPOSE EXISTING

00
D
CH.250+077 EXIST X1200mm

TOW
250+100

CH.250+741

250+40

CH.
TYPE : HP TYPE :HPC CH.25 ING

250+200

250+300
SIZE:3X12 C SIZE: 1X1000mm TYPE 0+955
00
EXISTING mm SIZE: :HPC
CH.250+084 EXISTING CENTRE LINE 1X600
mm

100
TYPE :CA
SIZE: - USEWAY PROPOSED CENTRE LINE

251+
PROPOSED CARRIAGEWAY
PLAN
EXISTING GROUND AT-8m FROM PCL

VIP CH=:250+490.00
RECONSTRUCTION RECONSTRUCTION
RECONSTRUCTION
EXISTING GROUND AT +8m FROM PCL

VIP LVL=:471.331
CHAINAGE 250+077 CHAINAGE 250+955

VIP CH=:250+860.00
CH=250+410.000
PROPOSED ROAD LEVEL CHAINAGE 250+735

CH=250+570.000
CH=250+390.000
SIZE 3 X 1200mm SIZE 1 X 1200mm

CH=250+910.000
VIP LVL=:469.062
SPAN 1 X 3.0m

LVL=469.505
TYPE HPC TYPE HPC

LVL=469.898
EXISTING ROAD LEVEL

VIP CH=:250+350.00

LVL=469.049
TYPE BOX CULVERT

CH=250+810.000

LVL=469.489
VIP CH=:250+210.00

CH=250+790.000
CH=250+310.000

VIP LVL=:468.136

VIP CH=:250+750.00
CH=250+250.000
VIP LVL=:467.360

CH=250+710.000

LVL=467.976
VIP LVL=:466.673
CH=250+170.000

LVL=467.542
LVL=467.914
472

LVL=467.582

LVL=467.390
LVL=467.022

470

468

466

464

462
250040 465.628 463.752 464.670 465.921

250360 469.755 467.661 467.623 468.461


250380 468.155 468.087 467.999 468.831

250420 469.241 469.485 469.069 469.721

250540 469.569 470.318 469.675 470.321

250600 468.583 468.499 468.827 469.361


250000 465.537 464.406 464.955 465.583

250760 466.388 465.709 465.216 467.113


250180 465.913 466.576 466.235 467.105

250240 467.162 466.720 466.783 467.525

250440 470.003 470.672 469.477 470.075

250660 468.016 467.462 467.744 468.285

250720 464.840 465.284 464.961 467.235


250740 464.762 464.994 464.583 467.075

250920 469.196 469.092 469.265 469.575


250120 464.346 464.328 464.408 466.598
250140 464.549 464.671 464.915 466.768

250280 467.302 467.112 466.946 467.748

250340 468.893 467.503 467.426 468.178

250460 470.775 471.183 469.896 470.328

250500 470.837 471.265 470.486 470.528

250840 467.499 467.470 467.784 468.568

250980 468.288 468.326 468.327 470.088


250100 464.206 464.036 463.969 466.429

250160 465.030 465.470 465.486 466.937

250200 467.495 466.783 466.547 467.259


250220 467.857 466.738 466.700 467.399

250260 467.177 467.023 466.850 467.637

250300 467.497 466.837 467.062 467.859

250400 468.691 468.286 468.583 469.277

250480 471.111 471.642 470.600 470.479

250580 468.729 468.667 469.084 469.719

250680 467.109 466.767 467.207 467.927


250700 466.209 466.253 466.074 467.569

250780 466.295 465.762 466.459 467.349


250800 466.497 466.109 466.798 467.759
250820 466.914 466.656 467.299 468.187

250860 468.760 469.215 468.217 468.897

250900 469.278 468.811 469.316 469.397

250960 468.071 469.028 468.423 469.917

251000 468.678 468.090 468.524 470.259


250020 465.921 464.141 465.067 465.752

250060 464.604 463.533 463.977 466.090


250080 464.063 462.995 463.718 466.260

250320 467.599 467.626 467.240 467.980

250520 470.145 471.084 470.143 470.476

250560 469.243 468.808 469.294 470.064

250620 468.242 468.170 468.583 469.002


250640 468.021 467.910 468.245 468.644

250880 468.679 468.604 468.958 469.174

250940 468.629 469.402 468.912 469.746


PROPOSED ROAD LEVEL(m)
______________________

EXISTING LEVEL BELOW


CENTER LINE (m)
____________________

EXISTING GROUND LEVEL


AT-8m FROM PCL (m)
------------------------------------

EXISTING GROUND LEVEL


AT +8m FROM PCL (m)
------------------------------------

CHAINAGE

2.283% 2.172%
249805.000

250170.000

250250.000

250310.000

250570.000

250710.000

250910.000

251080.000
250790.000
250810.000
250390.000
250410.000

0.847% K:273.340 0.554% K:46.276 K:39.270 -1.792% K:20.184 K:75.933 0.855%


VERTICAL ALIGNMENT
LVC:80.00 LVC:80.00 LVC:160.00 LVC:80.00 LVC:100.00

HORIZONTAL ALIGNMENT L =87.336 30.000 D: 3.7341 30.000 L =111.394 50.000 D: 3.5966 50.000 L =80.555 35.000 D: 6.9023 35.000 L =290.794 30.000 D: 9.7850 30.000
R: 1000.000 R: 250.000 R: 200.000 R: 250.000
VCL: 65.172 VCL: 15.693 VCL: 24.094 VCL: 42.695

SUPERELEVATION
e:-2.84% e:-2.84% e:-5.00% e:-5.00% e:5.00% e:5.00% e:5.00% e:5.00%
e:2.84% e:2.84% e:5.00% e:5.00% e:-5.00% e:-5.00% e:-5.00% e:-5.00%

PROFILE
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-13 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km250+000 to Km 251+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
MORSHI THARPARDI

SETOUT DATA
SETOUT DATA HIP CH = 251+227 SETOUT DATA SETOUT DATA
HIP CH = 251+110 E - 222544.275,N - 2344458.429 HIP CH = 251+448 SETOUT DATA HIP CH = 252+022
E - 222427.659,N - 2344462.720 D = 6.174 E - 222762.978,N - 2344 HIP CH = 251+
SETOUT DATA E - 223330.715,N - 2344343.652
426.598 611 HIP CH = 251+780 D = 5.875
D = 4.397 R = 100.000m D = 1.580 E - 222923.901
R = 900.000m ,N - 2344398.62 E - 223088.898,N - 2344365.052 R = 800.000m
250+959 9.978 Ls = 10.000m R = 2000.000m D = 1.641 5
- 234447 Ls = 30.000m D = 6.444 Ls = 30.000m
76.297,N Ts = 10.395 Ls = 30.000m R = 1500.000m
R = 1000.000m
Ts = 49.556 Ts = 56.053

TOWARDS FIELD
shift = 0.042 Ts = 42.571 Ls = 30.000m
shift = 0.042 Ls = 30.000m shift = 0.047
Es = 0.187 shift = 0.019 Ts = 36.479
Es = 0.705 Ts = 71.298 Es = 1.099
Lc = 0.775m Es = 0.209 shift = 0.025
Lc = 39.075m shift = 0.037 Lc = 52.029m
KM DESIGN SPEED = 20 km/h Lc = 25.139m Es = 0.179
251 DESIGN SPEED = 80 km/h DESIGN SPEED = 80 km Lc = 12.954m
Es = 1.621 DESIGN SPEED = 80 km/h
/h Lc = 82.473m
DESIGN SPEE KM
D = 80 km/h DESIGN SPEED = 80 km/h
km /h 252
ED = 50
GN SPE
D/S

D/S
GPS
TBM

E
WIR

D/S
HUT
CH.251+000
251+000
U/S

U/S
C

T- MINOR JUNCTION DEVELOPMENT


251+200

251+300
TRI

AT DESIGN CHAINAGE - 51+300

251+400
251+100

RUCTION

CH.252+000
251+500
RECONSTRUCTION
RECONST

252+000
RECONSTRUCTION
C

U/S
D PROPOSED

251+600
PROPOSE55
ELE

CH.251+525 PROPOSED
CH.250+9PC CH.251+772

251+700
TYPE : H 200mm TYPE : BOX CULVERT

251+900
TYPE : HPC

251+800
SIZE:1X1 SPAN: 1X6.0m SIZE:1X1200mm
EXISTING EXISTING EXISTING
55
CH.250+9PC CH.251+500
TYPE :SLAB CULVERT CH.251+772
TYPE :H 00mm TYPE :HPC
SIZE: 1X6 SIZE: 1X4.0m SIZE: 1X900mm
EXISTING CENTRE LINE
PROPOSED CENTRE LINE
PROPOSED CARRIAGEWAY

PLAN
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-14 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km251+000 to Km 252+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT -
SUPERELEVATION
CHAINAGE
CENTER LINE (m)

AT-8m FROM PCL (m)


MORSHI

____________________

AT +8m FROM PCL (m)


------------------------------------
------------------------------------
EXISTING LEVEL BELOW
______________________

EXISTING GROUND LEVEL


EXISTING GROUND LEVEL

VERTICAL ALIGNMENT

HORIZONTAL ALIGNMENT
454
460
464
470
474

456
462
466
472
476

458
468

PROPOSED ROAD LEVEL(m)


250910.000
251000 468.678 468.090 468.524 470.259
251020 468.850 468.679 469.035 470.430

PUBLIC WORKS DEPARTMENT


GOVERNMENT OF MAHARASHTRA
251040 469.318 469.630 469.651 470.601

L =51.160
0.855%
251060 470.025 470.452 470.140 470.772
251080.000 CH=251+080.000

30.000
251080 470.446 470.881 470.588 470.943 LVL=470.943

e:3.16%
e:-3.16%
251100 470.833 471.233 470.898 471.062

CONSULTANT -
D: 2.4876
R: 900.000
251120 470.662 471.319 470.894 471.076

VCL: 39.075

e:3.16%
e:-3.16%
251140 470.404 471.089 470.673 470.987

30.000
251160 470.328 470.800 470.418 470.793
VIP CH=:251+180.00
251180 470.019 470.513 470.140 470.494 VIP LVL=:471.798

K:38.357
LVC:200.00

KOLAR ROAD, BHOPAL - 462042(M.P)


L =56.745

AICONS ENGINEERING PVT.LTD.


251200 469.872 470.414 469.767 470.092

Email Id:- info@aicons.in & aiconsgroup@gmail.com


A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
251220 469.081 469.365 469.088 469.585

D: 0.4443
R: 100.000
VCL: 0.775
251240 468.169 468.764 468.238 468.974

10.000 10.000

e:7.00% e:7.00%
e:-7.00% e:-7.00%
251260 467.335 469.276 467.356 468.258
CH=251+280.000
251280.000 251280 466.690 467.376 466.531 467.439 LVL=467.439

251300 465.217 466.056 465.805 466.567


EXISTING ROAD LEVEL
PROPOSED ROAD LEVEL

251320 464.329 464.824 464.954 465.695

NAME OF WORK -
L =168.041
251340 464.007 463.616 464.069 464.823
251360 463.225 462.730 463.237 463.951

-4.359%
251380 463.154 462.069 462.440 463.079
251400 462.205 461.764 461.569 462.207
251430.000 251420 461.224 460.977 460.649 461.336 CH=251+430.000
LVL=460.900
251440 460.835 459.682 459.712 460.489
R: 2000.000
VCL: 25.139
251460 460.078 458.067 458.773 459.817

PROFILE
30.000 D: 0.7202 30.000

251480 458.415 457.410 457.907 459.346


EXISTING GROUND AT-8m FROM PCL
EXISTING GROUND AT +8m FROM PCL

251500 457.489 458.747 457.466 459.075 VIP CH=:251+510.00


VIP LVL=:457.412
K:19.971

251520 457.116 457.447 457.217 459.004


LVC:160.00
TYPE
SPAN

251540 457.354 456.505 457.448 459.134


L =84.286

21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI)


251560 458.278 458.801 458.281 459.464
RECONSTRUCTION
CHAINAGE 251+525
1 X 6.0m

APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND

PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
251580 459.635 460.168 459.238 459.994 CH=251+590.000

MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI
BOX CULVERT

THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC
251590.000 LVL=460.334
30.000

PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
251600 459.822 460.392 460.020 460.699
3.652%

251620.000 CH=251+620.000
D: 0.4948

251620 460.839 460.655 460.742 461.430 LVL=461.430


R: 1500.000
VCL: 12.954
30.000

251640 461.817 461.267 461.450 462.146


251660 462.312 462.063 462.183 462.834
251680 466.407 462.975 462.822 463.493
REV DETAILS OF REVISION
L =60.602

251700 465.435 463.884 463.714 464.124


251720 465.455 464.575 464.520 464.726
R0 DRAFT DETAILED PROJECT REPORT

VIP CH=:251+730.00
30.000

VIP LVL=:465.447
K:140.673

251740 465.604 464.743 464.895 465.300


e:2.84%
LVC:220.00

e:-2.84%

AKP

251760 466.685 465.044 464.787 465.846


SSS
SIZE
TYPE

251780 468.684 468.030 465.091 466.363


D: 4.7254
R: 1000.000
VCL: 82.473

251800 465.699 466.003 465.727 466.852


MKH
HPC
RECONSTRUCTION
CHAINAGE 251+772

251820 467.104 466.277 466.594 467.312


e:2.84%
e:-2.84%
1 X 1200mm

CH=251+840.000
30.000

251840.000
251840 468.305 467.129 467.371 467.744 LVL=467.744
DESIGN DRAWN CHECKED APPROVED

251860.000 CH=251+860.000
251860 468.013 467.331 467.751 468.162 LVL=468.162
SCALE

TITLE:

VIP CH=:251+880.00
251880 468.321 468.092 467.848 468.740 VIP LVL=:468.579
2.088% K:12.483
LVC:40.00

CH=251+900.000
251900.000
251900 469.057 468.571 468.801 469.638 LVL=469.638
L =115.410

251920 471.427 470.812 469.826 470.697


5.293%

H-1:2000 V-1:200

251935.000 CH=251+935.000
251940 472.975 472.686 470.945 471.744 LVL=471.490
VIP CH=:251+975.00
VIP LVL=:473.607
251960 472.631 472.388 472.180 472.545
DRG. NO. Package No. DPR- 3A (6) /P&P-14
THARPARDI

PLAN & PROFILE


Km251+000 to Km 252+000
K:11.629
LVC:80.00

251980 473.608 472.664 472.948 473.001


30.000

R
e:3.56%

252000 474.329 473.151 472.909 473.114


e:-3.56%

0
DATE: FEBRUARY-2024
MORSHI THARPARDI

050
6 2. SETOUT DATA
6 HIP CH = 252+847
44
TA 733 - 23 E - 223923.014,N - 2344753.729
DA 52+ ,N D = 68.743
T 2 77

SE P C 40 87 m
OU H = 3.1 R = 20.000m

HI - 22 2.7 00 1m
TO
T 5
SE IP C 38 59 m

E = 4 0.0 34
Ts = 13.680m

UT 2 9
99

D = 8 31. 20m 1m ED
H - 22 7.7 .000 m

H
.7 Es = 4.231m

R = 5.9 74 E

DA 52+ ,N
E = 2 00 000

=
3 /h
56

Ts s = 59. SP
Lc = 23.996m

TA 9 - 2
D = 1 20. 747 7 km

4
E = GN
44

2.
R = 34. .16 20 DESIGN SPEED = 20 km/h

8
2 3

Lc ESI
TA 63 - 2

9
SE Ls s = = 0 79 m D =

1
D
A

5 34
HI TOU +
D 52 8,N
P T ift 3.1 448 EE
E - CH T D UT = 2 .61 sh = 28. SP
D 223 = 2 ATA TO CH 830 Es = GN

46
R = 5.8 330. 52+0 E
S IP 23 159 00m Lc ESI

68
= H - 2 20. .0 /h
Ls 80 75 715, 22

.6
D
E = 150 ?m km

44
= 0 N
30 .000

=
Ts -2 D = ?? ? 20

20
sh = 56 000 m. 34
43 SE R s = ?? ?? =
Es ift = .053 m

km
43 H TO L s = = ? ? 7m ED
0 . 6 UT

/h
Lc = 1. .04 52 IP T ift ?? .77 PE
E - CH DAT

25
0 SETOUT
=
DE 52 99 0 7 6 4 sh s = 52 N S 90
D = 2234 = 252 A A 8 + DATA

2+
T 54 .
52

RE OP 2+9 X C
DA 515 HIP CH =

SE P C 397 8
SIG .02 T 4 4 E c = IG 2

80
54 +1

CO
PR H.25 : BO4.0m
1 OU 52+ 23 4 253+053

HI 22 .93 0m
9 R = 1 5.090 .591, 48

C PE :1X
N
SP m SET H = 2 75,N - L ES E - 2241

TO H = 4.1

NS
0 T SIZE

TY AN ING 60
E
03.679,N

SP IST 2+9 C m

TR
Ls 5 N- C .0 D
= 1 0.00

EX .25 :HP 00m


D
EE

OS 60 U
- 234466

UT 25 10
I P 6 D = 39.0

UC
234 H 37 7

CH E
KM D K 64 4.326

R = ? ?? ?
T

=
0 2

ED
0

TI
s = 2 .000 m 431 2 D/S 25 M
E - 6.230

YP : 4
=8 SETOUT DATA R = 30.0

DA 2+8 ,N -
252

Ls = ? ??

ON
33 .00
=
0k s hift 4.8 m 9.7 5 m 3 00m

Ts ift = ?? 63m ED

70 ?m
HIP CH = 252+273 D = 5.000

TA 96 23
m/ Es = 0 7 1 25 25 U/S Ts = 10.6

sh = ? 1.4 SPE
h 2344328.788 5 42m

X
= . 0 = 2+
E - 223579.257,N -

Es = 4 N
m

?
R Es = 1.8
2 ???

LV
6
Lc 1.3 8 70 32m

Lc SIG
DE = 29. 38 Ls = ???

ER
D = 44.909 0 Lc = 20.4

DE
54m
Ts = = ???

T
SIG 506 DESIGN
NS m R = 50.000m t h S PEED =
shif ??? km/ HU

44
PE Ls = 10.000m 0 T 20 km/h
ED = 7 m 2
Es 53.97 EED =

74

+0 0
=2 Ts = 25.697

53 0
2.
0k Lc = IGN SP

.2 3+0
00
01
shift = 0.083
.25 +000

m/h
DES
00

CH 25
6
TB
M

Es = 4.192
2+0

=
252

20
Lc = 29.191m
20 km/h

km
DESIGN SPEED =
CH

/h

253+100
25
2+
60
0
D/S

00
SETOUT DATA

2
0

253+
1
10

RE
22 HIP CH = 253+099
2+

C .
PR ONST
09 E - 224141.922,N - 23
25

CH OPO RUCT 5
252+400
U/S

TY .25 SE ION 4 44691.104


SIZ PE : 2+16 D A 67 234 D = 29.550

00
T

252+500
EX E:1 HP 3 5 -
DA 52+ ,N R = 60.000m

3
CH ISTI X120 C
SE

3+
TY .25 NG 0m U T 2 5 2 Ts = 15.825m HIP TOUT

25
SIZ PE : 2+17 m O H = 5.0 E - CH DAT
00

E: HPC 0 T 9 Es = 2.052m
1X SE IP C 237 46 0m D = 2243 = 253 A
2

Lc = 30.945m
252

600
252+

mm H - 2 3.8 .00 R = 17.7 14.83 +272


E = 1 10 m /h DESIGN SPEED = 20
+30

T DATA km km/h Ls 150 99 8,N


SETOU 99 D = 1 ??? = .00 -2
= 252+3 25.630 20
0

HIP CH ,N - 23444 R = ??? ?? =


Ts
=
2 0.0 0m 34
47
6 3 .2 4 1 Ls s = = ? shi 33. 00m 07
EXISTING CENTRE LINE E - 2236 T ift ??? 582 EE
m D f
Es = 0 t 504
.60
3
4 .5 42
PROPOSED CENTRE LINE D = 3 s = 26 SP
h .
Lc = .
1.9 111
0.000m Es = IGN
PROPOSED CARRIAGEWAY R = 5 .000m DE = 26. 40
Ls = 20 Lc ES SIG 597
36 D NS m
Ts = 25.6 3 PE
0 .3 3 ED
shift = =2
.7 1 0 0k
Es = 2 m/h
0 .1 44m 0 km/h
Lc = 1 P EED = 2
N S
DESIG

PLAN

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-15(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km252+000 to Km 253+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT -
SUPERELEVATION
CHAINAGE
MORSHI

CENTER LINE (m)

AT-8m FROM PCL (m)


____________________

AT +8m FROM PCL (m)


------------------------------------
------------------------------------
EXISTING LEVEL BELOW
______________________

EXISTING GROUND LEVEL


EXISTING GROUND LEVEL

HORIZONTAL ALIGNMENT
440
444
446
450
454
456
460
464
466
470
474
476

442
452
462
472

438
448
458
468

PROPOSED ROAD LEVEL(m)


252000 474.329 473.151 472.909 473.114

VERTICAL ALIGNMENT K:11.629


CH=252+015.000

LVC:80.00

PUBLIC WORKS DEPARTMENT


252015.000 LVL=472.973

GOVERNMENT OF MAHARASHTRA
252020 473.545 472.854 472.654 472.893

D: 3.7263
R: 800.000
252040.000 CH=252+040.000

VCL: 52.029
-1.587%
252040 472.240 472.123 472.327 472.576 LVL=472.576

e:3.56%
e:-3.56%
VIP CH=:252+060.00
252060 472.055 471.538 472.104 472.423 VIP LVL=:472.259

30.000
K:12.206
LVC:40.00
CH=252+080.000
252080.000
252080 472.520 471.756 472.350 472.597 LVL=472.597

CONSULTANT -
252100 472.723 472.283 472.713 472.935

1.690%
252110.000 CH=252+110.000

L =45.242
LVL=473.104
252120 472.898 473.261 472.995 473.224 VIP CH=:252+130.00
VIP LVL=:473.442

10.000

e:5.00%
K:10.240

e:-5.00%
252140 473.224 476.338 473.025 473.171 CH=252+150.000

LVC:40.00
252155.000 LVL=472.999
252150.000 CH=252+155.000

D: 11.2704
R: 150.000
-2.216%

VCL: 29.506
252160 473.415 480.341 472.641 472.793 LVL=472.888

e:5.00%
e:-5.00%
SIZE

VIP CH=:252+175.00
TYPE

10.000
252180 473.615 473.339 472.719 472.729 VIP LVL=:472.445

K:7.911
LVC:40.00
CH=252+195.000

KOLAR ROAD, BHOPAL - 462042(M.P)


LVL=473.013
HPC

252195.000

AICONS ENGINEERING PVT.LTD.


252200 473.464 474.100 472.996 473.155
RECONSTRUCTION
CHAINAGE 252+163

Email Id:- info@aicons.in & aiconsgroup@gmail.com


A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
2.840%
1 X 1200mm

L =74.427
252230.000 252220 473.594 474.197 473.488 473.723 CH=252+230.000
LVL=474.007
252240 474.451 474.345 474.059 474.256

10.000
252260 474.910 474.290 474.625 474.544

e:7.00%
e:-7.00%
VIP CH=:252+270.00
VIP LVL=:475.143

K:14.316

R: 50.000
252280 474.955 474.297 474.486 474.554

LVC:80.00

D: 33.4501

VCL: 29.191

e:7.00%
e:-7.00%
10.000
252300 476.321 474.039 474.058 474.283 CH=252+310.000
252310.000 LVL=474.044
252320 474.726 473.823 473.546 473.769

-2.748%

NAME OF WORK -
252350.000 252340 472.869 473.331 473.003 473.219 CH=252+350.000

L =76.853
LVL=472.944
252360 472.946 472.668 472.438 472.648
VIP CH=:252+380.00
252380 471.605 471.727 471.831 471.924 VIP LVL=:472.120

K:22.918

20.000
LVC:60.00
252400 470.637 471.364 470.806 471.025 CH=252+410.000

R: 50.000
D: 11.6236

VCL: 10.144
252410.000 LVL=470.510

20.000

e:7.00% e:7.00%
e:-7.00% e:-7.00%
252420 469.537 470.475 469.688 469.974
252440 468.710 468.601 468.604 468.901

-5.366%
252460.000 CH=252+460.000
252460 468.280 467.480 467.578 467.827 LVL=467.827

L =61.539
252480 466.615 466.299 466.553 466.864 VIP CH=:252+490.00
VIP LVL=:466.218

PROFILE
K:18.147
252500 465.904 466.851 465.857 466.122

LVC:60.00
CH=252+520.000

R: 55.000
252520.000 252520 465.431 465.897 465.371 465.600

D: 56.2297
LVL=465.600

VCL: 53.977

e:7.00% e:7.00%
e:-7.00% e:-7.00%
252540 464.832 464.941 464.949 465.188
-2.059%

252550.000 CH=252+550.000
L =14.834
LVL=464.982
252560 464.399 464.693 464.426 464.759
VIP CH=:252+580.00
D: 13.8457
R: 110.000
VCL: 26.582 252580 463.702 464.307 463.816 464.214
e:7.00% e:7.00%
e:-7.00%e:-7.00%
VIP LVL=:464.364
K:29.936

21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI)


LVC:60.00

252600 463.020 463.184 463.241 463.535


L =25.123
EXISTING ROAD LEVEL

CH=252+610.000
PROPOSED ROAD LEVEL

252610.000 LVL=463.145

APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND

PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
252620 462.262 462.473 462.540 462.739

MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC
252640 461.441 461.720 461.739 461.926
D: 20.1594
R: 150.000

PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
VCL: 52.777

e:5.00% e:5.00%
e:-5.00% e:-5.00%
-4.064%

252660 460.596 461.060 460.913 461.113


252680 459.961 460.050 460.147 460.300
252695.000 CH=252+695.000
252700 459.582 459.260 459.425 459.474 LVL=459.691
VIP CH=:252+715.00
252720 458.686 458.499 458.280 458.324 VIP LVL=:458.878
K:8.906

e:7.00%
e:-7.00%

CH=252+735.000
LVC:40.00

252740.000 LVL=457.167
REV DETAILS OF REVISION

252735.000 252740 457.768 457.880 456.756 456.739 CH=252+740.000


R: 100.000
-8.555%

VCL: 28.448

LVL=456.739
e:7.00%
e:-7.00%

VIP CH=:252+760.00
252760 456.013 455.991 454.937 454.843 VIP LVL=:455.028
K:10.779
LVC:40.00

CH=252+780.000
252780 454.840 454.847 452.635 452.575
R0 DRAFT DETAILED PROJECT REPORT

252780.000 LVL=452.575
EXISTING GROUND AT-8m FROM PCL
EXISTING GROUND AT +8m FROM PCL

252810.000 252800 450.592 451.423 450.219 450.122


-12.266%

CH=252+810.000
AKP

LVL=448.895
252820 447.617 447.913 447.674 447.711
VIP CH=:252+840.00
SSS

252840 445.254 444.964 445.056 445.600 VIP LVL=:445.216


K:11.689
LVC:60.00

R: 20.000
L =39.396 20.000D: 16.2995 20.000L =20.654 L =46.354 D: 68.7425

VCL: 23.996

252860 444.146 443.503 443.668 443.832


e:7.00% e:7.00%
e:-7.00% e:-7.00%

CH=252+870.000
252870.000 LVL=443.076
MKH

252885.000 252880 442.969 442.014 442.247 442.362 CH=252+885.000


-7.133%

LVL=442.006
252900 441.316 440.435 440.921 441.071
R: 70.000
L =17.381D: 33.9381

VCL: 41.463
e:7.00% e:7.00%

DESIGN DRAWN CHECKED APPROVED


e:-7.00% e:-7.00%

252920 440.634 440.116 440.251 440.243


VIP CH=:252+935.00
252940 440.185 440.116 439.969 439.895 VIP LVL=:438.439
K:8.346

SCALE

TITLE:
LVC:100.00

L =47.869

252960 337.980 438.680 439.840 440.026


TYPE

CH=252+985.000
SPAN

LVL=440.863
252990.000 252980 441.654 439.981 440.032 440.636 CH=252+990.000
252985.000 LVL=441.106
4.848%

253000 442.770 440.862 440.891 441.573


R: 80.000

VIP CH=:253+040.00
D: 42.7866
RECONSTRUCTION

e:7.00% e:7.00%
CHAINAGE 252+960

e:-7.00% e:-7.00%
VCL: 59.741
1 X 6.0m

H-1:2000 V-1:200

VIP LVL=:443.530
BOX CULVERT

K:27.992
LVC:100.00
THARPARDI

PLAN & PROFILE


DRG. NO. Package No. DPR- 3A (6) /P&P-15(ii)

Km252+000 to Km 253+000
R
0
DATE: FEBRUARY-2024
SETOUT DATA MORSHI THARPARDI
HIP CH = 252+847
E - 223923.014,N - 2344
753.729
D = 68.743

SE P C 40 87
R = 20.000m

HI - 22 2.7 00m m
TO H 2.
Ts = 13.680m

E = 4 0.0 341

UT 2 91
D = 8 31. 20m m D =
Es = 4.231m

R = 5.9 41 EE

DA 52+ ,N
=
Lc = 23.996m

Ts = 59.7 SP

TA 995 - 23
4
E s = GN
DESIGN SPEED = 20 km

Lc ESI
/h

8
D
SETOUT DATA

44
4
HIP CH = 254+05

66
,N - 2345081.770

8.
E - 22 49 48.8 15

64
D = 20.228

4
20 T DATA
SETOU 253+965 R = 150.000m
026.678
km =
/h HIP CH 8.600,N - 2345 Ls = 20.000m
25

00 87
+9 SETOU E - 224 Ts = 36.775
2+

2 T DATA 17
RE OP 2+9 X C

25 D= 9 .4
shift = 0.111
80

HIP CH
PR H.25 : BO4.0m
CO
ET CH 74

.000m
C PE 1X

= 0
E - 2241 253+053 5
0 T SIZE

NS

1
TY AN: ING 60

R= Es = 2.481
OU = .11

SP IST 2+9 C m

TR

.000m
EX H.25 :HP 00m

03.679,N
Ls = 20
OS 60 U
UC

Lc = 32.956m
C PE 4X6
T 252 0,N

K D = 39.0 - 23446 .362 KM


ED
TI

64 64.326
Y :

Ts = 22 = 30 km/h
DA +8 -

D/S 25 M DESIGN SPEED


ON

3 R = 30.0
00m .111 254
.424
TA 96 234

U/S Ts = 10 A shift = 0
.64 DAT +776 908 19
Es = 1.8 2m T 44 Es = 0.6 m
LV

OU 53 - 23 53
32m SET CH = 2 656,N Lc = 4.6 PEED = 30 km
/h
ER

Lc = 20 SETOU .
T

.454m T HIP 24733 N S


DESIGN HIP CH DATA 2 DESIG
HU SPEED = 253+ - 5
E 9.54 0m
47

D/S
T = 20 km E - 224 420
0 /h 4
D = 52 59.122,N - 23 D = 100.00
4

00 00
2.0

0
+
R = 50 98
.5 44676.0 R = 8.349

54+00
3 0 h
16

25 53+ .000m 16
RO M =
Ts 0.34 m 8 m km/

00
2 Ls = 10 L F = 9 2 0
. AL HS =
Es 16.65 EED

254+0
.0 RE W 53+740 B

254+100
CH Ts = 2 00m

CH.2
U/S
S E D c = S P
9.750 O O2 L IGN
shift =
0.083 PROP 3+680 T DES RECO
NSTRU
CTION
5 ED
KM 2 OS
PROP 3+935

253+900
Es = 5
253+100

.866 C H .2 5
Lc = 35 : HPC
.9 TYPE X1200mm
DESIG 01m SIZE:1 ING

D/S
N SPE EXIST53+943
ED = 2
0 km/h CH.2 :HPC
200

253
SETOUT DATA TYPE 1X1000mm
SIZE:

+80
253+

HIP CH = 253+09

ELE
9

U/S

0
E - 224141.922,N A
DAT

CT
- 2344691.104 23
D = 29.550 TOUT 53+870 344980.8

RIC
E

253+
S 2
CH = ,N - 2
0
R = 60.000m
HIP 4794.850
SE 30

WI
HIP TOU
3+
Ts = 15.825m 2
E - 2 .093

700
25

T N 1

RE
Es = 2.052m E - CH DA
= T RU
CTIO
D = 2 0.000m

253+
Lc = 30.945m 2
D = 243 25 A NST
SED ER
T
= 2 0
3+ RE
CO
PO +700 CULV R 00m
DESIGN SPEED R = 7.71 1 4 .83 272 O
PR .253 BOX = 15.0 4
Ls
= 20 km/h 44. 4

600
Ls 150 99 8,N CH PE : X4.0m 7
. -2 TY AN:1 G Ts = 0.047
Ts = 20. 000m 34 SP ISTIN 695 =
shift .484

253+
= 0 0 47
shi 33 0 m 07 EX .254+ PC 0mm 3 /h
f . 5 .60 CH PE :H 100 Es = 8.629m 30 km

0
t
Es = 0 04 =

40
3 TY E: 3X

500
5 E D
= . 1 Lc = N SPE
3+
Lc 1.9 11 SIZ IG
=
DE 26. 0 4 25 EXISTING CENTRE LINE DES
SIG 597
NS m PROPOSED CENTRE LINE
PE
ED PROPOSED CARRIAGEWAY
=2
0k
m/
h

PLAN
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-16(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km253+000 to Km 254+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT -
SUPERELEVATION
CHAINAGE
CENTER LINE (m)

AT-8m FROM PCL (m)


____________________

AT +8m FROM PCL (m)


MORSHI

------------------------------------
------------------------------------
EXISTING LEVEL BELOW
______________________

EXISTING GROUND LEVEL


EXISTING GROUND LEVEL

VERTICAL ALIGNMENT

HORIZONTAL ALIGNMENT
434
440
444

432
436
442
446

438
448

PROPOSED ROAD LEVEL(m)


253000 442.770 440.862 440.891 441.573
253020 442.512 441.306 441.790 442.400

PUBLIC WORKS DEPARTMENT


253040 443.471 442.125 442.728 443.084

e:7.00%
L =18.958

e:-7.00%

GOVERNMENT OF MAHARASHTRA
K:27.992
LVC:100.00
253060 443.950 445.245 443.678 443.624

R: 30.000
D: 39.0636

VCL: 20.454
253080 443.679 442.566 443.496 444.023

L =20.219
CH=253+090.000
253090.000 LVL=444.168
253100 443.604 442.845 443.473 444.296

R: 60.000
D: 29.5501

VCL: 30.945
e:-7.00% e:7.00%e:7.00%
e:7.00% e:-7.00%e:-7.00%

CONSULTANT -
253120 443.899 443.123 443.560 444.551
253140 445.057 443.104 443.688 444.806

1.276%
253160 446.720 443.185 443.753 445.061
253180 445.521 443.881 444.079 445.316

L =124.372
253200 445.215 444.267 444.535 445.571

KOLAR ROAD, BHOPAL - 462042(M.P)


AICONS ENGINEERING PVT.LTD.
253220.000 CH=253+220.000

Email Id:- info@aicons.in & aiconsgroup@gmail.com


253220 445.389 444.610 445.051 445.827 LVL=445.827

A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE


253240 445.958 444.986 445.410 446.012

20.000
253260 446.672 445.879 445.524 446.056
253280 447.058 446.098 445.859 445.960

D: 10.1594
R: 150.000
VCL: 26.597
VIP CH=:253+290.00

e:5.00% e:5.00%
e:-5.00% e:-5.00%
VIP LVL=:446.720

K:28.488

20.000
253300 446.279 446.009 445.658 445.724

LVC:140.00
253320 445.873 446.052 445.040 445.347

NAME OF WORK -
253340 446.062 445.585 444.206 444.830
CH=253+360.000

L =84.448
253360.000 253360 443.494 445.246 443.452 444.173 LVL=444.173

253380 442.739 445.117 443.008 443.445

-3.638%

10.000
253400 442.621 442.779 442.018 442.718

e:7.00%
e:-7.00%
253415.000 CH=253+415.000
253420 442.024 441.333 441.265 441.998 LVL=442.172

R: 50.000
D: 41.1391
VIP CH=:253+435.00

VCL: 35.901
VIP LVL=:441.444

e:7.00%
440.756 440.784 440.661 441.460

e:-7.00%
253440

10.000
LVC:40.00
CH=253+455.000
253455.000 253460 440.514 440.097 440.371 441.167 LVL=441.222
253470.000
K:15.816 -1.109% CH=253+470.000

PROFILE
LVL=441.056
253480 441.460 439.850 440.258 440.910
EXISTING ROAD LEVEL
PROPOSED ROAD LEVEL

VIP CH=:253+500.00
253500 440.838 440.577 440.013 440.410 VIP LVL=:440.723
K:14.391
LVC:60.00

253520 440.306 440.333 439.427 439.632 CH=253+530.000


253530.000 LVL=439.139
253540 439.300 439.641 438.317 438.611

21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI)


-5.279%

253570.000 253560 436.986 439.341 436.682 437.556 CH=253+570.000


LVL=437.028
253580 435.525 435.837 435.733 436.533

APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND

PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC
253600 434.888 435.323 435.113 435.741
PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
VIP CH=:253+610.00
VIP LVL=:434.916
L =321.599
K:15.155

253620 434.452 434.708 434.543 435.213


LVC:80.00

253640 434.168 434.405 434.037 434.949 CH=253+650.000


253650.000 LVL=434.916
253660 434.322 434.023 433.606 434.916
EXISTING GROUND AT-8m FROM PCL
EXISTING GROUND AT +8m FROM PCL

253680 433.866 433.492 433.479 434.916


-0.000%

REV DETAILS OF REVISION

253700.000 CH=253+700.000
253700 435.909 436.512 433.418 434.916 LVL=434.916

253720 435.421 434.553 433.806 435.050 VIP CH=:253+730.00


TYPE
SPAN

R0 DRAFT DETAILED PROJECT REPORT

VIP LVL=:434.916
253740 434.594 433.736 434.586 435.450
LVC:60.00

CH=253+760.000
AKP

253770.000
253760.000
253760 435.557 434.414 435.556 436.117 LVL=436.117
e:7.00%
RECONSTRUCTION

e:-7.00%
CHAINAGE 253+700
1 X 4.0m

CH=253+770.000
K:14.986 4.004%

LVL=436.518
SSS
BOX CULVERT

253780 436.255 435.762 436.296 436.888


R: 100.000
VCL: 16.659

e:7.00%
e:-7.00%

253800 436.662 435.786 436.817 437.447


MKH

VIP CH=:253+820.00
253820 436.973 436.225 437.106 437.764 VIP LVL=:438.520
K:16.548
LVC:100.00

D: 9.5448 L =41.703 15.000

253840 437.425 437.206 437.168 437.840


e:5.00%
e:-5.00%

DESIGN DRAWN CHECKED APPROVED

253860 438.040 438.287 437.031 437.674 CH=253+870.000


253870.000 LVL=437.500
SCALE

TITLE:
D: 16.7959
R: 200.000

253880 437.299 436.715 436.722 437.296


VCL: 58.629
-2.039%

253910.000 253900 436.500 435.837 436.217 436.888


e:5.00%
e:-5.00%

CH=253+910.000
15.000

LVL=436.684
253920 436.056 436.041 435.747 436.513
H-1:2000 V-1:200

VIP CH=:253+940.00
SIZE

253940 436.067 437.081 435.576 436.365


TYPE

VIP LVL=:436.072
K:15.357
LVC:60.00

253960 436.574 438.174 435.885 436.478 CH=253+970.000


HPC
THARPARDI

LVL=436.633
D: 1.7775

253970.000
DRG. NO. Package No. DPR- 3A (6) /P&P-16(ii)

PLAN & PROFILE


R: 150.000
VCL: 4.653

Km253+000 to Km 254+000
RECONSTRUCTION
CHAINAGE 253+935

253980 437.420 439.151 436.069 436.819


L =28.375 20.000 20.000

e:5.00% e:5.00%
e:-5.00% e:-5.00%
1.868%
1 X 1200mm

254035.000
R

254000 437.062 438.891 436.429 437.193


0
DATE: FEBRUARY-2024
MORSHI THARPARDI
DATA
SETOUT
254+054 5081.770
HIP CH = 15,N - 234
SETOUT
2 4 9 48 .8 DATA
E-2 HIP CH
= 254+9
8
D = 20.22 SETOUT DATA E - 2257
83
47
1 5 0 .0 00m HIP CH = 254+635 D = 26.2 .757,N - 234539
DATA 5 R=
OUT 6 .678 Ls = 20.00
0m E - 225502.146,N - 2345260.390 62 6.060
= 253+9 - 2345026 SETOUT DATA R = 125.0
00m
C H 75 809 PRO
8.600
,N Ts = 36.7 D = 7.518 HIP CH = 254+ Ls = 20.0
22487 11 ,N - 2345334.89
6 00m KM POSED
shift = 0.1 R = 1000.000m E - 225658.992 Ts = 39.1 254+ R
1 89 940 E
.000m Es = 2.48 Ls = 30.000m D = 0.707 shift = 0.1 TO
= 150 00m Lc = 32.9
56m
0 km/h PROPOSED RE WALL FROM Ts = 80.705 R = 2000.000m Es = 3.4 3
3
.0
s = 20 362 KM N S PEED = 3 93
2. 254 D E S IG KM 254+200 TO 254+500 LHS shift = 0.038 Ts = 12.343m Lc = 37.2
96m
Ts = 2 .111 Es = 2.194 Es = 0.038m DESIGN
KM
255
0 SPEED
shift = 19 Lc = 101.216m Lc = 24.685m = 30 km
= 0 .6 ED = 80 km/h /h
Es
.653m ED = 30 km
/h DESIGN SPEED = 80 km/h DESIGN SPE

D/S
Lc = 4
T-
M
NSP E AT INO
DES R JU
DESIG IGN NCT

D/S
CH I
AIN ON DE
D/S

TBM AG
E-
254+ +000

U/S
TBM

TION
000

255S FIELD
RECONSTRUC
54

254+100

0
PROPOSED

+00
254+200
CH.2

CH 000
U/S

254+900
CH.254+942
U/S

254+300
TION

.255
RECONSTRUC TYPE : HPC m

254+800
254+400

+
N
CTIO
PROPOSED SIZE:1X1200m

ARD
STRU

254+500

254+700
RECON D
POSE CH.254+715

254+600
EXISTING
PRO 53+935
253+90

TYPE : HPC m CH.254+945

TOW
. 2
C E : HPC mm
H
SIZE:1X1200m TYPE :HPC m
TYP :1X1200 EXISTING CENTRE LINE
SIZE TING
EXISTING SIZE: 1X600m
CH.254+706
EXIS253+943 PROPOSED CENTRE LINE
0

TYPE :HPC mm
CH. E :HPC mm
TYP : 1X1000 PROPOSED CARRIAGEWAY PLAN SIZE: 1X1000
SIZE
RECONSTRUCTION RECONSTRUCTION

VIP CH=:254+455.00
CHAINAGE 254+715 CHAINAGE 254+942

VIP CH=:254+110.00

CH=254+405.000

VIP LVL=:440.282
CH=254+185.000
VIP LVL=:439.247
SIZE 1 X 1200mm SIZE 1 X 1200mm
PROPOSED ROAD LEVEL EXISTING GROUND AT-8m FROM PCL

LVL=440.132
TYPE HPC TYPE HPC

LVL=439.472

CH=254+505.000
EXISTING ROAD LEVEL EXISTING GROUND AT +8m FROM PCL
CH=254+035.000

LVL=437.943
LVL=437.846

442

440

CH=254+615.000
438

VIP CH=:254+665.00
LVL=432.796

VIP CH=:254+840.00
VIP LVL=:430.457

VIP LVL=:431.047
CH=254+770.000
CH=254+715.000
436

CH=254+910.000
LVL=430.811
LVL=430.626

LVL=429.769
434

432

430

428

426
254060 438.263 436.403 437.628 438.281
254080 439.345 436.904 438.128 438.581

254140 439.491 438.848 438.048 439.231

254420 438.957 437.898 438.890 440.121

254500 437.322 437.261 437.340 438.171


254520 436.426 436.631 436.520 437.241

254940 427.271 427.209 427.703 429.221


254000 437.062 438.891 436.429 437.193

254900 429.678 428.861 429.476 429.943


254160 440.492 439.460 438.013 439.365

254540 435.415 435.274 435.576 436.305

254680 430.637 430.453 430.680 430.815

255000 426.474 426.693 427.120 428.125


254600 432.300 432.685 432.829 433.498

254840 432.424 430.886 431.206 430.668


254860 431.357 430.620 431.207 430.488
437.738 438.058 437.158 437.939

254200 439.187 438.783 438.177 439.517


254220 438.714 437.463 438.279 439.577
254240 438.593 437.032 438.387 439.637
254260 438.705 437.446 438.515 439.697
254280 438.634 437.393 438.498 439.757
254300 439.944 437.304 438.463 439.817
254320 439.595 437.496 438.495 439.877
254340 438.776 437.784 438.675 439.937
254360 439.180 438.211 439.030 439.997
254380 439.950 438.361 439.375 440.057
254400 439.500 438.261 439.250 440.117

254440 438.511 437.512 438.517 439.932

254480 438.080 437.306 437.961 438.957

431.846 431.881 432.195 432.569

254660 431.009 431.006 431.236 431.199

254700 430.069 429.804 430.341 430.632


429.842 429.425 430.106 430.642

254760 429.613 429.671 430.036 430.777


254780 429.857 429.565 430.144 430.837
254800 430.292 429.834 430.359 430.842

254880 430.811 430.858 430.610 430.247


254020 437.308 438.436 436.788 437.566

254100 438.594 438.716 438.039 438.840


254120 438.860 438.479 438.021 439.056

254180 439.736 439.085 438.026 439.456

438.327 437.381 438.289 439.544

254560 434.151 434.159 434.587 435.370


254580 432.921 433.708 433.631 434.434

254640 431.465 431.463 431.694 431.784

254740 429.755 429.348 429.994 430.710

254820 431.497 430.480 430.810 430.786

254920 428.272 427.605 428.371 429.586

254960 426.712 427.032 427.474 428.856


254980 426.548 426.773 427.307 428.490
PROPOSED ROAD LEVEL(m)
______________________

EXISTING LEVEL BELOW


CENTER LINE (m)
____________________

EXISTING GROUND LEVEL


AT-8m FROM PCL (m)
------------------------------------

EXISTING GROUND LEVEL


AT +8m FROM PCL (m)
------------------------------------
254040

254460

254620

254720
CHAINAGE
254035.000
253970.000

254185.000

254405.000

254505.000

254615.000

254715.000

254770.000

254910.000

255050.000
1.868% K:95.688 0.300% K:20.086 -4.679% K:19.938 0.337% K:64.731 -1.826%
VERTICAL ALIGNMENT
LVC:150.00 LVC:100.00 LVC:100.00 LVC:140.00

L =30.111 20.000 D: 12.5884 20.000


HORIZONTAL ALIGNMENT L =463.967 30.000 D: 5.7993 30.000 L =80.595 D: 0.7072 L =87.419 20.000 D: 17.0952 20.000
R: 150.000 R: 1000.000 R: 2000.000 R: 125.000
VCL: 32.956 VCL: 101.216 VCL: 24.685 VCL: 37.296

SUPERELEVATION
e:5.00% e:5.00% e:-2.84% e:-2.84% e:7.00% e:7.00%
e:-5.00% e:-5.00% e:2.84% e:2.84% e:-7.00% e:-7.00%

PROFILE
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-17 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km254+000 to Km 255+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
6
3.99
6 + 031 34536
= 25 -2 NE
D

I P CH 5.412,N AI
ET ST
H 6 R
268 EX
I
MORSHI E - 2 4.913 THARPARDI
SETOUT DATA 3
D = 0.000m
488
SETOUT DATA HIP CH = 255+ 9 SETOUT DATA = 8 00m
HIP CH = 255+126 SETOUT DATA .0 52 ,N - 2345390.87 R 10.0 73 M
RO HS
4 E - 226322 HIP CH = 255+698 Ls =
HIP CH = 255+36 30 . 1 L F
E WALL FROM E - 225963.491,N - 2345395.601 - 2345367.640 D = 16.348 Ts = = 0.052 AL 180
B
0 PROPOSED R S E - 22 61 99.382,N E - 226532.052,N - 2345370.212
W
96.06 O 255+020 BH D = 6.613 R = 400.000m t
shif 3.917 /h RE 256
+
- 234
53 KM 254+940 T D = 17.487
D = 4.553
m 0 km ED 0 TO
R = 600.000m Ls = 20.000m Es = 38.747 ED = 2

TOWARDS ADNADEVI
R = 700.000m S
R = 250.000m E O 8
Ls = 35.000m Ts = 67.461 Ls = 35.000m Lc = GN SP OP 56+0

TOWARDS FIELD
Ls = 30.000m R

TOWARD FIE
S I P 2
Ts = 52.169 shift = 0.042 DE

NG
Ts = 45.327 M
shift = 0.085 Ts = 53.471 K
Es = 4.147

DI
shift = 0.073
KM shift = 0.150 KM

IL
255
Es = 1.086 Lc = 94.131m Es = 0.626

BU
Es = 3.091 D = 50 km/h 256 E
Lc = 34.253m DESIGN SPEE Lc = 20.620m IR
T - MINOR JUNCTION DEVELOPMENT DESIGN SPEED = 80 km/h Lc = 46.302m IRE X - MINOR JUNCTION DEVELOPMENT W
= 50 km/h IC W C
TBM

DESIGN SPEED = 80 km/h


DESIGN SPEED
AT DESIGN CHAINAGE - 255+820
AT DESIGN CHAINAGE - 255+000
RI
CTR

LD
/h CT
= 30 km PROPOSED
ELE E
EED BUS SHELTER EL

25
D/S

6+
TBM

10
0
CH.255+000
TOWARDS FIELD

EL
U/S

CH.256+000
PROPOSED RE WALL FROM
255+000

256+000
EC
TOWARDS
KM 255+580 TO 255+620 BHS

TR
255+500

RAJANI
255+100

255+600
RECONSTRUCTION

TOWARDS

IC

255+900
X - MINOR JUNCTION DEVELOPMENT

255+200

255+800
PROPOSED

255+700

W
FIELD
AT DESIGN CHAINAGE - 255+800

0
CH.255+630

255+40
255+300

IR
TYPE : MINOR BRIDGE

E
SPAN:1X8.0m
EXISTING
EXISTING CENTRE LINE CH.255+600
PROPOSED CENTRE LINE TYPE :CAUSEWAY

PROPOSED CARRIAGEWAY PLAN SIZE: -

RECONSTRUCTION
CHAINAGE 255+630
SPAN 1 X 8.0m
CH=255+050.000

PROPOSED ROAD LEVEL EXISTING GROUND AT-8m FROM PCL


VIP CH=:255+090.00

TYPE MINOR BRIDGE


LVL=427.212

CH=255+130.000
VIP LVL=:426.482

EXISTING ROAD LEVEL EXISTING GROUND AT +8m FROM PCL


LVL=426.082

VIP CH=:255+410.00
430

CH=255+350.000

VIP LVL=:423.279
LVL=423.880
428

VIP CH=:255+750.00
CH=255+470.000

CH=255+790.000

VIP CH=:255+850.00
CH=255+820.000
VIP LVL=:421.743
CH=255+710.000
VIP CH=:255+580.00
CH=255+520.000
LVL=422.227

VIP LVL=:420.432
LVL=421.219
CH=255+640.000
VIP LVL=:420.299

LVL=420.825
426

LVL=421.403

CH=255+880.000
LVL=421.351

LVL=420.808

LVL=420.249
424

422

420

418
255080 425.905 425.513 425.955 426.711

255160 424.824 424.772 425.149 425.781


255180 424.321 424.704 424.869 425.581
255200 424.072 424.672 424.644 425.381
255220 424.342 426.579 424.456 425.181
255240 425.212 427.259 424.269 424.981

255380 424.383 424.217 423.332 423.551


255400 423.634 422.825 422.792 423.301

255500 420.766 421.174 421.144 421.701


255520 420.230 420.729 420.842 421.351

255980 418.775 419.220 418.863 419.641


255540 420.290 420.093 420.274 421.043
255560 421.275 419.435 419.792 420.823
255000 426.474 426.693 427.120 428.125

255040 426.172 426.512 426.690 427.395


255060 425.848 425.915 426.296 427.035

255420 422.562 422.378 422.380 423.025


255440 421.735 422.450 421.984 422.725

255720 421.204 423.164 421.361 421.475

255820 422.722 422.085 420.025 420.825


255100 425.898 425.164 425.699 426.428

255640 419.932 419.339 419.132 420.808


255660 421.180 421.617 420.258 420.978
255680 420.677 421.836 420.855 421.148
255700 420.838 423.128 421.245 421.318
255120 425.282 425.107 425.502 426.187

255740 421.209 422.764 421.234 421.537

255800 422.321 420.950 420.237 421.087

255900 422.545 419.780 419.354 420.127


255020 426.374 426.863 426.947 427.760

255140 424.790 425.373 425.335 425.982

255260 424.020 424.736 424.082 424.780


255280 424.061 424.343 423.955 424.580
255300 423.580 424.257 423.801 424.380
255320 423.594 423.916 423.699 424.180
255340 423.731 423.770 423.615 423.980
255360 423.190 424.556 423.519 423.776

255460 421.296 422.957 421.529 422.399


255480 420.553 421.829 421.291 422.052

255580 419.563 420.170 419.396 420.689


255600 419.142 421.233 419.221 420.642
255620 419.235 419.964 418.953 420.682

255760 420.411 421.556 420.902 421.490


255780 420.360 420.817 420.545 421.336

255840 420.983 421.653 419.853 420.586

255880 421.413 419.733 419.360 420.249

255920 422.970 419.664 419.326 420.006

255960 418.789 419.329 419.063 419.762

256000 418.581 418.939 418.764 419.519


255860 420.439 420.164 419.551 420.394

255940 421.745 419.557 419.226 419.884


PROPOSED ROAD LEVEL(m)
______________________

EXISTING LEVEL BELOW


CENTER LINE (m)
____________________

EXISTING GROUND LEVEL


AT-8m FROM PCL (m)
------------------------------------

EXISTING GROUND LEVEL


AT +8m FROM PCL (m)
------------------------------------

CHAINAGE
254910.000

255050.000

255130.000

255350.000

255470.000

255520.000

255640.000

255710.000

255790.000

255880.000

256010.000
255820.000
-1.826% K:96.963 -1.001% K:159.501 -1.753% K:46.103 0.850% K:37.020 -1.311% K:85.374 -0.609%
VERTICAL ALIGNMENT
LVC:80.00 LVC:120.00 LVC:120.00 LVC:80.00 LVC:60.00

HORIZONTAL ALIGNMENT L =88.376 35.000 D: 3.2709 35.000 L =131.902 30.000 D: 10.6115 L =3.919
30.000 20.000 D: 13.4832 20.000 L =98.226 35.000 D: 1.6878 35.000 L =257.918
R: 600.000 R: 250.000 R: 400.000 R: 700.000
VCL: 34.253 VCL: 46.302 VCL: 94.131 VCL: 20.620

SUPERELEVATION
e:4.74% e:4.74% e:-5.00% e:-5.00% e:4.69% e:4.69% e:-4.06%e:-4.06%
e:-4.74% e:-4.74% e:5.00% e:5.00% e:-4.69% e:-4.69% e:4.06% e:4.06%
PROFILE
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-18 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km255+000 to Km 256+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
MORSHI THARPARDI
SE
HI TOU
E P CH T D
-
D 227 = 2 ATA
R = 1 178 56+ SE
= 4 HI TOU
Ts 10 .961 .047 448 P
Es = 1 0.00 ,N E - CH T D
3 -2 2 A
Lc = 0. .13 m 0 34 D
= 27 = 2 TA
0 5 1 2 0 5 6
DE = 26 858 m 52
5.2
R
= 5 0.92 4.90 +512
942 S I . 1 m
0 T s 0 0 5,N
. GN 12 5 E = .00
5 79 SP m s = 4.7 0m -2
34
45 EE Lc 0.2 79m 54 SE
TA 02 23 D D = 9 28 67 HI TOU
=2 .57
4 -
DA 56+ ,N 0k
ES .52 m
IG 9m 2 E P CH T D
-
T
U = 2 .37 0 m/ N
SP D 227 = 2 ATA
O h EE R = 14 232 56+
E T H 68 1 =
C
S IP 27 .31 4 / h D
=2 Ls 10 .143 .353 574
H - 2 19 0m 5m km 0 = 0 ,N
E = 1 .00 .96 m 20 F
km T s = 15. .000 -2
= RO /h sh 19 00 0 m 34
D = 7 11 62 m D M NA E if t = . 9 m 54
12
R s = 6.8 580 EE KM RA s = 0 15 .14

IRE
. P 2 V L 0 . 0 SE
T = 14 S 5 6+3 ILL c = .86 4 9 2 T
s
E = IGN 00 AG D ES 9.6 1
H IP OUT

W
c T OK E IG 8 E CH D
L ES T-
N 4m -
D 227 = 2 ATA

RIC
D AT MA M SP =
DE JOR 2 56+ EE R 4 2 8 56
= 2 .058 0.51 +655
SIG JU

CT
N NC
CH TI 4 8 0 D Ls 8,N
=2 = 1 00.0
AI ON

ELE
NA D

ELECTRIC WIRE
GE EV
EL 0k T s 0 0 0 -2
I NG R E - 25 OP
6+ ME m/
h s hif
= 1 .00 m 34
53 SE
LD I 4 2.0 0m

RA DS
50 NT
U I T W E t = 8 46 T
s . H IP OUT

NA AR
B HU I C = 0 0.02 6 5 02
L E C

IRE
TR c H D

W
. 1
EC DE = 4. 146 -
D 227 = 2 ATA

TO
16 =
L S 40 27 56+7

RIC W
E IG 4 R 3

5
N m

G
T = . .
Ls 20. 741 308, 57

.74

IN
HU T T T SP
HU HUT HU EE = 0 N

LD
486

00
D Ts 10 0 0m -2

ELECT
U = = . 00 34

256+4
I

G
H 20 sh 1 52

BU
345
E 2 0

IN
k i ft . 4 m 58
IR m/ Es = 93 .65

LD
h 0
-2
R = 7.56 4.77 255 W L = 1 .20 2
T c . 8

I
C = 4 556
D = 2270 256 A

U I

BU
,N
ELEC T H D

m/h
E - CH DAT

R ES .22
+
M
TB

TRIC U
CT
6

WIRE H BU E
IG
N m
1

0k
ILD L S
HIP TOUT

m
E PE
=

IN

=2
ELEC
hift 7.8 m
ED
5

= 3 0.000

G
5

TRIC
0

G
=2
Es = 0. 3
WIRE
0

ED

IN
7

0
0k
SE

9
0.0

256

50
4

NS m
m/
0

ILD
+30
0

PE
DE 75.6 3
8

6+
SIG 27 BO h

L
0
= .79
M
TB

L
6

25
UN

BU

WA
=

1
Ls

DA
Ts

HU RY

RY
T SE
s

HI TOU
Lc

DA
GE
E P CH T D AL
RID

UN
-
D 227 = 2 ATA
L BO

E
UN
RB

ELECTRIC WIR
= 2 5 DA

BO
0
D/S R 1 1 6

+60
= 6 3.7 6.1 +53 RY
HS SIZ PE :M+220
- AJO
0 B M TY .256 NG
CH ISTI D

Ts 7 0 WA EL PR
EX AINE

0.0 9 4,N 1

256
= LL EC K
Es M OPO
S
U/ 7.2 00m -2 TR
T
RE

Lc = 0 49 34 IC 25 SE
E:

DE = 14 .436 m 54 W 6+ D
S
GP

m 52 I R 88 R S
96 256
SI .42
GN 9
.10 E 0 E HI ETO
.9 4

0
m T W E PC U

+70
3 +20 SP O A
18 O

36 0 D - 22 H T D
6+ FR

5 EE SE 25 LL

256
4 D HI TO
TB
M

7+ F R = 6 74 = 2 AT
A 31 23 =2
25 L

08 RO
S

E P C UT Ls = 4 3.4 29. 57+ A


GP
O AL

AT 6+0 ,N - 0k 0
BH M T = 0.0 58 60 10
D 5 2 m/ D - 22 H = DAT

75
0T W

T
U = 2 .41
h = 7 2 A S sh s = 10. 00 9, 4

4.7
R 29 319 56 N
08 RE

= 2 0 m
TO CH 865 Ls 80 .96 .68 +71 ELE i
Es ft = 9. 00 -2

43
7 34
6+ D

E = . 6 0 6 C T L = 9 m
13

S IP 26 m Ts 0 RIC 0

0
45 ,N c
25 E

/h 10 00 .1 4 49
00 0m 7

+80
W
.9

H -2 =
OS

D .
DING

m sh = 2 .00 m -2 IRE ES 34 151 04 51


23
0
34

. 0 k i 3 .1
E 80 .0 73 Es ft = 6.4 0m SET
7
KM OP

45 .3

256
20 O I 74
=

G
R = 2.0 70.9 6+15
-

= 10 0.1 52 U
D = 2269 = 25 TA

Lc = 2 0.0 24 30 T DA N 02m
D

HIP
,N
PR

R s = 3 0.0 = 0 T A
BUIL

. C H S
E - CH T DA

. 5

h
m ED DE = 3 86 2 37
63

L s= = E-2 = 25 PE

m/
7

47 PE SI 1.8 9 0 2 6+7
91

T ift 256 D = 9 7349.117 84 ED

0k
7

0
. GN 41 SETO
3.

Ts 20 00m
HIP TOU

90
sh 38 S +10 .447 ,N - 2 = UT
M

m
TB
sh = 24 000m
=

IP CH DATA
=2
= IGN SP R=7 20

6+
0 3452 H
Ls 800 3
Es

KM57
0.00
4

4
RE

EE 1

25
Lc ES .057 k E - 22 = 257+20
Es = 0 63

2
SE

KM56 Ts = 0 m
.

5.78 m

SE C 4
ED
0.1 21

D /
WI

h 7 6
2
.

= D = 2 507.539,N

HI - 22 .99 .000 m
D 2 Es = 4m
0

TO
.

NS m

20
DE = 8.5 48

PE

0.23
.

P
E
0 . 5 2 - 2344
IC

SIG 22

km Lc = 9 6
=

UT = 2 .972
11.5 m R=1

D = 2 10.0 857 7
0

H
TR

/h 0 .

=
0

R = 26. 01
DES 4 00m
ift

IGN 2m

DA 6+ ,N
Ls = 1

7
=

9
Ls s = = 0. 70 m D =
EC

SPE 0.000

TA 941 - 23
3
T = 23.1 m

5
T ift 0.9 99 EE
ED = 0 s

RE OP 7+ OX m
5
0
EL

Lc

2
SE +0 00

0
sh = 33.5 SP
20 km D/S 1

CO
PR H.25 : B 6.0
T 7 s h ift = 0.0 3

C YPE :1X G
/h

Es = GN
5 +0 S

NS
HIP OU

T AN IN 29
2 4 2

TR ED
NT 7 U / Es = 1

Lc ESI

SP IST 57+0
0
E - CH T DA .25

m
E

OS 020 CU
EXISTING CENTRE LINE

EX .2 :-
0

UC
PM .668
I

D
256 +000

LO

CHYPE : -
EV

22 = 2 TA H L

TI
VE +820 c

T ZE
E D C = 25

ON
PROPOSED CENTRE LINE 7

SI
N D 55 = 5 DESIG .824m
0

R = 19. 408.5 6+8

45
IO E - 2
AD

+00

CT G
6

11
UN AINA PROPOSED CARRIAGEWAY 6 7 N SPE
Ls 150 35 23,N 4
.25

J
D

R
NO N CH ED =

1.
212
IEL

I
D

LV
M G
Ts 10 000 = . M
20 km
CH

35
70. X - DESI -2 TB
A

3 /h

ER
453 .
AT m

5
4
SF

= 0 51
DS

sh 30 00m

T
23 i f . 7 4.2
RD

Es t = 0 962
R

77
WA

30
Lc = 2. .028

SE P C 74 67
A

2
W

HI - 22 2.8 00m m
DE = 41 58

km

TO H 47.
TO

E
TO

SIG .40

UT = 2 827
h

D = 6 10.0 148 9
ELE N S 5m
00

CTR

=
R

DA 57+ ,N
5+9

IC W PE

2
Ls s = = 0. 86 m D =
ED

TA 008 - 23
IRE

T
=
0
25

=2

.0 00
s
0k

hi = 1 3.94 SPE
DS

m/h
AR I

0
Es = GN
TO AJAN

1
f
m/

10
t
k

7. 6
Lc ESI
80 h

7+
=

25
ED
W

0
.
R

2
1
P E

45
S
0
+80
DS

04
WA LD

7 E
T

6.
EN
R

255

200
32
T FIE

OP
EL 0
EV 5+80
PLAN

9
D 5
SET

257+
N -2
O

IO
CT AGE O
R JUN AIN HIP UT DAT

20
H
NO
MI GN
C CH = A
CLIENT - X - DESI CONSULTANT - NAME OF WORK - E-2 DRG. NO. Package No. DPR- 3A (6) /P&P-19(i)
2747 257+162
R 0

km
A T
9.42 SCALE

/h
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND 3,N - H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN 2344
913.
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: 114
PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km256+000 to Km 257+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
MORSHI THARPARDI

NOT IN SCOPE
FROM KM 256+200 TO KM 256+300
NARA VILLAGE

VIP CH=:256+640.00
RETAINED

VIP LVL=:426.221

VIP CH=:256+770.00
CH=256+670.000
FROM KM 256+300 TO KM 256+480

CH=256+700.000
VIP CH=:256+470.00
CHAINAGE 256+220

CH=256+610.000

VIP LVL=:425.814
EXISTING GROUND AT-8m FROM PCL

LVL=426.127
CH=256+520.000
VIP LVL=:425.263

LVL=426.033
SPAN --

VIP CH=:256+350.00
PROPOSED ROAD LEVEL

CH=256+410.000

CH=256+420.000

LVL=426.051
EXISTING GROUND AT +8m FROM PCL

VIP LVL=:424.075
TYPE MAJOR BRIDGE

LVL=425.544

CH=256+840.000
LVL=424.669

LVL=424.768
EXISTING ROAD LEVEL

VIP CH=:256+995.00
LVL=424.066

VIP LVL=:420.196
CH=256+895.000
428

LVL=422.693
426
VIP CH=:256+040.00
CH=256+010.000

CH=256+070.000
VIP LVL=:419.275

424
LVL=419.458

LVL=419.375

422

420

418

416

256340 423.473 423.357 423.178 423.301

256620 426.430 426.118 425.664 426.101

256660 425.741 426.034 425.667 426.151

256900 420.696 420.223 420.125 422.571


256500 426.058 425.282 425.067 425.423

256700 425.298 425.891 425.479 426.033

256740 424.563 425.076 424.899 425.783

256780 424.635 424.992 424.666 425.283

257000 419.617 419.556 418.439 421.313


256020 419.489 419.000 418.671 419.405

256100 417.781 417.430 418.835 419.475

256160 418.796 417.635 420.026 419.675

256480 427.179 426.322 424.929 425.285

256600 425.814 426.112 425.518 425.995

256640 426.193 426.140 425.701 426.155

256680 425.343 425.997 425.600 426.095

256980 419.683 419.862 418.804 421.385


256380 424.396 423.640 424.152 424.248

256420 424.473 424.183 424.120 424.768

256880 422.071 421.674 421.669 423.068

256940 419.798 420.836 419.139 421.798


256000 418.581 418.939 418.764 419.519

256080 418.234 417.822 418.234 419.409

256140 418.096 418.062 419.552 419.609

256200 419.299 418.901 419.619 419.809

256440 424.328 425.237 424.403 424.957

256540 425.138 425.799 425.218 425.657

256720 425.027 425.545 425.261 425.939

256860 423.038 423.019 422.961 423.567

256920 420.161 420.145 419.379 422.139


256040 419.871 419.345 418.491 419.346
256060 420.013 419.096 418.206 419.350

256120 417.711 417.803 419.262 419.542

256180 418.869 418.351 419.914 419.742

256300 422.694 422.089 421.498 421.912


256320 423.067 422.696 422.376 422.662

256360 423.980 423.276 423.946 423.830

256400 424.230 423.640 423.732 424.556

256460 425.200 426.849 424.639 425.130

256520 425.082 425.677 425.132 425.544

256560 425.213 425.981 425.299 425.770


256580 425.178 426.093 425.341 425.882

256760 424.420 424.849 424.808 425.564

256800 424.442 424.634 424.426 424.940


256820 424.168 424.235 424.071 424.534
256840 423.587 423.759 423.614 424.066

256960 419.784 420.892 418.974 421.546


PROPOSED ROAD LEVEL(m)
______________________

EXISTING LEVEL BELOW


CENTER LINE (m)
____________________

EXISTING GROUND LEVEL


AT-8m FROM PCL (m)
------------------------------------

EXISTING GROUND LEVEL


AT +8m FROM PCL (m)
------------------------------------
256220
256240
256260
256280

CHAINAGE
256285.001
256225.001

256410.000
256070.000

256520.000

256610.000

256670.000

256700.000

256840.000

256895.000
256420.000
255880.000

256010.000

-0.609% K:63.702 0.333% 4.298% K:36.267 0.989% K:234.869 0.564% K:68.462 -0.313% K:64.108 -2.497% K:44.393
VERTICAL ALIGNMENT
LVC:60.00 LVC:120.00 LVC:100.00 LVC:60.00 LVC:140.00 LVC:200.00

20.000 20.000 L =30.490 15.000 15.000 10.000 10.000 10.000 10.000 10.000 L =9.745
10.000 10.000 L =6.462 L =45.674 L =7.068L =15.974 L =3.493 10.000 L =22.481
L =22.003 L =10.055
HORIZONTAL ALIGNMENT D: 27.7507 L =72.650 D: 0.6103 30.000 30.000 L =67.074 D: 119.3414 D: 14.9609 D: 10.9197 D: 13.7785 D: 5.5487 L =49.414 D: 1.1929 D: 22.8043 D: 12.0933 D: 9.4471L =52.634 10.000 D: 15.8155 10.000 10.000D: 7.7004 10.000 10.000
R: 80.000 R: 800.000 R: 7.000 R: 100.000 R: 50.000 R: 60.000 R: 100.000 R: 200.000 R: 80.000 R: 20.000 R: 70.000 R: 150.000 R: 250.000
VCL: 38.747 VCL: 8.522 VCL: 14.580 VCL: 26.112 VCL: 9.529 VCL: 14.429 VCL: 9.684 VCL: 4.164 VCL: 31.841 VCL: 4.221VCL: 11.542 VCL: 41.405 VCL: 33.599

SUPERELEVATION
e:-7.00% e:-7.00% e:-2.09% e:-2.09% e:7.00% e:7.00% e:-7.00%e:-7.00% e:-7.00% e:7.00% e:-7.00% e:7.00% e:-7.00% e:-7.00% e:-5.00% e:-5.00% e:7.00% e:7.00% e:-7.00%e:-7.00%e:7.00% e:7.00% e:5.00% e:5.00% e:5.00% e:5.00%
e:7.00% e:7.00% e:2.09% e:2.09% e:-7.00% e:-7.00% e:7.00% e:7.00% e:7.00% e:-7.00% e:7.00% e:-7.00% e:7.00% e:7.00% e:5.00% e:5.00% e:-7.00% e:-7.00% e:7.00% e:7.00%e:-7.00%e:-7.00% e:-5.00% e:-5.00% e:-5.00% e:-5.00%

PROFILE
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-19(ii) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km256+000 to Km 257+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
30
8,N
Ts -2
=2 sh = 12 34
0k 525
m/ Es ift = .493 8.6
h 0 52
Lc = 1. .208
=
DE 4. 56 5
SIG 221 MORSHI THARPARDI
N m
SP
EE
D
=2
0k
m/
h

P
KMROP
25 OSE
6+ D
88 R S
0 E HI ETO
TO W E PC U
25 ALL D - 22 H T D
7+ F
08 RO R = 6 74 = 2 AT
0 L = 3. 29 57 A
BH M T s = 40.0 458 .60 +10
S sh s = 10. 00 9, 4
N
ELE Es ift = 29. 000 m -2
CTR L = 7 9 m 34
IC W D
c
= 7. 0.10 4 49
IRE E 3 15 4 51
SI 4. 1 .1
G 30 74
N 2m
SP
EE
D
0

SETO
90

= U
20 HIP C T DATA
6+

KM57

H=2 SETOUT DATA SETOUT DA


25

km TA
2

E - 22 57
SE C 4

/h 7507. +206 HIP CH = 257+323 HIP CH = 25


HI - 22 .99 .000 m

7+468
TO H 3.

D=2 5 39,N
P
E

0. - 2344 E - 227603.941,N - 2344812.688 E - 227728.7


R = 1 526 62,N - 234473
UT = 2 972

878.2
D

00.00 14 D = 19.154 D = 11.654 9.664 SETOU


=
R = 26. 017

0m
DA 6+ ,N

Ls = 1 T
HIP CH DATA
7
9
=
Ls =

0.000 R = 60.000m R = 100.000m


TA 941 - 23
3
25 0.0 57

Ts = 2 m = 257+6
5
Ts ift =

0
RE OP 7+ OX m

00 0 3 Ls = 10.000m SETOUT DATA


2

E - 227 52
shift = .113
0

Ls = 10.000m
sh

D/S
CO
1

PR H.25 : B 6.0

7 + 87
0 D = 12.0 4.796,N - 2344
C PE :1X

25 7+0U/S HIP CH = 257+800


NS

0 Ts = 15.209
TY AN TING029

Es = 1 .042 Ts = 15.134
TR ED
SP IS 57+

628.134
0

5
5 R = 250 1 SETOUT DATA
m

E - 228000.581,N - 2344550.364
OS 020 CU
EX .2 :-
8
0

UC

.2 .668 shift = 0.042


0

shift = 0.069
CH PE : -

Lc = 2
.

CH .000m
TI
TY ZE

D = 5.952 HIP CH = 258+032


ON

5 Es = 0.561 Ls = 15
SI

DESIG .824m Es = 0.918


45

.00 6.174
Lc = 10.340m Ts = 33 0m R = 600.000m E - 228195.906,N - 234442
11

N SPE Lc = 10.058m
ED = .891
1.

Ls = 15.000m
SP

DESIGN SPE D = 16.848


LV

M
20 km DESIGN SPEED = 20 km/h shift = 0
35

TB

/h ED = 20 km/h .0
Es = 1.4 37
EE

ER

Ts = 38.691 R = 300.000m
5

T
D

26
Lc = 37 shift = 0.016 Ls = 15.000m
=

.58
DESIGN 1m
30

Es = 0.826
SE P C 74 67

Ts = 51.932
HI - 22 2.8 00m m

SPEED
km

TO H 47.

= 20 km Lc = 47.324m shift = 0.031


E
/

/h
UT = 2 827
h

D = 6 10.0 148 9

DESIGN SPEED = 40 km/h Es = 3.303


=
R

DA 57+ ,N

Lc = 73.214m
2
Ls s = = 0. 86 m D =

TA 008 - 23

DESIGN SPEED = 20 km/h


T
=
0 .0 00
s hi = 1 3.94 SPE

0
Es = GN

1
f

10
t

ELECTRIC WIRE
7. 6
Lc ESI

7+
D

25

PROP
0
. 2
1

NG KM
45

DI I NG 258 KM 25
04

IL G
IN UILD
BU
7 E

M
6.

TB

D
L B
200
32

UI
EL

B
9

EC

SET
257+

257+400
O
257+30

HIP UT DAT
TR

M
TB

257+500
20

CH = A
IC

E-2
2747 257+162 ELE
km

CTR

00
D= 9.42
/h

1 IC W
IR

3,N -
R = 3.764 SETOUT D

6
2344 IRE

257+
E

100. 913. ATA


000m HIP CH = 2

257+700
Ls = 114

CH.258+000
57+273 SETOUT DATA

258+000
10.0

257+800
E - 227565 SETOUT

257+900
Ts = 00m .310,N - 23 HIP CH = 257+35 DATA
1
shift 7.074 D = 8.428 44844.023
E - 227632.536,N
3 HIP CH =
257+440
= 0.0 R = 100.00 - 2344802.340 SETOUT DATA
Es = 42 0m D = 11.163 E - 22770
0 7.427,N - HIP CH = 257+503
Lc = .768 Ls = 10.00
0m R = 100.000m D = 8.428 2344757.2
41
SETOUT DATA
1
DES 4.023m Ts = 12.37
0 Ls = 10.000m R = 80.00 E - 227760.100,N
- 2344723.120 HIP CH = 257+
587 SETOUT DA
TA
IGN 0m D = 8.548 E - 227827.446 8 +1
SPE shift = 0.04 Ls = 10.00 ,N - 2344673.50 HIP CH = 2 5
ED = 2 Ts = 14.776 0m R = 100.000m SETOUT DATA
Es = 0.313 D = 7.400 7 .6 7 8
20 k
m/h shift = 0.042 Ts = 10.89
8 Ls = 10.000m HIP CH = 257+855 E - 228268
Lc = 4.709 shift = 0.0 R = 100.000m 10.720
m Es = 0.518 52 Ts = 12.476 E - 228049.777,N - 2344526.607 EXISTING CENTRE LINE D =
DESIGN S
PEED = 20 Lc = 9.484m Es = 0.269 Ls = 10.000m
D = 8.724 R = 200.000m
km/h shift = 0.042 Ts = 11.469 PROPOSED CENTRE LINE m
DESIGN SPEED Lc = 1.768
m Es = 0.321 R = 100.000m Ls = 10.000
= 20 km/h DESIGN S shift = 0.042 PROPOSED CARRIAGEWAY s = 23.766
PEED = 2 Lc = 4.919m Ls = 10.000m T
Es = 0.251
0 km/h
DESIGN SPEED = Ts = 12.631 shift = 0.021
Lc = 2.915m
20 km/h shift = 0.042 Es = 0.899
DESIGN SPEE m
D = 20 km/h Es = 0.332 Lc = 27.420
N SP E
Lc = 5.226m DESIG
DESIGN SPEED = 20 km/h

PLAN
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-20(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km257+000 to Km 258+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
MORSHI THARPARDI

VIP CH=:258+010.00
RECONSTRUCTION

VIP LVL=:439.739
CHAINAGE 257+020

CH=257+930.000
SPAN 1 X 6.0m
PROPOSED ROAD LEVEL EXISTING GROUND AT-8m FROM PCL

LVL=438.061
TYPE BOX CULVERT
EXISTING ROAD LEVEL EXISTING GROUND AT +8m FROM PCL
440

438

436

VIP CH=:257+520.00

CH=257+550.000
VIP LVL=:429.458
CH=257+490.000

LVL=430.087
434

LVL=428.993
432

VIP CH=:257+240.00

CH=257+280.000
VIP LVL=:425.117

LVL=425.738
430

CH=257+200.000
LVL=424.314
428
CH=257+095.000
LVL=422.205

426

424

422

420

418
257040 419.800 419.383 418.992 421.441

257160 423.019 422.340 422.740 423.511

257900 436.544 436.535 436.208 437.431


257920 436.853 436.883 436.552 437.851

257960 437.796 437.373 437.286 438.641


257000 419.617 419.556 418.439 421.313

257500 427.810 429.300 427.767 429.153

257780 433.780 433.707 433.432 434.913


257800 434.228 433.927 433.858 435.333
257820 434.877 434.702 434.418 435.753
422.254 421.581 422.071 422.305

257680 431.827 431.740 431.642 432.815


257700 432.317 432.708 432.018 433.235

257940 437.256 436.931 436.871 438.265


257280 424.742 424.698 424.408 425.738
257300 425.025 424.929 424.783 426.048
257320 425.278 424.965 425.177 426.358
257340 425.458 425.508 425.466 426.668
257360 425.709 425.709 425.675 426.978
257380 425.978 425.942 425.973 427.288
257400 426.387 426.960 426.271 427.598
257420 426.731 426.613 426.564 427.908
257440 426.788 427.184 426.875 428.218
257460 427.006 427.310 427.188 428.528
257480 427.423 427.758 427.490 428.838
257020 419.475 420.122 418.373 421.332

257080 421.128 420.727 420.960 421.929

257120 422.719 422.318 422.515 422.707


257140 422.922 422.432 422.646 423.109

257180 423.228 422.590 422.881 423.912

257240 424.098 423.620 423.894 425.072


257260 424.465 423.968 424.223 425.416

257520 428.253 428.802 428.006 429.499


257540 428.610 429.023 428.330 429.882
257560 428.934 429.413 428.815 430.297
257580 429.512 429.922 429.353 430.717
257600 429.960 430.444 429.828 431.137
257620 430.397 430.549 430.257 431.556
257640 430.884 430.911 430.694 431.976
257660 431.367 431.318 431.164 432.396

257840 435.274 435.244 435.027 436.172


257860 435.766 435.606 435.412 436.592
257880 436.337 436.042 435.787 437.012

257980 438.093 437.402 437.776 438.972


258000 438.450 438.096 438.228 439.259
257060 420.732 419.457 419.871 421.640

257200 423.463 423.083 423.183 424.314


257220 423.732 423.168 423.497 424.704

257720 432.748 433.046 432.453 433.654


257740 433.029 432.980 432.787 434.074
257760 433.319 433.432 433.112 434.494
PROPOSED ROAD LEVEL(m)
______________________

EXISTING LEVEL BELOW


CENTER LINE (m)
____________________

EXISTING GROUND LEVEL


AT-8m FROM PCL (m)
------------------------------------

EXISTING GROUND LEVEL


AT +8m FROM PCL (m)
------------------------------------
257100

CHAINAGE
257095.000

257200.000

257280.000

257490.000

257550.000

257930.000
K:44.393 2.009% K:174.534 1.550% K:109.486 2.098% K:90.657
VERTICAL ALIGNMENT
LVC:200.00 LVC:80.00 LVC:60.00 LVC:160.00

L =15.821 L =4.629 L =31.647 L =22.237 L =0.499 L =1.536 L =7.752 L =20.220 15.000 10.000 10.000
10.000 10.000 10.000 10.000 10.00010.000 10.000 10.000 10.000 10.00010.000 10.000 10.000 10.00010.00010.00010.00010.000 10.000 10.000 10.000 L =3.311
HORIZONTAL ALIGNMENTD: 13.3180 L =49.942 D: 49.1341 D: 8.0344 D: 14.7962 D: 2.6980 D: 9.6044 D: 5.4338 L =61.748 D: 1.2662 D: 5.9243 D: 2.8184 L =59.703 D: 1.6702 15.000 D: 8.6129 15.000 L =75.302 15.000 D: 4.5192 D: 2.9944 L =112.752 15.000
R: 60.000 R: 40.000 R: 100.000 R: 100.000 R: 100.000 R: 60.000 R: 100.000 R: 80.000 R: 100.000 R: 100.000 R: 100.000 R: 250.000 R: 600.000 R: 100.000
VCL: 13.947 VCL: 34.302 VCL: 14.023 VCL: 25.824 VCL: 4.709 VCL: 10.058VCL: 9.484 VCL: 1.768 VCL: 10.340VCL: 4.919 VCL: 2.915 VCL: 37.581 VCL: 47.324 VCL: 5.226
e:7.00% e:7.00% e:-7.00% e:-7.00% e:7.00% e:7.00% e:-7.00% e:-7.00% e:7.00% e:7.00% e:-7.00%e:-7.00% e:7.00% e:7.00% e:7.00% e:7.00% e:-7.00% e:-7.00%e:7.00% e:7.00% e:7.00% e:7.00% e:-5.00% e:-5.00% e:-3.13% e:-3.13% e:7.00% e:7.00% e:-5.00%
SUPERELEVATION
e:-7.00% e:-7.00% e:7.00% e:7.00% e:-7.00% e:-7.00% e:7.00% e:7.00% e:-7.00% e:-7.00% e:7.00% e:7.00% e:-7.00% e:-7.00% e:-7.00% e:-7.00% e:7.00% e:7.00%e:-7.00% e:-7.00% e:-7.00% e:-7.00% e:5.00% e:5.00% e:3.13% e:3.13% e:-7.00% e:-7.00% e:5.00%

PROFILE
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-20(ii) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km257+000 to Km 258+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
MORSHI THARPARDI

45
.7
19
43
34
Es = 0.0 9 24 05
-2
R = 4 85 25 TA
Ts = 8 6.23 47.2 8+4
,N
D - 22 H = DA

/h
E P C UT

+533 ENT
km
HI TO

M
20
Lc = 6 34.1 00m

AGE EVELOP
m
SE

=
DE = 6 .98 5

- 258
5
SI 4.5 6m

D
2m
EE

D
N CH CTION
GN 6
SP

AIN
N
AT D AJOR JU
ESIG
TO
67 JAL WAR
0.0

X-M
A TA 9 4 3 2 ALK DS
D +31
UT 234 HED TOW
E TO = 258 2,N - A ARD
S CH 0.84 S KA
HIP 2846 RAN
2 5 J A
E - 12.36 0m 258
S
GP

= . 0
0 + 533
D
= 250 081m
R 7. m/h
T A = 2 462m

RE
O U T D A s 0k
SETOUT DATA SE T T 1 . 1 m = 2
8+231 =

51
WI
HIP CH = 258+032 HIP CH = 25 23 44339.400 Es 53.95 PEED 258
+50
-

73.7
8 ,N = S

EL
6.174 .1 9
E - 228195.906,N - 234442 E - 228374 Lc IGN 0

IC

EC
S
DE

TR
2 0 .6 4 6

443
D = 16.848 =

TR
D

EC
0 0 m
R = 200.0

I
R = 300.000m

- 23
EL
m

W
Ls = 10.000

km/h
Ls = 15.000m

31,N 6
IR

285 258+47
Ts = 41.4 3 3

TA
Ts = 51.932

RE
shift = 0.021

= 20
HIP UT DA
shift = 0.031

WI

99.3
Es = 3.312

m
Es = 3.303

m
Ls = 50.000
=

ED
m

IC
Lc = 62.069

.000
Lc = 73.214m

R = .172

.105
/h

CH
EED = 20 km

Es = = 0.017
O
TR
P

SPE
S
DESIGN SPEED = 20 km/h N

DES 8.202m
DESIG

SET

Lc = 0.182
EC

0
E-2
4

4
2
1
1
D=
EL

IGN
ELECTRIC WIRE

Ts =
ALL FROM

shift
PROPOSED RE W 25
KM 258+180 BHS
258 KM 258+080 TO 8+
40
0
M
TB
00 3
CH.258+000

258+
258+000

258+100

258+200

TA SETOUT DATA
SETOUT DA EXISTING CENTRE LINE
= 2 5 8+108 HIP CH = 258+162
HIP CH 403.016 PROPOSED CENTRE LINE
78,N - 2344 E - 228316.537,N - 2344377.1
E - 228268.6 68 PROPOSED CARRIAGEWAY
D = 4.852
D = 10.720
m R = 300.000m
R = 200.000
1 0 .0 0 0 m Ls = 15.000m
Ls =
Ts = 20.212
Ts = 23.766
shift = 0.031
shift = 0.021
Es = 0.300
Es = 0.899
m Lc = 10.406m
Lc = 27.420 /h
EED = 20 km DESIGN SPEED = 20 km/h
DESIGN SP

PLAN
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-21(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km258+000 to Km 258+533
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
MORSHI THARPARDI

PROPOSED ROAD LEVEL EXISTING GROUND AT-8m FROM PCL


EXISTING ROAD LEVEL EXISTING GROUND AT +8m FROM PCL

VIP CH=:258+190.00

VIP CH=:258+320.00
VIP LVL=:440.339
446

VIP LVL=:439.050
CH=258+140.000
CH=258+090.000

CH=258+290.000
CH=258+240.000

CH=258+350.000
LVL=440.173
LVL=440.006

LVL=439.348
LVL=439.844
444

LVL=439.150
442

440

438

436

258040 439.020 438.383 438.728 439.701

258140 438.738 438.234 438.803 440.173


258160 438.844 438.568 438.950 440.213

258360 438.034 438.274 438.408 439.183

258520 439.571 439.432 439.685 439.713


258220 438.895 439.060 438.759 440.015

258260 438.227 439.304 438.308 439.645

258400 438.361 438.499 438.663 439.315


258340 438.031 438.291 438.357 439.128

258440 438.735 438.764 438.927 439.448


258000 438.450 438.096 438.228 439.259
258020 438.825 438.464 438.550 439.502

258060 439.075 438.331 438.786 439.856


258080 438.993 438.441 438.719 439.967
258100 438.753 438.079 438.664 440.039
258120 438.738 438.063 438.702 440.106

258280 438.001 438.823 438.295 439.447

258320 437.982 438.451 438.347 439.149

258380 438.192 438.406 438.522 439.249

258420 438.581 438.621 438.787 439.382

258500 439.329 439.290 439.611 439.647

439.756 439.756
258180 438.797 438.954 439.091 440.200
258200 438.851 439.260 438.985 440.134

258240 438.578 439.514 438.547 439.844

258300 438.023 438.684 438.352 439.260

258460 438.926 438.915 439.208 439.514


258480 439.109 439.101 439.415 439.580
PROPOSED ROAD LEVEL(m)
______________________

EXISTING LEVEL BELOW


CENTER LINE (m)
____________________

EXISTING GROUND LEVEL


AT-8m FROM PCL (m)
------------------------------------

EXISTING GROUND LEVEL


AT +8m FROM PCL (m)
------------------------------------

258533
CHAINAGE

258533.162
258090.000

258140.000

258240.000

258290.000

258350.000
K:90.657 0.333% K:75.475 -0.992% K:45.354 0.331%
VERTICAL ALIGNMENT
LVC:160.00 LVC:100.00 LVC:60.00

15.000 10.000 10.000 15.000 15.000 10.000 10.000 10.000


L =0.669 L =10.415 L =7.284 L =20.260 L =26.785
HORIZONTAL ALIGNMENT D: 13.9828 D: 7.8551 D: 1.9874 D: 17.7815 10.000 D: 12.3646 L =25.148 D: 46.2389 D: 1.8797 L =42.833
R: 300.000 R: 200.000 R: 300.000 R: 200.000 R: 250.000 R: 80.000 R: 250.000
VCL: 73.214 VCL: 27.420 VCL: 10.406 VCL: 62.069 VCL: 53.951 VCL: 64.562 VCL: 8.202

SUPERELEVATION
e:-5.00% e:5.00% e:5.00% e:5.00% e:5.00% e:-5.00% e:-5.00% e:-5.00% e:-5.00% e:-7.00% e:-7.00% e:5.00% e:5.00%
e:5.00% e:-5.00% e:-5.00% e:-5.00% e:-5.00% e:5.00% e:5.00% e:5.00% e:5.00% e:7.00% e:7.00% e:-5.00% e:-5.00%

PROFILE
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-21(ii) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km258+000 to Km 258+533
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
MISCELLANEOUS DRAWINGS
MANDATORY / REGULATORY SIGNS
Right of Way Signs Operational Control sign
As per IRC : 67-2022 Table 14.1 Sizes and Dimensions of 'STOP' signs

Approach Speed Font


Height Border Regulatory Signs
on minor road
in kmph
Size (mm) (mm)
Size
(mm) Shape/Size: Circle/900mm Dia.
GIVE
Upto 50 Small 750 25 175
Background: White WAY
Border: Red
51 - 65 Normal 900 30 210
Symbol/Text: Black
> 65 Large 1200 40 280

As per IRC : 67-2022 Table 14.3 Sizes and Dimensions of 'GIVE WAY' signs
Height Border Fig. 14.01 Fig. 14.02
Approach Speed on Fig. 14.39
Size (mm) (mm) STOP
minor road in kmph GIVE WAY MAXIMUM SPEED LIMIT
Upto 50 Small 600 45
51 - 80 Normal 900 70
> 80 Large 1200 90
Compulsory Direction Control

Prohibitory Signs
Shape/Size: Circle/600mm Dia.
Background: White
Border: Red
Symbol/Text: Black

Fig. 14.31 NO PARKING


Fig. 14.19 Fig. 14.24 Fig. 14.30
HORN PROHIBITED NO PARKING
OVERTAKING PROHIBITED NO STOPPING
Compulsory Direction Control sign Define Plate to Fig. No. 14.31
(Optional)

As per IRC : 67-2022 Table 14.4 Sizes and Dimensions of Mandatory & Regulatory signs
Compulsory Signs
Shape/Size: Circle/600mm Dia. Design Speed in Diameter Border Oblique Font Size
Background: Blue Kmph (mm) (mm) Bar (mm) (mm)
Symbol/Text: White 300 35 35 75
Upto 65
600 50 50 100
66 - 80 750 60 60 125

Fig. 14.50 Fig. 14.52 81 - 100 900 75 75 150

COMPULSORY KEEP LEFT PASS EITHER SIDE 101 - 120 1200 100 100 225
101 - 120 1500 125 125 250

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6)/MIS-01(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM ROAD SIGNS
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CAUTIONARY / WARNING SIGNS

Fig. 15.05 Fig. 15.06 Fig. 15.07


Fig. 15.01 Fig. 15.02
RIGHT REVERSE BEND LEFT REVERSE BEND SERIES OF BENDS
LEFT HAND CURVE RIGHT HAND CURVE

Fig. 15.09 Fig. 15.10 Fig. 15.12 Fig. 15.13 Fig. 15.14
Fig. 15.11
SIDE ROAD RIGHT SIDE ROAD LEFT Y- INTERSECTION Y- INTERSECTION CROSS ROAD
Y- INTERSECTION

Fig. 15.23 Fig. 15.24 Fig. 12.25


Fig. 15.18 Fig. 15.19 Fig. 15.20
NARROW ROAD AHEAD ROAD WIDENS NARROW BRIDGE AHEAD
T- INTERSECTION MAJOR MAJOR ROAD AHEAD STAGGERED INTERSECTION
ROAD AHEAD

Warning Signs
Shape/Size: Triangle/900mm Each Side.
Background: White
Border: Red
Symbol/Text: Black
Fig. 15.03 Fig. 15.04
RIGHT HAIRPIN BEND LEFT HAIRPIN BEND

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6)/MIS-01(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM ROAD SIGNS
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CAUTIONARY / WARNING SIGNS

Fig. 15.33 FIG. 15.49 Fig. 15.34 Fig. 15.35 Fig.15.15


PEDESTRAIN CROSSING SPEED BREAKER SCHOOL AHEAD BUILT-UP AREA ROUNDABOUT

FACILITY INFORMATORY SIGNS

500m 500m
Fig. 17.01 Fig. 17.05 Fig. 17.06 Fig. 17.07 Fig. 17.13 Fig. 17.35
EATING PLACE TOILET FILLING STATION (FUEL PUMP) HOSPITAL POLICE STATION BUS STOP

Information Signs
Shape/Size: Sqare/Rectangular 600mm X 800mm
Background: White
Border: Red
Symbol/Text: Black

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6)/MIS-01(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM ROAD SIGNS
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
Destination1

10 50 125
Destination1 Destination2 Destination1 Destination2 Destination3

Fig. 16.11 GANTRY MOUNTED ADVANCE DIRECTION AHEAD


OF A AT GRADE JUNCTION
Destination2 Destination3

STACK TYPE ADVANCE DIRECTION SIGN Fig. 16.01


(SHOULDER MOUNTED) STACK TYPE ADVANCE DIRECTION SIGN
(SHOULDER MOUNTED)

Destination1 Destination1
TABLE 8.3 COLOUR PATTERN FOR DIRECTION INFORMATION SIGNS
ROAD TYPE BACKGROUND ARROW/BORDER/LETTER
Destination1
Sr.No
Destination1
1 Expressway Blue White
2 National Highway (NH) Green White
3 State Highway (SH) Green White
4 Major District Road (MDR) Green White Fig. 16.04
5 Village Road (ODR & VR) White Black Fig. 16.06 PLACE IDENTIFICATION SIGN
6 Urban/City Road Blue White
FLAG TYPE DIRECTION SIGN
Other Scenario
7 Tourism Related Signs Brown White
8 Village Road (ODR & VR) Yellow Black

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6)/MIS-02 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM INFORMATORY SIGNS
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
B
A

H G
D D

No Shoulder Shoulder

Table 4.1
Height and Clearence Required
for Sign Placement
Minimum Desirable Maximum
(mm) (mm) (mm)
A 600 1000 2500
B 1000 2000 3000
C 300 600 1000
D 2000 2000 2500
E 2100 2100 2500
F 5500 6000 6500
G 750
H 5000
I 5000 7000 9000
J 1800 2000 2500

C
C F

I
J Carriageway
E D Edge Line
Kerb

Footway
Kerb
Shoulder Verage

Siting of Sign with Respect to Carriageway


(Height and Clearance)
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-03(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM SITING OF SIGN BOARDS
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
C
C F

I
J Carriageway
E D Edge Line
Kerb

Footway
Kerb
Shoulder Verage
Table 4.1
Height and Clearence Required
for Sign Placement Siting of Sign with Respect to Carriageway
Minimum Desirable Maximum
(mm) (mm) (mm)
(Height and Clearance)
A 600 1000 2500
B 1000 2000 3000
C 300 600 1000
D 2000 2000 2500
E 2100 2100 2500
F 5500 6000 6500
G 750
H 5000
I 5000 7000 9000
J 1800 2000 2500

C
C F F

I
J Carriageway
E D Edge Line
Kerb

Footway
Kerb
Shoulder Verage

Siting of Sign with Respect to Carriageway


(Height and Clearance)
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-03(ii) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM SITING OF SIGN BOARDS
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
300
(Min.) 600
FRL (Min.)

SHOULDER EDGE
Chamfer 50x50

50 1000
Concrete Pedestal (Min.)
(M25)

450
X X

Post to be Painted With PCC M10 50 Post to be Painted With


Alternate 250mm Wide Alternate 250mm Wide
Black & White Bands 75 450 75 Black & White Bands
2100
(Min.) DETAIL - 'A' 2000
(Min.)
65mmØ NB Light 65mmØ NB Light
Class Tube Class Tube

65Ø NB Light 75
Class Tube
100 Sq. BasePlate
6mm Thick 300
450X450X300mm
Concrete Pedestal
75
Interlocking Tiles
75 450 75
KERB
3.0%
2.0% SLOPE
SECTION - 'AA'

2
1

G.L.
450
DETAIL - 'A' DETAIL - 'A'

URBAN RURAL 60°

b
b
600
Rivet 60° 60°
TYPICAL POSITION OF SIGN POST ON MAIN CARRIAGEWAY Welding
b
Supporting Frame Supporting Frame Properties of Equalateral Triangle
ISA - 25 x 25x 3 ISA - 25 x 25x 3
All dimensions are in mm
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-03(iii) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL POSITION OF SIGN POST ON MAIN CARRIAGEWAY
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
600

400

12
00
70

400
800
1200
12MM HOLE

35X35X4
MS ANGLE GALVANISED ALUMINIUM SHEET
3MM THK.
Post to be Painted With Post to be Painted With
Alternate 250mm Wide Alternate 250mm Wide
Black & White Bands Black & White Bands
ALUMINIUM SHEET
2100 2100
3MM THK.
(Min.) (Min.) ANGLE IRON(GALAN)
65mmØ NB Light 35X35X4 65mmØ NB Light 35X35X4
Class Tube MS ANGLE GALVANISED Class Tube

ANGLE IRON (GALAN)


35X35X4
REAR VIEW

Interlocking Tiles Interlocking Tiles

2.0% SLOPE KERB REAR VIEW 2.0% SLOPE KERB

GI Pipe (As per IS 1239) GI Pipe (As per IS 1239)


Nominal Bore 65.00mm Nominal Bore 65.00mm

As per IS 67-2012 As per IS 67-2012


Clause No.7.1 Page No.19 Clause No.7.1 Page No.19

FRONT VIEW FRONT VIEW


CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-03(iv) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM DETAILS OF SIGN BOARDS
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
40
900
750

1200
12MM HOLE 12MM HOLE

ALUMINIUM SHEET
3MM THK.
ALUMINIUM SHEET
Post to be Painted With 3MM THK. Post to be Painted With
Alternate 250mm Wide Alternate 250mm Wide
Black & White Bands Black & White Bands ANGLE IRON (GALVANISED)
2100 ANGLE IRON (GALVANISED) 2100 35X35X4
(Min.) 35X35X4 (Min.)
65mmØ NB Light 65mmØ NB Light
Class Tube Class Tube

REAR VIEW

Interlocking Tiles Interlocking Tiles


REAR VIEW
2.0% SLOPE KERB 2.0% SLOPE KERB

GI Pipe (As per IS 1239) GI Pipe (As per IS 1239)


Nominal Bore 65.00mm Nominal Bore 65.00mm

As per IS 67-2012 As per IS 67-2012


Clause No.7.1 Page No.19 Clause No.7.1 Page No.19

FRONT VIEW FRONT VIEW

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-03(v) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM DETAILS OF SIGN BOARDS
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
Post to be Painted With Post to be Painted With Post to be Painted With
Alternate 250mm Wide Alternate 250mm Wide Alternate 250mm Wide
Black & White Bands Black & White Bands Black & White Bands

65mmØ NB Light 65mmØ NB Light 65mmØ NB Light


Class Tube Class Tube Class Tube
FRL

Chamfer 50x50

50 1000
Concrete Pedestal (Min.)
(M25)

450
X X

PCC M10 50

75 450 75
DETAIL - 'A'

65Ø NB Light 75
Class Tube
100 Sq. BasePlate
6mm Thick 300
450X450X300mm
Concrete Pedestal
75

FRONT VIEW FRONT VIEW FRONT VIEW 75 450 75


SECTION - 'AA'

REAR VIEW REAR VIEW

GI Pipe (As per IS 1239)


Nominal Bore 65.00mm
As per IS 67-2012
Clause No.7.1 Page No.19

REAR VIEW

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-03(vi) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM DETAILS OF SIGN BOARDS
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
500

VARIES

250

250
250

80 50
ROUTE NO. ROUTE NO.

100
350 350 250

50 50 50 50
6

50 80 50

50 80 50

350
250

175

175

175

220
ROUTE NO. ROUTE NO. TERMINAL STATION STARTING STATION

50 50 50

130

130
50

5
PLACE NAME KILOMETRAGE
PLACE NAME KILOMETRAGE

1073

1073
560

560

130

300
50 80 50

50 80 50
695

695
660

695
385

385
385

400
NEXT IMP. STATION NEXT IMP. STATION

130
KILOMETERAGE KILOMETERAGE

100
10 10

130

130
KILOMETRAGE KILOMETRAGE 100 150 100 100 100 100

10
100

100

100
10 10

75

75
SECTIONAL ELEVATION SIDE ELEVATION
350 350

270
250

130

130

130
130

130
370 370
150 150 100
FACE - 1 FACE - 2 500

600
520 500 150 150 Ø
520

10

100
10
TYPICAL DESIGN OF 350
TYPICAL DESIGN OF

150
370
KILOMETRE STONE KILOMETRE STONE FACE I

100
FACE II

270
250
SECTIONAL PLAN

600
SIDE ELEVATION Ø

600

300

100
10

100
500
520
100 150 100
DETAIL OF 5TH KM. STONE

150
SECTIONAL PLAN

PLAN SCHEDULE OF
SIDE ELEVATION REINFORCEMENT
TYPICAL DESIGN OF 200 METERE STONE

ROUTE
NUMBER

PLACE NAME

KILOMERAGE

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6)/MIS-04(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL DRAWING FOR 1KM, 5TH KM, 200
METER, BOUNDARY STONES & GUARD POST
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
185

M-20 GRADE R.C.C


300

MAIN BARS 4 NOS 6mm DIA


185

STIRRUPS 5 NOS 6mm DIA


185

G.L. G.L. G.L. G.L.


600
185

M-15 GRADE C.C


150

150 250 150 150 250 150

ELEVATION
SECTION ON AB
150 200 150
150

BAR BENDING SCHEDULE


NO OF LENGTH OF M.S.
Sr.No TYPE OF SHAPE OF DIA IN
BARS BAR INCLUDING
M.S. BAR BARS MM
HOOKS
1 Main Bars 2 6mm 2.0 m A B
200

2 TopMost Stirrup 1 6mm 600 mm


3 Stirrup (First) 1 6mm 600 mm
4 Stirrup (Second) 1 6mm 600 mm
5 Stirrup (Three) 1 6mm 600 mm
6 Bottom Stirrup 1 6mm 600 mm
150

PLAN

TYP. BOUNDARY STONE DESIGN WITH R.C.C AS MATERIAL

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6)/MIS-04(ii) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL DRAWING FOR 1KM, 5TH KM, 200
METER, BOUNDARY STONES & GUARD POST
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
LONGITUDINAL MARKING (LM)
IRC:35-2015 - Table : A.1
NO OVERTAKING FOR TRAFFIC APPROACHING NON-VISIBILITY
WARNING CENTRELINE STRETCH, BUT OVERTAKING OPPORTUNITY FOR TRAFFIC LEAVING
NORMAL CENTRELINE LM04/LM05 NON-VISIBILITY STRETCH
LM23 LM23 LM23 LM01/LM02 (7-SEGMENTS) LM28/LM29

0.15 0.15 0.15


3.0 6.0 3.0 6.0 3.0 LM01/
6.0 3.0 6.0 3.0 LM04/ LM24
LM02 LM05

0.15 0.15 0.15

NO
NO VE 6/LM
LM23 LM23 LM23

O 2
N RTA 27
LM

VI
SI KIN /HM
NORMAL SECTION WARNING SECTION NO-OVER TAKING SECTION

BI G 10
LIT C /H
Y EN M1
ST TR 1
TWO LANE DIVIDED CARRIAGEWAY

RE EL
TC IN
A

H E
WSD MVD

EBL
FIR
ST
LAP
W
VIS HICH F MVD
O A
IBIL MA A
WSD = WARNING SIGHT DISTANCE A& IT Y B TUAL T
BR E
MVD = MAXIMUM VISIBILITY DISTANCE EGA TWEEN
INE
SBL = START OF BARRIER LINE D

B
EBL = END OF BARRIER LINE
LM04 (7-SEGMENTS)

FIR YOND ISIBIL B


MA TWEE O EXI
BE
ST

M
BE ES T
TUA
CA

LAP HIC

VD
S

LV A&

OF H
W
N

MV
D
ITY
STOP MARKING

ST
CARRIAGEWAY

A
CARRIAGEWAY LM19 SBL
CARRIAGEWAY
PAVED SHOULDER TM03 PAVED SHOULDER

NO OVERTAKING FOR TRAFFIC APPROACHING


NON-VISIBILITY STRETCH, BUT OVERTAKING
OPPORTUNITY FOR TRAFFIC LEAVING
NON-VISIBILITY STRETCH
PROCEDURE TO ESTABILISH NO--OVERTAKING CENTER LINE
D=2.5m 1.5m to 6m
Max=15m STOP 30 m TM04

LM28/LM29
WSD
STOP

DM01/DM02 LM23

LM23 COARSE TEXTURED RUMBLE STRIP


MADE OF PREMIX OR ANY EQUIVALENT
OF 200-300MM WIDE AND OF
20-30MM HEIGHT

LM04

RUMBLE STRIP IRC:35-2015

WARNING CENTRELINE
Table A.1 Longitudinal Marking (LM)

(7-SEGMENTS)
LM04/LM05
MAJOR ROAD WITH PAVED SHOULDER
Marking Length of Line Length of Width Colour
Type
Abbrevation Segment (mm) Gap (mm) (mm)
LM01 BROKEN 3000 6000 100 WHITE

LM02 BROKEN 3000 6000 150 WHITE

LM04 BROKEN 6000 3000 100 WHITE

NORMAL CENTRELINE
LM01/LM02
LM05 BROKEN 6000 3000 150 WHITE
LM23 NA NA 100 WHITE
LM24 NA NA 150 WHITE

15.0
1.0 1.0 FM14 1.0 1.0

3.0 1.0

1250mm
STOP
BUS

Width
1.0
0.10

KERB WITH PARKING


RESTRICTION MARKINGS DETAILS OF PICK UP BUS STOP MARKING
All dimensions are in meter (m)

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6)/MIS-05(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL ROAD MARKING
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
ARROW MARKING (AM)
IRC:35-2015 - Table : B.1
0.5 0.5 0.5 0.5

0.85 0.85 0.85


1.2 1.2 1.2 1.2
0.1 1.5 0.2 0.2 1.5 0.2 1.5
0.1 0.1 0.1 0.1 0.1
0.1
0.65 0.65 0.65
0.1
0.8 0.8 0.1 0.8
3.5 0.3 3.5 3.5
0.3 0.6 3.5 0.6 0.6
0.4 0.4
0.4 0.4 0.4
0.2 1.5 1.5 0.2 0.2 1.5
1.25 0.8 1.25 1.25
0.4 0.8 0.8

0.3 0.3 0.3 0.3 0.3 0.3 0.3


AM01 AM02 AM03 AM04 AM05 AM06 AM07
0.5 0.5 0.5

1.4 1.4
2 2 2
2.5 0.3 0.3 2.5
0.1 0.2 0.2 0.1
0.1
1.1 1.1
0.1 0.1

5 5 0.3 0.3 5 5 5
0.8 0.8

0.7 0.7
0.4 0.4
2 2 1.9
1.9 0.2 0.2
1.3 1.3

0.3 0.4 0.4 0.3 0.3

AM08 AM09 AM10 AM11 AM12

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6)/MIS-05(ii) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL ROAD MARKING
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
&

PLAN W- BEAM CRASH BARRIER WITH END TERMINAL( START AND END)

' '

&

ELEVATION OF W- BEAM CRASH BARRIER WITH END TERMINAL( START & END)

&

PCC M15

DETAIL 'A'
CHANNEL SECTION FOR
POST & SPACER

Design Speed in km per hr. Flare Rates


100 17:1
80 14:1
60 11:1
40 8:1
DETAILS AT POST

ø &
{ ' ' , ,
,
( ,
) }
SPLICE BOLT AND NUT
W-BEAM

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6)/MIS-06 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL DETAILS OF MATAL
BEAM CRASH BARRIER
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
HAZARD MARKERS

Fig. 15.74 Fig. 15.75


SINGLE CHEVRON(NORMAL) SINGLE CHEVRON Fig. 15.78 Fig. 15.79
(>100KMPH SPEED) OBJECT HAZARD OBJECT HAZARD
(LEFT) (RIGHT)

Fig. 15.80 Fig. 15.76 Fig. 15.77


TWO WAY HAZARD TWO WAY HAZARD TWO WAY HAZARD
MARKER MARKER MARKER

DETAILS OF HAZARD MARKER & CHEVRON MARKER


AT FOUR LANE SECTION

' '
' '

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-07 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL DETAIL OF HAZARD MARKER
AND CHEVRON MARKING
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
NORMAL SECTION
Paved

WARNING SECTION

DIVIDER/CHANELISER IN ACCESS ROAD


Paved

DETAIL OF CAT EYES (ROAD STUD)


NO OVERTAKING SECTION
MEDIAN OPENING PLAN
Paved

BUILTUP SECTION

Structure portion and adjoining Structure portion and adjoining


180 m on either side 180 m on either side
Paved

DETAIL OF CAT EYES (ROAD STUD)


AT PEDESTRIAN CROSSING

DETAIL OF ROAD STUD AT STRUCTURE PORTION

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-08(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL DRAWING OF ROAD STUD
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
NO-OVERTAKING
SECTION

CURVE RADIUS 751m TO 2000m AND


CURVE RADIUS UPTO 450m CURVE RADIUS 451m TO 750m CRITICAL SECTION
Warrants for Road Studs for Two Lane Section
IRC:SP:73-2018 Table 9.1
Sr. Description of section Length Spacing Location &Colour
No.
1 Curve radius upto 450 6m
All sections of
Project Highway Curve length including
2 Curve radius 451 to 750 9m
having horizontal transition with 20 m on either
Curve radius 751 to 2000 m side. Red-White Bidirectional on
3 curves 18m
and critical section shoulder side & Yellow-Yellow
Bi-directional on Centreline of No
All sections of Length including vertical grade
Length of high-way where overtaking portions and
Project Highway
4 vertical gradient is 2.5% and and curves and adjoining 180 m 9m White-White Bidirectional sign for
100 having horizontal
above and its vertical curves portion on either side centreline of other reaches
curves
REFLECTIVE PANEL
A ll sections of
Project Highway Sections where over-taking
5 Length of no overtaking zone. 6m
where overtaking prohibited
prohibited

90 6 Structure portion and adjoining


Structure 9m
ROAD STUD All Major/Minor 180 m on either side
Red-White Bidirectional on
Bridge, ROB and all
DETAIL (SIDE VIEW) structures (Inter-
App roach length including the
length of acceleration/decel-
shoulder side & Yellow-Yellow
7 change/Flyover/ Approaches 18 m Bi-directional on Centreline of No
VUP) eration length if any and 180 m overtaking portions and
adjoining on either side. White-White Bidirectional sign for
Built-up Length of built up from the start centreline of other reaches
8 Built-up areas 9m
area/settlement/villages to end

100 Entry/exit slip roads and


Length of both side edge lines
9 All entry/exit slip of slip roads/ramp+edge line of 9m Red colour on edge lines
ROAD STUD roads/ramps and ramps
acceleration/ deceleration lane
its acceleration
DETAIL (TOP VIEW) /deceleration Chevron/diagonal markings on Red Colour for Chevrons/diagonal
10 gorge 6m markings
lanes
Continuity line for ac- Length of crossable continuity
Green Colour for crossable
11 celeration/deceleration lane line for lane changing of 8m continuity line
for entry/exit of slip entry/exit slip roads
Length of Shoulder and median Red colour on Shoulder side and
12 Storage lane and ac- 9m
edge lines Yellow Colour for median sides
celeration/ deceleration
All junctions and lanes including 180 m on Red Colour for Chevrons/diagonal
13 Chevron/diagonal markings 6m
median openings either side markings
3 rows at
14 Across the carriage way At the start of acceleration lane Green Color
1m apart
2 rows & at
Pedestrian Crossing For zebra crossing marking At four corners of all block of
15 0.5 m Yellow Color
Zebra crossing markings
spacing

All dimensions are in meter (m)

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6)/MIS-08(ii) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL DRAWING OF ROAD STUD
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
B
2m PERFORATED SLAB
RCC WALL BED LEVEL
A
FLEXIBLE APRON
A

3m
1m COURSE SAND 1m

1m GRAVEL 1m
Cap
PLAN B
PERFORATED SLAB
BED LEVEL
1m BOULDER 1m
FLEXIBLE APRON

1m COURSE SAND 1m

Cap
1m GRAVEL 1m
Non Perforated Pipe

1m BOULDER 1m

Details `A'

NON PERFORATED PIPE

Rock level
5m

5m

Details `A'
Rock level

Rock level PERFORATED PIPE

PERFORATED PIPE

Aquifer

Aquifer

5m

5m

NOTE:- (i) REFER WRITTEN DIMENSIONS


150mm PVC PIPE 150mm PVC PIPE ONLY UNLESS OTHERWISE SPECIFIED
SECTION A-A SECTION B-B (ii) THE DRAWING TO BE READ IN CONJUNCTION
VERTICAL DRAIN/WATER HARVESTING STRUCTURE VERTICAL DRAIN/WATER HARVESTING STRUCTURE WITH STRUCTURE DRAWING
REFERENCE :- AS PER CPWD MANNUAL.

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6)/MIS-09 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL DRAWING FOR
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 & RAIN WATER HARVESTING
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
TOP COVER SEAL ALL AROUND WITH A WATERING
NB110L 4.5MM THK. APPROVED SEALING COMPOUND
4250
1200 1200 1200
50

110
NO WELD
12MM Thk. BACK-UP BAR
ACROSS(TYP)
FOR TOP COVER
2 3 10MM THK.

12(TYP)
65NB(L) PIPE

25
NA
5
NB 300H 6.3MM THK. ARM TYP
1525

O
5

AG
DI
VERTICAL 12MM Thk. PLATE

1525
CHORD

8 DETAIL-4
8 THESE DIMENSIONS VARY
LINEARLY BETWEEN 50 AND K SCALE 1:10

200
DIAGONAL
350 3600 A 300
MEMBER

12MM Thk.
STIFFENER PLATE
12MM Thk. PLATE
CORNER COPED
C
2500

NB300H PIPE 6.3MM THK DETAIL C


SCALE 1:25
ELEVATION 10mmø @ 150mm
ARM CONNECTION DETAIL C/C At Top
SCALE 1:10

600
12mmø @150mm
10mmø @ 150mm
C/C at Bottom
DRILL AND TAP 2 HOLES C/C At Top
FOR 12.7mm DIA BOLTS

2500

600
NO WELD ACROSS (TYP)

400 300 20(TYP)

60(TYP)
VERTICAL COLUMN

10(TYP)
200
25X25
COPE 12X12 (TYP) CHAMFER 4

TYP
6mm Thk. TOP 5
6200

COVER PLATE

CHORD
10 10 12mmø @ 150mm
ARM 12MM Thk. PLATE C/C At Bottom
DETAIL-A
ARM SCALE 1:25

75
10 PLAN 1-1
25 250
12MM Thk. SCALE 1:25
STIFFENER PLATE 25
PLAN
SCALE 1:10 LEG

2-19 DIA DRAIN HOLES


180 APART AND 50mm
UP FROM TOP OF BASE PLATE F TYP
F
8
TYP
8
IDENTIFICATION PLATE

498 20mm THICK

300
STIFFENER PLATE (TYP)

NOTES:
M24 BOLT 12
1) ALL DIMENSIONS ARE IN MM AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE

40
2) ALL NON-STAINLESS STEEL BOLTS NUTS AND WASHERS SHALL BE ACCORDING TO
ASTM A325M AND BE HOT DIP GALVANIZED UNLESS SPECIFIED OTHERWISE.

380
3) ASTM A325 1" (M25.4) BOLTS MAY BE SUBSTITUTED FOR M24 BOLTS AND SHALL BE HOT

25
DIP GALVANIZED.
12MM THK. CHAMFER STIFFENER 25X25(TYP)

45
EL+0.15M 500 4) ALL BOLTS SHALL BE INSTALLED BY TURN OF NUT TIGHTENING IN CONFORMANCE
PLATE WITH CAN/CAS S6-06.
TOP OF PEDESTAL 5) ALL STRUCTURAL STEEL SHALL BE GALVANIZED AFTER FABRICATION . LEGS ONLY
EL+0.00M 25MM THK. BASE PLATE
SHALL BE SUBSQUENTLY COATED WITH AN APPROVED PAINT SYSTEM ACCORDING TO
PLATE OPSS 911.
F.G.L 40 12MM THK.
500 6) STRUCTURE SHALL NOT BE ERECTED UNTILL FOUNDATION CONCRETE HAS REACHED
CORNER COPED 80 OF SPECIFIED STRENGTH.
40 7) NO SHOP SPLICES SHALL BE ALLOWED IN ANY MEMBERS.
DETAIL 3 8) ELEVATIONS TO BE VERIFIED IN THE FIELD BEFORE SIGN SUPPORT STRUCTURE
SCALE 1:10 8-BOLT DIA + 26mm HOLES
FABRICATION.
EQUALLY SPACED
9) THIS STANDARD TO BE READ IN CONJUNCTION WITH SS118-3 ( FOOTING FOR GROUND
MOUNTED SIGNS) AND /OR SS118-4 ( FOOTING FOR SYMMETRICAL MEDIAN MOUNTED
SIGN) AND /OR SS118-5( FOOTING FOR ASYMMETRICAL MEDIAN MOUNTED SIGN.)
8 STIFFNERS EQUALLY
10) EACH SIGN SUPPORT SHALL HAVE AN IDENTIFICATION MARKING SHOWING THE
2 30 SPACED
2 STRUCTURE I.D NUMBER, THE DESIGN SIGN AREA, CORRESPONDING ECCENTRICITY,
0
THE LOCAL REFRENCE WIND PRESSURE AS SHOWN IN TABLE1, THE MANUFACTURERS
NAME OR TRADEMARK , AND THE DATE OF MANUFACTURE. THIS 4mm THICK

23°
RECTANGULAR STAINLESS STEEL PLATE SHALL HAVE A RUBBER BACKING, AND BE OF
SUFFICENT DIMENSIONS TO ACCOMMODATE THE REQUIRED INFORMATION USING 6mm
8 8-BOLT M24MMDIA HIGH ENGRAVED LETTERING . THE PLATE SHALL BE ATTACHED TO THE LEG OF THE
2500 BELOW NGL

8 TYP
8 8 STRUCTURE BY MEANS OF STAINLESS STEEL BEND CLAMPS THAT GO THROUGH
TYP F VERTICAL HOLES AT EACH SIDE OF THE PLATE, PASS BEHIND THE PLATE , AND WRAP
8 TYP
0.26 X INSIDE AROUND THE LEG. NO DRILLING INTO THE HSS FOR ATTACHMENT OF PLATE IS
F
PERMITTED.
DIA.
2 OPENING BASE DETAIL 11) ALL CONTACT SURFACES OF GUSSET PLATES HAVING ERECTION BOLTS SHALL BE
WELDED AFTER ERECTION AND ALINGMENT.
1 SCALE 1:10 12) STRUCTURAL STEEL USED SHALL CONFORM TO IS2062 AND is 1161:2014
1
13) CLEAR COVER FOR COLUMNS AND FOOTING 50mm WILL BE USED.
14) NET BEARING CAPACITY IS CONSIDERED 10T/M2 AT 2.5M BELOW FGL.
25MM THK. 15) NOT ANY FOUNDATION SHALL BE REST ON FILLED UP SOIL.
PLATE 12MM THK. 16) GRADE OF CONCRETE SHALL BE
STIFFENER R.C.CM25 -PEDESTAL
600 R.C.CM25 -FOOTING
10mmø @ 150mmC/C
P.C.CM10 -LEVELING COURSE
17) LEGEND: SST DENOTES STAINLESS STEEL.

8mmø200c/c LINK

600
400

200

75
50

DETAIL 2 12Nos.-12mmø bars


2500 SCALE 1:10
12mmø @ 150mmC/C

STRUCTURAL G.A OF CANTILEVER GANTRY STRUCTURE PLAN 2-2


SCALE 1:25
SCALE 1:25
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6)/MIS/10 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
TYPICAL GENERAL ARRANGEMENT
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM DRAWING FOR CANTILEVER GANTRY
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
BASE PLATE 550X550X25 THK
60°
13200

275

60
60
1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 4 6-27ø HOLES FOR M25 BOLTS

°
4

275
NB PIPE

°
60
49

60
°
(TYP.)

°
NB PIPE 6 60°

750
NB PIPE

NB PIPE 75
SECTION 3-3
SCALE 1:25
DETAIL-D1
SCALE 1:25

25 300
PLAN AT TOP
NB PIPE SCALE 1:30 2500

13200

1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200

NB PIPE NB PIPE
750

NB PIPE
600

6
(TYP.) PLAN 4-4
SCALE 1:25

2500

600
PLAN AT BOTTOM D7
NB PIPE
SCALE 1:30
DETAIL-D2
SCALE 1:25

NB PIPE 7
13200

1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200
(TYP.)
6

D3
DETAIL-D3
NB PIPE
SCALE 1:25 PLAN 1-1
SCALE 1:25
1525

NB PIPE

NB PIPE
6 6 300

300
49°
49

50MM GROUTING
D4 D1 D2 7
°

NB PIPE
WASHER
NUT

10 10
20

1525
BASE PLATE

100

B
T
200
NB PIPE
(AS KNEE BRACING ON BOYH PARALLEL
TRUSS TO NB MAIN VERTICAL COLUMN) NB PIPE
(TYP.)
(AS KNEE BRACING ON BOYH PARALLEL
6

H
TRUSS TO NB MAIN VERTICAL COLUMN)

h
SECTION 7-7
SCALE 1:25
NB PIPE NB PIPE TYP. DETAIL OF ANCHOR BOLT
6000

SCALE 1:12.5

DETAIL-D4
SCALE 1:25

600

TOE EARTHEN EARTHEN TOE


BERM SHOULDER CARRIAGEWAY SHOULDER BERM

600
1000 2000 2500 7000 2500 2000

3 3 3 3

PLAN 2-2
SCALE 1:25
EL+0.15M EL+0.15M
TOP OF PEDESTAL TOP OF PEDESTAL
2.5% 2.5%
3.0% 3.0%
8MM THK STIFFNER PLATE

7000
2500 OR 500 BELOW NGL WHICHEVER IS HIGHER

Existing Carriageway 2H
H:1
V :1V DETAIL D7 ANCHOR BOLT SCHEDULE mm
2
SCALE 1:25
2 2 2 2
SYMBOL QUANTITY DIAMETER H h B T R TOTAL LENGTH

12 25 1200 125 125 150 65 1450

6-17.5øNotes:
HOLES FOR M16 BOLTS Notes:

1 1 1 1) ALL DIMENSIONS ARE IN MM AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE
1
STRUCTURAL G.A OF GANTRY STRUCTURE 2) ALL FILLET WELDS ARE 6mm FILET WELDS U.N.O.
SCALE 1:30 3) ALL BUTT WELDS SHALL BE PROVIDED WITH A SEALING RUN
4) ALL GUSSET PLATE SHALL BE 8 mm THK. U.N.O.
100 100 5) ALL INCLINED MEMBERS AND GUSSET PLATES ARE TO BE CHECKED BY FULL SHOP LAYOUT.

900
750
6) ALL ERECTION HOLES ARE 14Ø MKD. FOR 12Ø ERECTION BOLTS (U.N.O.)
300

7) ALL PERMANENT HOLES ARE 14Ø MKD. FOR 12Ø PERMANENT BOLTS (U.N.O.)
600

8) ALL CONTACT SURFACES OF GUSSET PLATES HAVING ERECTION BOLTS


300

75
75 SHALL BE WELDED AFTER ERECTION AND ALINGMENT.
50

50

P.C.C 1:4:8 9) STRUCTURAL STEEL USED SHALL CONFORM TO IS2062


2500 2500 10) CLEAR COVER FOR COLUMNS AND FOOTING 50mm WILL BE USED.
PL 500X1150 10 THK
PLAN 6-6 11) NET BEARING CAPACITY IS CONSIDERED 10T/M2 AT 2.5M BELOW FGL.

SCALE 1:25 STIFF PL.8THK 12) NOT ANY FOUNDATION SHALL BE REST ON FILLED UP SOIL.

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-11 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM GENERAL ARRANGEMENT
DRAWING FOR OVERHEAD GANTRY
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
SOLAR CELL SOLAR CELL

PANEL

TIANG PJU OCTAGONAL TIANG PJU OCTAGONAL SAFETY GUARD


(SINGLE PARABOLE TYPE)

HAND HOLE HAND HOLE

2000

2000
RIP PLATE
BASE PLATE

2
1

TAMPAK DEPAN
NTS TAMPAK SAMPING (SINGLE PARABOLE TYPE)
NTS

300
4 D13
400
560 50 200 50 9 D13-100 4 D13

50

150

183
250

300
200

1000
180

b2

850

817
50 200 50
300

50
500
LAMPU PJU BASE PLATE BASE PLATE D13-100
NTS SIDE VIEW
TOP VIEW
DETAIL A
SIDE VIEW

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-12 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL DETAILS OF SOLAR CELL
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
6MM. WIRE ROPE

BLINKER BLINKER

MS JUNCTION MS JUNCTION

38MM. GI PIPE FOR CABLE 38MM. GI PIPE FOR CABLE

MS. CLAMP MS. CLAMP

R.C.C. FOUNDATION R.C.C. FOUNDATION

CANTILEVAR POLE WITH


L. E. D. BLINKER
L. E. D. BLINKER
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-13 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM SOLAR BLINKER
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-14 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM BUS SHELTER DETAILS
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-15 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM BUS SHELTER DETAILS
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-16 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM BUS SHELTER DETAILS
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
1.0 1.0
1.5 1.5

Gabion of size Geotextile Membrane Gabion of size


1.0mX1.0m 1.0mX1.0m
Back fill Back fill
0.5m 0.5m Geotextile Membrane

Gabion of size Gabion of size


1.5mX1.0m 1.5mX1.0m
0.5m 0.5m
0.5m

Gabion of size Gabion of size


2.0mX0.5m GL 2.0mX1.0m GL

1m
Geotextile Membrane

2.5m Gabion wall Geotextile Membrane

3.0m Gabion wall

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-17 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL DETAILS GABION WALL
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
1.5 1.0 1.5 1.0

Gabion of size
1.0mX1.0m Geotextile Membrane Gabion of size
1.0mX1.0m

0.5m Back fill 0.5m Back fill Geotextile Membrane

Gabion of size
1.5mX1.0m Gabion of size
1.5mX1.0m

Gabion of size0.5m
2.0mX0.5m GL Gabion of size
2.0mX1.0m 0.5m GL

0.5m

1m
Geotextile Membrane

2.5m Gabion wall 3.0m Gabion wall Geotextile Membrane

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-18 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM DETAILS OF TOILET BLOCK
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-19 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM DETAILS OF TOILET BLOCK
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
Destination2

Destination2

Destination1

PEDESTRIAN
Destination1

CROSSING
Destination1

Taper 65m 25m


60m 20m 25m Taper 65m
60m 50m
30m LM18 LM19 LM19

7m
7m

1m

1m
7m
7m

3m
5.5m 50m
LM24 LM24 LM05

5.5m
5.5m
LM19 HM06 60m 60m

R3
5.5m HM06

0m

PEDESTRIAN
0m

CROSSING
30m
R3

Destination1

Destination2
BM04 & BM 05
1m

Destination3
7m 7m

25m
2m 2m

ST

30m
OP

60m

TAPER 65.0m
Destination2

30m
LM24 CONTINUOUS LINE
20m

Destination3 OF 30m LENGTH

(7-SEGMENTS)
LM04
1.5m 1.5m
SPEED BREAKER
LM24
LM24

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-20 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL MAJOR T- JUNCTION
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
LM24
LM24
SPEED BREAKER
1.5m 1.5m

(7-SEGMENTS)
LM04
Destination3

20m
LM24 CONTINUOUS LINE
OF 30m LENGTH

TAPER 65.0m

30m
Destination2

60m
30m
BM04 & BM 05

25m
Destination2

Destination1
7m 7m 2m
2m

PEDESTRIAN
Destination1

CROSSING
Destination1
STOP
1m

30m
R3
0m
25m

0m
Taper 65m

5.5m
5.5m 5.5m

5.5m

R3
60m 25m Taper 65m
60m 50m
30m

3m

7m
7m

1m

1m
7m
7m

3m
5.5m 50m
LM24 LM24 LM05

5.5m
5.5m
LM19 HM06 60m 60m

R3
5.5m HM06

0m

PEDESTRIAN
0m

CROSSING
30m
R3

Destination1

Destination2
Destination1
BM04 & BM 05
1m

Destination3
7m 7m

25m
2m 2m

ST
O

30m
P

60m

TAPER 65.0m
Destination2
30m

LM24 CONTINUOUS LINE


20m

Destination3 OF 30m LENGTH

(7-SEGMENTS)
LM04
1.5m 1.5m
SPEED BREAKER
LM24
LM24

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-21 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL MAJOR X- JUNCTION
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
Destination2

Destination1

PEDESTRIAN
Destination1

CROSSING
Taper 65m 25m
60m 20m 25m Taper 65m
60m 50m
30m LM18 LM19 LM19

7m
7m

1m

1m
7m
7m
50m
LM24 LM24 LM05

5m
5.5
LM19 HM06 m m 60m 60m
5.5

R1

R3
HM06

0m

PEDESTRIAN
CROSSING
ST

Destination1

Destination2
OP
De
De

5m
st
st

1.
in
in
at

at
io

io

45
n3

n2

Destination3
m

1m
7m

7m m
.5 1
15
m
SP
EE
D
BR
EA
KE
R

Ta
er p
65
m

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-22 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL MAJOR Y- JUNCTION
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
SIDE ROAD RIGHT

Destination1
LM05
(7-SEGMENTS)
60m 60m
TM03 LM19 TM04

RE RE RE

RE RE RE

RE

RE
RE

RE
RE

RE

3m
5m
60m 60m

R1
R1

5m
ARROW 3.5m LENGTH 11m
LM24

SIDE ROAD LEFT


SPACED AT 15m, 15m ,45m & BM04 & BM 05
90m (INTERVAL FROM
JUNCTION) LM23 CONTINUOUS LINE
OF 30m LENGTH

Destination1
AM06
STOP

45m

TAPER 55m
AM01

LM04
T- INTERSECTION (7-SEGMENTS)

15m
MAJOR ROAD AHEAD
3.57m
1.5m 1.5m

SPEED BREAKER

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-23 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL MINOR T- JUNCTION
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
SPEED BREAKER

1.5m 1.5m
3.57m

15m
MAJOR ROAD AHEAD

TAPER 55m

45m
Destination1
CROSS ROAD

Destination1
STOP

LM05
(7-SEGMENTS) 11m

R1

m
60m 60m

5
5m

R1
3m
RE RE RE RE

RE RE RE RE

RE RE RE RE

RE RE RE RE

TM03 LM19 TM04


RE RE RE

RE RE RE

RE RE RE

RE RE RE

3m
5m
60m 60m

R1
R1
ARROW 3.5m LENGTH

5m
LM24 11m
SPACED AT 15m, 15m ,45m &
BM04 & BM 05
90m (INTERVAL FROM

CROSS ROAD
JUNCTION) LM23 CONTINUOUS LINE
OF 30m LENGTH
AM06

Destination1

Destination1
STOP

45m

TAPER 55m
AM01

LM04
(7-SEGMENTS)
15m

MAJOR ROAD AHEAD

3.57m
1.5m 1.5m

SPEED BREAKER
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-24 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL MINOR X- JUNCTION
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
Destination1
Y- INTERSECTION

LM05
(7-SEGMENTS)
60m TM03 TM04

3m
5 m
ARROW 3.5m LENGTH R1 60m 60m
SPACED AT 15m, 15m ,45m &

R2
LM24
LM

5m
90m (INTERVAL FROM

Y- INTERSECTION
23

Destination1
JUNCTION) C
7m OF ON
ST 30 TINU
OP m
LE OUS
NG
BM TH LINE
04
60m

&

m
AM BM

25
06 05
Y-
IN
TE
RS 3.7
EC
TI 1.5 5m
ON m AM
01
SP
EE
m

D 1.5
15

BR m
EA
KE
R

(7-
SE LM0
GM 4
EN
T S)

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-25 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL MINOR Y- JUNCTION
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
Ø
@
Ø
@

NOTE:-1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE SPECIFIED.


2. DIMENSIONS ARE NOT TO BE SCALED AND ONLY WRITTEN
DIMENSION TO BE FOLLOWED.

CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-26 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL DETAILS OF DRAIN
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
STRUCTURE DRAWINGS

You might also like