MAHARASHTRA
PUBLIC WORK DIVISION AARVI
DRAFT DETAILED PROJECT REPORT
APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND
PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE
STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE)
PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI
ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH
292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM)
TALUKA-KARANJA DISTRICT - WARDHA. (PART - ASHTI TO NARA GODHANI)
VOLUME-X
DRAWINGS
JANUARY - 2024
SUBMITTED BY
AICONS ENGINEERING PVT.LTD.
O
TF
F OPTICAL FIBRE CABLE STONE TRANSFORMER PROPOSED MEDIAN
C
MATCH LINE
ELECTRIC POLE P
B
POST BOX MATCHLINE
00.000 KM CH.00+000
ROAD SIDE DRAIN TBM TBM STONE PROW PROW PROPOSED ROW
NALA, CANAL
BRIDGE
CULVERT
WATER TANK
B
S
N
BSNL STONE
L
KM KM STONE
FURLONG STONE
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /Legends-01 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI LEGENDS
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
JAMMU AND KASHMIR
District Index
Nandurbar
HIMACHAL
PRADESH
Bhandara
PUNJAB Dhule Amravati Nagpur Gondiya
Jalgaon
SH
HARYANAA
PR
AD
E
Akola Wardha
DELHI AL
UN
AC
H
Buldana
SIKKIM AR
RAJASTHAN
UTTAR PRADESH
Nashik Washim Chandrapur
ASSAM
NAGALAND Yavatmal
BIHAR
MEGHALAYA
MANIPUR Palghar Aurangabad
BANGLADESH
TRIPURA
Jalna Hingoli Gadchiroli
JHARKHAND MIZORAM
GUJARAT
MADHYA PRADESH WEST BENGAL Thane Ahmednagar Parbhani
Mumbai Suburban Nanded
H
Bid
AR
Mumbai
SG
TI
DAMAN
T
HA
DADARA & ORISS A
NAGAR HAVELI
CH
Raigarh Pune
MAHARASHTRA
Latur Bidar
S E A
B A Y O F B A N G A L Osmanabad
ANDHARA PRADESH
Satara Solapur
A B I A N
GOA
Ratnagiri
Sangli
KARANATA KA
Maharashtra State
KE
RA
LA
TAMIL NADU Kolhapur
A R
Sindhudurg
Dharwad
I N D I A N O C E A N
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) 01 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR , SURVEY AND SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE
GOVERNMENT OF MAHARASHTRA STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) TITLE:
PACKAGE NO DPR - 3A (6) (LENGTH-21.000 Km) IMPROVEMENT AND WIDENING TO LOCATION PLAN
MORSHI-ASHTI-THAR-PARDI ROAD SH-292 Km 238 / 00 TO 245 / 00 TALUKA -ASHTI (PART-1) & MORSHI -
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P) ASHTI - THAR - PARDI ROAD SH-292 Km 245 / 00 TO 259 / 00 & SH-323 MISSING LENGTH 3.00 Km TALUKA- R0 DRAFT DETAILED PROJECT REPORT AKP MKH
ADM
Email Id:- info@aicons.in & aiconsgroup@gmail.com KARANJA,DISTRICT-WARDHA (PART-2). REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
238+00 Km
239+00 Km
0 Km
00 Km
0 Km
242+00K
Km
240+0
243+0
244+00
241+
Km
NARA VILLAGE
+00
256+00Km
Km m
245
255+00Km
+00 0 K
254+00Km
THAR VILLAGE
247 46+0
PARDI HETI VILLAGE
253+00 Km
BORKHEDI VILLAGE
252+00Km
Km
251+00 Km
00 Km
2
249+00 Km
258 0 Km
250+00 Km
7Km
00
BOTONA VILLAGE
7+
0
+56
248+
25
+
258
PROJECT START POINT GONDNI VILLAGE
@238+000 OF SH-292
(AT ASHTI)
55K/4 55K/8
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) 01 R 0
AICONS ENGINEERING PVT.LTD. SCALE NTS DATE: FEBRUARY-2024
APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR , SURVEY AND PREPARATION
PUBLIC WORKS DEPARTMENT
GOVERNMENT OF MAHARASHTRA OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF TITLE:
MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO DPR - KEY PLAN
3A (6) (LENGTH-21.000 Km) IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA -
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL
KOLAR ROAD, BHOPAL - 462042(M.P) R0 DRAFT DETAILED PROJECT REPORT AKP ADM MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT - WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /HGR-01 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI HORIZONTAL GEOMETRIC REPORT
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /HGR-02 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI HORIZONTAL GEOMETRIC REPORT
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /HGR-03 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI HORIZONTAL GEOMETRIC REPORT
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /HGR-04 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI HORIZONTAL GEOMETRIC REPORT
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /HGR-05 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI HORIZONTAL GEOMETRIC REPORT
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /HGR-06 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI HORIZONTAL GEOMETRIC REPORT
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /HGR-07 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI HORIZONTAL GEOMETRIC REPORT
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /HGR-08 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI HORIZONTAL GEOMETRIC REPORT
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /VGR-01 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI VERTICAL GEOMETRIC REPORT
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CL
ROW
Proposed Roadway
Existing Carriageway
GL GL
Embakment fill The Existing BT PQC (M-40 Grade with fiber reinforcement ) - Minimum 260mm Thk.
shall be removal DLC (M-15 Grade) - Minimum 150mm Thk.
Unlined Drain Unlined Drain
Granular Sub Base - Minimum 100mm Thk. (Drainage Layer, Gr.III)
Granular Sub Base - Minimum 100mm Thk. (filter/separation layer Gr.II )
CL
ROW
Proposed Roadway
Existing Carriageway
GL GL
PACKAGE NO EPC - 70 IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM
GOVERNMENT OF MAHARASHTRA (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) TITLE: TYPICAL CROSS SECTION
TCS-1 & TCS-1A
CL
ROW
Proposed Roadway
Utility
Corridor
RCC Paver Granular/Hard Toe Earthen
Drain Block Carriageway Shoulder Berm Drain
ROW LINE
600mm dia NP3
Longitudinal Utility
Duct (Both side) Selected Soil (CBR Not less than 30%)
Slope Protection
Works
Existing Carriageway GL
The Existing Crust & PQC (M-40 Grade with fiber reinforcement )
Precast Interlocking CC
Embankment shall be Minimum 260mm Thk.
Paving blocks M-40 (100mm) removal and for use in
over sand bedding Embankment portion as per FRL DLC (M-15 Grade) - Minimum 150mm Thk. Unlined Drain
WMM (Mini. 260mm Thk.) to match PQC level Granular Sub Base - Minimum 100mm Thk. (Drainage Layer, Gr.III)
Utility Chamber @ 25m C/C on LHS Granular Sub Base - Minimum 100mm Thk. (filter/separation layer Gr.II )
Subgrade - Minimum 500mm Thk. (CBR Minimum 8%)
TCS - 2
UP GRADATION AND RECONSTRUCTION TO INTERMEDIATE LANE CARRIAGEWAY INCLUDING
PAVER BLOCK FLOORING AND RCC DRAIN ON LHS IN BUILT-UP AREA
CL
ROW
Proposed Roadway
Utility
Corridor
Earthen Toe Granular/Hard Paver RCC
Drain Berm Shoulder Carriageway Block Drain
ROW LINE
600mm dia NP3
Longitudinal Utility
Selected Soil (CBR Not less than 30%) Duct (Both side)
GL Existing Carriageway
PQC (M-40 Grade with fiber reinforcement ) The Existing Crust &
Embankment shall be Precast Interlocking CC
Minimum 260mm Thk. removal and for use in Paving blocks M-40 (100mm)
Unlined Drain DLC (M-15 Grade) - Minimum 150mm Thk. Embankment portion as per FRL over sand bedding
Granular Sub Base - Minimum 100mm Thk. (Drainage Layer, Gr.III) WMM (Mini. 260mm Thk.) to match PQC level
Granular Sub Base - Minimum 100mm Thk. (filter/separation layer Gr.II )
Utility Chamber @ 25m C/C on RHS
Subgrade - Minimum 500mm Thk. (CBR Minimum 8%)
TCS - 2A
PACKAGE NO EPC - 70 IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM
GOVERNMENT OF MAHARASHTRA (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) TITLE: TYPICAL CROSS SECTION
TCS23 & TCS-2A
CL
ROW
Proposed Roadway
Existing Existing
Paver Paver
Block Carriageway Block
ROW LINE
ROW LINE
Existing Drain
On Both Side
CL
ROW
RCC RCC
Drain Carriageway Drain
ROW LINE
ROW LINE
RCC Drain
Existing CC Pavement
TCS - 3A
RESURFACING / STRENGTHENING TO EXISTING CC PAVEMENT
WITH WHITE TOPING AND RCC DRAIN IN BUILT-UP
CL
CLIENT - NAME OF WORK - DRG. NO. Package No. EPC- 70 /TCS-03 R 0
PACKAGE NO EPC - 70 IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM
GOVERNMENT OF MAHARASHTRA (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) TITLE: TYPICAL CROSS SECTION
TCS-3 & TCS-3A
WITH WHITE TOPING AND RCC DRAIN IN BUILT-UP
CL
Proposed Roadway
TCS - 4
STRENGTHENING TO EXISTING CARRIAGEWAY WITH EARTHEN SHOULDER IN FOREST PORTION
CL
Proposed Roadway
BC - 40mm
Unlined Drain DBM - 60mm Unlined Drain
WMM - 125 mm
TCS - 5
STRENGTHENING TO EXISTING CARRIAGEWAY WITH EARTHEN SHOULDER IN FOREST PORTION
PACKAGE NO EPC - 70 IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM
GOVERNMENT OF MAHARASHTRA (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) TITLE: TYPICAL CROSS SECTION
TCS-4 & TCS-5
CL
Proposed Roadway
Carriageway
BC - 40mm
DBM - 60mm
TCS - 6 WMM - 125 mm
CL
ROW
Proposed Roadway
GL GL
Embakment fill
PQC (M-40 Grade with fiber reinforcement ) - Minimum 260mm Thk.
DLC (M-15 Grade) - Minimum 150mm Thk.
Unlined Drain Unlined Drain
Granular Sub Base - Minimum 100mm Thk. (Drainage Layer, Gr.III)
Granular Sub Base - Minimum 100mm Thk. (filter/separation layer Gr.II )
PACKAGE NO EPC - 70 IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM
GOVERNMENT OF MAHARASHTRA (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) TITLE: TYPICAL CROSS SECTION
TCS-6 & TCS-7
MORSHI A THARPARDI DATA
T DAT ETOUT S 73
SETOUT SETOU 238+903 .616 = 238+9 8.0
DATA = 47460 HIP CH - 234747
HIP CH = HIP CH 14.644,N - 23 8 2 .81 3 ,N
23
E - 21098 8+159 T DATA 7 E - 2117
SETOU 238+788 E - 211 5 9
4.578,N - SETOUT DATA SETOUT DATA 79 2 D = 3.48 0m
D = 6.069 2347343.9 SETOUT DATA = 7417.5 D= 7 .7 0
R = 700.0
71 HIP CH = 238+396 HIP CH = 238+563 HIP CH = 238+684 HIP CH 8.418,N - 234 4 0 0 .000m R = 80 0 .0
60 R= 67m
00m E - 211221.115,N - 2347358.563 E - 211506.464,N - 2347394.160 E - 211 .0 00m Ts = 2 4 .3
KM Ls = 35.0
00m
E - 211385.982,N - 2347386.146
9 .1 19 Ls = 20 08 M .3 7 1m
D= K Es = 0
IRE
D = 5.968 D = 9.131 .000m 7 .0
238 Ts = 54.6
13
D = 5.693
4 0 0 Ts = 3 239 8 .7 20m km/h
R = 900.000m R = 400.000m R= 0.042 Lc = 4 ED = 50
.000m
W
shift = 0.0 R = 700.000m shif t = P E
73 Ls = 30.000m Ls = 30.000m Ls = 30 05 .952 DESIG N S
Es = 1.05 Ls = 20.000m Es = 0 29m
TRIC
.9
6 Ts = 46 94 .9 km/h
Lc = 39.1
50m
Ts = 61.915 Ts = 44.805 Ts = 46.949
shift =
0.0 Lc = 33 SPEED = 50
shift = 0.042 shift = 0.094 N
DESIG
ELEC
DESIGN shift = 0.024 64
SPEED =
65 km/h Es = 1.264 Es = 0.889 Es = 1.367 Es = 1.3 61m
3 .6 40 km/h
GPS
+000
+000
0
D/S
9
238+00
239+00
CH.238
CH.23
0
U/S
238+90
0
238+10
238+200
0
CTION
238+300
238+80
NSTRU
RECO
238+500
238+600
OSED
238+400
PROP 8+825
238+700
C H .2 3
: HPC
TYPE X1200mm
S I Z E :1
EXISTING CENTRE LINE ING
EXIST 8+825
PROPOSED CENTRE LINE C H .2 3
PROPOSED CARRIAGEWAY
PLAN Z E :
:HPC
TYPE 1X1000mm
S I
RECONSTRUCTION
CHAINAGE 238+825
PROPOSED ROAD LEVEL SIZE 1 X 1200mm
EXISTING GROUND AT-8m FROM PCL TYPE HPC
EXISTING ROAD LEVEL EXISTING GROUND AT +8m FROM PCL
430
CH=238+550.000
VIP CH=:238+590.00
CH=238+540.000
VIP CH=:238+500.00
VIP LVL=:423.442
VIP LVL=:423.061
LVL=423.273
LVL=423.230
VIP CH=:238+960.00
VIP CH=:238+380.00
428
VIP CH=:238+685.00
CH=238+460.000
CH=238+630.000
CH=238+665.000
VIP LVL=:421.390
CH=238+420.000
VIP LVL=:421.337
VIP LVL=:421.172
CH=238+980.000
LVL=422.486
LVL=422.486
VIP CH=:238+855.00
LVL=421.650
CH=238+940.000
CH=238+705.000
LVL=421.912
LVL=421.784
426
VIP LVL=:419.959
CH=238+875.000
CH=238+835.000
LVL=421.117
LVL=421.029
CH=238+340.000
LVL=420.232
LVL=420.102
CH=238+305.000
424
LVL=419.643
VIP CH=:238+275.00
LVL=418.161
VIP LVL=:416.891
422
CH=238+245.000
LVL=415.999
420
VIP CH=:238+140.00
CH=238+170.000
VIP LVL=:412.878
LVL=413.769
418
CH=238+110.000
LVL=411.878
416
414
412
410
408
406
238000 408.711 407.789 408.801 408.211
238640
CHAINAGE
238305.000
238340.000
238550.000
238665.000
239020.000
238000.000
238110.000
238170.000
238245.000
238420.000
238460.000
238540.000
238630.000
238705.000
238835.000
238875.000
238940.000
238980.000
3.333% K:166.331 2.973% K:47.541 4.235% K:28.595 1.437% K:78.868 0.423% K:28.450 -2.389% K:23.865 -0.713% K:19.271 1.362% K:65.755 1.971%
VERTICAL ALIGNMENT
LVC:60.00 LVC:60.00 LVC:80.00 LVC:80.00 LVC:80.00 LVC:40.00 LVC:40.00 LVC:40.00
HORIZONTAL ALIGNMENT L =104.590 35.000 D: 3.2045 35.000 L =120.459 30.000 D: 4.0578 30.000 L =60.439 20.000 D: 4.0557 20.000 L =28.995 30.000 D: 4.8342 30.000L =10.75530.000 D: 4.8216 30.000 L =30.701 20.000 D: 4.8599 20.000
L =8.983 D: 3.4893
R: 700.000 R: 900.000 R: 700.000 R: 400.000 R: 400.000 R: 400.000 R: 800.000
VCL: 39.150 VCL: 63.740 VCL: 49.550 VCL: 33.749 VCL: 33.661 VCL: 33.929 VCL: 48.720
SUPERELEVATION
e:-4.06% e:-4.06% e:-3.16% e:-3.16% e:2.68% e:2.68% e:-4.69% e:-4.69% e:-4.69% e:-4.69% e:4.69% e:4.69% e:-2.35% e:-2.35%
e:4.06% e:4.06% e:3.16% e:3.16% e:-2.68% e:-2.68% e:4.69% e:4.69% e:4.69% e:4.69% e:-4.69% e:-4.69% e:2.35% e:2.35%
PROFILE
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-01 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km 238+000 to Km 239+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
EE
474
D=
60.
50
616
k
m/h
ELECTRIC WIRE
CLIENT -
23
E
SUPERELEVATION
-
TO
CHAINAGE
Ts
T
L
s=
DE
9
2
0
+00 0
.
U 238
TA
____________________
6
2
CH
.72
3.4 00m
R = 24.3 m
D = 800.0 7m
0
DA +973
MORSHI
------------------------------------
------------------------------------
EXISTING LEVEL BELOW
N-
______________________
m
VERTICAL ALIGNMENT
KM9 E c = 48 N SPE
2
HORIZONTAL ALIGNMENT
ED
420
424
426
430
434
422
432
428
238980.000
=
47
km
CH=239+020.000
31
1.971%
/h
GOVERNMENT OF MAHARASHTRA
VIP LVL=:423.163 +10
K:57.928
239060 424.127 422.522 422.956 423.222 239
LVC:60.00
L =122.392
CH=239+080.000
239080.000
239080 425.507 422.951 423.208 423.444 LVL=423.444
CONSULTANT -
239120 423.745 423.199 423.504 423.818
239140 425.418 423.613 423.731 424.005 200
239+
0.935%
239160 424.030 424.259 423.947 424.192
75.000
Ts = 1
shift =
TBM
Ls = 75
Es = 1
E - 2120
SETOUT
R = 350
4
HIP CH =
7
0
6
D = 35.16
8
.0
.0
4
.8
.6
.6
5
7
.0
Lc = 139.8
4
0
0
05
0m
00m
239200.000
DATA
CH=239+200.000
e:5.00%
08m
e:-5.00%
,N
VIP CH=:239+220.00
239220 425.195 424.345 424.491 424.802 VIP LVL=:424.753
K:40.554
CH=239+240.000
239250.000
40 km/h
239240.000 CH=239+250.000
1.921%
LVL=425.329
SIGN C
D: 22.8869
VIP CH=:239+280.00
AT DE OR JUNCTIO
R: 350.000
VCL: 139.808
239280 428.967 425.266 425.329 425.702 VIP LVL=:425.905
N DEV
K:22.148
LVC:60.00
239+40
0
-0.788%
LVL=425.512
NAME OF WORK -
e:5.00%
TOW
e:-5.00%
239340 424.830 424.976 425.209 425.439 ARD
FIELD S
RECON
VIP CH=:239+370.00
TYPE +474
X600m
SIZE:2 : HPC
TYPE +474
CH.239OSED
VIP LVL=:425.196
m
75.000
EXIST 1200mm
K:82.531
PROP UCTION
LVC:80.00
U/S
239400 424.857 425.664 425.019 425.257 D/S
CH=239+410.000
239410.000 LVL=425.269 239+50
239420 425.597 425.601 425.015 425.287 0
0.182%
239440 425.627 425.778 425.108 425.324
239460.000 CH=239+460.000
EXISTING GROUND AT-8m FROM PCL
EXISTING GROUND AT +8m FROM PCL
VIP CH=:239+480.00
PROFILE
SIZE
VIP LVL=:425.396
K:24.391
LVC:40.00
CH=239+500.000
239500.000
239500 424.804 425.830 425.429 425.760 LVL=425.760
HPC
VIP CH=:239+540.00
L =243.446 239540 426.803 426.477 426.143 426.414 VIP LVL=:426.489
K:26.588
LVC:40.00
CH=239+560.000
239560 426.045 426.558 426.317 426.552
APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
VIP CH=:239+600.00
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
239600 427.021 427.664 426.432 426.739 VIP LVL=:426.679
THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC
K:33.646
PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
LVC:40.00
CH=239+620.000
239+700
239620.000
239620 426.483 428.089 426.677 426.980 LVL=426.980
239+800
239720 427.844 428.029 428.007 428.296 CH=239+725.000
239725.000 LVL=428.335
R0 DRAFT DETAILED PROJECT REPORT
SSS
PROPOSED CENTRE LINE
D = 9.303
Lc = 405.93
DESIGN SP
Ts = 203.41
239800.000
Es = 8.262m
HIP CH = 2
R = 2500.00
CH=239+800.000
PROPOSED CARRIAGEWAY
SETOUT D
E - 212632.3
1m
LVL=428.898
0m
ATA
239+900
39+856
MKH
/h
TITLE:
VIP CH=:239+890.00
VIP LVL=:429.574
K:107.058
240+000
239920 428.836 428.534 428.542 429.127
KM
240
CH.240+000
H-1:2000 V-1:200
CH=239+980.000
THARPARDI
240090.000
-0.930%
240+100
DATE: FEBRUARY-2024
MORSHI THARPARDI
SETOUT DATA
SETOUT DATA
SETOUT DATA HIP CH = 240+737 SETOUT DATA
HIP CH = 240+543
HIP CH = 240+161 E - 213480.224,N - 2347161.284 HIP CH = 240+949
2347348.139 E - 213294.307,N - 2347218.590
E - 212935.070,N - D = 1.675 E - 213680.694,N - 2347093.015
D = 2.700
D = 11.789 R = 2000.000m D = 1.018
R = 1500.000m
R = 300.000m Ls = 30.000m R = 2000.000m
Ls = 30.000m
Ls = 40.000m Ts = 44.238 Ls = 30.000m
Ts = 50.344
WIRE
Ts = 50.993 shift = 0.019 Ts = 32.770
shift = 0.025
shift = 0.222 Es = 0.232 shift = 0.019
TOWARDS THAR
IC WIRE
Es = 0.441
IRE
Es = 1.818 Lc = 28.472m Es = 0.098
ELECTRIC
IRE
E
Lc = 40.675m
Lc = 21.727m
WIR
DESIGN SPEED = 80 km/h Lc = 5.539m
RIC W
65 km/h DESIGN SPEED = 80 km/h KM
RIC W
KM DESIGN SPEED =
TOWARDS
BUILDING DESIGN SPEED = 80 km/h 241 X- MINOR JUNCTION DEVELO
240 BUILDING
ELECTR
AT DESIGN CHAINAGE - 241+0
TRIC
THAR
WIRE PROPOSED T - MINOR JUNCTION DEVELOPMENT
ELECT
ELECTRIC
AT DESIGN CHAINAGE - 241+000
HUT BUS SHELTER
T
HUT
ELEC
ELEC
HUT
TBM
HUT
D/S
HUT
D/S
TBM
000
U/S
TOWARDS CHAMLA
240+200
BUS STAND
CH.241+000
TOWARDS THAR
240+300
241+000
T - MINOR JU
U/S
240+100
RECONSTRUCTION
CH.240+
NC
240+000
240+400
HUT
240+500
AINAGE - 24 PROPOSED
240+700
240+600
0+500
240+800
240+900
CH.240+608
241+100
RECONSTRUCTION
TYPE : HPC
SIZE:2X1200mm PROPOSED
EXISTING THAR VILLAGE CH.241+009
CH.240+608 TYPE : HPC
EXISTING CENTRE LINE FROM KM 240+500 TO KM 240+800 SIZE:2X1200mm
TYPE :HPC
PROPOSED CENTRE LINE SIZE: 2X600mm EXISTING
CH.241+020
PROPOSED CARRIAGEWAY TYPE :HPC
SIZE: 2X600mm
PLAN
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-03(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km240+000 to Km 241+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT -
SUPERELEVATION
CHAINAGE
CENTER LINE (m)
------------------------------------
------------------------------------
EXISTING LEVEL BELOW
______________________
VERTICAL ALIGNMENT
HORIZONTAL ALIGNMENT
410
414
420
424
430
434
406
412
416
422
426
432
436
408
418
428
438
405
GOVERNMENT OF MAHARASHTRA
-0.930%
240060 427.817 427.786 427.274 427.993
240090.000 240080 428.066 428.745 427.067 427.807 CH=240+090.000
LVL=427.714
L =51.276
240100 429.080 427.699 426.941 427.632
VIP CH=:240+120.00
CONSULTANT -
240120 428.223 428.082 426.868 427.530 VIP LVL=:427.435
K:47.227
LVC:60.00
240140 427.474 427.321 426.863 427.514 CH=240+150.000
240150.000 LVL=427.537
240160 427.537 426.934 426.881 427.571
R: 300.000
VCL: 21.727
0.340%
e:5.00% e:5.00%
e:-5.00% e:-5.00%
240190.000 240180 427.582 427.380 426.898 427.639 CH=240+190.000
LVL=427.673
K:52.218
240260 426.773 426.833 426.611 427.442
LVC:120.00
240280 426.686 426.913 426.407 427.204
240300 426.256 426.265 426.219 426.889 CH=240+310.000
240310.000 LVL=426.702
240320 425.842 425.662 425.863 426.507
EXISTING ROAD LEVEL
PROPOSED ROAD LEVEL
NAME OF WORK -
240340 425.830 425.223 425.525 426.115
240360 425.626 424.910 425.128 425.724
L =280.545
-1.958%
240380 424.846 424.972 424.678 425.332
240400 424.418 424.764 424.296 424.940
240420.000 CH=240+420.000
240420 423.965 423.850 423.736 424.549 LVL=424.549
PROFILE
K:19.845
240480 421.832 421.702 421.720 422.467
LVC:100.00 240500 420.444 421.036 420.503 421.370
30.000
CH=240+520.000
EXISTING GROUND AT-8m FROM PCL
240520.000
EXISTING GROUND AT +8m FROM PCL
CH=240+550.000
240550.000
D: 1.5537
LVL=417.972
R: 1500.000
VCL: 40.675
30.000
TYPE
VIP CH=:240+590.00
APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
VIP LVL=:415.174
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
K:12.977
THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC
PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
HPC
RECONSTRUCTION
CH=240+630.000
240630.000
2 X 1200mm
LVL=414.841
240640 413.427 413.722 413.844 414.757
L =99.966
-0.832%
AKP
LVL=411.936
L =134.767
TITLE:
240935.000
H-1:2000 V-1:200
VCL: 5.539
VIP CH=:241+020.00
-4.627%
30.000
THARPARDI
VIP LVL=:405.553
PLAN & PROFILE
DRG. NO. Package No. DPR- 3A (6) /P&P-03(ii)
CH=240+990.000
LVL=406.941
R
0
LVC:60.00
DATE: FEBRUARY-2024
Lc = E - 21
46
DES 5.539m D = 12 75.183,N -
.8 23
IGN R = 30 19
T-
MIN
SPE
ED
MORSHI 934 THARPARDI Ls = 2
0.000m
AT
DES OR JU = ATA 528 0 51. 5.
80 k 7 Ts = 4 000m
IGN NC D
CH TION
UT 241+ 4
AIN
AG DEVEL
m/h
TO - 23 6.210
SE CH = .705,N
IRE
E-
241 OPME KM KM shift =
0
Es = 1 .087
R
+00 NT
241 0
HIP 1423
0
242
TH A
RIC W
- 2 2 .974
SETOUT DATA E 2.0
7 Lc = 4
2.
HIP CH = 241+346 D = ???m DESIG 121m
S
ARD
N SPE
E - 214058.653,N - 2346971.754 R = ???m
X- M
ELECT
AT INOR
m/h
TBM
ED = 3
= 0k 0 km
??m
DES J
IGN UNCTI Ts
D = 42.774 3
TO W
CHA ON D ? =
D/S
=
Es ???m PEED
INA E
GE VELOP
- 24
1+0 MENT PRO R = 220.000m =
50 L c NS
KM POSED
TBM
REC
ONS Ls = 30.000m SIG
DE
241+900 D
PRO TRUCT 241+ R RECONSTRUC
0
020 E WAL Ts = 101.224 TION
TOW CH 41+000
241+800
FIEL
CH. POSE ION
241+70
S TH 0 0 0
PROPOSED
AR
0
00
TYP 241+0 D TO
241+ L FRO shift = 0.170 ELECTRIC W
U/S
42+00
CH.241+874
SIZE E : HP09 IRE
D/S
ARD.241+
2 42+ 0
140 M TYPE : HPC
LA
EXI :2X12 C Es = 16.453
TOWARDS
T - MINOR
BHS SIZE:1X1200m JU
AT DESIGN NCTION DEVELOPM
2
AM
m CHAINAG
EXISTING E - 241+90 ENT
CH .2
TYP 241+0 0
241
SIZE E :HPC20 S CH DESIGN SPEED = 35 km/h CH.241+874
: 2X TYPE :HPC
+60
U/S
600m SIZE: 1X600m
DATA m
SETOUT 41+707
m
ARD
TBM
00
0
.911
D/S
+10
=2 2347121
HIP CH
REC
1
ON
7 ,N -
242+
PRO STRUCT 96.2 4
TOW
E - 2143
241
CH. POSE ION
TBM
241
TYP 241+1 D 5 .8 68
SPA E : BO20 D=2
+50
.0 00m
U/S
EXI N:1X3 X CUL R=1 7 0
0
CH. STING .0m VER 00m
+20
0
Ls = 30.0 8
T N
TIO
TYP 241+1 UC E
1 STR
IDG EXISTING CENTRE LINE Ts = 54.08
241
E
SIZE :HPC 1 ON ED
: 1X RE
C OS 2 BR 21
OP 41+42 NOR PROPOSED CENTRE LINE shift = 0.2
400
1000 R
P .2 MI
mm
CH PE : X8.0m 52
PROPOSED CARRIAGEWAYEs = 4.6 52m
241+300
241+
TY AN:1 G
SP ISTIN+424 Lc = 46.7 EED = 30 km/h
EX .241 PC 0mm SP
CH PE :H 100 DESIGN
TY E: 3X
SIZ
PLAN
RECONSTRUCTION RECONSTRUCTION RECONSTRUCTION
CHAINAGE 241+422 RECONSTRUCTION
CHAINAGE 241+009 CHAINAGE 241+120
VIP CH=:241+920.00
SPAN 1 X 8.0m
PROPOSED ROAD LEVEL EXISTING GROUND AT-8m FROM PCL CHAINAGE 241+874
SIZE 2 X 1200mm
VIP LVL=:408.101
SIZE 1 X 3.0m SIZE 1 X 1200mm
CH=241+960.000
TYPE HPC TYPE BOX CULVERT TYPE MINOR BRIDGE EXISTING ROAD LEVEL EXISTING GROUND AT +8m FROM PCL TYPE HPC
CH=241+880.000
VIP CH=:241+580.00
LVL=408.851
VIP CH=:241+290.00
CH=241+660.000
VIP LVL=:406.958
LVL=407.967
412
CH=241+500.000
VIP LVL=:406.751
CH=241+240.000
VIP CH=:241+140.00
CH=241+470.000
LVL=407.227
CH=241+340.000
VIP CH=:241+430.00
CH=241+170.000
CH=241+050.000
CH=241+110.000
VIP LVL=:405.553
CH=241+390.000
LVL=405.900
LVL=406.352
VIP LVL=:404.975
LVL=405.504
LVL=406.117
LVL=405.793
410
LVL=405.553
LVL=405.553
LVL=405.483
408
406
404
402
241040 405.159 405.226 404.231 405.591
CHAINAGE
241500.000
241050.000
241110.000
241170.000
241240.000
241340.000
241390.000
241470.000
241660.000
241880.000
241960.000
242090.000
K:12.967 0.000% K:75.113 0.799% K:48.373 -1.268% K:30.885 1.322% K:162.381 0.336% K:52.062 1.873%
VERTICAL ALIGNMENT
LVC:60.00 LVC:60.00 LVC:100.00 LVC:80.00 LVC:160.00 LVC:80.00
HORIZONTAL ALIGNMENT L =262.940 30.000 D: 34.9611 30.000 L =88.594 L =125.636 30.000 D: 15.7570 30.000 L =179.009 25.000 D: 8.0445
R: 220.000 R: 170.000 R: 300.000
VCL: 134.241 VCL: 46.752 VCL: 42.121
SUPERELEVATION
e:-5.00% e:-5.00% e:5.00% e:5.00% e:5.00%
e:5.00% e:5.00% e:-5.00% e:-5.00% e:-5.00%
PROFILE
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-04 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km241+000 to Km 242+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
MORSHI ATA THARPARDI
SETOUT D +608
= 2 42 28.871
SETOUT DATA HIP CH 3 ,N - 23470
SETOUT DAT 5 2 8 4 .5 3
HIP CH = 241+985 A ATA E - 21
HIP CH = 242+ SETOUT D D = 18.300
E - 214675.183,N - 2347107.520 195 2 42+416
E - 214877.643 HIP CH = 47005.930 R = 100.00
0m
D = 12.819 ,N - 2347050. .090,N - 23
D = 4.179 334 E - 215094 Ls = 2 5 .0 0 0 m
R = 300.000m R = 2000.000
m D = 18.462 Ts = 2 8 .64 2
Ls = 25.000m 0m
Ls = 30.000m R = 100.00 shift = 0.26
0
Ts = 46.210 .0 0 0 m
Ts = 87.975 Ls = 25 Es = 1 .5 5 3
shift = 0.087 8 .7 8 8 m
shift = 0.019 Ts = 2 Lc = 6.939 0 km/h
KM Es = 1.974 Es = 1.350 shift = 0.26
0
S IG N S PEED = 3 KM
242 Lc = 42.121m 6 DE 243
Lc = 115.885m Es = 1 .5 7
DESIGN SPEED = 30 km/h m
DESIGN SPE Lc = 7.222 km/h
ED = 30 km/h N S PEED = 30
DESIG
D/S
E
IR
D/S
W
IC
D/S
TR
TBM
IRE
TRIC W EC
TBM
U/S
ELEC EL
U/S
CH.242+000
CH.243+000
TBM
0
242+000
243+000
N ION
242+700
CTIO STRUCT
242+60
RECONSTRUC
U/S
RECON
GPS
TRU TION
242+800
ONS SED PROPOSED
EL REC ED GE PROPO+561
242+900
EC POS 2 RID 2 CH.242+760
TR PRO.242+51 NOR B C H .24
HPC TYPE : HPC
243+100
DEVELOPMENT IC CH E : MI 0.0m TYPE : 1200mm
500
MINOR JUNCTION - 241+900 TYP N: 3X1 SIZE:1X G
SIZE:1X1200mm
242 +100
N CHAIN AG E W EXISTING
DESIG
IR SPA TING 0 IDG
E EXISTIN+561
242+
E EXIS.242+50 OR BR
242+200
CH.242 PC CH.242+800
N
CH E :MI 0m TYPE :HPC
TYPE :HX600mm
242+300
TYPE: 3X5. EXISTING CENTRE LINE
242+400
SIZE: 1 SIZE: 1X600mm
SIZ PROPOSED CENTRE LINE
PROPOSED CARRIAGEWAY
PLAN
EXISTING ROAD LEVEL EXISTING GROUND AT +8m FROM PCL
VIP CH=:242+190.00
RECONSTRUCTION RECONSTRUCTION RECONSTRUCTION
VIP LVL=:413.159
CHAINAGE 242+512 CHAINAGE 241+561 CHAINAGE 242+760
CH=242+290.000
SPAN 3 X 10.0m SIZE 1 X 1200mm SIZE 1 X 1200mm
CH=242+090.000
LVL=412.038
CH=242+890.000
TYPE MINOR BRIDGE TYPE HPC TYPE HPC
VIP CH=:242+850.00
LVL=411.286
VIP CH=:242+570.00
CH=242+810.000
VIP LVL=:409.833
LVL=410.532
CH=242+525.000
CH=242+615.000
VIP LVL=:408.899
LVL=409.699
414
LVL=409.404
LVL=409.049
412
410
408
406
404
242240 411.639 411.202 411.780 412.411
242440
CHAINAGE
241960.000
242090.000
242290.000
242525.000
242615.000
242810.000
242890.000
243110.000
1.873% K:66.803 -1.121% K:61.890 0.333% K:56.592 1.747%
VERTICAL ALIGNMENT
LVC:200.00 LVC:90.00 LVC:80.00
PROFILE
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-05 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km242+000 to Km 243+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
MORSHI THARPARDI
SETOUT DATA
HIP CH = 243+
429 TA SETOUT
E - 216089.456
,N - 2346866.11 SETOUT DATA SETOUT DA DATA
3+835 HIP CH =
D = 3.787 3
HIP CH = 243+667 HIP CH = 24 789.809 244+027
49,N - 2346 E - 21667
R = 1000.000m E - 216319.075,N - 2346803.648 E - 216487.2 9.446,N -
D = 29.08 23467
KM
Ls = 30.000m D = 10.514 D = 2.927 2
0m R = 150.0
243 Ts = 48.062 R = 400.000m R = 2000.00 00
m Ls = 30.0 m
shift = 0.038 Ls = 30.000m Ls = 30.000 KM 00m
Es = 0.584 6 6 .1 0 0 244 Ts = 53.9
BORKHEDI
=
TOWARDS
Ts = 51.813 Ts 67
shift = 0.2
Lc = 36.097m shift = 0.094 shift = 0.019 50
Es = 5.22
DESIGN SPEE
D = 80 km/h Es = 1.784 Es = 0.671 2
m Lc = 46.1
Lc = 43.403m Lc = 72.177 /h 36m
EED = 80 km
TBM
P DESIGN
DESIGN SPEED = 65 km/h DESIGN S SPEED =
40 km/h
CH.243+000
243+000
ELEC
TBM
TRIC TBM
CH.244+000
T - MINOR JUNCTION DEVELOPM WIR
244+000
ENT
E
243+100
243+300
243+400
243+900
243+500
243+800
0
243+600
+10
RE
243+700
CO
PR NSTR
244
EXISTING CENTRE LINE CH OPO UC
TY .244 SED
PROPOSED CENTRE LINE SIZ PE : +173
EX E:1X HPC
PROPOSED CARRIAGEWAY CH ISTIN 1200
TY .244 G mm
SIZ PE :H +174
E: 1 PC
X4
50m
m
PLAN
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-06(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km243+000 to Km 244+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
SUPERELEVATION
CHAINAGE
CLIENT -
CENTER LINE (m)
VERTICAL ALIGNMENT
410
414
420
424
430
434
440
412
416
422
426
432
436
418
428
438
242890.000
243000 413.369 412.516 411.711 412.453
1.747%
243060 412.077 413.449 412.795 413.501
CONSULTANT -
243140 413.534 414.061 414.284 415.000 VIP CH=:243+150.00
VIP LVL=:415.074
K:44.423
243160 414.500 415.021 414.814 415.530
LVC:80.00
243180 414.634 414.895 415.310 416.149 CH=243+190.000
243190.000 LVL=416.493
243200 416.652 415.062 416.015 416.848
243220 418.688 415.559 416.748 417.557
3.548%
243320 419.679 419.767 420.259 421.105
243340 420.505 420.055 421.004 421.815
NAME OF WORK -
243360 420.976 420.465 421.708 422.524
243380 421.744 421.376 422.380 423.234
30.000
243400 423.906 422.178 423.130 423.943
EXISTING ROAD LEVEL
PROPOSED ROAD LEVEL
e:2.84%
e:-2.84%
243420 423.322 422.803 423.788 424.653
243440.000 CH=243+440.000
D: 2.0682
R: 1000.000
VCL: 36.097
243440 424.313 423.563 424.423 425.362 LVL=425.362
e:2.84%
e:-2.84%
243460 425.161 424.613 425.109 426.042
30.000
243480 424.896 426.442 425.906 426.664
VIP CH=:243+500.00
PROFILE
243500 426.396 426.020 426.638 427.226 VIP LVL=:427.491
K:67.800
LVC:120.00
243560.000
243560 428.014 427.016 427.778 428.558 LVL=428.558
APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
243620 429.348 429.495 428.703 429.625
THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC
PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
1.778%
30.000
LVL=430.869
e:-4.69%
VIP CH=:243+800.00
243800 432.679 430.813 431.707 432.429 VIP LVL=:432.825
SSS
K:152.701
LVC:220.00
SCALE
CH=243+910.000
243910.000 LVL=433.196
243920 432.752 431.938 432.524 433.230
243940 433.078 433.144 432.564 433.297
0.337%
L =72.222
H-1:2000 V-1:200
Km243+000 to Km 244+000
R
0
DATE: FEBRUARY-2024
MORSHI SETOUT
DATA THARPARDI
TA SETOUT DATA
SETOUT DA TA
HIP CH =
24
4 4 +027 SETOUT DA HIP CH = 244+882 E - 21752 4+954
HIP CH = 2 3.846 4 4 +691 9.431,N -
.4 4 6,N - 234678 HIP C H = 2
27.034 E - 217466.983,N - 2346 D = 2.073 2346430.0
E - 2 1 6 6 7 9 28,N - 23465 465.562 66
E - 217286.1 D = 10.842 R = 1000.0
D = 29.082 00m
D = 4.967 R = 250.000m
R = 150.000m SETOUT DATA m
Ls = 30.0
00m
R = 600.000 Ls = 30.000m
Ls = 30.000m HIP CH = 244+382
3 5 .0 0 0 m
Ts = 33.0
91
Ls = Ts = 38.737 shift = 0.0
Ts = 53.967 E - 216985.701,N - 2346600.854 38
Ts = 43.529 shift = 0.150 Es = 0.20
KM shift = 0.250 D = 17.054 1
244 shift = 0.085 Es = 1.274 Lc = 6.17
Es = 5.222 R = 100.000m 7m KM
Es = 0.649 Lc = 17.307m DESIGN
Lc = 46.136m Ls = 25.000m RECONSTRUC
TION SPEED = 245
ED = 40 km/h Lc = 17.019m DESIGN SPEED = 50 km 80 km/h
DESIGN SPE Ts = 27.526 PROPOSED EED = 80 km
/h /h
shift = 0.260 CH.244+450 DESIGN SP
TYPE : HPC mm
Es = 1.381 SIZE:2X1200
EXISTING
D/S
Lc = 4.765m
CH.244+447
DESIGN SPEED = 40 km/h TYPE :HPC m TBM
SIZE: 2X600m
00
TBM
000
44+0
D/S
TBM
RDS
244+
245+000
CH.245+000
U/S
244+900
244+800
CH.2
244+100
TBM
FIELD
RECO T - MINOR
244+700
NS JUNCTION
TOWA
PRO TRUCTION AT DESIGN
CHAINAGE
DEVELOPM
ENT
CH.2 POSED - 244+900
TYPE44+173
244+600
244+200
U/S
SIZE: : HPC
EXIS 1X1200m EXISTING CENTRE LINE
0
244+500
+90
CH.2 TING m
244+300
PROPOSED CENTRE LINE
TYPE 44+174
243
244+400
SIZE: :HPC PROPOSED CARRIAGEWAY
1X45
0mm
PLAN
RECONSTRUCTION RECONSTRUCTION
CHAINAGE 244+173 CHAINAGE 244+450
VIP CH=:244+830.00
VIP CH=:244+670.00
CH=244+860.000
CH=244+800.000
VIP LVL=:435.473
PROPOSED ROAD LEVEL SIZE 1 X 1200mm SIZE 2 X 1200mm
CH=244+740.000
VIP LVL=:434.939
EXISTING GROUND AT-8m FROM PCL
LVL=435.761
TYPE HPC TYPE HPC
LVL=435.373
LVL=435.173
EXISTING ROAD LEVEL EXISTING GROUND AT +8m FROM PCL
CH=244+600.000
CH=244+050.000
VIP CH=:244+290.00
438
VIP CH=:244+155.00
LVL=433.403
VIP LVL=:432.325
CH=244+115.000
CH=244+240.000
LVL=432.967
CH=244+195.000
VIP LVL=:431.480
CH=244+340.000
VIP CH=:244+440.00
CH=244+490.000
LVL=432.046
LVL=432.012
CH=244+390.000
436 LVL=431.730
LVL=431.514
VIP LVL=:429.892
LVL=430.989
LVL=430.703
434
432
430
428
244000 431.809 432.705 432.703 433.401
CHAINAGE
244050.000
244115.000
244195.000
244240.000
244340.000
244390.000
244490.000
244600.000
244740.000
244800.000
244860.000
245270.000
K:45.634 -1.416% K:39.187 0.626% K:44.499 -1.622% K:26.204 2.194% K:75.222 0.333% K:95.465 0.962%
VERTICAL ALIGNMENT
LVC:80.00 LVC:80.00 LVC:100.00 LVC:100.00 LVC:140.00 LVC:60.00
PROFILE
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-07 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km244+000 to Km 245+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
MORSHI THARPARDI
SETO
U
HIP C T DATA
H = 24
E - 21 5+756
82
D = 37 74.642,N -
.4 23461
R = 15 33 42.664
TA 0.000
UT DA 517 Ts = 5 m
SETO 9.599
= 5+
2 4 34622 0
Es = 8 .820m
HIP CH 52.458,N - 2 .375m
0
E - 218 9 Lc = 9
8.
D= 6 . 8 4 DESIG 000m
4 0 0 .000m N SPE
ED =
R= 20 km
0.000m /h
Ls = 3 942
8.
DATA Ts = 3 094
SETOUT
X TD
0.
245+233 shift =
- M ES
A
ETOUT DATA
HIP CH = 6300.918
RE
IN IGN
0,N - 234 .809
Es = 0 17m
OR C
P CH = 244+954 77 7 .0 8
E - 21 7 m/h
IC WI
JU HA
Lc = 1
7.8 = 65 k
N C IN
- 217529.431,N - 2346430.066 22 E E D
D = 13.0 NS P M
TI AG
TB
DESIG T
ON E
6 0 0 .0 00m HU
R=
DE 245
S
R
D/
00m
VE +9
-
= 1000.000m Ls = 35.0
ELECT
T
LO 00
87 HU
PM
= 30.000m Ts = 85.9
EN
85 P
= 33.091 shift = 0.0 BU ROP
T
245+700
D
FR
1 S S OS OL FIEL
ift = 0.038 Es = 3.98 5m HE ED
U/S
O
OM
KM .36 H DS
245+600
LT
Lc = 101 80 km/h SC
0
N
245 UCTIO ER
PEED = AR
+80
NSTR T
BO 245
SE
KM
= 6.177m IG N S RECO
HU
DE S OSED HI TO W L
PROP45+522
00
TO
TA +80
245
ESIGN SPEED = 80 km/h .2
CH : HPC E P C UT HOO
245+5
NI 0 T
TYPE X1200mm D - 21 H = DA SC
SIZE:1 ING T
VI O
R = 2 833 24 TA HU
EXIST45+521
LL KM
= 2
00
Ts 8 .4 0 .7 +85 S
CH.2 :HPC RD A HUT
AG 2 XA-T DESI
M
Es = 1 0.00 99 94, 60 E
TB
245+4
BO
TYPE 1X600mm A T IR
L N N HU
E 46+ MINOGN CH
EL SIZE: Lc = 1 5.9 0m OW TO 00
UN
-2 W
W = . 1 T O 5+9 HUT C
DE 3 56 2m 34 RI
D
00
B
SI 1.4 m 7 60 24
AR
CT
BU
CH.245+000
245+000
245+3
GN 1 49 E
24
M
Y
TB
5m . T
9 EL
ILD
EXISTING CENTRE LINE SP 39 HU
0
245+200
KM46
245+100
EE
AL
PROPOSED CENTRE LINE
2
T - MINOR JUNCTION DEVELOPMENT
IN
AT DESIGN CHAINAGE - 244+900 D
RJ
L
G
PROPOSED CARRIAGEWAY =
UN AINA
20
CT
km
IO E -
/h
N D 246
G
T
HU0
EV +00
EL
EL 0
D S 0HUT0 T ECT
0
OP
SE P CH 355
R +
6 0 U 0 RI
HI - 218 .147 0m
A
W NA 24 46+ H
ME
TO = .16
C
NT
TO OTO W
D
. 2
IRE
UT 24 4,N
IR
R = 20 .31
B CH
BU
E CW
Ls
I
=
15 .00 m
R
DA 6+0 - 2
CT
Ts ift = .048
ILD
ELE
10 00
sh = 1 437 PEE
TA 21 345
0
=
Es = 6. N S
IN
2
Lc SIG
.
3
G
DE
0
T
.16
HU
5
7
m
89
T
HU
0.6
D
53
0
+10
=2
246
5k
m/
h
BU
ILD
ING
S
PM
TB
G
HU
0
T
+20
246
ELECTRIC
T - DE
AT
M SIG
IN N
OR CH
JU AI
NC NA
TI GE
ON -
DE 246
VE +30
LO 0
PM
00 DS
EN
+3 AR A
T
6
24 OW TON
PLAN T O
B
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-08(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km245+000 to Km 246+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT -
SUPERELEVATION
CHAINAGE
CENTER LINE (m)
MORSHI
VERTICAL ALIGNMENT
HORIZONTAL ALIGNMENT
440
444
450
436
442
446
438
448
435
L =160.223
245080 436.427 438.584 437.004 437.877
245100 436.823 437.652 437.155 438.070
CONSULTANT -
245120 437.358 439.067 437.378 438.262
0.962%
245140 437.926 438.836 437.667 438.454
245160 437.617 438.084 437.917 438.647
35.000
245180 437.817 438.257 438.050 438.839
e:4.74%
e:-4.74%
D: 9.6796
245240 438.842 439.118 438.865 439.416
EXISTING ROAD LEVEL
R: 600.000
VCL: 101.365
PROPOSED ROAD LEVEL
e:4.74%
e:-4.74%
245300 440.285 443.388 439.272 439.974 VIP CH=:245+310.00
35.000
VIP LVL=:440.089
K:231.522
245320 439.579 441.290 439.231 440.132
LVC:80.00
NAME OF WORK -
245340 439.646 438.774 439.262 440.272 CH=245+350.000
245350.000 LVL=440.336
245360 439.705 438.881 439.373 440.398
0.616%
245390.000 245380 440.032 441.090 439.575 440.521 CH=245+390.000
LVL=440.582
245400 440.354 441.397 439.893 440.641
L =159.535
245420 439.984 440.157 440.030 440.737
EXISTING GROUND AT-8m FROM PCL
EXISTING GROUND AT +8m FROM PCL
PROFILE
K:147.426
LVC:140.00
VCL: 17.817
e:4.69%e:4.69%
TYPE
e:-4.69%e:-4.69%
245530.000 LVL=440.781
245540 440.040 439.145 440.037 440.747
30.000 D: 2.5520 30.000
245580.000
APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND
CH=245+580.000
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
1 X 1200mm
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC
PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
245600 440.219 439.516 440.075 440.611
VIP CH=:245+620.00
245620 440.460 439.751 440.382 440.737 VIP LVL=:440.481
K:31.238
LVC:80.00
CH=245+660.000
245660.000
245660 440.504 440.524 440.987 441.372 LVL=441.372
AKP
SSS
245820.000 CH=245+820.000
245820 444.119 444.418 444.476 444.936 LVL=444.936
L =41.669
TITLE:
R: 80.000
D: 22.4993
VCL: 31.415
VIP CH=:245+880.00
e:7.00% e:7.00%
e:-7.00% e:-7.00%
CH=245+940.000
LVL=446.484
BOTANA VILLAGE
L =121.913
245940.000 LVL=446.520
DRG. NO. Package No. DPR- 3A (6) /P&P-08
VIP LVL=:446.696
Km245+000 to Km 246+000
D - 21 H = DAT
2
h
7+
m/
24
E P C UT
5k
Lc = 0 .19 00m
9
TA
H I TO
=6
DE = 3 .166 6m
DA 7+
0.0
SE
D
T 4
SI 6.3 m
OU = 2 .06
m
0
EE
GN 8 9
T
8
SE P CH 8911
SP
= 1
7
SET
O HI - 21 .42
HIP UT DA 9
E = 3 0.0
Es
CH T
E-2 = 24 A D = 14 5.
BOTA 1 8 33 6 +22 R =3
ROM D=
KM 24 NI VILLAG 16.9 1.847,N 9
4 0
5+800 E R= 12 .69 10 + Ls = 6
- 23 64
TO KM 2
Ls = 00.000 456 0
47 2 Ts ift
246+2 m 84.3 SETOU 45 sh
40 Ts = 35.000m 51
E
T 2 3
HIP CH DATA A
T 95 - 2
ELECTRIC WIR
4 DA 46+ ,N
X-
M
AT INOR shift 7.266 E - 218
= 246+
417
E
UT 2 62
24 M
Es = = 0.255
DES
DG
IGN JUNCT 36
D = 1.8 6.135,N - 234
7
O H = 7.1
K
KM CH I
AIN ON DE
I
Lc = 2.456 T
m BR
AG
E - VELOP
45 5498.6 3
246 SE IP C 186 71 0m
T .2 IN D
R = 120 85
CHXIST INE
DES 24.033m
246
5.0 OR
HUT
+00 MENT
S
0.000m
E: :M 005
SIZYPE 47+ G
8 D/
IRE
2 0. .00 m
0
Ls = 30 H -
2X IN
E TA
IGN /h
SPE .00
Ts = 34 0m E = 3 00 000 4
RE
W
BOUN ED
= 50 .319 D = 1 30. .70 5 km 00S
+0U/ 0
20
IC
s = 0 1
TBM
L s 3 m D CH 247+
WIRE 87 T ift = 4.1 881 EE
EC
ELECTRIC Lc = 8.6
34m s s = 23 SP
h .
EL
DESIG E = IGN
N SPEE
ELECTRIC WIRE
246+00HUT
Lc ES
HUT
D = 50
CH.246 HUT
km/h
TBM
+000
0
DATA D
SETOUT
246+609 308.690
HIP CH = 2 ,N - 2345
BOTO DS
BUIL 3 9 4 .9 3
E - 218
NA
HUT
DIN
AR
G 3
D = 36.17
TOW
.0 0 0m
E R = 50
246 HUT
IR 0 0m
0
SET Ls = 2 0 .0
+90
O W
HIP UT DATA
0
C 6 .4 25
RI 2
+10
CH = Ts =
246
E-2 246+ T 0 .3 3 3
EC shift =
PSM
1 0 BUI
TB
D = 1 8355.164 21
G
LDI EL Es = 2 .9 5 0
5.14 ,N - 2 NG HU 67m
R=1 7 3458 T E Lc = 11.5 EED = 20 km/h
0 90.6 IR
Ls = 0.000m
LL
53 W SP
DESIGN
0
20.0 IC
WE
+80
Ts = 0 0m TR
200
2
shift 3.315 EC
246
EL
+
= 0.1
TBM
246
Es = 67
BOTON S
1
RD
Lc = .048
A
T-M
6 TOWA 0
I
AT D NOR JUN
DES .437m
246+30
ESIG C
N CH TION DE
IGN
0
AINA V
SPE GE - ELOPME
+70
246+400
246+3 NT
ED = 00
25 km
246
/h
0
246+50
246+600
EXISTING CENTRE LINE
PROPOSED CENTRE LINE
PROPOSED CARRIAGEWAY
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-09(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km246+000 to Km 247+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT -
SUPERELEVATION
CHAINAGE
CENTER LINE (m)
------------------------------------
------------------------------------
EXISTING LEVEL BELOW
______________________
VERTICAL ALIGNMENT
HORIZONTAL ALIGNMENT
430
434
436
440
444
446
450
432
442
438
448
D: 3.6879
R: 100.000
VCL: 6.437
K:33.534
LVC:100.00
e:7.00% e:7.00%
e:-7.00%e:-7.00%
CH=246+050.000
GOVERNMENT OF MAHARASHTRA
246050.000 LVL=445.381
246060 444.414 444.023 444.690 445.119
-2.629%
246080.000 CH=246+080.000
246080 443.394 443.093 444.257 444.593 LVL=444.593
CONSULTANT -
K:29.759
246120 442.843 442.589 443.757 443.810
LVC:60.00
L =137.034
CH=246+140.000
246140.000 246140 442.381 442.858 443.527 443.620 LVL=443.620
BOTANA VILLAGE
-0.613%
e:5.00% e:5.00%
e:-5.00% e:-5.00%
246260 443.240 441.797 442.576 442.885
NAME OF WORK -
VIP CH=:246+340.00
L =107.220
246340 442.437 442.018 441.854 442.320 VIP LVL=:442.394
K:169.374
LVC:100.00
246360 442.395 441.167 441.608 442.127
246380 441.286 440.536 441.302 441.910 CH=246+390.000
246390.000 LVL=441.792
246400 440.639 441.479 440.924 441.672
30.000
246420 440.266 442.215 440.578 441.431
D: 0.4122
VCL: 8.634
R: 1200.000
e:2.09% e:2.09%
e:-2.09% e:-2.09%
30.000
246440 439.848 440.835 440.293 441.191
246460 439.547 439.320 440.040 440.950
PROFILE
246480 439.414 439.198 439.811 440.709
246500 439.701 440.749 439.741 440.469
246520 439.722 440.845 439.492 440.228
EXISTING ROAD LEVEL
PROPOSED ROAD LEVEL
L =131.422
APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
20.000
THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC
PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
R: 50.000
D: 13.2549
VCL: 11.567
e:7.00% e:7.00%
e:-7.00% e:-7.00%
LVL=437.701
246740 438.050 437.658 436.977 437.577
AKP
L =274.686
TITLE:
H-1:2000 V-1:200
LVL=434.624
VCL: 23.881
246960.000
e:7.00% e:7.00%
e:-7.00% e:-7.00%
THARPARDI
247010.000
R
0
DATE: FEBRUARY-2024
m/h
8 0k
1m E D=
.45 E
c = 4 N SP
L I G
S
MORSHI OUT
A
DAT 15
0 048.
710
2.0
25 DE THARPARDI
SET H = 247+ N - 2345 A TA 33 5 9
SETOUT DATA 5, D +9 44
C
HIP 8699.70 UT 7 - 23
TO = 24 66,N
RE
HIP CH = 246+952 1 E GE
E - 2 085 S CH 4.0 LA
VIL
WI
E - 218637.162,N - 2345064.694 .
D = 2 00.000m SETOUT DATA HIP 21942 ETI
D = 30.871
E - 1.473 000m IH
IC
0
R = 100.000m R = 1 8.196m HIP CH = 247+673
. R D G
CTR
= 1 E - 219159.115,N - 2344620.755 D = 1200 0m PA IN
Ls = 30.000m Ts
0.16
6m
km/h R = 30.0 26
0 ILD
Es = 6.389m D = 49.660 BU G
ELE
Ts = 42.704 D = 65 s = 0.4 G IN
3 E L IN ILD
E
Lc = SP E R = 100.000m =3 31
IR
Ls = 20.000m f 0 BU IN HU
D/S
Es = 4.131 shi 0.13 m 80 D
IC
Ts = 56.344 = 0 D = I L
Es 0.85 PEE BU
TR
Lc = 23.881m KM8 T
shift = 0.167 = S HU
EC
Es = 10.369 S M
DE AG
TB
ILL ING
U/S
Lc = 66.673m
T I V
I RE BUILD
DESIGN SPEED = 30 km/h HE W
R DI C DING
PA RI BUIL
10 0
247+200
D/S
CT
248+
E
EL
D/S
0
2 4 8 00 0
+30
0
SED
0
PO TER STRUCTI
247+ U0/S0
+00
247+1
8+
M
RECON
TB
247
INED R L SED
000
P
SETOUT DA SHE PROPO+115
47+0
.24
RETA NG TA
BUS
ELECTRIC WIRE
S
I CH.248 HPC
U/
S T GE HIP CH = 24
T DATA
CH
X I 5
E 47+00 BRID 7+235 TYPE : 120
CH.2 :MINOR SETOU 248+113
CH.2
900
E - 218911.0 N G 28 SIZE:1X G
P E
TY : 2X5.0m 63,N - 234498 DI HIP CH
= 44571.2 EXISTIN+10
6.417 IL 5,N - 23
246+
D = 39.427
0
SIZE 7
BU 3 .0 CH.248 LA
+40
6 0
R = 140.000m RE N G E - 219 2 TYPE :S X
TA
DI D = 31.2 0m
5
247
EX INED IL SPAN: 1
Ls = 35.000m
0
CH ISTI BU 0
+90
TY .247 NG R = 8 0.0
Ts = 67.786 00m
SIZ PE :M+390 1 0 .0
247
shift = 0.365 E: 2 IN Ls =
X5 OR G .389
Es = 9.103 .0m BR IN Ts = 27
LD
0
I DG 0 .052
+50
EXISTING CENTRE LINE Lc = 61.338m E B UI shift =
= 3 .1 24
247
DESIGN SP Es
00
PROPOSED CENTRE LINE EED = 30 km c = 3 3 .636m 10 km/h
PEED =
+8
/h L
EL
PROPOSED CARRIAGEWAY IG N S
247
DES
EC
PLAN
TR
0
VIP CH=:248+040.00
IC
+60
W
RETAINED RETAINED
VIP CH=:247+910.00
VIP LVL=:437.772
CH=247+970.000
247
IR
CH=248+000.000
CHAINAGE 247+005 CHAINAGE 247+390
VIP LVL=:438.205
E
VIP CH=:247+760.00
CH=247+850.000
LVL=438.005
SPAN 2 X 5.0m SPAN 2 X 5.0m
LVL=437.905
PROPOSED ROAD LEVEL
CH=247+810.000
VIP LVL=:436.632
EXISTING GROUND AT-8m FROM PCL
VIP CH=:247+200.00
TYPE MINOR BRIDGE TYPE MINOR BRIDGE
LVL=437.576
LVL=437.156
CH=247+110.000
VIP LVL=:436.800
EXISTING ROAD LEVEL EXISTING GROUND AT +8m FROM PCL
CH=247+090.000
CH=247+710.000
VIP CH=:247+050.00
LVL=435.494
LVL=435.204
CH=247+010.000
VIP LVL=:434.624
440
LVL=435.519
CH=247+290.000
LVL=434.624
CH=247+330.000
LVL=433.954
CH=247+585.000
438
LVL=432.690
VIP CH=:247+535.00
VIP CH=:247+380.00
LVL=432.737
CH=247+485.000
VIP LVL=:431.624
CH=247+430.000
VIP LVL=:431.109
436
LVL=431.457
LVL=431.275
434
432
430
CHAINAGE
247010.000
-0.333%
247110.000
247090.000
247290.000
247330.000
247430.000
247485.000
247585.000
247710.000
247810.000
247850.000
246960.000
247970.000
248000.000
0.000% 1.451% -3.162% 0.332% 2.226% 1.049%
K:55.133 K:39.020 K:28.619 K:52.806 K:84.936 K:86.834 K:54.703
VERTICAL ALIGNMENT
LVC:80.00 LVC:180.00 LVC:100.00 LVC:100.00 LVC:100.00 LVC:120.00 LVC:80.00
SUPERELEVATION
e:2.09% e:2.09% e:7.00% e:7.00% e:-7.00% e:-7.00% e:2.39% e:2.39% e:-2.37%
e:-2.09% e:-2.09% e:-7.00% e:-7.00% e:7.00% e:7.00% e:-2.39% e:-2.39% e:2.37%
PROFILE
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-10 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km247+000 to Km 248+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
MORSHI THARPARDI
ATA 74
T O UT D 8+381 4 483.3
SE 2 4 3 4
H= ,N - 2
HIP C 852.206
1 9
E - 2 290
.
SETOUT DATA D 7 0.000m
=
TA 15 HIP CH = 248+192 1 0
U T DA +000 4 4 5 83.1 R = 0.000m
1
REC
O 8 ON
SET H = 24 8,N - 23 E - 219666.764,N - 2344522.765 Ls = 1.373 PRO STRUCTI
C 9 = 1 CH.2 POSED ON
HIP 9490.2 D = 26.630 Ts 42 TYP 48+66
2 1 f t = 0.0 SIZE E : HPC6
E - .645 R = 100.000m shi
1 m 0.244 km/h EXI :1X120
D = 200.000 Ls = 20.000m Es = .724m = 10 E CH.2STING 0mm
R = 1 0 0 m Ts = 33.703 Lc = 2
SPE E D PARDI HETI VILLAG TYP 48+68
30.0 IGN SPA E :SLAB0
Ls = 32.227 DES
TOWARDS PARDI
shift = 0.167 N: 1
X1.2 CUVER
Ts = 0.031 Es = 2.934 m T SETOUT DA
= TA
shift 0.155 km/h Lc = 26.478m HIP CH = 24
= 8+922
Es 4.451m ED = 80 DESIGN SPEED = 25 km/h E - 220296.0
26,N - 2344
Lc = GN SPE
DI
D = 32.760 214.828
I E
ILLAG
PAR
DES IV
I HET D ING R = 70.000m
PARD UIL Ls = 20.000 DATA
RDS
B m SETOUT
S
ARD
249+011
DI
Ts = 30.639 =
HIP CH
A
GE
PAR
shift = 0.238 3.937,N -
IRE
ILLA
TOW
E - 22038
RE
W
X-
IV ING
M
Es = 3.209
HET
D/S
AT INOR
D = 7.925
WI
O
ILD
W
DI
DES
IGN JUNCT
PAR
T
G BU CHA ION Lc = 20.024 00m
DIN m R = 100.0
RIC
INA DEV
RIC
G IL GE E
- 24 LOPM DESIGN SP
DIN BU DEVELOPMENT 8+7
00 ENT EED = 20 km Ls = 1 0 .0 0 0m
UIL DING
T - MINOR JUNCTION
LECT
/h
CT
B GE - 248+600 3 0
AT DESIGN CHAINA .9
ING BUIL 1
248+600
1
U/S
M
Ts =
ELE
TB
ILD
LD
G PROPOSED 0 .0 4 2
DIN shift =
00
BU KM
E
IL
FIE
G BUS SHELTER 8 1
248+5
KM8 DIN BU T 249 Es = 0 .2
L HU m
D/S
I Lc = 3.832
248+ RDS
24
DS
TOW MBA
BU
0
T PEED
+70
HU N S
AR
DE S IG
A
400
E
A
SETOUT
248
W
IR PME
NT
EK
W VELO DATA
TO
O N DE 48+400 HIP CH
C T I
JUNC NAGE - 2 = 248+6
RI
M
U/S
TB
BUILDING G INOR 13
DIN
AI E - 2200
T X - M SIGN CH
0
EC IL TA 77.493,N T
0
UT DA
248+30
E
HU
D
EL BU AT
D = 24.2 - 234443
+80
SETO = 248+509 .449
+000
77 4.382
D 44469
00
M
TB
248
HIP 16,N
248+1
00m
9979.8 HIP OUT D
0
248+ 00
248+200
SH Ls = 20.0
9
E - 21 22
249+00
BUS 00 E - CH = ATA
000
CH.24
Ts = 22.9 m
48+0
.5
D = 13 .000m 55 2 2
D = 20178 48+75
0 shift = 0.2
R = 25 000m
900
. 3
R = 2.032 815,N
CH.2
78
0. Es = 1.6
G Ls = 3 653 1 -
+
RECONSTRUCTION
TA 56 Ls = 200.0 234
DIN UT DA
248
4. Lc = 5.42 433
ING B UIL SETOUT DATA PROPOSED
SETO = 248+292 344504.21
7 Ts = 4 150 2m Ts = 30.00 00m 6.44
D CH.248+115 0. DESIGN
BU
IL HIP CH = 248+113 TYPE : HPC HIP C H
511, N - 2 shift = 02 SPEED shif 36.28 m
0 8
900
E - 219603.075,N - 234457
1.228 SIZE:1X1200mm 9765. Es = 1 .9 = 20 km/h t= 1
E - 21 79 8.999m D = 50 km/
h Es 0.03
247+
EXISTING 2 =
D = 31.252 CH.248+100
8
D = 2. .000m Lc = S P EE Lc = 0.220 1
N
R = 80.000m TYPE :SLAB CULVERT R = 600
m DESIG DES 12.55
SPAN: 1X1.2m 0.000 IGN 7m EXISTING CENTRE LINE
Ls = 10.000m Ls = 2 .080 SPE
5 PROPOSED CENTRE LINE
Ts = 27.389 Ts = 2 .028 ED
=2
= 0 0 km PROPOSED CARRIAGEWAY
shift = 0.052 shift
0 .217 /h
Es = 3.124 Es = m /h
0.153 ED = 65 km
Lc = 33.636m Lc = 1
N SPE
DESIGN SPEED = 10 km/h DESIG
PLAN
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-11(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km248+000 to Km 249+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT -
SUPERELEVATION
CHAINAGE
CENTER LINE (m)
______________________
VERTICAL ALIGNMENT
HORIZONTAL ALIGNMENT
440
444
450
454
460
436
442
446
452
456
438
448
458
435
e:2.37%
e:-2.37%
LVL=437.905
-0.333%
248020 436.548 436.242 437.539 437.875
30.000
247970.000
VIP CH=:248+040.00
248040 436.640 436.296 437.626 437.918 VIP LVL=:437.772
LVC:80.00
L =53.785
CH=248+080.000
248080.000
248080 437.033 436.579 437.815 438.223 LVL=438.223
10.000
e:7.00%
e:-7.00%
248100 438.084 437.918 438.180 438.449
1.129%
248120 438.144 438.050 438.292 438.675
R: 80.000
SIZE
CONSULTANT -
TYPE
VCL: 33.636
e:7.00%
e:-7.00%
10.000
248150.000 248140 438.320 437.933 438.418 438.901 CH=248+150.000
HPC
LVL=439.014
D: 24.0897 L =18.940
RECONSTRUCTION
20.000
248180 438.537 438.392 438.984 439.322
248200 438.702 438.930 439.166 439.495
R: 100.000
VCL: 26.478
VIP CH=:248+210.00
e:7.00% e:7.00%
e:-7.00% e:-7.00%
LVC:120.00
L =41.690
248260 439.062 438.248 439.375 439.854 CH=248+270.000
248270.000 LVL=439.891
20.000
248280 439.173 438.291 439.435 439.924
0.333%
248300.000 CH=248+300.000
D: 0.9696
248300 439.144 438.325 439.518 439.991
R: 600.000
LVL=439.991
VCL: 10.153
20.000
e:3.13% e:3.13%
e:-3.13% e:-3.13%
248320 439.361 438.674 439.578 440.083 VIP CH=:248+330.00
VIP LVL=:440.091
NAME OF WORK -
K:80.297
248340 439.514 439.018 439.706 440.224
LVC:60.00
CH=248+360.000
248360.000
248360 439.626 439.194 439.965 440.415 LVL=440.415
L =52.712 D: 1.5609
R: 100.000
VCL: 2.724
10.000 10.000
e:7.00% e:7.00%
e:-7.00% e:-7.00%
248400 440.246 439.668 440.602 440.847
EXISTING ROAD LEVEL
PROPOSED ROAD LEVEL
1.081%
L =72.342
248440 440.679 440.115 440.912 441.280
248460 440.594 440.421 441.080 441.496
PROFILE
248480 440.747 440.856 441.217 441.712
248500.000 CH=248+500.000
e:5.00%
e:-5.00%
248500 440.994 441.104 441.433 441.928 LVL=441.928
R: 250.000
VCL: 28.999 248520 441.219 441.329 441.710 442.209
e:5.00%
e:-5.00%
VIP CH=:248+540.00
248540 441.797 442.622 442.134 442.621 VIP LVL=:442.360
30.000 D: 6.6461 30.000
K:30.707
LVC:80.00
248580.000 LVL=443.835
APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
EXISTING GROUND AT-8m FROM PCL
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI
EXISTING GROUND AT +8m FROM PCL
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
3.686%
THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC
PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
248620.000 CH=248+620.000
D: 5.1779
LVL=445.309
VCL: 5.422
e:7.00% e:7.00%
e:-7.00% e:-7.00%
20.000 20.000
VIP CH=:248+700.00
REV DETAILS OF REVISION
VIP LVL=:448.257
K:146.617
RECONSTRUCTION
CHAINAGE 248+666
LVC:160.00
30.000
AKP
R: 1200.000
VCL: 12.557
e:2.09% e:2.09%
e:-2.09% e:-2.09%
CH=248+780.000
30.000
248780.000
248780 448.043 449.048 449.413 450.333 LVL=450.333
SSS
MKH
VIP CH=:248+860.00
DESIGN DRAWN CHECKED APPROVED
TITLE:
CH=248+890.000
248890.000 LVL=453.412
248900 452.531 453.575 453.424 453.746
20.000
3.343%
LVL=454.749
VCL: 20.024
e:7.00% e:7.00%
e:-7.00% e:-7.00%
H-1:2000 V-1:200
VIP CH=:248+960.00
248960 454.196 455.138 454.986 455.660 VIP LVL=:455.751
K:49.002
LVC:60.00
THARPARDI
CH=248+990.000
L =47.765
Km248+000 to Km 249+000
LVL=456.387
249000 454.787 456.450 455.942 456.599
2.118%
248990.000
0
DATE: FEBRUARY-2024
SE
HIP TOUT
E - CH DAT
=
D = 2203 249 A SETOUT DATA
8 +
MORSHI KM R = 7.92 3.93 011
1 5 7,N SETO HIP CH = 249+609 THARPARDI
249 Ls 0
= 1 0.000 -2
344
U
HIP C T DATA E - 220959.826,N - 23 SETOUT
DATA
TBM
0
ED 0.444 Ts = 30 8 .2
+00
CH 000
=2 Es = Lc = 43.365m shift = 0.0 Ts = 85.086
0k 7 3 m 94
7.417 Es = 0.5 Es = 4.08
.249
m/h Lc = 4 DESIGN SPEED = 20 shift = 0.013
+
.5 4 7m km/h 1 KM
Lc = 60
249
9 0 km/h
DESI .622m
D/S
Lc = 82.4
GN S N S PEED = 2 71m Es = 0.831 250
PEED DESIG DESIGN Lc = 110.146m
= 20 k SPEED =
m/h 65 km/h DESIGN SPEED = 80 km/h
D/S
D/S
249+600 U/S
D/S
TBM
0
+10
RUCTION
RECONST
D
249
PROPOSE95
249+500
U/S
CH.250+000
CH.249+5PC
RECONSTRUCTION
U/S
250+000
U/S
TYPE : H 00mm
249+400
00
PROPOSED RECONSTRUCTION
TOWARDS
SIZE:1X12 CH.249+813
249+7
PROPOSED
249+300
RECONSTRUCTION
249+900
249+800
EXISTING95 TYPE : HPC
FIELD
CH.249+900
249+200
T - MINOR JUNCTION DEVELOPMENT PROPOSED
AT DESIGN CHAINAGE - 249+200 CH.249+5AB CUVERT SIZE:1X1200mm TYPE : HPC CH.250+077
TYPE :SL 1.2m EXISTING SIZE:2X1200mm TYPE : HPC
SPAN: 1X CH.249+815 EXISTING SIZE:3X1200mm
EXISTING CENTRE LINE TYPE :SLAB CULVERT CH.249+900 EXISTING
SIZE: 1X1.3m TYPE :HPC CH.250+084
PROPOSED CENTRE LINE SIZE: 1X600mm TYPE :CAUSEWAY
PLAN PROPOSED CARRIAGEWAY SIZE: -
RECONSTRUCTION
RECONSTRUCTION RECONSTRUCTION
CHAINAGE 249+595
VIP CH=:249+540.00
CHAINAGE 249+813 CHAINAGE 249+900
CH=249+470.000
VIP CH=:249+380.00
CH=249+450.000
SIZE 1 X 1200mm
VIP LVL=:467.968
PROPOSED ROAD LEVEL SIZE 1 X 1200mm SIZE 2 X 1200mm
VIP LVL=:466.568
EXISTING GROUND AT-8m FROM PCL TYPE HPC
LVL=467.356
LVL=467.181
TYPE HPC TYPE HPC
CH=249+610.000
CH=249+310.000
EXISTING GROUND AT +8m FROM PCL
CH=249+645.000
EXISTING ROAD LEVEL
CH=249+300.000
VIP CH=:249+725.00
VIP CH=:249+260.00
VIP CH=:249+150.00
LVL=466.184
LVL=465.298
LVL=465.293
CH=249+220.000
LVL=465.117
CH=249+200.000
470
VIP LVL=:463.255
VIP LVL=:464.391
VIP LVL=:464.038
CH=249+805.000
LVL=464.263
LVL=464.198
LVL=463.932
468
CH=249+100.000
CH=249+090.000
466
LVL=460.848
LVL=460.210
VIP CH=:249+050.00
464
VIP LVL=:457.658
CH=249+010.000
462
LVL=456.811
460
458
456
455 249280 463.271 463.755 464.050 464.791
CHAINAGE
249645.000
249610.000
249805.000
250170.000
249010.000
248990.000
249200.000
249220.000
249300.000
249090.000
249450.000
249470.000
249100.000
249310.000
10.000 10.000
HORIZONTAL ALIGNMENT D: 2.1958 L =89.916 40.000 D: 18.9541 40.000 L =233.398 D: 4.3364 L =29.773 20.000 L =16.44830.000
D: 16.5644 20.000 D: 11.8131 30.000 L =23.122 30.000 D: 2.1036 30.000
R: 100.000 R: 150.000 R: 800.000 R: 150.000 R: 400.000 R: 3000.000
VCL: 3.832 VCL: 49.622 VCL: 60.547 VCL: 43.365 VCL: 82.471 VCL: 110.146
SUPERELEVATION
e:7.00% e:7.00% e:-5.00% e:-5.00% e:-2.35% e:-2.35% e:5.00% e:5.00% e:-4.69% e:-4.69%
e:-7.00% e:-7.00% e:5.00% e:5.00% e:2.35% e:2.35% e:-5.00% e:-5.00% e:4.69% e:4.69%
PROFILE
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-12 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km249+000 to Km 250+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
ATA
SETOUT D
MORSHI 2 50+569 SETO
HIP CH = 411.262 UT DA THARPARDI
87,N - 2344 HIP C T
DATA E - 2 21 8 9 2.6 H = 25 A
SETOUT D = 16.929
E - 22 0+959
250+384 .603
22
D = 16 76.297,N - 2
- 2344251.31 SETOUT DATA HIP CH = 2 ,N - 2344326 R = 200.00
0m .6 34447
3 HIP CH = 250+152 E - 2217 2 7 .1 4
0 0 m R = 25 60 9.978 SET
6 Ls = 35.0 0.000m HIP UT D
O
PROPOSED R E - 221500.137,N -
2344278.232 D = 15.05 Ts = 47 .2 9 7 Ls = 3
0. CH
E WALL FRO D = 5.453 R = 250 .0 00m Ts = 5 000m E-2 = 25
KM 249+880
TO 249+960 B
M
.0 0 0m shift = 0.255 1.626 2
D = 2427.6
HS R = 1000.000m Ls = 50 Es = 2.461
shift = 4
8 .0 8 4 0
Es = 2 .150 R = .397
Ls = 30.000m Ts = 5 Lc = 24.094
m
m/h .817 900.
KM Ts = 62.623 shift = 0 .4 1 7
N S P EED = 50 k Lc = 4 Ls =
3
000m
DESIG 2. Ts = 0.000m
250 shift = 0.038 Es = 2 .5 9 4 DESIG 695m KM
3m N SPE 251 shift 49.556
Es = 1.171 Lc = 15.69 0 km/h ED = 5 =
PEED = 8 0 km/h Es = 0.042
D/S
Lc = 65.172m DESIG N S 0
Lc = .705
DESIGN SPEED = 3
D/S
80 km/h DES 9.075m
IGN
PROPOSED RE WALL FROM
TBM
SPE
D/S
ED =
U/S
T
MEN
KM 250+080 TO 250+160 BHS LOP
EVE +500
LD
D
250+600
ON 50 RECONSTRUCTION
U/S
CTI GE - 2
250+700
JUN
S FIE
A PROPOSED RECO
OR CHAIN
0
250+800
NSTR
250+000
IN
PROP UCTION
TBM
CH.250+00
T - M ESIGN CH.250+735
250+900
251+ 0
250+5
000
CH.25 OSED
U/S
00
AT TYPE : BOX CULBERT
ARD
RECONST TYPE 0+955
251+
RUCTIO SPAN:1X3.0m
SIZE:1 : HPC
N
PROPOSE EXISTING
00
D
CH.250+077 EXIST X1200mm
TOW
250+100
CH.250+741
250+40
CH.
TYPE : HP TYPE :HPC CH.25 ING
250+200
250+300
SIZE:3X12 C SIZE: 1X1000mm TYPE 0+955
00
EXISTING mm SIZE: :HPC
CH.250+084 EXISTING CENTRE LINE 1X600
mm
100
TYPE :CA
SIZE: - USEWAY PROPOSED CENTRE LINE
251+
PROPOSED CARRIAGEWAY
PLAN
EXISTING GROUND AT-8m FROM PCL
VIP CH=:250+490.00
RECONSTRUCTION RECONSTRUCTION
RECONSTRUCTION
EXISTING GROUND AT +8m FROM PCL
VIP LVL=:471.331
CHAINAGE 250+077 CHAINAGE 250+955
VIP CH=:250+860.00
CH=250+410.000
PROPOSED ROAD LEVEL CHAINAGE 250+735
CH=250+570.000
CH=250+390.000
SIZE 3 X 1200mm SIZE 1 X 1200mm
CH=250+910.000
VIP LVL=:469.062
SPAN 1 X 3.0m
LVL=469.505
TYPE HPC TYPE HPC
LVL=469.898
EXISTING ROAD LEVEL
VIP CH=:250+350.00
LVL=469.049
TYPE BOX CULVERT
CH=250+810.000
LVL=469.489
VIP CH=:250+210.00
CH=250+790.000
CH=250+310.000
VIP LVL=:468.136
VIP CH=:250+750.00
CH=250+250.000
VIP LVL=:467.360
CH=250+710.000
LVL=467.976
VIP LVL=:466.673
CH=250+170.000
LVL=467.542
LVL=467.914
472
LVL=467.582
LVL=467.390
LVL=467.022
470
468
466
464
462
250040 465.628 463.752 464.670 465.921
CHAINAGE
2.283% 2.172%
249805.000
250170.000
250250.000
250310.000
250570.000
250710.000
250910.000
251080.000
250790.000
250810.000
250390.000
250410.000
HORIZONTAL ALIGNMENT L =87.336 30.000 D: 3.7341 30.000 L =111.394 50.000 D: 3.5966 50.000 L =80.555 35.000 D: 6.9023 35.000 L =290.794 30.000 D: 9.7850 30.000
R: 1000.000 R: 250.000 R: 200.000 R: 250.000
VCL: 65.172 VCL: 15.693 VCL: 24.094 VCL: 42.695
SUPERELEVATION
e:-2.84% e:-2.84% e:-5.00% e:-5.00% e:5.00% e:5.00% e:5.00% e:5.00%
e:2.84% e:2.84% e:5.00% e:5.00% e:-5.00% e:-5.00% e:-5.00% e:-5.00%
PROFILE
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-13 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km250+000 to Km 251+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
MORSHI THARPARDI
SETOUT DATA
SETOUT DATA HIP CH = 251+227 SETOUT DATA SETOUT DATA
HIP CH = 251+110 E - 222544.275,N - 2344458.429 HIP CH = 251+448 SETOUT DATA HIP CH = 252+022
E - 222427.659,N - 2344462.720 D = 6.174 E - 222762.978,N - 2344 HIP CH = 251+
SETOUT DATA E - 223330.715,N - 2344343.652
426.598 611 HIP CH = 251+780 D = 5.875
D = 4.397 R = 100.000m D = 1.580 E - 222923.901
R = 900.000m ,N - 2344398.62 E - 223088.898,N - 2344365.052 R = 800.000m
250+959 9.978 Ls = 10.000m R = 2000.000m D = 1.641 5
- 234447 Ls = 30.000m D = 6.444 Ls = 30.000m
76.297,N Ts = 10.395 Ls = 30.000m R = 1500.000m
R = 1000.000m
Ts = 49.556 Ts = 56.053
TOWARDS FIELD
shift = 0.042 Ts = 42.571 Ls = 30.000m
shift = 0.042 Ls = 30.000m shift = 0.047
Es = 0.187 shift = 0.019 Ts = 36.479
Es = 0.705 Ts = 71.298 Es = 1.099
Lc = 0.775m Es = 0.209 shift = 0.025
Lc = 39.075m shift = 0.037 Lc = 52.029m
KM DESIGN SPEED = 20 km/h Lc = 25.139m Es = 0.179
251 DESIGN SPEED = 80 km/h DESIGN SPEED = 80 km Lc = 12.954m
Es = 1.621 DESIGN SPEED = 80 km/h
/h Lc = 82.473m
DESIGN SPEE KM
D = 80 km/h DESIGN SPEED = 80 km/h
km /h 252
ED = 50
GN SPE
D/S
D/S
GPS
TBM
E
WIR
D/S
HUT
CH.251+000
251+000
U/S
U/S
C
251+300
TRI
251+400
251+100
RUCTION
CH.252+000
251+500
RECONSTRUCTION
RECONST
252+000
RECONSTRUCTION
C
U/S
D PROPOSED
251+600
PROPOSE55
ELE
CH.251+525 PROPOSED
CH.250+9PC CH.251+772
251+700
TYPE : H 200mm TYPE : BOX CULVERT
251+900
TYPE : HPC
251+800
SIZE:1X1 SPAN: 1X6.0m SIZE:1X1200mm
EXISTING EXISTING EXISTING
55
CH.250+9PC CH.251+500
TYPE :SLAB CULVERT CH.251+772
TYPE :H 00mm TYPE :HPC
SIZE: 1X6 SIZE: 1X4.0m SIZE: 1X900mm
EXISTING CENTRE LINE
PROPOSED CENTRE LINE
PROPOSED CARRIAGEWAY
PLAN
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-14 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km251+000 to Km 252+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT -
SUPERELEVATION
CHAINAGE
CENTER LINE (m)
____________________
VERTICAL ALIGNMENT
HORIZONTAL ALIGNMENT
454
460
464
470
474
456
462
466
472
476
458
468
L =51.160
0.855%
251060 470.025 470.452 470.140 470.772
251080.000 CH=251+080.000
30.000
251080 470.446 470.881 470.588 470.943 LVL=470.943
e:3.16%
e:-3.16%
251100 470.833 471.233 470.898 471.062
CONSULTANT -
D: 2.4876
R: 900.000
251120 470.662 471.319 470.894 471.076
VCL: 39.075
e:3.16%
e:-3.16%
251140 470.404 471.089 470.673 470.987
30.000
251160 470.328 470.800 470.418 470.793
VIP CH=:251+180.00
251180 470.019 470.513 470.140 470.494 VIP LVL=:471.798
K:38.357
LVC:200.00
D: 0.4443
R: 100.000
VCL: 0.775
251240 468.169 468.764 468.238 468.974
10.000 10.000
e:7.00% e:7.00%
e:-7.00% e:-7.00%
251260 467.335 469.276 467.356 468.258
CH=251+280.000
251280.000 251280 466.690 467.376 466.531 467.439 LVL=467.439
NAME OF WORK -
L =168.041
251340 464.007 463.616 464.069 464.823
251360 463.225 462.730 463.237 463.951
-4.359%
251380 463.154 462.069 462.440 463.079
251400 462.205 461.764 461.569 462.207
251430.000 251420 461.224 460.977 460.649 461.336 CH=251+430.000
LVL=460.900
251440 460.835 459.682 459.712 460.489
R: 2000.000
VCL: 25.139
251460 460.078 458.067 458.773 459.817
PROFILE
30.000 D: 0.7202 30.000
APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
251580 459.635 460.168 459.238 459.994 CH=251+590.000
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI
BOX CULVERT
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC
251590.000 LVL=460.334
30.000
PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
251600 459.822 460.392 460.020 460.699
3.652%
251620.000 CH=251+620.000
D: 0.4948
VIP CH=:251+730.00
30.000
VIP LVL=:465.447
K:140.673
e:-2.84%
AKP
CH=251+840.000
30.000
251840.000
251840 468.305 467.129 467.371 467.744 LVL=467.744
DESIGN DRAWN CHECKED APPROVED
251860.000 CH=251+860.000
251860 468.013 467.331 467.751 468.162 LVL=468.162
SCALE
TITLE:
VIP CH=:251+880.00
251880 468.321 468.092 467.848 468.740 VIP LVL=:468.579
2.088% K:12.483
LVC:40.00
CH=251+900.000
251900.000
251900 469.057 468.571 468.801 469.638 LVL=469.638
L =115.410
H-1:2000 V-1:200
251935.000 CH=251+935.000
251940 472.975 472.686 470.945 471.744 LVL=471.490
VIP CH=:251+975.00
VIP LVL=:473.607
251960 472.631 472.388 472.180 472.545
DRG. NO. Package No. DPR- 3A (6) /P&P-14
THARPARDI
R
e:3.56%
0
DATE: FEBRUARY-2024
MORSHI THARPARDI
050
6 2. SETOUT DATA
6 HIP CH = 252+847
44
TA 733 - 23 E - 223923.014,N - 2344753.729
DA 52+ ,N D = 68.743
T 2 77
SE P C 40 87 m
OU H = 3.1 R = 20.000m
HI - 22 2.7 00 1m
TO
T 5
SE IP C 38 59 m
E = 4 0.0 34
Ts = 13.680m
UT 2 9
99
D = 8 31. 20m 1m ED
H - 22 7.7 .000 m
H
.7 Es = 4.231m
R = 5.9 74 E
DA 52+ ,N
E = 2 00 000
=
3 /h
56
Ts s = 59. SP
Lc = 23.996m
TA 9 - 2
D = 1 20. 747 7 km
4
E = GN
44
2.
R = 34. .16 20 DESIGN SPEED = 20 km/h
8
2 3
Lc ESI
TA 63 - 2
9
SE Ls s = = 0 79 m D =
1
D
A
5 34
HI TOU +
D 52 8,N
P T ift 3.1 448 EE
E - CH T D UT = 2 .61 sh = 28. SP
D 223 = 2 ATA TO CH 830 Es = GN
46
R = 5.8 330. 52+0 E
S IP 23 159 00m Lc ESI
68
= H - 2 20. .0 /h
Ls 80 75 715, 22
.6
D
E = 150 ?m km
44
= 0 N
30 .000
=
Ts -2 D = ?? ? 20
20
sh = 56 000 m. 34
43 SE R s = ?? ?? =
Es ift = .053 m
km
43 H TO L s = = ? ? 7m ED
0 . 6 UT
/h
Lc = 1. .04 52 IP T ift ?? .77 PE
E - CH DAT
25
0 SETOUT
=
DE 52 99 0 7 6 4 sh s = 52 N S 90
D = 2234 = 252 A A 8 + DATA
2+
T 54 .
52
RE OP 2+9 X C
DA 515 HIP CH =
SE P C 397 8
SIG .02 T 4 4 E c = IG 2
80
54 +1
CO
PR H.25 : BO4.0m
1 OU 52+ 23 4 253+053
HI 22 .93 0m
9 R = 1 5.090 .591, 48
C PE :1X
N
SP m SET H = 2 75,N - L ES E - 2241
TO H = 4.1
NS
0 T SIZE
TY AN ING 60
E
03.679,N
SP IST 2+9 C m
TR
Ls 5 N- C .0 D
= 1 0.00
OS 60 U
- 234466
UT 25 10
I P 6 D = 39.0
UC
234 H 37 7
CH E
KM D K 64 4.326
R = ? ?? ?
T
=
0 2
ED
0
TI
s = 2 .000 m 431 2 D/S 25 M
E - 6.230
YP : 4
=8 SETOUT DATA R = 30.0
DA 2+8 ,N -
252
Ls = ? ??
ON
33 .00
=
0k s hift 4.8 m 9.7 5 m 3 00m
Ts ift = ?? 63m ED
70 ?m
HIP CH = 252+273 D = 5.000
TA 96 23
m/ Es = 0 7 1 25 25 U/S Ts = 10.6
sh = ? 1.4 SPE
h 2344328.788 5 42m
X
= . 0 = 2+
E - 223579.257,N -
Es = 4 N
m
?
R Es = 1.8
2 ???
LV
6
Lc 1.3 8 70 32m
Lc SIG
DE = 29. 38 Ls = ???
ER
D = 44.909 0 Lc = 20.4
DE
54m
Ts = = ???
T
SIG 506 DESIGN
NS m R = 50.000m t h S PEED =
shif ??? km/ HU
44
PE Ls = 10.000m 0 T 20 km/h
ED = 7 m 2
Es 53.97 EED =
74
+0 0
=2 Ts = 25.697
53 0
2.
0k Lc = IGN SP
.2 3+0
00
01
shift = 0.083
.25 +000
m/h
DES
00
CH 25
6
TB
M
Es = 4.192
2+0
=
252
20
Lc = 29.191m
20 km/h
km
DESIGN SPEED =
CH
/h
253+100
25
2+
60
0
D/S
00
SETOUT DATA
2
0
253+
1
10
RE
22 HIP CH = 253+099
2+
C .
PR ONST
09 E - 224141.922,N - 23
25
CH OPO RUCT 5
252+400
U/S
00
T
252+500
EX E:1 HP 3 5 -
DA 52+ ,N R = 60.000m
3
CH ISTI X120 C
SE
3+
TY .25 NG 0m U T 2 5 2 Ts = 15.825m HIP TOUT
25
SIZ PE : 2+17 m O H = 5.0 E - CH DAT
00
E: HPC 0 T 9 Es = 2.052m
1X SE IP C 237 46 0m D = 2243 = 253 A
2
Lc = 30.945m
252
600
252+
PLAN
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-15(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km252+000 to Km 253+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT -
SUPERELEVATION
CHAINAGE
MORSHI
HORIZONTAL ALIGNMENT
440
444
446
450
454
456
460
464
466
470
474
476
442
452
462
472
438
448
458
468
LVC:80.00
GOVERNMENT OF MAHARASHTRA
252020 473.545 472.854 472.654 472.893
D: 3.7263
R: 800.000
252040.000 CH=252+040.000
VCL: 52.029
-1.587%
252040 472.240 472.123 472.327 472.576 LVL=472.576
e:3.56%
e:-3.56%
VIP CH=:252+060.00
252060 472.055 471.538 472.104 472.423 VIP LVL=:472.259
30.000
K:12.206
LVC:40.00
CH=252+080.000
252080.000
252080 472.520 471.756 472.350 472.597 LVL=472.597
CONSULTANT -
252100 472.723 472.283 472.713 472.935
1.690%
252110.000 CH=252+110.000
L =45.242
LVL=473.104
252120 472.898 473.261 472.995 473.224 VIP CH=:252+130.00
VIP LVL=:473.442
10.000
e:5.00%
K:10.240
e:-5.00%
252140 473.224 476.338 473.025 473.171 CH=252+150.000
LVC:40.00
252155.000 LVL=472.999
252150.000 CH=252+155.000
D: 11.2704
R: 150.000
-2.216%
VCL: 29.506
252160 473.415 480.341 472.641 472.793 LVL=472.888
e:5.00%
e:-5.00%
SIZE
VIP CH=:252+175.00
TYPE
10.000
252180 473.615 473.339 472.719 472.729 VIP LVL=:472.445
K:7.911
LVC:40.00
CH=252+195.000
252195.000
L =74.427
252230.000 252220 473.594 474.197 473.488 473.723 CH=252+230.000
LVL=474.007
252240 474.451 474.345 474.059 474.256
10.000
252260 474.910 474.290 474.625 474.544
e:7.00%
e:-7.00%
VIP CH=:252+270.00
VIP LVL=:475.143
K:14.316
R: 50.000
252280 474.955 474.297 474.486 474.554
LVC:80.00
D: 33.4501
VCL: 29.191
e:7.00%
e:-7.00%
10.000
252300 476.321 474.039 474.058 474.283 CH=252+310.000
252310.000 LVL=474.044
252320 474.726 473.823 473.546 473.769
-2.748%
NAME OF WORK -
252350.000 252340 472.869 473.331 473.003 473.219 CH=252+350.000
L =76.853
LVL=472.944
252360 472.946 472.668 472.438 472.648
VIP CH=:252+380.00
252380 471.605 471.727 471.831 471.924 VIP LVL=:472.120
K:22.918
20.000
LVC:60.00
252400 470.637 471.364 470.806 471.025 CH=252+410.000
R: 50.000
D: 11.6236
VCL: 10.144
252410.000 LVL=470.510
20.000
e:7.00% e:7.00%
e:-7.00% e:-7.00%
252420 469.537 470.475 469.688 469.974
252440 468.710 468.601 468.604 468.901
-5.366%
252460.000 CH=252+460.000
252460 468.280 467.480 467.578 467.827 LVL=467.827
L =61.539
252480 466.615 466.299 466.553 466.864 VIP CH=:252+490.00
VIP LVL=:466.218
PROFILE
K:18.147
252500 465.904 466.851 465.857 466.122
LVC:60.00
CH=252+520.000
R: 55.000
252520.000 252520 465.431 465.897 465.371 465.600
D: 56.2297
LVL=465.600
VCL: 53.977
e:7.00% e:7.00%
e:-7.00% e:-7.00%
252540 464.832 464.941 464.949 465.188
-2.059%
252550.000 CH=252+550.000
L =14.834
LVL=464.982
252560 464.399 464.693 464.426 464.759
VIP CH=:252+580.00
D: 13.8457
R: 110.000
VCL: 26.582 252580 463.702 464.307 463.816 464.214
e:7.00% e:7.00%
e:-7.00%e:-7.00%
VIP LVL=:464.364
K:29.936
CH=252+610.000
PROPOSED ROAD LEVEL
252610.000 LVL=463.145
APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
252620 462.262 462.473 462.540 462.739
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC
252640 461.441 461.720 461.739 461.926
D: 20.1594
R: 150.000
PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
VCL: 52.777
e:5.00% e:5.00%
e:-5.00% e:-5.00%
-4.064%
e:7.00%
e:-7.00%
CH=252+735.000
LVC:40.00
252740.000 LVL=457.167
REV DETAILS OF REVISION
VCL: 28.448
LVL=456.739
e:7.00%
e:-7.00%
VIP CH=:252+760.00
252760 456.013 455.991 454.937 454.843 VIP LVL=:455.028
K:10.779
LVC:40.00
CH=252+780.000
252780 454.840 454.847 452.635 452.575
R0 DRAFT DETAILED PROJECT REPORT
252780.000 LVL=452.575
EXISTING GROUND AT-8m FROM PCL
EXISTING GROUND AT +8m FROM PCL
CH=252+810.000
AKP
LVL=448.895
252820 447.617 447.913 447.674 447.711
VIP CH=:252+840.00
SSS
R: 20.000
L =39.396 20.000D: 16.2995 20.000L =20.654 L =46.354 D: 68.7425
VCL: 23.996
CH=252+870.000
252870.000 LVL=443.076
MKH
LVL=442.006
252900 441.316 440.435 440.921 441.071
R: 70.000
L =17.381D: 33.9381
VCL: 41.463
e:7.00% e:7.00%
SCALE
TITLE:
LVC:100.00
L =47.869
CH=252+985.000
SPAN
LVL=440.863
252990.000 252980 441.654 439.981 440.032 440.636 CH=252+990.000
252985.000 LVL=441.106
4.848%
VIP CH=:253+040.00
D: 42.7866
RECONSTRUCTION
e:7.00% e:7.00%
CHAINAGE 252+960
e:-7.00% e:-7.00%
VCL: 59.741
1 X 6.0m
H-1:2000 V-1:200
VIP LVL=:443.530
BOX CULVERT
K:27.992
LVC:100.00
THARPARDI
Km252+000 to Km 253+000
R
0
DATE: FEBRUARY-2024
SETOUT DATA MORSHI THARPARDI
HIP CH = 252+847
E - 223923.014,N - 2344
753.729
D = 68.743
SE P C 40 87
R = 20.000m
HI - 22 2.7 00m m
TO H 2.
Ts = 13.680m
E = 4 0.0 341
UT 2 91
D = 8 31. 20m m D =
Es = 4.231m
R = 5.9 41 EE
DA 52+ ,N
=
Lc = 23.996m
Ts = 59.7 SP
TA 995 - 23
4
E s = GN
DESIGN SPEED = 20 km
Lc ESI
/h
8
D
SETOUT DATA
44
4
HIP CH = 254+05
66
,N - 2345081.770
8.
E - 22 49 48.8 15
64
D = 20.228
4
20 T DATA
SETOU 253+965 R = 150.000m
026.678
km =
/h HIP CH 8.600,N - 2345 Ls = 20.000m
25
00 87
+9 SETOU E - 224 Ts = 36.775
2+
2 T DATA 17
RE OP 2+9 X C
25 D= 9 .4
shift = 0.111
80
HIP CH
PR H.25 : BO4.0m
CO
ET CH 74
.000m
C PE 1X
= 0
E - 2241 253+053 5
0 T SIZE
NS
1
TY AN: ING 60
R= Es = 2.481
OU = .11
SP IST 2+9 C m
TR
.000m
EX H.25 :HP 00m
03.679,N
Ls = 20
OS 60 U
UC
Lc = 32.956m
C PE 4X6
T 252 0,N
64 64.326
Y :
Ts = 22 = 30 km/h
DA +8 -
3 R = 30.0
00m .111 254
.424
TA 96 234
U/S Ts = 10 A shift = 0
.64 DAT +776 908 19
Es = 1.8 2m T 44 Es = 0.6 m
LV
OU 53 - 23 53
32m SET CH = 2 656,N Lc = 4.6 PEED = 30 km
/h
ER
Lc = 20 SETOU .
T
D/S
T = 20 km E - 224 420
0 /h 4
D = 52 59.122,N - 23 D = 100.00
4
00 00
2.0
0
+
R = 50 98
.5 44676.0 R = 8.349
54+00
3 0 h
16
25 53+ .000m 16
RO M =
Ts 0.34 m 8 m km/
00
2 Ls = 10 L F = 9 2 0
. AL HS =
Es 16.65 EED
254+0
.0 RE W 53+740 B
254+100
CH Ts = 2 00m
CH.2
U/S
S E D c = S P
9.750 O O2 L IGN
shift =
0.083 PROP 3+680 T DES RECO
NSTRU
CTION
5 ED
KM 2 OS
PROP 3+935
253+900
Es = 5
253+100
.866 C H .2 5
Lc = 35 : HPC
.9 TYPE X1200mm
DESIG 01m SIZE:1 ING
D/S
N SPE EXIST53+943
ED = 2
0 km/h CH.2 :HPC
200
253
SETOUT DATA TYPE 1X1000mm
SIZE:
+80
253+
HIP CH = 253+09
ELE
9
U/S
0
E - 224141.922,N A
DAT
CT
- 2344691.104 23
D = 29.550 TOUT 53+870 344980.8
RIC
E
253+
S 2
CH = ,N - 2
0
R = 60.000m
HIP 4794.850
SE 30
WI
HIP TOU
3+
Ts = 15.825m 2
E - 2 .093
700
25
T N 1
RE
Es = 2.052m E - CH DA
= T RU
CTIO
D = 2 0.000m
253+
Lc = 30.945m 2
D = 243 25 A NST
SED ER
T
= 2 0
3+ RE
CO
PO +700 CULV R 00m
DESIGN SPEED R = 7.71 1 4 .83 272 O
PR .253 BOX = 15.0 4
Ls
= 20 km/h 44. 4
600
Ls 150 99 8,N CH PE : X4.0m 7
. -2 TY AN:1 G Ts = 0.047
Ts = 20. 000m 34 SP ISTIN 695 =
shift .484
253+
= 0 0 47
shi 33 0 m 07 EX .254+ PC 0mm 3 /h
f . 5 .60 CH PE :H 100 Es = 8.629m 30 km
0
t
Es = 0 04 =
40
3 TY E: 3X
500
5 E D
= . 1 Lc = N SPE
3+
Lc 1.9 11 SIZ IG
=
DE 26. 0 4 25 EXISTING CENTRE LINE DES
SIG 597
NS m PROPOSED CENTRE LINE
PE
ED PROPOSED CARRIAGEWAY
=2
0k
m/
h
PLAN
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-16(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km253+000 to Km 254+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT -
SUPERELEVATION
CHAINAGE
CENTER LINE (m)
------------------------------------
------------------------------------
EXISTING LEVEL BELOW
______________________
VERTICAL ALIGNMENT
HORIZONTAL ALIGNMENT
434
440
444
432
436
442
446
438
448
e:7.00%
L =18.958
e:-7.00%
GOVERNMENT OF MAHARASHTRA
K:27.992
LVC:100.00
253060 443.950 445.245 443.678 443.624
R: 30.000
D: 39.0636
VCL: 20.454
253080 443.679 442.566 443.496 444.023
L =20.219
CH=253+090.000
253090.000 LVL=444.168
253100 443.604 442.845 443.473 444.296
R: 60.000
D: 29.5501
VCL: 30.945
e:-7.00% e:7.00%e:7.00%
e:7.00% e:-7.00%e:-7.00%
CONSULTANT -
253120 443.899 443.123 443.560 444.551
253140 445.057 443.104 443.688 444.806
1.276%
253160 446.720 443.185 443.753 445.061
253180 445.521 443.881 444.079 445.316
L =124.372
253200 445.215 444.267 444.535 445.571
20.000
253260 446.672 445.879 445.524 446.056
253280 447.058 446.098 445.859 445.960
D: 10.1594
R: 150.000
VCL: 26.597
VIP CH=:253+290.00
e:5.00% e:5.00%
e:-5.00% e:-5.00%
VIP LVL=:446.720
K:28.488
20.000
253300 446.279 446.009 445.658 445.724
LVC:140.00
253320 445.873 446.052 445.040 445.347
NAME OF WORK -
253340 446.062 445.585 444.206 444.830
CH=253+360.000
L =84.448
253360.000 253360 443.494 445.246 443.452 444.173 LVL=444.173
-3.638%
10.000
253400 442.621 442.779 442.018 442.718
e:7.00%
e:-7.00%
253415.000 CH=253+415.000
253420 442.024 441.333 441.265 441.998 LVL=442.172
R: 50.000
D: 41.1391
VIP CH=:253+435.00
VCL: 35.901
VIP LVL=:441.444
e:7.00%
440.756 440.784 440.661 441.460
e:-7.00%
253440
10.000
LVC:40.00
CH=253+455.000
253455.000 253460 440.514 440.097 440.371 441.167 LVL=441.222
253470.000
K:15.816 -1.109% CH=253+470.000
PROFILE
LVL=441.056
253480 441.460 439.850 440.258 440.910
EXISTING ROAD LEVEL
PROPOSED ROAD LEVEL
VIP CH=:253+500.00
253500 440.838 440.577 440.013 440.410 VIP LVL=:440.723
K:14.391
LVC:60.00
APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC
253600 434.888 435.323 435.113 435.741
PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
VIP CH=:253+610.00
VIP LVL=:434.916
L =321.599
K:15.155
253700.000 CH=253+700.000
253700 435.909 436.512 433.418 434.916 LVL=434.916
VIP LVL=:434.916
253740 434.594 433.736 434.586 435.450
LVC:60.00
CH=253+760.000
AKP
253770.000
253760.000
253760 435.557 434.414 435.556 436.117 LVL=436.117
e:7.00%
RECONSTRUCTION
e:-7.00%
CHAINAGE 253+700
1 X 4.0m
CH=253+770.000
K:14.986 4.004%
LVL=436.518
SSS
BOX CULVERT
e:7.00%
e:-7.00%
VIP CH=:253+820.00
253820 436.973 436.225 437.106 437.764 VIP LVL=:438.520
K:16.548
LVC:100.00
TITLE:
D: 16.7959
R: 200.000
CH=253+910.000
15.000
LVL=436.684
253920 436.056 436.041 435.747 436.513
H-1:2000 V-1:200
VIP CH=:253+940.00
SIZE
VIP LVL=:436.072
K:15.357
LVC:60.00
LVL=436.633
D: 1.7775
253970.000
DRG. NO. Package No. DPR- 3A (6) /P&P-16(ii)
Km253+000 to Km 254+000
RECONSTRUCTION
CHAINAGE 253+935
e:5.00% e:5.00%
e:-5.00% e:-5.00%
1.868%
1 X 1200mm
254035.000
R
D/S
Lc = 4
T-
M
NSP E AT INO
DES R JU
DESIG IGN NCT
D/S
CH I
AIN ON DE
D/S
TBM AG
E-
254+ +000
U/S
TBM
TION
000
255S FIELD
RECONSTRUC
54
254+100
0
PROPOSED
+00
254+200
CH.2
CH 000
U/S
254+900
CH.254+942
U/S
254+300
TION
.255
RECONSTRUC TYPE : HPC m
254+800
254+400
+
N
CTIO
PROPOSED SIZE:1X1200m
ARD
STRU
254+500
254+700
RECON D
POSE CH.254+715
254+600
EXISTING
PRO 53+935
253+90
TOW
. 2
C E : HPC mm
H
SIZE:1X1200m TYPE :HPC m
TYP :1X1200 EXISTING CENTRE LINE
SIZE TING
EXISTING SIZE: 1X600m
CH.254+706
EXIS253+943 PROPOSED CENTRE LINE
0
TYPE :HPC mm
CH. E :HPC mm
TYP : 1X1000 PROPOSED CARRIAGEWAY PLAN SIZE: 1X1000
SIZE
RECONSTRUCTION RECONSTRUCTION
VIP CH=:254+455.00
CHAINAGE 254+715 CHAINAGE 254+942
VIP CH=:254+110.00
CH=254+405.000
VIP LVL=:440.282
CH=254+185.000
VIP LVL=:439.247
SIZE 1 X 1200mm SIZE 1 X 1200mm
PROPOSED ROAD LEVEL EXISTING GROUND AT-8m FROM PCL
LVL=440.132
TYPE HPC TYPE HPC
LVL=439.472
CH=254+505.000
EXISTING ROAD LEVEL EXISTING GROUND AT +8m FROM PCL
CH=254+035.000
LVL=437.943
LVL=437.846
442
440
CH=254+615.000
438
VIP CH=:254+665.00
LVL=432.796
VIP CH=:254+840.00
VIP LVL=:430.457
VIP LVL=:431.047
CH=254+770.000
CH=254+715.000
436
CH=254+910.000
LVL=430.811
LVL=430.626
LVL=429.769
434
432
430
428
426
254060 438.263 436.403 437.628 438.281
254080 439.345 436.904 438.128 438.581
254460
254620
254720
CHAINAGE
254035.000
253970.000
254185.000
254405.000
254505.000
254615.000
254715.000
254770.000
254910.000
255050.000
1.868% K:95.688 0.300% K:20.086 -4.679% K:19.938 0.337% K:64.731 -1.826%
VERTICAL ALIGNMENT
LVC:150.00 LVC:100.00 LVC:100.00 LVC:140.00
SUPERELEVATION
e:5.00% e:5.00% e:-2.84% e:-2.84% e:7.00% e:7.00%
e:-5.00% e:-5.00% e:2.84% e:2.84% e:-7.00% e:-7.00%
PROFILE
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-17 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km254+000 to Km 255+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
6
3.99
6 + 031 34536
= 25 -2 NE
D
I P CH 5.412,N AI
ET ST
H 6 R
268 EX
I
MORSHI E - 2 4.913 THARPARDI
SETOUT DATA 3
D = 0.000m
488
SETOUT DATA HIP CH = 255+ 9 SETOUT DATA = 8 00m
HIP CH = 255+126 SETOUT DATA .0 52 ,N - 2345390.87 R 10.0 73 M
RO HS
4 E - 226322 HIP CH = 255+698 Ls =
HIP CH = 255+36 30 . 1 L F
E WALL FROM E - 225963.491,N - 2345395.601 - 2345367.640 D = 16.348 Ts = = 0.052 AL 180
B
0 PROPOSED R S E - 22 61 99.382,N E - 226532.052,N - 2345370.212
W
96.06 O 255+020 BH D = 6.613 R = 400.000m t
shif 3.917 /h RE 256
+
- 234
53 KM 254+940 T D = 17.487
D = 4.553
m 0 km ED 0 TO
R = 600.000m Ls = 20.000m Es = 38.747 ED = 2
TOWARDS ADNADEVI
R = 700.000m S
R = 250.000m E O 8
Ls = 35.000m Ts = 67.461 Ls = 35.000m Lc = GN SP OP 56+0
TOWARDS FIELD
Ls = 30.000m R
TOWARD FIE
S I P 2
Ts = 52.169 shift = 0.042 DE
NG
Ts = 45.327 M
shift = 0.085 Ts = 53.471 K
Es = 4.147
DI
shift = 0.073
KM shift = 0.150 KM
IL
255
Es = 1.086 Lc = 94.131m Es = 0.626
BU
Es = 3.091 D = 50 km/h 256 E
Lc = 34.253m DESIGN SPEE Lc = 20.620m IR
T - MINOR JUNCTION DEVELOPMENT DESIGN SPEED = 80 km/h Lc = 46.302m IRE X - MINOR JUNCTION DEVELOPMENT W
= 50 km/h IC W C
TBM
LD
/h CT
= 30 km PROPOSED
ELE E
EED BUS SHELTER EL
25
D/S
6+
TBM
10
0
CH.255+000
TOWARDS FIELD
EL
U/S
CH.256+000
PROPOSED RE WALL FROM
255+000
256+000
EC
TOWARDS
KM 255+580 TO 255+620 BHS
TR
255+500
RAJANI
255+100
255+600
RECONSTRUCTION
TOWARDS
IC
255+900
X - MINOR JUNCTION DEVELOPMENT
255+200
255+800
PROPOSED
255+700
W
FIELD
AT DESIGN CHAINAGE - 255+800
0
CH.255+630
255+40
255+300
IR
TYPE : MINOR BRIDGE
E
SPAN:1X8.0m
EXISTING
EXISTING CENTRE LINE CH.255+600
PROPOSED CENTRE LINE TYPE :CAUSEWAY
RECONSTRUCTION
CHAINAGE 255+630
SPAN 1 X 8.0m
CH=255+050.000
CH=255+130.000
VIP LVL=:426.482
VIP CH=:255+410.00
430
CH=255+350.000
VIP LVL=:423.279
LVL=423.880
428
VIP CH=:255+750.00
CH=255+470.000
CH=255+790.000
VIP CH=:255+850.00
CH=255+820.000
VIP LVL=:421.743
CH=255+710.000
VIP CH=:255+580.00
CH=255+520.000
LVL=422.227
VIP LVL=:420.432
LVL=421.219
CH=255+640.000
VIP LVL=:420.299
LVL=420.825
426
LVL=421.403
CH=255+880.000
LVL=421.351
LVL=420.808
LVL=420.249
424
422
420
418
255080 425.905 425.513 425.955 426.711
CHAINAGE
254910.000
255050.000
255130.000
255350.000
255470.000
255520.000
255640.000
255710.000
255790.000
255880.000
256010.000
255820.000
-1.826% K:96.963 -1.001% K:159.501 -1.753% K:46.103 0.850% K:37.020 -1.311% K:85.374 -0.609%
VERTICAL ALIGNMENT
LVC:80.00 LVC:120.00 LVC:120.00 LVC:80.00 LVC:60.00
HORIZONTAL ALIGNMENT L =88.376 35.000 D: 3.2709 35.000 L =131.902 30.000 D: 10.6115 L =3.919
30.000 20.000 D: 13.4832 20.000 L =98.226 35.000 D: 1.6878 35.000 L =257.918
R: 600.000 R: 250.000 R: 400.000 R: 700.000
VCL: 34.253 VCL: 46.302 VCL: 94.131 VCL: 20.620
SUPERELEVATION
e:4.74% e:4.74% e:-5.00% e:-5.00% e:4.69% e:4.69% e:-4.06%e:-4.06%
e:-4.74% e:-4.74% e:5.00% e:5.00% e:-4.69% e:-4.69% e:4.06% e:4.06%
PROFILE
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-18 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km255+000 to Km 256+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
MORSHI THARPARDI
SE
HI TOU
E P CH T D
-
D 227 = 2 ATA
R = 1 178 56+ SE
= 4 HI TOU
Ts 10 .961 .047 448 P
Es = 1 0.00 ,N E - CH T D
3 -2 2 A
Lc = 0. .13 m 0 34 D
= 27 = 2 TA
0 5 1 2 0 5 6
DE = 26 858 m 52
5.2
R
= 5 0.92 4.90 +512
942 S I . 1 m
0 T s 0 0 5,N
. GN 12 5 E = .00
5 79 SP m s = 4.7 0m -2
34
45 EE Lc 0.2 79m 54 SE
TA 02 23 D D = 9 28 67 HI TOU
=2 .57
4 -
DA 56+ ,N 0k
ES .52 m
IG 9m 2 E P CH T D
-
T
U = 2 .37 0 m/ N
SP D 227 = 2 ATA
O h EE R = 14 232 56+
E T H 68 1 =
C
S IP 27 .31 4 / h D
=2 Ls 10 .143 .353 574
H - 2 19 0m 5m km 0 = 0 ,N
E = 1 .00 .96 m 20 F
km T s = 15. .000 -2
= RO /h sh 19 00 0 m 34
D = 7 11 62 m D M NA E if t = . 9 m 54
12
R s = 6.8 580 EE KM RA s = 0 15 .14
IRE
. P 2 V L 0 . 0 SE
T = 14 S 5 6+3 ILL c = .86 4 9 2 T
s
E = IGN 00 AG D ES 9.6 1
H IP OUT
W
c T OK E IG 8 E CH D
L ES T-
N 4m -
D 227 = 2 ATA
RIC
D AT MA M SP =
DE JOR 2 56+ EE R 4 2 8 56
= 2 .058 0.51 +655
SIG JU
CT
N NC
CH TI 4 8 0 D Ls 8,N
=2 = 1 00.0
AI ON
ELE
NA D
ELECTRIC WIRE
GE EV
EL 0k T s 0 0 0 -2
I NG R E - 25 OP
6+ ME m/
h s hif
= 1 .00 m 34
53 SE
LD I 4 2.0 0m
RA DS
50 NT
U I T W E t = 8 46 T
s . H IP OUT
NA AR
B HU I C = 0 0.02 6 5 02
L E C
IRE
TR c H D
W
. 1
EC DE = 4. 146 -
D 227 = 2 ATA
TO
16 =
L S 40 27 56+7
RIC W
E IG 4 R 3
5
N m
G
T = . .
Ls 20. 741 308, 57
.74
IN
HU T T T SP
HU HUT HU EE = 0 N
LD
486
00
D Ts 10 0 0m -2
ELECT
U = = . 00 34
256+4
I
G
H 20 sh 1 52
BU
345
E 2 0
IN
k i ft . 4 m 58
IR m/ Es = 93 .65
LD
h 0
-2
R = 7.56 4.77 255 W L = 1 .20 2
T c . 8
I
C = 4 556
D = 2270 256 A
U I
BU
,N
ELEC T H D
m/h
E - CH DAT
R ES .22
+
M
TB
TRIC U
CT
6
WIRE H BU E
IG
N m
1
0k
ILD L S
HIP TOUT
m
E PE
=
IN
=2
ELEC
hift 7.8 m
ED
5
= 3 0.000
G
5
TRIC
0
G
=2
Es = 0. 3
WIRE
0
ED
IN
7
0
0k
SE
9
0.0
256
50
4
NS m
m/
0
ILD
+30
0
PE
DE 75.6 3
8
6+
SIG 27 BO h
L
0
= .79
M
TB
L
6
25
UN
BU
WA
=
1
Ls
DA
Ts
HU RY
RY
T SE
s
HI TOU
Lc
DA
GE
E P CH T D AL
RID
UN
-
D 227 = 2 ATA
L BO
E
UN
RB
ELECTRIC WIR
= 2 5 DA
BO
0
D/S R 1 1 6
+60
= 6 3.7 6.1 +53 RY
HS SIZ PE :M+220
- AJO
0 B M TY .256 NG
CH ISTI D
Ts 7 0 WA EL PR
EX AINE
0.0 9 4,N 1
256
= LL EC K
Es M OPO
S
U/ 7.2 00m -2 TR
T
RE
Lc = 0 49 34 IC 25 SE
E:
DE = 14 .436 m 54 W 6+ D
S
GP
m 52 I R 88 R S
96 256
SI .42
GN 9
.10 E 0 E HI ETO
.9 4
0
m T W E PC U
+70
3 +20 SP O A
18 O
36 0 D - 22 H T D
6+ FR
5 EE SE 25 LL
256
4 D HI TO
TB
M
7+ F R = 6 74 = 2 AT
A 31 23 =2
25 L
08 RO
S
AT 6+0 ,N - 0k 0
BH M T = 0.0 58 60 10
D 5 2 m/ D - 22 H = DAT
75
0T W
T
U = 2 .41
h = 7 2 A S sh s = 10. 00 9, 4
4.7
R 29 319 56 N
08 RE
= 2 0 m
TO CH 865 Ls 80 .96 .68 +71 ELE i
Es ft = 9. 00 -2
43
7 34
6+ D
E = . 6 0 6 C T L = 9 m
13
S IP 26 m Ts 0 RIC 0
0
45 ,N c
25 E
/h 10 00 .1 4 49
00 0m 7
+80
W
.9
H -2 =
OS
D .
DING
. 0 k i 3 .1
E 80 .0 73 Es ft = 6.4 0m SET
7
KM OP
45 .3
256
20 O I 74
=
G
R = 2.0 70.9 6+15
-
= 10 0.1 52 U
D = 2269 = 25 TA
Lc = 2 0.0 24 30 T DA N 02m
D
HIP
,N
PR
R s = 3 0.0 = 0 T A
BUIL
. C H S
E - CH T DA
. 5
h
m ED DE = 3 86 2 37
63
L s= = E-2 = 25 PE
m/
7
47 PE SI 1.8 9 0 2 6+7
91
0k
7
0
. GN 41 SETO
3.
Ts 20 00m
HIP TOU
90
sh 38 S +10 .447 ,N - 2 = UT
M
m
TB
sh = 24 000m
=
IP CH DATA
=2
= IGN SP R=7 20
6+
0 3452 H
Ls 800 3
Es
KM57
0.00
4
4
RE
EE 1
25
Lc ES .057 k E - 22 = 257+20
Es = 0 63
2
SE
KM56 Ts = 0 m
.
5.78 m
SE C 4
ED
0.1 21
D /
WI
h 7 6
2
.
= D = 2 507.539,N
HI - 22 .99 .000 m
D 2 Es = 4m
0
TO
.
NS m
20
DE = 8.5 48
PE
0.23
.
P
E
0 . 5 2 - 2344
IC
SIG 22
km Lc = 9 6
=
UT = 2 .972
11.5 m R=1
D = 2 10.0 857 7
0
H
TR
/h 0 .
=
0
R = 26. 01
DES 4 00m
ift
IGN 2m
DA 6+ ,N
Ls = 1
7
=
9
Ls s = = 0. 70 m D =
EC
SPE 0.000
TA 941 - 23
3
T = 23.1 m
5
T ift 0.9 99 EE
ED = 0 s
RE OP 7+ OX m
5
0
EL
Lc
2
SE +0 00
0
sh = 33.5 SP
20 km D/S 1
CO
PR H.25 : B 6.0
T 7 s h ift = 0.0 3
C YPE :1X G
/h
Es = GN
5 +0 S
NS
HIP OU
T AN IN 29
2 4 2
TR ED
NT 7 U / Es = 1
Lc ESI
SP IST 57+0
0
E - CH T DA .25
m
E
OS 020 CU
EXISTING CENTRE LINE
EX .2 :-
0
UC
PM .668
I
D
256 +000
LO
CHYPE : -
EV
22 = 2 TA H L
TI
VE +820 c
T ZE
E D C = 25
ON
PROPOSED CENTRE LINE 7
SI
N D 55 = 5 DESIG .824m
0
45
IO E - 2
AD
+00
CT G
6
11
UN AINA PROPOSED CARRIAGEWAY 6 7 N SPE
Ls 150 35 23,N 4
.25
J
D
R
NO N CH ED =
1.
212
IEL
I
D
LV
M G
Ts 10 000 = . M
20 km
CH
35
70. X - DESI -2 TB
A
3 /h
ER
453 .
AT m
5
4
SF
= 0 51
DS
sh 30 00m
T
23 i f . 7 4.2
RD
Es t = 0 962
R
77
WA
30
Lc = 2. .028
SE P C 74 67
A
2
W
HI - 22 2.8 00m m
DE = 41 58
km
TO H 47.
TO
E
TO
SIG .40
UT = 2 827
h
D = 6 10.0 148 9
ELE N S 5m
00
CTR
=
R
DA 57+ ,N
5+9
IC W PE
2
Ls s = = 0. 86 m D =
ED
TA 008 - 23
IRE
T
=
0
25
=2
.0 00
s
0k
hi = 1 3.94 SPE
DS
m/h
AR I
0
Es = GN
TO AJAN
1
f
m/
10
t
k
7. 6
Lc ESI
80 h
7+
=
25
ED
W
0
.
R
2
1
P E
45
S
0
+80
DS
04
WA LD
7 E
T
6.
EN
R
255
200
32
T FIE
OP
EL 0
EV 5+80
PLAN
9
D 5
SET
257+
N -2
O
IO
CT AGE O
R JUN AIN HIP UT DAT
20
H
NO
MI GN
C CH = A
CLIENT - X - DESI CONSULTANT - NAME OF WORK - E-2 DRG. NO. Package No. DPR- 3A (6) /P&P-19(i)
2747 257+162
R 0
km
A T
9.42 SCALE
/h
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND 3,N - H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN 2344
913.
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: 114
PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km256+000 to Km 257+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
MORSHI THARPARDI
NOT IN SCOPE
FROM KM 256+200 TO KM 256+300
NARA VILLAGE
VIP CH=:256+640.00
RETAINED
VIP LVL=:426.221
VIP CH=:256+770.00
CH=256+670.000
FROM KM 256+300 TO KM 256+480
CH=256+700.000
VIP CH=:256+470.00
CHAINAGE 256+220
CH=256+610.000
VIP LVL=:425.814
EXISTING GROUND AT-8m FROM PCL
LVL=426.127
CH=256+520.000
VIP LVL=:425.263
LVL=426.033
SPAN --
VIP CH=:256+350.00
PROPOSED ROAD LEVEL
CH=256+410.000
CH=256+420.000
LVL=426.051
EXISTING GROUND AT +8m FROM PCL
VIP LVL=:424.075
TYPE MAJOR BRIDGE
LVL=425.544
CH=256+840.000
LVL=424.669
LVL=424.768
EXISTING ROAD LEVEL
VIP CH=:256+995.00
LVL=424.066
VIP LVL=:420.196
CH=256+895.000
428
LVL=422.693
426
VIP CH=:256+040.00
CH=256+010.000
CH=256+070.000
VIP LVL=:419.275
424
LVL=419.458
LVL=419.375
422
420
418
416
CHAINAGE
256285.001
256225.001
256410.000
256070.000
256520.000
256610.000
256670.000
256700.000
256840.000
256895.000
256420.000
255880.000
256010.000
-0.609% K:63.702 0.333% 4.298% K:36.267 0.989% K:234.869 0.564% K:68.462 -0.313% K:64.108 -2.497% K:44.393
VERTICAL ALIGNMENT
LVC:60.00 LVC:120.00 LVC:100.00 LVC:60.00 LVC:140.00 LVC:200.00
20.000 20.000 L =30.490 15.000 15.000 10.000 10.000 10.000 10.000 10.000 L =9.745
10.000 10.000 L =6.462 L =45.674 L =7.068L =15.974 L =3.493 10.000 L =22.481
L =22.003 L =10.055
HORIZONTAL ALIGNMENT D: 27.7507 L =72.650 D: 0.6103 30.000 30.000 L =67.074 D: 119.3414 D: 14.9609 D: 10.9197 D: 13.7785 D: 5.5487 L =49.414 D: 1.1929 D: 22.8043 D: 12.0933 D: 9.4471L =52.634 10.000 D: 15.8155 10.000 10.000D: 7.7004 10.000 10.000
R: 80.000 R: 800.000 R: 7.000 R: 100.000 R: 50.000 R: 60.000 R: 100.000 R: 200.000 R: 80.000 R: 20.000 R: 70.000 R: 150.000 R: 250.000
VCL: 38.747 VCL: 8.522 VCL: 14.580 VCL: 26.112 VCL: 9.529 VCL: 14.429 VCL: 9.684 VCL: 4.164 VCL: 31.841 VCL: 4.221VCL: 11.542 VCL: 41.405 VCL: 33.599
SUPERELEVATION
e:-7.00% e:-7.00% e:-2.09% e:-2.09% e:7.00% e:7.00% e:-7.00%e:-7.00% e:-7.00% e:7.00% e:-7.00% e:7.00% e:-7.00% e:-7.00% e:-5.00% e:-5.00% e:7.00% e:7.00% e:-7.00%e:-7.00%e:7.00% e:7.00% e:5.00% e:5.00% e:5.00% e:5.00%
e:7.00% e:7.00% e:2.09% e:2.09% e:-7.00% e:-7.00% e:7.00% e:7.00% e:7.00% e:-7.00% e:7.00% e:-7.00% e:7.00% e:7.00% e:5.00% e:5.00% e:-7.00% e:-7.00% e:7.00% e:7.00%e:-7.00%e:-7.00% e:-5.00% e:-5.00% e:-5.00% e:-5.00%
PROFILE
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-19(ii) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km256+000 to Km 257+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
30
8,N
Ts -2
=2 sh = 12 34
0k 525
m/ Es ift = .493 8.6
h 0 52
Lc = 1. .208
=
DE 4. 56 5
SIG 221 MORSHI THARPARDI
N m
SP
EE
D
=2
0k
m/
h
P
KMROP
25 OSE
6+ D
88 R S
0 E HI ETO
TO W E PC U
25 ALL D - 22 H T D
7+ F
08 RO R = 6 74 = 2 AT
0 L = 3. 29 57 A
BH M T s = 40.0 458 .60 +10
S sh s = 10. 00 9, 4
N
ELE Es ift = 29. 000 m -2
CTR L = 7 9 m 34
IC W D
c
= 7. 0.10 4 49
IRE E 3 15 4 51
SI 4. 1 .1
G 30 74
N 2m
SP
EE
D
0
SETO
90
= U
20 HIP C T DATA
6+
KM57
km TA
2
E - 22 57
SE C 4
7+468
TO H 3.
D=2 5 39,N
P
E
878.2
D
0m
DA 6+ ,N
Ls = 1 T
HIP CH DATA
7
9
=
Ls =
Ts = 2 m = 257+6
5
Ts ift =
0
RE OP 7+ OX m
E - 227 52
shift = .113
0
Ls = 10.000m
sh
D/S
CO
1
PR H.25 : B 6.0
7 + 87
0 D = 12.0 4.796,N - 2344
C PE :1X
0 Ts = 15.209
TY AN TING029
Es = 1 .042 Ts = 15.134
TR ED
SP IS 57+
628.134
0
5
5 R = 250 1 SETOUT DATA
m
E - 228000.581,N - 2344550.364
OS 020 CU
EX .2 :-
8
0
UC
shift = 0.069
CH PE : -
Lc = 2
.
CH .000m
TI
TY ZE
5 Es = 0.561 Ls = 15
SI
.00 6.174
Lc = 10.340m Ts = 33 0m R = 600.000m E - 228195.906,N - 234442
11
N SPE Lc = 10.058m
ED = .891
1.
Ls = 15.000m
SP
M
20 km DESIGN SPEED = 20 km/h shift = 0
35
TB
/h ED = 20 km/h .0
Es = 1.4 37
EE
ER
Ts = 38.691 R = 300.000m
5
T
D
26
Lc = 37 shift = 0.016 Ls = 15.000m
=
.58
DESIGN 1m
30
Es = 0.826
SE P C 74 67
Ts = 51.932
HI - 22 2.8 00m m
SPEED
km
TO H 47.
/h
UT = 2 827
h
D = 6 10.0 148 9
DA 57+ ,N
Lc = 73.214m
2
Ls s = = 0. 86 m D =
TA 008 - 23
0
Es = GN
1
f
10
t
ELECTRIC WIRE
7. 6
Lc ESI
7+
D
25
PROP
0
. 2
1
NG KM
45
DI I NG 258 KM 25
04
IL G
IN UILD
BU
7 E
M
6.
TB
D
L B
200
32
UI
EL
B
9
EC
SET
257+
257+400
O
257+30
HIP UT DAT
TR
M
TB
257+500
20
CH = A
IC
E-2
2747 257+162 ELE
km
CTR
00
D= 9.42
/h
1 IC W
IR
3,N -
R = 3.764 SETOUT D
6
2344 IRE
257+
E
257+700
Ls = 114
CH.258+000
57+273 SETOUT DATA
258+000
10.0
257+800
E - 227565 SETOUT
257+900
Ts = 00m .310,N - 23 HIP CH = 257+35 DATA
1
shift 7.074 D = 8.428 44844.023
E - 227632.536,N
3 HIP CH =
257+440
= 0.0 R = 100.00 - 2344802.340 SETOUT DATA
Es = 42 0m D = 11.163 E - 22770
0 7.427,N - HIP CH = 257+503
Lc = .768 Ls = 10.00
0m R = 100.000m D = 8.428 2344757.2
41
SETOUT DATA
1
DES 4.023m Ts = 12.37
0 Ls = 10.000m R = 80.00 E - 227760.100,N
- 2344723.120 HIP CH = 257+
587 SETOUT DA
TA
IGN 0m D = 8.548 E - 227827.446 8 +1
SPE shift = 0.04 Ls = 10.00 ,N - 2344673.50 HIP CH = 2 5
ED = 2 Ts = 14.776 0m R = 100.000m SETOUT DATA
Es = 0.313 D = 7.400 7 .6 7 8
20 k
m/h shift = 0.042 Ts = 10.89
8 Ls = 10.000m HIP CH = 257+855 E - 228268
Lc = 4.709 shift = 0.0 R = 100.000m 10.720
m Es = 0.518 52 Ts = 12.476 E - 228049.777,N - 2344526.607 EXISTING CENTRE LINE D =
DESIGN S
PEED = 20 Lc = 9.484m Es = 0.269 Ls = 10.000m
D = 8.724 R = 200.000m
km/h shift = 0.042 Ts = 11.469 PROPOSED CENTRE LINE m
DESIGN SPEED Lc = 1.768
m Es = 0.321 R = 100.000m Ls = 10.000
= 20 km/h DESIGN S shift = 0.042 PROPOSED CARRIAGEWAY s = 23.766
PEED = 2 Lc = 4.919m Ls = 10.000m T
Es = 0.251
0 km/h
DESIGN SPEED = Ts = 12.631 shift = 0.021
Lc = 2.915m
20 km/h shift = 0.042 Es = 0.899
DESIGN SPEE m
D = 20 km/h Es = 0.332 Lc = 27.420
N SP E
Lc = 5.226m DESIG
DESIGN SPEED = 20 km/h
PLAN
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-20(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km257+000 to Km 258+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
MORSHI THARPARDI
VIP CH=:258+010.00
RECONSTRUCTION
VIP LVL=:439.739
CHAINAGE 257+020
CH=257+930.000
SPAN 1 X 6.0m
PROPOSED ROAD LEVEL EXISTING GROUND AT-8m FROM PCL
LVL=438.061
TYPE BOX CULVERT
EXISTING ROAD LEVEL EXISTING GROUND AT +8m FROM PCL
440
438
436
VIP CH=:257+520.00
CH=257+550.000
VIP LVL=:429.458
CH=257+490.000
LVL=430.087
434
LVL=428.993
432
VIP CH=:257+240.00
CH=257+280.000
VIP LVL=:425.117
LVL=425.738
430
CH=257+200.000
LVL=424.314
428
CH=257+095.000
LVL=422.205
426
424
422
420
418
257040 419.800 419.383 418.992 421.441
CHAINAGE
257095.000
257200.000
257280.000
257490.000
257550.000
257930.000
K:44.393 2.009% K:174.534 1.550% K:109.486 2.098% K:90.657
VERTICAL ALIGNMENT
LVC:200.00 LVC:80.00 LVC:60.00 LVC:160.00
L =15.821 L =4.629 L =31.647 L =22.237 L =0.499 L =1.536 L =7.752 L =20.220 15.000 10.000 10.000
10.000 10.000 10.000 10.000 10.00010.000 10.000 10.000 10.000 10.00010.000 10.000 10.000 10.00010.00010.00010.00010.000 10.000 10.000 10.000 L =3.311
HORIZONTAL ALIGNMENTD: 13.3180 L =49.942 D: 49.1341 D: 8.0344 D: 14.7962 D: 2.6980 D: 9.6044 D: 5.4338 L =61.748 D: 1.2662 D: 5.9243 D: 2.8184 L =59.703 D: 1.6702 15.000 D: 8.6129 15.000 L =75.302 15.000 D: 4.5192 D: 2.9944 L =112.752 15.000
R: 60.000 R: 40.000 R: 100.000 R: 100.000 R: 100.000 R: 60.000 R: 100.000 R: 80.000 R: 100.000 R: 100.000 R: 100.000 R: 250.000 R: 600.000 R: 100.000
VCL: 13.947 VCL: 34.302 VCL: 14.023 VCL: 25.824 VCL: 4.709 VCL: 10.058VCL: 9.484 VCL: 1.768 VCL: 10.340VCL: 4.919 VCL: 2.915 VCL: 37.581 VCL: 47.324 VCL: 5.226
e:7.00% e:7.00% e:-7.00% e:-7.00% e:7.00% e:7.00% e:-7.00% e:-7.00% e:7.00% e:7.00% e:-7.00%e:-7.00% e:7.00% e:7.00% e:7.00% e:7.00% e:-7.00% e:-7.00%e:7.00% e:7.00% e:7.00% e:7.00% e:-5.00% e:-5.00% e:-3.13% e:-3.13% e:7.00% e:7.00% e:-5.00%
SUPERELEVATION
e:-7.00% e:-7.00% e:7.00% e:7.00% e:-7.00% e:-7.00% e:7.00% e:7.00% e:-7.00% e:-7.00% e:7.00% e:7.00% e:-7.00% e:-7.00% e:-7.00% e:-7.00% e:7.00% e:7.00%e:-7.00% e:-7.00% e:-7.00% e:-7.00% e:5.00% e:5.00% e:3.13% e:3.13% e:-7.00% e:-7.00% e:5.00%
PROFILE
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-20(ii) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km257+000 to Km 258+000
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
MORSHI THARPARDI
45
.7
19
43
34
Es = 0.0 9 24 05
-2
R = 4 85 25 TA
Ts = 8 6.23 47.2 8+4
,N
D - 22 H = DA
/h
E P C UT
+533 ENT
km
HI TO
M
20
Lc = 6 34.1 00m
AGE EVELOP
m
SE
=
DE = 6 .98 5
- 258
5
SI 4.5 6m
D
2m
EE
D
N CH CTION
GN 6
SP
AIN
N
AT D AJOR JU
ESIG
TO
67 JAL WAR
0.0
X-M
A TA 9 4 3 2 ALK DS
D +31
UT 234 HED TOW
E TO = 258 2,N - A ARD
S CH 0.84 S KA
HIP 2846 RAN
2 5 J A
E - 12.36 0m 258
S
GP
= . 0
0 + 533
D
= 250 081m
R 7. m/h
T A = 2 462m
RE
O U T D A s 0k
SETOUT DATA SE T T 1 . 1 m = 2
8+231 =
51
WI
HIP CH = 258+032 HIP CH = 25 23 44339.400 Es 53.95 PEED 258
+50
-
73.7
8 ,N = S
EL
6.174 .1 9
E - 228195.906,N - 234442 E - 228374 Lc IGN 0
IC
EC
S
DE
TR
2 0 .6 4 6
443
D = 16.848 =
TR
D
EC
0 0 m
R = 200.0
I
R = 300.000m
- 23
EL
m
W
Ls = 10.000
km/h
Ls = 15.000m
31,N 6
IR
285 258+47
Ts = 41.4 3 3
TA
Ts = 51.932
RE
shift = 0.021
= 20
HIP UT DA
shift = 0.031
WI
99.3
Es = 3.312
m
Es = 3.303
m
Ls = 50.000
=
ED
m
IC
Lc = 62.069
.000
Lc = 73.214m
R = .172
.105
/h
CH
EED = 20 km
Es = = 0.017
O
TR
P
SPE
S
DESIGN SPEED = 20 km/h N
DES 8.202m
DESIG
SET
Lc = 0.182
EC
0
E-2
4
4
2
1
1
D=
EL
IGN
ELECTRIC WIRE
Ts =
ALL FROM
shift
PROPOSED RE W 25
KM 258+180 BHS
258 KM 258+080 TO 8+
40
0
M
TB
00 3
CH.258+000
258+
258+000
258+100
258+200
TA SETOUT DATA
SETOUT DA EXISTING CENTRE LINE
= 2 5 8+108 HIP CH = 258+162
HIP CH 403.016 PROPOSED CENTRE LINE
78,N - 2344 E - 228316.537,N - 2344377.1
E - 228268.6 68 PROPOSED CARRIAGEWAY
D = 4.852
D = 10.720
m R = 300.000m
R = 200.000
1 0 .0 0 0 m Ls = 15.000m
Ls =
Ts = 20.212
Ts = 23.766
shift = 0.031
shift = 0.021
Es = 0.300
Es = 0.899
m Lc = 10.406m
Lc = 27.420 /h
EED = 20 km DESIGN SPEED = 20 km/h
DESIGN SP
PLAN
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-21(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km258+000 to Km 258+533
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
MORSHI THARPARDI
VIP CH=:258+190.00
VIP CH=:258+320.00
VIP LVL=:440.339
446
VIP LVL=:439.050
CH=258+140.000
CH=258+090.000
CH=258+290.000
CH=258+240.000
CH=258+350.000
LVL=440.173
LVL=440.006
LVL=439.348
LVL=439.844
444
LVL=439.150
442
440
438
436
439.756 439.756
258180 438.797 438.954 439.091 440.200
258200 438.851 439.260 438.985 440.134
258533
CHAINAGE
258533.162
258090.000
258140.000
258240.000
258290.000
258350.000
K:90.657 0.333% K:75.475 -0.992% K:45.354 0.331%
VERTICAL ALIGNMENT
LVC:160.00 LVC:100.00 LVC:60.00
SUPERELEVATION
e:-5.00% e:5.00% e:5.00% e:5.00% e:5.00% e:-5.00% e:-5.00% e:-5.00% e:-5.00% e:-7.00% e:-7.00% e:5.00% e:5.00%
e:5.00% e:-5.00% e:-5.00% e:-5.00% e:-5.00% e:5.00% e:5.00% e:5.00% e:5.00% e:7.00% e:7.00% e:-5.00% e:-5.00%
PROFILE
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /P&P-21(ii) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND SCALE H-1:2000 V-1:200 DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT PREPARATION OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN
GOVERNMENT OF MAHARASHTRA THE STATE OF MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC TITLE: PLAN & PROFILE
MODE) PACKAGE NO DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI Km258+000 to Km 258+533
THAR PARDI ROAD SH-292 KM 238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
PARDI ROAD SH 292 KM 245/00 TO 259/00 & SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH =
R0 DRAFT DETAILED PROJECT REPORT AKP SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA. (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
MISCELLANEOUS DRAWINGS
MANDATORY / REGULATORY SIGNS
Right of Way Signs Operational Control sign
As per IRC : 67-2022 Table 14.1 Sizes and Dimensions of 'STOP' signs
As per IRC : 67-2022 Table 14.3 Sizes and Dimensions of 'GIVE WAY' signs
Height Border Fig. 14.01 Fig. 14.02
Approach Speed on Fig. 14.39
Size (mm) (mm) STOP
minor road in kmph GIVE WAY MAXIMUM SPEED LIMIT
Upto 50 Small 600 45
51 - 80 Normal 900 70
> 80 Large 1200 90
Compulsory Direction Control
Prohibitory Signs
Shape/Size: Circle/600mm Dia.
Background: White
Border: Red
Symbol/Text: Black
As per IRC : 67-2022 Table 14.4 Sizes and Dimensions of Mandatory & Regulatory signs
Compulsory Signs
Shape/Size: Circle/600mm Dia. Design Speed in Diameter Border Oblique Font Size
Background: Blue Kmph (mm) (mm) Bar (mm) (mm)
Symbol/Text: White 300 35 35 75
Upto 65
600 50 50 100
66 - 80 750 60 60 125
COMPULSORY KEEP LEFT PASS EITHER SIDE 101 - 120 1200 100 100 225
101 - 120 1500 125 125 250
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6)/MIS-01(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM ROAD SIGNS
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CAUTIONARY / WARNING SIGNS
Fig. 15.09 Fig. 15.10 Fig. 15.12 Fig. 15.13 Fig. 15.14
Fig. 15.11
SIDE ROAD RIGHT SIDE ROAD LEFT Y- INTERSECTION Y- INTERSECTION CROSS ROAD
Y- INTERSECTION
Warning Signs
Shape/Size: Triangle/900mm Each Side.
Background: White
Border: Red
Symbol/Text: Black
Fig. 15.03 Fig. 15.04
RIGHT HAIRPIN BEND LEFT HAIRPIN BEND
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6)/MIS-01(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM ROAD SIGNS
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CAUTIONARY / WARNING SIGNS
500m 500m
Fig. 17.01 Fig. 17.05 Fig. 17.06 Fig. 17.07 Fig. 17.13 Fig. 17.35
EATING PLACE TOILET FILLING STATION (FUEL PUMP) HOSPITAL POLICE STATION BUS STOP
Information Signs
Shape/Size: Sqare/Rectangular 600mm X 800mm
Background: White
Border: Red
Symbol/Text: Black
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6)/MIS-01(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM ROAD SIGNS
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
Destination1
10 50 125
Destination1 Destination2 Destination1 Destination2 Destination3
Destination1 Destination1
TABLE 8.3 COLOUR PATTERN FOR DIRECTION INFORMATION SIGNS
ROAD TYPE BACKGROUND ARROW/BORDER/LETTER
Destination1
Sr.No
Destination1
1 Expressway Blue White
2 National Highway (NH) Green White
3 State Highway (SH) Green White
4 Major District Road (MDR) Green White Fig. 16.04
5 Village Road (ODR & VR) White Black Fig. 16.06 PLACE IDENTIFICATION SIGN
6 Urban/City Road Blue White
FLAG TYPE DIRECTION SIGN
Other Scenario
7 Tourism Related Signs Brown White
8 Village Road (ODR & VR) Yellow Black
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6)/MIS-02 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM INFORMATORY SIGNS
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
B
A
H G
D D
No Shoulder Shoulder
Table 4.1
Height and Clearence Required
for Sign Placement
Minimum Desirable Maximum
(mm) (mm) (mm)
A 600 1000 2500
B 1000 2000 3000
C 300 600 1000
D 2000 2000 2500
E 2100 2100 2500
F 5500 6000 6500
G 750
H 5000
I 5000 7000 9000
J 1800 2000 2500
C
C F
I
J Carriageway
E D Edge Line
Kerb
Footway
Kerb
Shoulder Verage
I
J Carriageway
E D Edge Line
Kerb
Footway
Kerb
Shoulder Verage
Table 4.1
Height and Clearence Required
for Sign Placement Siting of Sign with Respect to Carriageway
Minimum Desirable Maximum
(mm) (mm) (mm)
(Height and Clearance)
A 600 1000 2500
B 1000 2000 3000
C 300 600 1000
D 2000 2000 2500
E 2100 2100 2500
F 5500 6000 6500
G 750
H 5000
I 5000 7000 9000
J 1800 2000 2500
C
C F F
I
J Carriageway
E D Edge Line
Kerb
Footway
Kerb
Shoulder Verage
SHOULDER EDGE
Chamfer 50x50
50 1000
Concrete Pedestal (Min.)
(M25)
450
X X
65Ø NB Light 75
Class Tube
100 Sq. BasePlate
6mm Thick 300
450X450X300mm
Concrete Pedestal
75
Interlocking Tiles
75 450 75
KERB
3.0%
2.0% SLOPE
SECTION - 'AA'
2
1
G.L.
450
DETAIL - 'A' DETAIL - 'A'
b
b
600
Rivet 60° 60°
TYPICAL POSITION OF SIGN POST ON MAIN CARRIAGEWAY Welding
b
Supporting Frame Supporting Frame Properties of Equalateral Triangle
ISA - 25 x 25x 3 ISA - 25 x 25x 3
All dimensions are in mm
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-03(iii) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL POSITION OF SIGN POST ON MAIN CARRIAGEWAY
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
600
400
12
00
70
400
800
1200
12MM HOLE
35X35X4
MS ANGLE GALVANISED ALUMINIUM SHEET
3MM THK.
Post to be Painted With Post to be Painted With
Alternate 250mm Wide Alternate 250mm Wide
Black & White Bands Black & White Bands
ALUMINIUM SHEET
2100 2100
3MM THK.
(Min.) (Min.) ANGLE IRON(GALAN)
65mmØ NB Light 35X35X4 65mmØ NB Light 35X35X4
Class Tube MS ANGLE GALVANISED Class Tube
1200
12MM HOLE 12MM HOLE
ALUMINIUM SHEET
3MM THK.
ALUMINIUM SHEET
Post to be Painted With 3MM THK. Post to be Painted With
Alternate 250mm Wide Alternate 250mm Wide
Black & White Bands Black & White Bands ANGLE IRON (GALVANISED)
2100 ANGLE IRON (GALVANISED) 2100 35X35X4
(Min.) 35X35X4 (Min.)
65mmØ NB Light 65mmØ NB Light
Class Tube Class Tube
REAR VIEW
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-03(v) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM DETAILS OF SIGN BOARDS
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
Post to be Painted With Post to be Painted With Post to be Painted With
Alternate 250mm Wide Alternate 250mm Wide Alternate 250mm Wide
Black & White Bands Black & White Bands Black & White Bands
Chamfer 50x50
50 1000
Concrete Pedestal (Min.)
(M25)
450
X X
PCC M10 50
75 450 75
DETAIL - 'A'
65Ø NB Light 75
Class Tube
100 Sq. BasePlate
6mm Thick 300
450X450X300mm
Concrete Pedestal
75
REAR VIEW
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-03(vi) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM DETAILS OF SIGN BOARDS
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
500
VARIES
250
250
250
80 50
ROUTE NO. ROUTE NO.
100
350 350 250
50 50 50 50
6
50 80 50
50 80 50
350
250
175
175
175
220
ROUTE NO. ROUTE NO. TERMINAL STATION STARTING STATION
50 50 50
130
130
50
5
PLACE NAME KILOMETRAGE
PLACE NAME KILOMETRAGE
1073
1073
560
560
130
300
50 80 50
50 80 50
695
695
660
695
385
385
385
400
NEXT IMP. STATION NEXT IMP. STATION
130
KILOMETERAGE KILOMETERAGE
100
10 10
130
130
KILOMETRAGE KILOMETRAGE 100 150 100 100 100 100
10
100
100
100
10 10
75
75
SECTIONAL ELEVATION SIDE ELEVATION
350 350
270
250
130
130
130
130
130
370 370
150 150 100
FACE - 1 FACE - 2 500
600
520 500 150 150 Ø
520
10
100
10
TYPICAL DESIGN OF 350
TYPICAL DESIGN OF
150
370
KILOMETRE STONE KILOMETRE STONE FACE I
100
FACE II
270
250
SECTIONAL PLAN
600
SIDE ELEVATION Ø
600
300
100
10
100
500
520
100 150 100
DETAIL OF 5TH KM. STONE
150
SECTIONAL PLAN
PLAN SCHEDULE OF
SIDE ELEVATION REINFORCEMENT
TYPICAL DESIGN OF 200 METERE STONE
ROUTE
NUMBER
PLACE NAME
KILOMERAGE
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6)/MIS-04(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL DRAWING FOR 1KM, 5TH KM, 200
METER, BOUNDARY STONES & GUARD POST
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
185
ELEVATION
SECTION ON AB
150 200 150
150
PLAN
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6)/MIS-04(ii) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL DRAWING FOR 1KM, 5TH KM, 200
METER, BOUNDARY STONES & GUARD POST
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
LONGITUDINAL MARKING (LM)
IRC:35-2015 - Table : A.1
NO OVERTAKING FOR TRAFFIC APPROACHING NON-VISIBILITY
WARNING CENTRELINE STRETCH, BUT OVERTAKING OPPORTUNITY FOR TRAFFIC LEAVING
NORMAL CENTRELINE LM04/LM05 NON-VISIBILITY STRETCH
LM23 LM23 LM23 LM01/LM02 (7-SEGMENTS) LM28/LM29
NO
NO VE 6/LM
LM23 LM23 LM23
O 2
N RTA 27
LM
VI
SI KIN /HM
NORMAL SECTION WARNING SECTION NO-OVER TAKING SECTION
BI G 10
LIT C /H
Y EN M1
ST TR 1
TWO LANE DIVIDED CARRIAGEWAY
RE EL
TC IN
A
H E
WSD MVD
EBL
FIR
ST
LAP
W
VIS HICH F MVD
O A
IBIL MA A
WSD = WARNING SIGHT DISTANCE A& IT Y B TUAL T
BR E
MVD = MAXIMUM VISIBILITY DISTANCE EGA TWEEN
INE
SBL = START OF BARRIER LINE D
B
EBL = END OF BARRIER LINE
LM04 (7-SEGMENTS)
M
BE ES T
TUA
CA
LAP HIC
VD
S
LV A&
OF H
W
N
MV
D
ITY
STOP MARKING
ST
CARRIAGEWAY
A
CARRIAGEWAY LM19 SBL
CARRIAGEWAY
PAVED SHOULDER TM03 PAVED SHOULDER
LM28/LM29
WSD
STOP
DM01/DM02 LM23
LM04
WARNING CENTRELINE
Table A.1 Longitudinal Marking (LM)
(7-SEGMENTS)
LM04/LM05
MAJOR ROAD WITH PAVED SHOULDER
Marking Length of Line Length of Width Colour
Type
Abbrevation Segment (mm) Gap (mm) (mm)
LM01 BROKEN 3000 6000 100 WHITE
NORMAL CENTRELINE
LM01/LM02
LM05 BROKEN 6000 3000 150 WHITE
LM23 NA NA 100 WHITE
LM24 NA NA 150 WHITE
15.0
1.0 1.0 FM14 1.0 1.0
3.0 1.0
1250mm
STOP
BUS
Width
1.0
0.10
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6)/MIS-05(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL ROAD MARKING
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
ARROW MARKING (AM)
IRC:35-2015 - Table : B.1
0.5 0.5 0.5 0.5
1.4 1.4
2 2 2
2.5 0.3 0.3 2.5
0.1 0.2 0.2 0.1
0.1
1.1 1.1
0.1 0.1
5 5 0.3 0.3 5 5 5
0.8 0.8
0.7 0.7
0.4 0.4
2 2 1.9
1.9 0.2 0.2
1.3 1.3
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6)/MIS-05(ii) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL ROAD MARKING
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
&
PLAN W- BEAM CRASH BARRIER WITH END TERMINAL( START AND END)
' '
&
ELEVATION OF W- BEAM CRASH BARRIER WITH END TERMINAL( START & END)
&
PCC M15
DETAIL 'A'
CHANNEL SECTION FOR
POST & SPACER
ø &
{ ' ' , ,
,
( ,
) }
SPLICE BOLT AND NUT
W-BEAM
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6)/MIS-06 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL DETAILS OF MATAL
BEAM CRASH BARRIER
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
HAZARD MARKERS
' '
' '
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-07 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL DETAIL OF HAZARD MARKER
AND CHEVRON MARKING
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
NORMAL SECTION
Paved
WARNING SECTION
BUILTUP SECTION
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-08(i) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL DRAWING OF ROAD STUD
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
NO-OVERTAKING
SECTION
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6)/MIS-08(ii) R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL DRAWING OF ROAD STUD
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
B
2m PERFORATED SLAB
RCC WALL BED LEVEL
A
FLEXIBLE APRON
A
3m
1m COURSE SAND 1m
1m GRAVEL 1m
Cap
PLAN B
PERFORATED SLAB
BED LEVEL
1m BOULDER 1m
FLEXIBLE APRON
1m COURSE SAND 1m
Cap
1m GRAVEL 1m
Non Perforated Pipe
1m BOULDER 1m
Details `A'
Rock level
5m
5m
Details `A'
Rock level
PERFORATED PIPE
Aquifer
Aquifer
5m
5m
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6)/MIS-09 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL DRAWING FOR
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 & RAIN WATER HARVESTING
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
TOP COVER SEAL ALL AROUND WITH A WATERING
NB110L 4.5MM THK. APPROVED SEALING COMPOUND
4250
1200 1200 1200
50
110
NO WELD
12MM Thk. BACK-UP BAR
ACROSS(TYP)
FOR TOP COVER
2 3 10MM THK.
12(TYP)
65NB(L) PIPE
25
NA
5
NB 300H 6.3MM THK. ARM TYP
1525
O
5
AG
DI
VERTICAL 12MM Thk. PLATE
1525
CHORD
8 DETAIL-4
8 THESE DIMENSIONS VARY
LINEARLY BETWEEN 50 AND K SCALE 1:10
200
DIAGONAL
350 3600 A 300
MEMBER
12MM Thk.
STIFFENER PLATE
12MM Thk. PLATE
CORNER COPED
C
2500
600
12mmø @150mm
10mmø @ 150mm
C/C at Bottom
DRILL AND TAP 2 HOLES C/C At Top
FOR 12.7mm DIA BOLTS
2500
600
NO WELD ACROSS (TYP)
60(TYP)
VERTICAL COLUMN
10(TYP)
200
25X25
COPE 12X12 (TYP) CHAMFER 4
TYP
6mm Thk. TOP 5
6200
COVER PLATE
CHORD
10 10 12mmø @ 150mm
ARM 12MM Thk. PLATE C/C At Bottom
DETAIL-A
ARM SCALE 1:25
75
10 PLAN 1-1
25 250
12MM Thk. SCALE 1:25
STIFFENER PLATE 25
PLAN
SCALE 1:10 LEG
300
STIFFENER PLATE (TYP)
NOTES:
M24 BOLT 12
1) ALL DIMENSIONS ARE IN MM AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE
40
2) ALL NON-STAINLESS STEEL BOLTS NUTS AND WASHERS SHALL BE ACCORDING TO
ASTM A325M AND BE HOT DIP GALVANIZED UNLESS SPECIFIED OTHERWISE.
380
3) ASTM A325 1" (M25.4) BOLTS MAY BE SUBSTITUTED FOR M24 BOLTS AND SHALL BE HOT
25
DIP GALVANIZED.
12MM THK. CHAMFER STIFFENER 25X25(TYP)
45
EL+0.15M 500 4) ALL BOLTS SHALL BE INSTALLED BY TURN OF NUT TIGHTENING IN CONFORMANCE
PLATE WITH CAN/CAS S6-06.
TOP OF PEDESTAL 5) ALL STRUCTURAL STEEL SHALL BE GALVANIZED AFTER FABRICATION . LEGS ONLY
EL+0.00M 25MM THK. BASE PLATE
SHALL BE SUBSQUENTLY COATED WITH AN APPROVED PAINT SYSTEM ACCORDING TO
PLATE OPSS 911.
F.G.L 40 12MM THK.
500 6) STRUCTURE SHALL NOT BE ERECTED UNTILL FOUNDATION CONCRETE HAS REACHED
CORNER COPED 80 OF SPECIFIED STRENGTH.
40 7) NO SHOP SPLICES SHALL BE ALLOWED IN ANY MEMBERS.
DETAIL 3 8) ELEVATIONS TO BE VERIFIED IN THE FIELD BEFORE SIGN SUPPORT STRUCTURE
SCALE 1:10 8-BOLT DIA + 26mm HOLES
FABRICATION.
EQUALLY SPACED
9) THIS STANDARD TO BE READ IN CONJUNCTION WITH SS118-3 ( FOOTING FOR GROUND
MOUNTED SIGNS) AND /OR SS118-4 ( FOOTING FOR SYMMETRICAL MEDIAN MOUNTED
SIGN) AND /OR SS118-5( FOOTING FOR ASYMMETRICAL MEDIAN MOUNTED SIGN.)
8 STIFFNERS EQUALLY
10) EACH SIGN SUPPORT SHALL HAVE AN IDENTIFICATION MARKING SHOWING THE
2 30 SPACED
2 STRUCTURE I.D NUMBER, THE DESIGN SIGN AREA, CORRESPONDING ECCENTRICITY,
0
THE LOCAL REFRENCE WIND PRESSURE AS SHOWN IN TABLE1, THE MANUFACTURERS
NAME OR TRADEMARK , AND THE DATE OF MANUFACTURE. THIS 4mm THICK
23°
RECTANGULAR STAINLESS STEEL PLATE SHALL HAVE A RUBBER BACKING, AND BE OF
SUFFICENT DIMENSIONS TO ACCOMMODATE THE REQUIRED INFORMATION USING 6mm
8 8-BOLT M24MMDIA HIGH ENGRAVED LETTERING . THE PLATE SHALL BE ATTACHED TO THE LEG OF THE
2500 BELOW NGL
8 TYP
8 8 STRUCTURE BY MEANS OF STAINLESS STEEL BEND CLAMPS THAT GO THROUGH
TYP F VERTICAL HOLES AT EACH SIDE OF THE PLATE, PASS BEHIND THE PLATE , AND WRAP
8 TYP
0.26 X INSIDE AROUND THE LEG. NO DRILLING INTO THE HSS FOR ATTACHMENT OF PLATE IS
F
PERMITTED.
DIA.
2 OPENING BASE DETAIL 11) ALL CONTACT SURFACES OF GUSSET PLATES HAVING ERECTION BOLTS SHALL BE
WELDED AFTER ERECTION AND ALINGMENT.
1 SCALE 1:10 12) STRUCTURAL STEEL USED SHALL CONFORM TO IS2062 AND is 1161:2014
1
13) CLEAR COVER FOR COLUMNS AND FOOTING 50mm WILL BE USED.
14) NET BEARING CAPACITY IS CONSIDERED 10T/M2 AT 2.5M BELOW FGL.
25MM THK. 15) NOT ANY FOUNDATION SHALL BE REST ON FILLED UP SOIL.
PLATE 12MM THK. 16) GRADE OF CONCRETE SHALL BE
STIFFENER R.C.CM25 -PEDESTAL
600 R.C.CM25 -FOOTING
10mmø @ 150mmC/C
P.C.CM10 -LEVELING COURSE
17) LEGEND: SST DENOTES STAINLESS STEEL.
8mmø200c/c LINK
600
400
200
75
50
275
60
60
1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 4 6-27ø HOLES FOR M25 BOLTS
°
4
275
NB PIPE
°
60
49
60
°
(TYP.)
°
NB PIPE 6 60°
750
NB PIPE
NB PIPE 75
SECTION 3-3
SCALE 1:25
DETAIL-D1
SCALE 1:25
25 300
PLAN AT TOP
NB PIPE SCALE 1:30 2500
13200
1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200
NB PIPE NB PIPE
750
NB PIPE
600
6
(TYP.) PLAN 4-4
SCALE 1:25
2500
600
PLAN AT BOTTOM D7
NB PIPE
SCALE 1:30
DETAIL-D2
SCALE 1:25
NB PIPE 7
13200
1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200
(TYP.)
6
D3
DETAIL-D3
NB PIPE
SCALE 1:25 PLAN 1-1
SCALE 1:25
1525
NB PIPE
NB PIPE
6 6 300
300
49°
49
50MM GROUTING
D4 D1 D2 7
°
NB PIPE
WASHER
NUT
10 10
20
1525
BASE PLATE
100
B
T
200
NB PIPE
(AS KNEE BRACING ON BOYH PARALLEL
TRUSS TO NB MAIN VERTICAL COLUMN) NB PIPE
(TYP.)
(AS KNEE BRACING ON BOYH PARALLEL
6
H
TRUSS TO NB MAIN VERTICAL COLUMN)
h
SECTION 7-7
SCALE 1:25
NB PIPE NB PIPE TYP. DETAIL OF ANCHOR BOLT
6000
SCALE 1:12.5
DETAIL-D4
SCALE 1:25
600
600
1000 2000 2500 7000 2500 2000
3 3 3 3
PLAN 2-2
SCALE 1:25
EL+0.15M EL+0.15M
TOP OF PEDESTAL TOP OF PEDESTAL
2.5% 2.5%
3.0% 3.0%
8MM THK STIFFNER PLATE
7000
2500 OR 500 BELOW NGL WHICHEVER IS HIGHER
Existing Carriageway 2H
H:1
V :1V DETAIL D7 ANCHOR BOLT SCHEDULE mm
2
SCALE 1:25
2 2 2 2
SYMBOL QUANTITY DIAMETER H h B T R TOTAL LENGTH
6-17.5øNotes:
HOLES FOR M16 BOLTS Notes:
1 1 1 1) ALL DIMENSIONS ARE IN MM AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE
1
STRUCTURAL G.A OF GANTRY STRUCTURE 2) ALL FILLET WELDS ARE 6mm FILET WELDS U.N.O.
SCALE 1:30 3) ALL BUTT WELDS SHALL BE PROVIDED WITH A SEALING RUN
4) ALL GUSSET PLATE SHALL BE 8 mm THK. U.N.O.
100 100 5) ALL INCLINED MEMBERS AND GUSSET PLATES ARE TO BE CHECKED BY FULL SHOP LAYOUT.
900
750
6) ALL ERECTION HOLES ARE 14Ø MKD. FOR 12Ø ERECTION BOLTS (U.N.O.)
300
7) ALL PERMANENT HOLES ARE 14Ø MKD. FOR 12Ø PERMANENT BOLTS (U.N.O.)
600
75
75 SHALL BE WELDED AFTER ERECTION AND ALINGMENT.
50
50
SCALE 1:25 STIFF PL.8THK 12) NOT ANY FOUNDATION SHALL BE REST ON FILLED UP SOIL.
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-11 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM GENERAL ARRANGEMENT
DRAWING FOR OVERHEAD GANTRY
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
SOLAR CELL SOLAR CELL
PANEL
2000
2000
RIP PLATE
BASE PLATE
2
1
TAMPAK DEPAN
NTS TAMPAK SAMPING (SINGLE PARABOLE TYPE)
NTS
300
4 D13
400
560 50 200 50 9 D13-100 4 D13
50
150
183
250
300
200
1000
180
b2
850
817
50 200 50
300
50
500
LAMPU PJU BASE PLATE BASE PLATE D13-100
NTS SIDE VIEW
TOP VIEW
DETAIL A
SIDE VIEW
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-12 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL DETAILS OF SOLAR CELL
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
6MM. WIRE ROPE
BLINKER BLINKER
MS JUNCTION MS JUNCTION
1m
Geotextile Membrane
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-17 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL DETAILS GABION WALL
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
1.5 1.0 1.5 1.0
Gabion of size
1.0mX1.0m Geotextile Membrane Gabion of size
1.0mX1.0m
Gabion of size
1.5mX1.0m Gabion of size
1.5mX1.0m
Gabion of size0.5m
2.0mX0.5m GL Gabion of size
2.0mX1.0m 0.5m GL
0.5m
1m
Geotextile Membrane
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-18 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM DETAILS OF TOILET BLOCK
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-19 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM DETAILS OF TOILET BLOCK
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
Destination2
Destination2
Destination1
PEDESTRIAN
Destination1
CROSSING
Destination1
7m
7m
1m
1m
7m
7m
3m
5.5m 50m
LM24 LM24 LM05
5.5m
5.5m
LM19 HM06 60m 60m
R3
5.5m HM06
0m
PEDESTRIAN
0m
CROSSING
30m
R3
Destination1
Destination2
BM04 & BM 05
1m
Destination3
7m 7m
25m
2m 2m
ST
30m
OP
60m
TAPER 65.0m
Destination2
30m
LM24 CONTINUOUS LINE
20m
(7-SEGMENTS)
LM04
1.5m 1.5m
SPEED BREAKER
LM24
LM24
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-20 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL MAJOR T- JUNCTION
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
LM24
LM24
SPEED BREAKER
1.5m 1.5m
(7-SEGMENTS)
LM04
Destination3
20m
LM24 CONTINUOUS LINE
OF 30m LENGTH
TAPER 65.0m
30m
Destination2
60m
30m
BM04 & BM 05
25m
Destination2
Destination1
7m 7m 2m
2m
PEDESTRIAN
Destination1
CROSSING
Destination1
STOP
1m
30m
R3
0m
25m
0m
Taper 65m
5.5m
5.5m 5.5m
5.5m
R3
60m 25m Taper 65m
60m 50m
30m
3m
7m
7m
1m
1m
7m
7m
3m
5.5m 50m
LM24 LM24 LM05
5.5m
5.5m
LM19 HM06 60m 60m
R3
5.5m HM06
0m
PEDESTRIAN
0m
CROSSING
30m
R3
Destination1
Destination2
Destination1
BM04 & BM 05
1m
Destination3
7m 7m
25m
2m 2m
ST
O
30m
P
60m
TAPER 65.0m
Destination2
30m
(7-SEGMENTS)
LM04
1.5m 1.5m
SPEED BREAKER
LM24
LM24
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-21 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL MAJOR X- JUNCTION
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
Destination2
Destination1
PEDESTRIAN
Destination1
CROSSING
Taper 65m 25m
60m 20m 25m Taper 65m
60m 50m
30m LM18 LM19 LM19
7m
7m
1m
1m
7m
7m
50m
LM24 LM24 LM05
5m
5.5
LM19 HM06 m m 60m 60m
5.5
R1
R3
HM06
0m
PEDESTRIAN
CROSSING
ST
Destination1
Destination2
OP
De
De
5m
st
st
1.
in
in
at
at
io
io
45
n3
n2
Destination3
m
1m
7m
7m m
.5 1
15
m
SP
EE
D
BR
EA
KE
R
Ta
er p
65
m
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-22 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL MAJOR Y- JUNCTION
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
SIDE ROAD RIGHT
Destination1
LM05
(7-SEGMENTS)
60m 60m
TM03 LM19 TM04
RE RE RE
RE RE RE
RE
RE
RE
RE
RE
RE
3m
5m
60m 60m
R1
R1
5m
ARROW 3.5m LENGTH 11m
LM24
Destination1
AM06
STOP
45m
TAPER 55m
AM01
LM04
T- INTERSECTION (7-SEGMENTS)
15m
MAJOR ROAD AHEAD
3.57m
1.5m 1.5m
SPEED BREAKER
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-23 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL MINOR T- JUNCTION
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
SPEED BREAKER
1.5m 1.5m
3.57m
15m
MAJOR ROAD AHEAD
TAPER 55m
45m
Destination1
CROSS ROAD
Destination1
STOP
LM05
(7-SEGMENTS) 11m
R1
m
60m 60m
5
5m
R1
3m
RE RE RE RE
RE RE RE RE
RE RE RE RE
RE RE RE RE
RE RE RE
RE RE RE
RE RE RE
3m
5m
60m 60m
R1
R1
ARROW 3.5m LENGTH
5m
LM24 11m
SPACED AT 15m, 15m ,45m &
BM04 & BM 05
90m (INTERVAL FROM
CROSS ROAD
JUNCTION) LM23 CONTINUOUS LINE
OF 30m LENGTH
AM06
Destination1
Destination1
STOP
45m
TAPER 55m
AM01
LM04
(7-SEGMENTS)
15m
3.57m
1.5m 1.5m
SPEED BREAKER
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-24 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL MINOR X- JUNCTION
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
Destination1
Y- INTERSECTION
LM05
(7-SEGMENTS)
60m TM03 TM04
3m
5 m
ARROW 3.5m LENGTH R1 60m 60m
SPACED AT 15m, 15m ,45m &
R2
LM24
LM
5m
90m (INTERVAL FROM
Y- INTERSECTION
23
Destination1
JUNCTION) C
7m OF ON
ST 30 TINU
OP m
LE OUS
NG
BM TH LINE
04
60m
&
m
AM BM
25
06 05
Y-
IN
TE
RS 3.7
EC
TI 1.5 5m
ON m AM
01
SP
EE
m
D 1.5
15
BR m
EA
KE
R
(7-
SE LM0
GM 4
EN
T S)
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-25 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL MINOR Y- JUNCTION
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
Ø
@
Ø
@
CLIENT - CONSULTANT - NAME OF WORK - DRG. NO. Package No. DPR- 3A (6) /MIS-26 R 0
AICONS ENGINEERING PVT.LTD. APPOINTMENT OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY CUM DPR, SURVEY AND PREPARATION SCALE NTS DATE: FEBRUARY-2024
PUBLIC WORKS DEPARTMENT OF LAND PLAN FOR WIDENING TO TWO LANE WITH PAVED SHOULDER TO ROAD IN THE STATE OF
GOVERNMENT OF MAHARASHTRA MAHARASHTRA WITH FINANCIAL AID OF ASIAN DEVELOPMENT BANK (UNDER EPC MODE) PACKAGE NO TITLE: MISCELLANEOUS DRAWINGS
DPR-3A (6) (TOTAL LENGTH = 21.000 KM)IMPROVEMENT TO MORSHI ASHTI THAR PARDI ROAD SH-292 KM TYPICAL DETAILS OF DRAIN
238/00 TO 245/00 TALUKA - ASHTI (PART -1) & MORSHI ASHTI THAR PARDI ROAD SH 292 KM 245/00 TO 259/00 &
A-06,JANKI RESIDENCY,NEAR MANDAKINI SQUARE
KOLAR ROAD, BHOPAL - 462042(M.P)
SH-323 MISSING LENGTH 3.00 KM (TOTAL LENGTH = 21.00KM) TALUKA-KARANJA DISTRICT – WARDHA.
R0 DRAFT DETAILED PROJECT REPORT CVT SSS MKH
Email Id:- info@aicons.in & aiconsgroup@gmail.com (PART - ASHTI TO NARA GODHANI) REV DETAILS OF REVISION DESIGN DRAWN CHECKED APPROVED
STRUCTURE DRAWINGS