Keep it clean inside and replace it (3/4inch Metal Silencer)
periodically. – replacement period of 6 months
‘SMPS’ needs periodic check with an Replacement period of
electronic tester. (Check each three years or on position of anode(+) and cathode(- instance of breakdown. ) first and then confirm its voltage – 24V.) Check if lamp is on in the printer Replacement period of drive. two years or on instance of break down.
Check if crosscutter spring is broken. Replacement period of
one year – however, replace it immediately in case of any breakdown If crosscutter blade needs to replace Replacement period of if fails in clean cut. one year – however, replace it immediately on instance of breakdown. Replace gauge in breakdown or Replacement period of damaged. three years (gauge spec: 4 bar, 1/8 inch)
If upper and lower limit valves emit Replacement period of
weak sound, adjust their angles. If two years in clean air they are totally dumb, it is a result supply – Replace of ‘malfunction’ that requires immediately upon replacement. breakage Extraneous substances on silicone Replacement period of bar need to be cleaned with three years – however, alcoholic swabs to prevent the film replace it immediately from losing its right position on on instance of eye-marking process. breakdown. Monthly Checklist
Check O-ring in the upper sealing Replacement period of
die block and if it is worn out, one year, however, replace it. replace it immediately on instance of break down Check O-ring in the upper sealing Replacement period of die block and if it is worn out, one year, however, replace it. replace it immediately on instance of break down Check O-ring in the upper forming Replacement period of die block and if it is worn out, one year, however, replace it. replace it immediately on instance of break down Check O-ring in the upper forming Replacement period of die block and if it is worn out, one year, however, replace it. replace it immediately on instance of break down Rotary knifes are consumable. Six months of lifespan Replace it with their edge worn-out. on basis of eight working hours a day.
Replace upper and lower tension Six months of life span.
springs when they lose tension or get broken.
Crosscutter shafts need to be oiled Lubricant, ISO VG #32
once in a month. or #46
Forming shaft and sealing shaft Lubricant, ISO VG #32
need to be oiled once in a month. or #46 Monthly Checklist
Check if servo drive connector is
fit in its position and keep the cable unbent.
Check if LCD screen describes Find the diagnosis and
‘AL’(alarm) in the servo drive. solution in the appendix as per each number of alarm.
Check if servo motor cable is wet
and unfit in its position.
Solenoid valves are vulnerable to In clean air, their life
moisture and they need dry and spans go beyond 3 years clean air to supply. (Keep the or so. compressor dry).
Solenoid valves are vulnerable to In clean air, their life
moisture and they need dry and spans go beyond 3 years clean air to supply. (Keep the or so. compressor dry).
Checking oil in the vacuum pump. ISO VG #100
Oil in the pump system should Use the oil which the not be filled beyond the ‘Max’ in vacuum pump the gauge. If it turns dark black or manufacturer supplies. white in color, change it Three years to replace. immediately. Check the vacuum pump inlet The wet filter should be filter and clean off the impurities. replaced immediately. Normal replacement period of three months.
Check air filter inside. Replacement period of
three months. Monthly Checklist
Check oil filter in the vacuum Replacement period of
pump. three months
Inject grease through grease inlet
holes of which each forming or sealing lift have 13 positions on each of them.
Air supply hose is set 16mm in
internal diameter. (We supply it). Install 20A pipe for air supply system in the site.