KODE KENDALA KATEGORI PART

S14 Boulder ST BPP Problem


S37 Broken Mineroad/Front loadingan ST Pit Problem
S02 Chute Penuh (No A2B) ST BPP Problem
S03 Chute Penuh (Over Capacity) ST BPP Problem
B08 Conveyor Boulder BD BPP Problem
B10 Conveyor Ore Wash BD BPP Problem
S06 Front Preparation ST Pit Problem
B02 Gearbox Tromol Baby BD BPP Problem
B03 Gearbox Tromol Primary BD BPP Problem
S20 Hopper Kosong ST Pit Problem
S05 Hopper Penuh (Material Lengket) ST BPP Problem
S04 Hopper Penuh (Over Capacity) ST BPP Problem
S39 Internal Problem ST PT. JUS
S21 Kolam Tailing Jebol ST Project
S23 Level Air Reservoir Kurang ST Pit Problem
B06 Lounder BD BPP Problem
S09 Maintenance Road ST Pit Problem
S25 Masalah Sosial ST CSR
B09 Mesin Conveyor Boulder BD BPP Problem
B11 Mesin Conveyor Wash BD BPP Problem
B01 Mesin Pompa WP BD BPP Problem
B04 Mesin Tromol Baby BD BPP Problem
B05 Mesin Tromol Primary BD BPP Problem
S18 No Operator Exca ST Mine support
S24 No/Kurang Exca LA di Kanal ST BPP Problem
S13 Off Early ST O.time Rest
S27 OFF Produksi (Kurang DT) ST Mine support
S26 OFF Produksi (Manpower WP kurang) ST BPP Problem
S15 OFF, Out Of Stock Intermediate ST Pit Problem
S34 OFF, Out Of Stock Shaft Ready ST Pit Problem
S35 OFF, Pergantian Tromol Primary ST BPP Problem
S50 Others ST Dll
S07 Pergantian Exca Loading ST BPP Problem
S28 Perrsiapan WP (P5m dll) ST BPP Problem
S08 Pindah Front Loading ST Pit Problem
S36 Problem Bearing Tromol Primary ST BPP Problem
S22 Problem Reservoar ST Project
S32 Produksi Slowly, Hujan ST Rain & Slippery
S30 Produksi Slowly, Kekurangan DT ST Mine support
S31 Produksi Slowly, Material Lengket/Halus ST BPP Problem
S29 Produksi Slowly, Tekanan Air Waterspray Lemah ST BPP Problem
S11 Rain (No Production) ST Rain & Slippery
S40 Rain and Slippery ST Rain & Slippery
S01 Refuel ST BBM
S12 Rewash (No Production) ST BPP Problem
B07 Salary Pump BD Pit Problem
S10 Slippery ST Rain & Slippery
S19 Standby (Plan Roster) ST MPE
S33 Waiting Unit ST Mine support
Boulder
Chute Penuh (No A2B)
Chute Penuh (Over Capacity)
Conveyor Boulder
Conveyor Ore Wash
Gearbox Tromol Baby
Gearbox Tromol Primary
Hopper Penuh (Material Lengket)
Hopper Penuh (Over Capacity)
Lounder
Mesin Conveyor Boulder
Mesin Conveyor Wash
Mesin Pompa WP
Mesin Tromol Baby
Mesin Tromol Primary
No/Kurang Exca LA di Kanal
OFF Produksi (Manpower WP kurang)
OFF, Pergantian Tromol Primary
Pergantian Exca Loading
Perrsiapan WP (P5m dll)
Problem Bearing Tromol Primary
Produksi Slowly, Material Lengket/Halus
Produksi Slowly, Tekanan Air Waterspray Lemah
Rewash (No Production)
DAILY RECORD LOST TIME BPP 04/17/2024

NO DATE BPP SHIFT START FINISH TOTAL KODE KATEGORI KENDALA PART

1 01 September 1 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 12


2 01 September 1 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 12
3 01 September 1 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 12
4 01 September 1 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 12
5 01 September 2 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 12
6 01 September 2 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 12
7 01 September 2 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 12
8 01 September 2 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 12
9 01 September 3 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 34
10 01 September 3 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 34
11 01 September 3 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 34
12 01 September 3 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 34
13 01 September 4 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 34
14 01 September 4 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 34
15 01 September 4 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 34
16 01 September 4 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 34
17 02 September 1 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 12
18 02 September 1 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 12
19 02 September 1 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 12
20 02 September 1 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 12
21 02 September 2 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 12
22 02 September 2 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 12
23 02 September 2 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 12
24 02 September 2 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 12
25 02 September 3 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 34
26 02 September 3 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 34
27 02 September 3 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 34
28 02 September 3 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 34
29 02 September 4 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 34
30 02 September 4 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 34
31 02 September 4 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 34
32 02 September 4 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 34
33 03 September 1 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 12
34 03 September 1 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 12
35 03 September 1 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 12
36 03 September 1 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 12
37 03 September 2 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 12
38 03 September 2 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 12
39 03 September 2 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 12
40 03 September 2 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 12
41 03 September 3 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 34
42 03 September 3 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 34
43 03 September 3 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 34
44 03 September 3 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 34
45 03 September 4 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 34
46 03 September 4 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 34
47 03 September 4 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 34
48 03 September 4 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 34
49 04 September 1 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 12
50 04 September 1 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 12
51 04 September 1 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 12
52 04 September 1 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 12
53 04 September 2 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 12
54 04 September 2 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 12
55 04 September 2 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 12
56 04 September 2 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 12
57 04 September 3 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 34
58 04 September 3 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 34
59 04 September 3 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 34
60 04 September 3 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 34
61 04 September 4 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 34
62 04 September 4 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 34
63 04 September 4 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 34
64 04 September 4 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 34
65 05 September 1 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 12
66 05 September 1 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 12
67 05 September 1 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 12
68 05 September 1 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 12
69 05 September 2 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 12
70 05 September 2 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 12
71 05 September 2 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 12
72 05 September 2 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 12
73 05 September 3 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 34
74 05 September 3 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 34
75 05 September 3 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 34
76 05 September 3 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 34
77 05 September 4 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 34
78 05 September 4 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 34
79 05 September 4 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 34
80 05 September 4 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 34
81 06 September 1 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 12
82 06 September 1 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 12
83 06 September 1 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 12
84 06 September 1 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 12
85 06 September 2 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 12
86 06 September 2 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 12
87 06 September 2 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 12
88 06 September 2 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 12
89 06 September 3 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 34
90 06 September 3 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 34
91 06 September 3 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 34
92 06 September 3 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 34
93 06 September 4 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 34
94 06 September 4 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 34
95 06 September 4 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 34
96 06 September 4 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 34
97 07 September 1 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 12
98 07 September 1 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 12
99 07 September 1 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 12
100 07 September 1 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 12
101 07 September 2 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 12
102 07 September 2 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 12
103 07 September 2 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 12
104 07 September 2 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 12
105 07 September 3 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 34
106 07 September 3 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 34
107 07 September 3 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 34
108 07 September 3 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 34
109 07 September 4 1 07:00 12:00 5.00 S39 ST PT. JUS Internal Problem WP 34
110 07 September 4 1 13:00 17:00 4.00 S39 ST PT. JUS Internal Problem WP 34
111 07 September 4 2 19:00 24:00 5.00 S39 ST PT. JUS Internal Problem WP 34
112 07 September 4 2 01:00 05:00 4.00 S39 ST PT. JUS Internal Problem WP 34
113 08 September 1 1 07:00 12:00 5.00 S09 ST Pit Problem Maintenance Road WP 12
114 08 September 1 2 19:00 24:00 5.00 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 12
115 08 September 1 2 01:00 05:00 4.00 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 12
116 08 September 2 1 07:00 12:00 5.00 S09 ST Pit Problem Maintenance Road WP 12
117 08 September 2 1 13:00 17:00 4.00 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 12
118 08 September 2 2 19:00 19:10 0.17 S33 ST Mine support Waiting Unit WP 12
119 08 September 2 2 19:20 19:38 0.30 B04 BD BPP Problem Mesin Tromol Baby WP 12
120 08 September 2 2 22:14 22:20 0.10 S08 ST Pit Problem Pindah Front Loading WP 12
121 08 September 2 2 23:55 24:00 0.08 S13 ST O.time Rest Off Early WP 12
122 08 September 2 2 01:00 01:10 0.17 B01 BD BPP Problem Mesin Pompa WP WP 12
123 08 September 2 2 01:10 02:06 0.93 B07 BD Pit Problem Salary Pump WP 12
124 08 September 2 2 04:54 05:00 0.10 S13 ST O.time Rest Off Early WP 12
125 08 September 3 1 07:00 12:00 5.00 S09 ST Pit Problem Maintenance Road WP 34
126 08 September 3 1 13:00 15:00 2.00 S04 ST BPP Problem Hopper Penuh (Over Capacity) WP 34
127 08 September 3 2 19:00 24:00 5.00 B11 BD BPP Problem Mesin Conveyor Wash WP 34
128 08 September 3 2 01:00 01:10 0.17 S33 ST Mine support Waiting Unit WP 34
129 08 September 3 2 01:43 01:55 0.20 S08 ST Pit Problem Pindah Front Loading WP 34
130 08 September 3 2 04:20 05:00 0.67 S13 ST O.time Rest Off Early WP 34
131 08 September 4 1 07:00 12:00 5.00 S09 ST Pit Problem Maintenance Road WP 34
132 08 September 4 2 19:00 19:30 0.50 S33 ST Mine support Waiting Unit WP 34
133 08 September 4 2 04:25 05:00 0.58 S13 ST O.time Rest Off Early WP 34
134 09 September 1 1 07:00 12:00 5.00 S21 ST Project Kolam Tailing Jebol WP 12
135 09 September 1 1 13:00 17:00 4.00 S21 ST Project Kolam Tailing Jebol WP 12
136 09 September 1 2 19:00 19:53 0.88 S37 ST Pit Problem Broken Mineroad/Front loadingan WP 12
137 09 September 1 2 20:20 20:32 0.20 S02 ST BPP Problem Chute Penuh (No A2B) WP 12
138 09 September 1 2 21:00 24:00 3.00 S31 ST BPP Problem Produksi Slowly, Material Lengket/Halus WP 12
139 09 September 1 2 01:18 01:35 0.28 B01 BD BPP Problem Mesin Pompa WP WP 12
140 09 September 1 2 01:35 04:58 3.38 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 12
141 09 September 1 2 04:58 05:00 0.03 S13 ST O.time Rest Off Early WP 12
142 09 September 2 1 07:00 07:13 0.22 S09 ST Pit Problem Maintenance Road WP 12
143 09 September 2 1 07:33 07:38 0.08 S03 ST BPP Problem Chute Penuh (Over Capacity) WP 12
144 09 September 2 1 09:32 10:12 0.67 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 12
145 09 September 2 2 19:00 24:00 5.00 S21 ST Project Kolam Tailing Jebol WP 12
146 09 September 2 2 01:00 05:00 4.00 S21 ST Project Kolam Tailing Jebol WP 12
147 09 September 3 1 07:00 07:29 0.48 S09 ST Pit Problem Maintenance Road WP 34
148 09 September 3 1 11:40 12:00 0.33 B08 BD BPP Problem Conveyor Boulder WP 34
149 09 September 3 1 14:20 14:22 0.03 S08 ST Pit Problem Pindah Front Loading WP 34
150 09 September 3 1 15:25 15:27 0.03 S12 ST BPP Problem Rewash (No Production) WP 34
151 09 September 3 1 16:31 17:00 0.48 S11 ST Rain & Slippery Rain (No Production) WP 34
152 09 September 3 2 19:00 19:15 0.25 S06 ST Pit Problem Front Preparation WP 34
153 09 September 3 2 03:14 03:34 0.33 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 34
154 09 September 3 2 04:47 04:47 0.00 B09 BD BPP Problem Mesin Conveyor Boulder WP 34
155 09 September 3 2 04:50 05:00 0.17 S13 ST O.time Rest Off Early WP 34
156 09 September 4 1 07:00 07:35 0.58 S09 ST Pit Problem Maintenance Road WP 34
157 09 September 4 1 15:23 17:00 1.62 S06 ST Pit Problem Front Preparation WP 34
158 09 September 4 2 19:40 20:03 0.38 B08 BD BPP Problem Conveyor Boulder WP 34
159 09 September 4 2 20:57 21:12 0.25 B08 BD BPP Problem Conveyor Boulder WP 34
160 09 September 4 2 22:41 22:53 0.20 S04 ST BPP Problem Hopper Penuh (Over Capacity) WP 34
161 09 September 4 2 23:55 24:00 0.08 S13 ST O.time Rest Off Early WP 34
162 09 September 4 2 01:00 01:24 0.40 S04 ST BPP Problem Hopper Penuh (Over Capacity) WP 34
163 09 September 4 2 04:02 04:26 0.40 B08 BD BPP Problem Conveyor Boulder WP 34
164 09 September 4 2 04:55 05:00 0.08 S13 ST O.time Rest Off Early WP 34
165 10 September 1 1 07:00 07:21 0.35 S09 ST Pit Problem Maintenance Road WP 12
166 10 September 1 1 07:35 07:53 0.30 B01 BD BPP Problem Mesin Pompa WP WP 12
167 10 September 1 1 11:00 12:00 1.00 S50 ST Dll Others WP 12
168 10 September 1 1 13:00 13:58 0.97 B01 BD BPP Problem Mesin Pompa WP WP 12
169 10 September 1 1 14:57 15:00 0.05 S08 ST Pit Problem Pindah Front Loading WP 12
170 10 September 1 2 19:00 19:27 0.45 B01 BD BPP Problem Mesin Pompa WP WP 12
171 10 September 1 2 20:22 20:50 0.47 S32 ST Rain & Slippery Produksi Slowly, Hujan WP 12
172 10 September 1 2 20:50 22:14 1.40 S11 ST Rain & Slippery Rain (No Production) WP 12
173 10 September 1 2 03:29 04:12 0.72 S08 ST Pit Problem Pindah Front Loading WP 12
174 10 September 2 1 07:00 07:21 0.35 S09 ST Pit Problem Maintenance Road WP 12
175 10 September 2 1 07:21 08:23 1.03 B01 BD BPP Problem Mesin Pompa WP WP 12
176 10 September 2 1 11:00 12:00 1.00 S50 ST Dll Others WP 12
177 10 September 2 1 13:00 13:58 0.97 B01 BD BPP Problem Mesin Pompa WP WP 12
178 10 September 2 1 16:55 17:00 0.08 S13 ST O.time Rest Off Early WP 12
179 10 September 2 2 19:03 19:15 0.20 B01 BD BPP Problem Mesin Pompa WP WP 12
180 10 September 2 2 20:22 20:35 0.22 S32 ST Rain & Slippery Produksi Slowly, Hujan WP 12
181 10 September 2 2 20:35 21:20 0.75 S11 ST Rain & Slippery Rain (No Production) WP 12
182 10 September 2 2 03:31 03:37 0.10 S08 ST Pit Problem Pindah Front Loading WP 12
183 10 September 3 1 07:00 12:00 5.00 B10 BD BPP Problem Conveyor Ore Wash WP 34
184 10 September 3 1 13:00 17:00 4.00 B10 BD BPP Problem Conveyor Ore Wash WP 34
185 10 September 3 2 19:00 19:20 0.33 S33 ST Mine support Waiting Unit WP 34
186 10 September 3 2 21:45 24:00 2.25 S11 ST Rain & Slippery Rain (No Production) WP 34
187 10 September 3 2 01:00 05:00 4.00 S11 ST Rain & Slippery Rain (No Production) WP 34
188 10 September 4 1 07:00 07:15 0.25 S09 ST Pit Problem Maintenance Road WP 34
189 10 September 4 1 11:00 12:00 1.00 S13 ST O.time Rest Off Early WP 34
190 10 September 4 1 14:00 16:00 2.00 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 34
191 10 September 4 1 16:50 17:00 0.17 S13 ST O.time Rest Off Early WP 34
192 10 September 4 2 19:00 21:25 2.42 S12 ST BPP Problem Rewash (No Production) WP 34
193 10 September 4 2 21:25 21:28 0.05 S08 ST Pit Problem Pindah Front Loading WP 34
194 10 September 4 2 03:54 04:02 0.13 S08 ST Pit Problem Pindah Front Loading WP 34
195 11 September 1 1 07:00 12:00 5.00 S11 ST Rain & Slippery Rain (No Production) WP 12
196 11 September 1 1 13:00 14:10 1.17 S09 ST Pit Problem Maintenance Road WP 12
197 11 September 1 1 14:15 14:45 0.50 S01 ST BBM Refuel WP 12
198 11 September 1 2 19:00 19:05 0.08 S33 ST Mine support Waiting Unit WP 12
199 11 September 1 2 22:22 22:58 0.60 B01 BD BPP Problem Mesin Pompa WP WP 12
200 11 September 1 2 04:02 04:13 0.18 S14 ST BPP Problem Boulder WP 12
201 11 September 1 2 04:42 05:00 0.30 B08 BD BPP Problem Conveyor Boulder WP 12
202 11 September 2 1 06:00 09:30 3.50 S11 ST Rain & Slippery Rain (No Production) WP 12
203 11 September 2 1 13:00 13:05 0.08 S08 ST Pit Problem Pindah Front Loading WP 12
204 11 September 2 2 19:00 19:07 0.12 S33 ST Mine support Waiting Unit WP 12
205 11 September 2 2 19:16 20:17 1.02 S08 ST Pit Problem Pindah Front Loading WP 12
206 11 September 2 2 22:25 23:02 0.62 B01 BD BPP Problem Mesin Pompa WP WP 12
207 11 September 2 2 23:58 24:00 0.03 S13 ST O.time Rest Off Early WP 12
208 11 September 2 2 02:33 03:00 0.45 S06 ST Pit Problem Front Preparation WP 12
209 11 September 2 2 03:50 04:11 0.35 B05 BD BPP Problem Mesin Tromol Primary WP 12
210 11 September 3 1 07:00 09:50 2.83 S11 ST Rain & Slippery Rain (No Production) WP 34
211 11 September 3 1 07:00 09:10 2.17 B05 BD BPP Problem Mesin Tromol Primary WP 34
212 11 September 3 1 10:31 10:54 0.38 B08 BD BPP Problem Conveyor Boulder WP 34
213 11 September 3 1 13:00 13:15 0.25 B05 BD BPP Problem Mesin Tromol Primary WP 34
214 11 September 3 1 13:55 14:12 0.28 S14 ST BPP Problem Boulder WP 34
215 11 September 3 1 14:35 14:50 0.25 B09 BD BPP Problem Mesin Conveyor Boulder WP 34
216 11 September 3 1 14:53 15:00 0.12 B08 BD BPP Problem Conveyor Boulder WP 34
217 11 September 3 2 19:00 24:00 5.00 S09 ST Pit Problem Maintenance Road WP 34
218 11 September 3 2 01:00 05:00 4.00 S09 ST Pit Problem Maintenance Road WP 34
219 11 September 4 1 07:00 09:50 2.83 S11 ST Rain & Slippery Rain (No Production) WP 34
220 11 September 4 1 09:50 12:00 2.17 S10 ST Rain & Slippery Slippery WP 34
221 11 September 4 1 13:00 15:00 2.00 S09 ST Pit Problem Maintenance Road WP 34
222 11 September 4 1 16:50 17:00 0.17 S13 ST O.time Rest Off Early WP 34
223 11 September 4 2 19:00 19:40 0.67 S33 ST Mine support Waiting Unit WP 34
224 12 September 1 1 07:00 07:50 0.83 S33 ST Mine support Waiting Unit WP 12
225 12 September 1 2 19:00 19:39 0.65 S06 ST Pit Problem Front Preparation WP 12
226 12 September 2 1 07:00 07:48 0.80 S33 ST Mine support Waiting Unit WP 12
227 12 September 2 1 08:16 08:24 0.13 S08 ST Pit Problem Pindah Front Loading WP 12
228 12 September 2 1 10:00 12:00 2.00 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 12
229 12 September 2 2 19:00 19:25 0.42 S02 ST BPP Problem Chute Penuh (No A2B) WP 12
230 12 September 2 2 21:45 22:51 1.10 B02 BD BPP Problem Gearbox Tromol Baby WP 12
231 12 September 2 2 04:35 05:00 0.42 S10 ST Rain & Slippery Slippery WP 12
232 12 September 3 1 07:00 07:20 0.33 S06 ST Pit Problem Front Preparation WP 34
233 12 September 3 1 11:11 11:27 0.27 S14 ST BPP Problem Boulder WP 34
234 12 September 3 1 11:57 12:00 0.05 S13 ST O.time Rest Off Early WP 34
235 12 September 3 1 13:00 13:15 0.25 B09 BD BPP Problem Mesin Conveyor Boulder WP 34
236 12 September 3 1 15:00 16:00 1.00 S31 ST BPP Problem Produksi Slowly, Material Lengket/Halus WP 34
237 12 September 3 1 16:53 17:00 0.12 S13 ST O.time Rest Off Early WP 34
238 12 September 3 2 19:00 24:00 5.00 S11 ST Rain & Slippery Rain (No Production) WP 34
239 12 September 3 2 01:00 05:00 4.00 S11 ST Rain & Slippery Rain (No Production) WP 34
240 12 September 4 1 07:00 12:00 5.00 S09 ST Pit Problem Maintenance Road WP 34
241 12 September 4 1 13:00 13:10 0.17 S33 ST Mine support Waiting Unit WP 34
242 12 September 4 1 14:10 14:12 0.03 S07 ST BPP Problem Pergantian Exca Loading WP 34
243 12 September 4 1 15:02 15:13 0.18 B09 BD BPP Problem Mesin Conveyor Boulder WP 34
244 12 September 4 1 16:54 17:00 0.10 S13 ST O.time Rest Off Early WP 34
245 12 September 4 2 19:00 24:00 5.00 S11 ST Rain & Slippery Rain (No Production) WP 34
246 12 September 4 2 01:00 05:00 4.00 S11 ST Rain & Slippery Rain (No Production) WP 34
247 13 September 1 1 07:00 07:45 0.75 S06 ST Pit Problem Front Preparation WP 12
248 13 September 1 1 10:33 10:50 0.28 S08 ST Pit Problem Pindah Front Loading WP 12
249 13 September 1 1 11:55 12:00 0.08 S13 ST O.time Rest Off Early WP 12
250 13 September 1 1 16:50 17:00 0.17 S13 ST O.time Rest Off Early WP 12
251 13 September 1 2 21:55 21:56 0.02 S11 ST Rain & Slippery Rain (No Production) WP 12
252 13 September 1 2 01:00 01:17 0.28 B08 BD BPP Problem Conveyor Boulder WP 12
253 13 September 1 2 04:13 04:31 0.30 S14 ST BPP Problem Boulder WP 12
254 13 September 2 1 07:00 08:15 1.25 S09 ST Pit Problem Maintenance Road WP 12
255 13 September 2 1 08:38 08:48 0.17 S14 ST BPP Problem Boulder WP 12
256 13 September 2 1 11:00 12:00 1.00 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 12
257 13 September 2 1 13:16 13:31 0.25 S14 ST BPP Problem Boulder WP 12
258 13 September 2 1 13:39 13:41 0.03 S14 ST BPP Problem Boulder WP 12
259 13 September 2 1 13:53 14:00 0.12 S14 ST BPP Problem Boulder WP 12
260 13 September 2 1 14:00 14:10 0.17 S14 ST BPP Problem Boulder WP 12
261 13 September 2 1 14:17 14:29 0.20 S14 ST BPP Problem Boulder WP 12
262 13 September 2 2 19:00 24:00 5.00 S11 ST Rain & Slippery Rain (No Production) WP 12
263 13 September 2 2 01:00 05:00 4.00 S11 ST Rain & Slippery Rain (No Production) WP 12
264 13 September 3 1 07:00 09:45 2.75 S09 ST Pit Problem Maintenance Road WP 34
265 13 September 3 1 11:57 12:00 0.05 S13 ST O.time Rest Off Early WP 34
266 13 September 3 1 15:10 15:20 0.17 S08 ST Pit Problem Pindah Front Loading WP 34
267 13 September 3 1 16:50 17:00 0.17 S13 ST O.time Rest Off Early WP 34
268 13 September 3 2 19:00 19:17 0.28 S09 ST Pit Problem Maintenance Road WP 34
269 13 September 3 2 20:21 24:00 3.65 S11 ST Rain & Slippery Rain (No Production) WP 34
270 13 September 3 2 01:00 05:00 4.00 S11 ST Rain & Slippery Rain (No Production) WP 34
271 13 September 4 1 07:00 12:00 5.00 S09 ST Pit Problem Maintenance Road WP 34
272 13 September 4 1 13:00 13:15 0.25 S33 ST Mine support Waiting Unit WP 34
273 13 September 4 1 16:55 17:00 0.08 S13 ST O.time Rest Off Early WP 34
274 13 September 4 2 19:00 19:15 0.25 S09 ST Pit Problem Maintenance Road WP 34
275 13 September 4 2 20:21 24:00 3.65 S11 ST Rain & Slippery Rain (No Production) WP 34
276 13 September 4 2 01:00 05:00 4.00 S11 ST Rain & Slippery Rain (No Production) WP 34
277 14 September 1 1 07:00 12:00 5.00 S09 ST Pit Problem Maintenance Road WP 12
278 14 September 1 1 16:50 17:00 0.17 S13 ST O.time Rest Off Early WP 12
279 14 September 1 2 19:00 24:00 5.00 S40 ST Rain & Slippery Rain and Slippery WP 12
280 14 September 1 2 01:00 05:00 4.00 S40 ST Rain & Slippery Rain and Slippery WP 12
281 14 September 2 1 07:00 07:16 0.27 S06 ST Pit Problem Front Preparation WP 12
282 14 September 2 1 08:52 08:58 0.10 S14 ST BPP Problem Boulder WP 12
283 14 September 2 1 11:22 12:00 0.63 S13 ST O.time Rest Off Early WP 12
284 14 September 2 1 15:23 15:39 0.27 S14 ST BPP Problem Boulder WP 12
285 14 September 2 1 13:00 16:50 3.83 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 12
286 14 September 2 1 16:50 17:00 0.17 S13 ST O.time Rest Off Early WP 12
287 14 September 2 2 19:00 24:00 5.00 S40 ST Rain & Slippery Rain and Slippery WP 12
288 14 September 2 2 01:00 05:00 4.00 S40 ST Rain & Slippery Rain and Slippery WP 12
289 14 September 3 1 07:00 12:00 5.00 S09 ST Pit Problem Maintenance Road WP 34
290 14 September 3 1 14:39 14:53 0.23 S14 ST BPP Problem Boulder WP 34
291 14 September 3 1 16:55 17:00 0.08 S13 ST O.time Rest Off Early WP 34
292 14 September 3 2 19:00 24:00 5.00 S40 ST Rain & Slippery Rain and Slippery WP 34
293 14 September 3 2 01:00 05:00 4.00 S40 ST Rain & Slippery Rain and Slippery WP 34
294 14 September 4 1 07:00 08:25 1.42 S33 ST Mine support Waiting Unit WP 34
295 14 September 4 1 10:46 11:16 0.50 S14 ST BPP Problem Boulder WP 34
296 14 September 4 1 14:43 15:16 0.55 B05 BD BPP Problem Mesin Tromol Primary WP 34
297 14 September 4 1 15:19 17:00 1.68 S12 ST BPP Problem Rewash (No Production) WP 34
298 14 September 4 2 19:00 24:00 5.00 S40 ST Rain & Slippery Rain and Slippery WP 34
299 14 September 4 2 01:00 05:00 4.00 S40 ST Rain & Slippery Rain and Slippery WP 34
300 15 September 1 2 07:00 08:01 1.02 S09 ST Pit Problem Maintenance Road WP 12
301 15 September 1 1 10:48 10:50 0.03 S08 ST Pit Problem Pindah Front Loading WP 12
302 15 September 1 1 11:31 12:00 0.48 S13 ST O.time Rest Off Early WP 12
303 15 September 1 1 13:00 13:10 0.17 S08 ST Pit Problem Pindah Front Loading WP 12
304 15 September 1 1 14:16 17:00 2.73 S37 ST Pit Problem Broken Mineroad/Front loadingan WP 12
305 15 September 1 2 20:12 20:45 0.55 B05 BD BPP Problem Mesin Tromol Primary WP 12
306 15 September 1 2 21:32 21:37 0.08 S14 ST BPP Problem Boulder WP 12
307 15 September 1 2 22:04 22:08 0.07 S08 ST Pit Problem Pindah Front Loading WP 12
308 15 September 1 2 23:27 23:33 0.10 S14 ST BPP Problem Boulder WP 12
309 15 September 1 2 01:00 05:00 4.00 S37 ST Pit Problem Broken Mineroad/Front loadingan WP 12
310 15 September 2 1 07:00 07:38 0.63 S09 ST Pit Problem Maintenance Road WP 12
311 15 September 2 1 08:52 08:58 0.10 S14 ST BPP Problem Boulder WP 12
312 15 September 2 1 11:55 12:00 0.08 S13 ST O.time Rest Off Early WP 12
313 15 September 2 1 14:26 14:30 0.07 S14 ST BPP Problem Boulder WP 12
314 15 September 2 1 14:44 15:23 0.65 S14 ST BPP Problem Boulder WP 12
315 15 September 2 1 16:52 17:00 0.13 S13 ST O.time Rest Off Early WP 12
316 15 September 2 2 19:00 19:25 0.42 S01 ST BBM Refuel WP 12
317 15 September 2 2 19:25 19:31 0.10 S01 ST BBM Refuel WP 12
318 15 September 2 2 19:36 19:49 0.22 S14 ST BPP Problem Boulder WP 12
319 15 September 2 2 19:52 19:55 0.05 S14 ST BPP Problem Boulder WP 12
320 15 September 2 2 19:55 24:00 4.08 S09 ST Pit Problem Maintenance Road WP 12
321 15 September 2 2 01:00 05:00 4.00 S09 ST Pit Problem Maintenance Road WP 12
322 15 September 3 1 07:00 07:30 0.50 S09 ST Pit Problem Maintenance Road WP 34
323 15 September 3 1 07:30 08:00 0.50 S01 ST BBM Refuel WP 34
324 15 September 3 1 11:07 11:18 0.18 S08 ST Pit Problem Pindah Front Loading WP 34
325 15 September 3 1 13:17 13:28 0.18 S14 ST BPP Problem Boulder WP 34
326 15 September 3 1 13:36 13:46 0.17 S14 ST BPP Problem Boulder WP 34
327 15 September 3 1 13:59 15:07 1.13 B09 BD BPP Problem Mesin Conveyor Boulder WP 34
328 15 September 3 1 15:13 15:41 0.47 S14 ST BPP Problem Boulder WP 34
329 15 September 3 1 16:20 17:00 0.67 S50 ST Dll Others WP 34
330 15 September 3 2 19:00 19:20 0.33 S33 ST Mine support Waiting Unit WP 34
331 15 September 3 2 20:06 20:26 0.33 S14 ST BPP Problem Boulder WP 34
332 15 September 3 2 01:00 05:00 4.00 S37 ST Pit Problem Broken Mineroad/Front loadingan WP 34
333 15 September 4 1 07:00 09:35 2.58 S09 ST Pit Problem Maintenance Road WP 34
334 15 September 4 1 10:44 10:57 0.22 B09 BD BPP Problem Mesin Conveyor Boulder WP 34
335 15 September 4 1 13:00 13:10 0.17 S33 ST Mine support Waiting Unit WP 34
336 15 September 4 1 16:20 17:00 0.67 S50 ST Dll Others Lebih Awal, Accident Unit DT
337 15 September 4 2 19:00 19:20 0.33 S33 ST Mine support Waiting Unit WP 34
338 15 September 4 2 04:00 05:00 1.00 S37 ST Pit Problem Broken Mineroad/Front loadingan WP 34
339 16 September 1 1 07:00 07:55 0.92 S09 ST Pit Problem Maintenance Road WP 12
340 16 September 1 1 07:55 11:50 3.92 S37 ST Pit Problem Broken Mineroad/Front loadingan WP 12
341 16 September 1 1 11:50 12:00 0.17 S13 ST O.time Rest Off Early WP 12
342 16 September 1 1 16:46 17:00 0.23 S13 ST O.time Rest Off Early WP 12
343 16 September 1 2 19:00 19:10 0.17 S33 ST Mine support Waiting Unit WP 12
344 16 September 1 2 22:59 23:03 0.07 S08 ST Pit Problem Pindah Front Loading WP 12
345 16 September 1 2 03:08 03:20 0.20 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 12
346 16 September 1 2 04:36 04:44 0.13 S50 ST Dll Others Problem chute
347 16 September 2 1 07:00 07:50 0.83 S09 ST Pit Problem Maintenance Road WP 12
348 16 September 2 1 07:56 08:00 0.07 S14 ST BPP Problem Boulder WP 12
349 16 September 2 1 08:24 08:30 0.10 S14 ST BPP Problem Boulder WP 12
350 16 September 2 1 11:26 11:37 0.18 S14 ST BPP Problem Boulder WP 12
351 16 September 2 1 11:55 12:00 0.08 S13 ST O.time Rest Off Early WP 12
352 16 September 2 1 13:00 13:14 0.23 S33 ST Mine support Waiting Unit WP 12
353 16 September 2 1 16:36 17:00 0.40 B03 BD BPP Problem Gearbox Tromol Primary WP 12
354 16 September 2 2 19:00 19:17 0.28 S06 ST Pit Problem Front Preparation WP 12
355 16 September 2 2 19:20 19:38 0.30 S50 ST Dll Others Problem chute
356 16 September 2 2 21:20 22:49 1.48 S12 ST BPP Problem Rewash (No Production) WP 12
357 16 September 2 2 22:49 22:55 0.10 S14 ST BPP Problem Boulder WP 12
358 16 September 2 2 01:53 01:59 0.10 S14 ST BPP Problem Boulder WP 12
359 16 September 2 2 03:15 03:22 0.12 S14 ST BPP Problem Boulder WP 12
360 16 September 2 2 03:22 03:45 0.38 S14 ST BPP Problem Boulder WP 12
361 16 September 3 1 07:00 08:10 1.17 S09 ST Pit Problem Maintenance Road WP 34
362 16 September 3 1 09:54 10:03 0.15 S08 ST Pit Problem Pindah Front Loading WP 34
363 16 September 3 1 10:38 10:40 0.03 S08 ST Pit Problem Pindah Front Loading WP 34
364 16 September 3 1 11:00 11:50 0.83 S08 ST Pit Problem Pindah Front Loading WP 34
365 16 September 3 1 11:50 12:00 0.17 S13 ST O.time Rest Off Early WP 34
366 16 September 3 1 13:00 14:00 1.00 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 34
367 16 September 3 1 16:50 17:00 0.17 S01 ST BBM Refuel WP 34
368 16 September 3 2 19:00 19:20 0.33 S33 ST Mine support Waiting Unit WP 34
369 16 September 3 2 20:04 20:22 0.30 S14 ST BPP Problem Boulder WP 34
370 16 September 3 2 20:33 20:42 0.15 S14 ST BPP Problem Boulder WP 34
371 16 September 3 2 23:07 23:25 0.30 S14 ST BPP Problem Boulder WP 34
372 16 September 3 2 01:37 01:49 0.20 S50 ST Dll Others Kayu tersangkut di tromol primary
373 16 September 4 1 07:00 09:35 2.58 S09 ST Pit Problem Maintenance Road WP 34
374 16 September 4 1 11:55 12:00 0.08 S13 ST O.time Rest Off Early WP 34
375 16 September 4 1 16:50 17:00 0.17 S01 ST BBM Refuel WP 34
376 16 September 4 2 19:00 19:10 0.17 S33 ST Mine support Waiting Unit WP 34
377 17 September 1 1 07:00 07:55 0.92 S33 ST Mine support Waiting Unit WP 12
378 17 September 1 1 11:00 12:00 1.00 S19 ST MPE Standby (Plan Roster) WP 12
379 17 September 1 2 20:50 21:22 0.53 S32 ST Rain & Slippery Produksi Slowly, Hujan WP 12
380 17 September 1 2 21:22 24:00 2.63 S10 ST Rain & Slippery Slippery WP 12
381 17 September 1 2 01:00 05:00 4.00 S10 ST Rain & Slippery Slippery WP 12
382 17 September 2 1 07:00 11:00 4.00 S50 ST Dll Others Maintenance BPP
383 17 September 2 1 13:39 15:22 1.72 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 12
384 17 September 2 1 15:52 17:00 1.13 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 12
385 17 September 2 2 19:00 24:00 5.00 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 12
386 17 September 2 2 01:00 05:00 4.00 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 12
387 17 September 3 1 07:00 08:10 1.17 S33 ST Mine support Waiting Unit WP 34
388 17 September 3 1 10:57 12:00 1.05 S19 ST MPE Standby (Plan Roster) WP 34
389 17 September 3 2 19:00 19:15 0.25 S33 ST Mine support Waiting Unit WP 34
390 17 September 3 2 19:54 20:16 0.37 S14 ST BPP Problem Boulder WP 34
391 17 September 3 2 20:22 20:31 0.15 S08 ST Pit Problem Pindah Front Loading WP 34
392 17 September 3 2 22:30 22:50 0.33 S32 ST Rain & Slippery Produksi Slowly, Hujan WP 34
393 17 September 4 1 10:54 12:00 1.10 S19 ST MPE Standby (Plan Roster) WP 34
394 17 September 4 1 15:56 16:01 0.08 S08 ST Pit Problem Pindah Front Loading WP 34
395 17 September 4 2 19:00 21:00 2.00 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 34
396 17 September 4 2 22:30 22:50 0.33 S32 ST Rain & Slippery Produksi Slowly, Hujan WP 34
397 17 September 4 2 23:10 24:00 0.83 S13 ST O.time Rest Off Early WP 34
398 17 September 4 2 01:00 01:20 0.33 S08 ST Pit Problem Pindah Front Loading WP 34
399 18 September 1 1 07:00 07:43 0.72 S06 ST Pit Problem Front Preparation WP 12
400 18 September 1 1 13:00 14:05 1.08 S50 ST Dll Others OFF - Driver Vaksin
401 18 September 1 2 19:00 24:00 5.00 S40 ST Rain & Slippery Rain and Slippery WP 12
402 18 September 1 2 01:00 05:00 4.00 S40 ST Rain & Slippery Rain and Slippery WP 12
403 18 September 2 1 07:00 07:29 0.48 S06 ST Pit Problem Front Preparation WP 12
404 18 September 2 1 08:49 08:56 0.12 S14 ST BPP Problem Boulder WP 12
405 18 September 2 1 08:56 08:58 0.03 S08 ST Pit Problem Pindah Front Loading WP 12
406 18 September 2 1 09:36 10:00 0.40 S14 ST BPP Problem Boulder WP 12
407 18 September 2 1 13:00 13:05 0.08 S33 ST Mine support Waiting Unit WP 12
408 18 September 2 1 15:07 15:18 0.18 S14 ST BPP Problem Boulder WP 12
409 18 September 2 1 16:10 16:18 0.13 S14 ST BPP Problem Boulder WP 12
410 18 September 2 2 19:00 24:00 5.00 S40 ST Rain & Slippery Rain and Slippery WP 12
411 18 September 2 2 01:00 05:00 4.00 S40 ST Rain & Slippery Rain and Slippery WP 12
412 18 September 3 1 07:00 07:30 0.50 S33 ST Mine support Waiting Unit WP 34
413 18 September 3 1 13:00 14:00 1.00 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 34
414 18 September 3 1 16:50 17:00 0.17 S11 ST Rain & Slippery Rain (No Production) WP 34
415 18 September 3 2 19:00 19:30 0.50 S40 ST Rain & Slippery Rain and Slippery WP 34
416 18 September 3 2 21:04 21:29 0.42 S50 ST Dll Others Problem bracket pipa boulder patah
417 18 September 3 2 23:50 24:00 0.17 S40 ST Rain & Slippery Rain and Slippery WP 34
418 18 September 3 2 01:00 05:00 4.00 S40 ST Rain & Slippery Rain and Slippery WP 34
419 18 September 4 1 07:00 07:30 0.50 S33 ST Mine support Waiting Unit WP 34
420 18 September 4 1 13:00 14:34 1.57 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 34
DAILY RECORD LOST TIME BPP 04/17/2024

421 18 September 4 1 13:34 14:01 0.45 S03 ST BPP Problem Chute Penuh (Over Capacity) WP 34
422 18 September 4 1 16:45 17:00 0.25 S11 ST Rain & Slippery Rain (No Production) WP 34
423 18 September 4 2 19:00 24:00 5.00 S40 ST Rain & Slippery Rain and Slippery WP 34
424 18 September 4 2 01:00 05:00 4.00 S40 ST Rain & Slippery Rain and Slippery WP 34
425 19 September 1 1 07:00 08:14 1.23 S09 ST Pit Problem Maintenance Road WP 12
426 19 September 1 1 09:39 09:45 0.10 S08 ST Pit Problem Pindah Front Loading WP 12
427 19 September 1 1 13:33 13:45 0.20 S08 ST Pit Problem Pindah Front Loading WP 12
428 19 September 1 1 13:56 14:07 0.18 S06 ST Pit Problem Front Preparation WP 12
429 19 September 1 1 15:01 16:00 0.98 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 12
430 19 September 1 2 19:00 24:00 5.00 S27 ST Mine support OFF Produksi (Kurang DT) WP 12
431 19 September 1 2 01:00 05:00 4.00 S27 ST Mine support OFF Produksi (Kurang DT) WP 12
432 19 September 2 1 07:00 07:25 0.42 S06 ST Pit Problem Front Preparation WP 12
433 19 September 2 1 07:40 07:47 0.12 S14 ST BPP Problem Boulder WP 12
434 19 September 2 1 08:41 08:47 0.10 S14 ST BPP Problem Boulder WP 12
435 19 September 2 1 09:43 09:45 0.03 S08 ST Pit Problem Pindah Front Loading WP 12
436 19 September 2 1 10:10 10:31 0.35 S14 ST BPP Problem Boulder WP 12
437 19 September 2 1 10:38 11:06 0.47 S14 ST BPP Problem Boulder WP 12
438 19 September 2 1 13:00 14:00 1.00 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 12
439 19 September 2 1 14:50 14:58 0.13 S20 ST Pit Problem Hopper Kosong WP 12
440 19 September 2 1 15:36 15:54 0.30 S14 ST BPP Problem Boulder WP 12
441 19 September 2 1 16:50 17:00 0.17 S13 ST O.time Rest Off Early WP 12
442 19 September 2 2 19:00 23:10 4.17 B06 BD BPP Problem Lounder WP 12
443 19 September 2 2 03:00 05:00 2.00 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 12
444 19 September 3 1 07:00 09:00 2.00 S10 ST Rain & Slippery Slippery WP 34
445 19 September 3 1 10:15 11:07 0.87 B08 BD BPP Problem Conveyor Boulder WP 34
446 19 September 3 2 19:00 22:10 3.17 B08 BD BPP Problem Conveyor Boulder WP 34
447 19 September 3 2 01:00 01:14 0.23 S33 ST Mine support Waiting Unit WP 34
448 19 September 3 2 03:00 04:37 1.62 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 34
449 19 September 3 2 04:37 05:00 0.38 S13 ST O.time Rest Off Early WP 34
450 19 September 4 1 07:00 07:40 0.67 S09 ST Pit Problem Maintenance Road WP 34
451 19 September 4 2 19:00 19:20 0.33 S33 ST Mine support Waiting Unit WP 34
452 19 September 4 2 20:18 20:55 0.62 S14 ST BPP Problem Boulder WP 34
453 19 September 4 2 21:24 21:26 0.03 S14 ST BPP Problem Boulder WP 34
454 19 September 4 2 23:10 24:00 0.83 S01 ST BBM Refuel WP 34
455 19 September 4 2 01:00 01:14 0.23 S33 ST Mine support Waiting Unit WP 34
456 19 September 4 2 03:00 04:54 1.90 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 34
457 19 September 4 2 04:54 05:00 0.10 S13 ST O.time Rest Off Early WP 34
458 20 September 1 1 07:00 07:25 0.42 S06 ST Pit Problem Front Preparation WP 12
459 20 September 1 1 08:00 10:00 2.00 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 12
460 20 September 1 1 10:10 10:15 0.08 S08 ST Pit Problem Pindah Front Loading WP 12
461 20 September 1 1 11:09 11:19 0.17 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 12
462 20 September 1 1 11:57 12:00 0.05 S13 ST O.time Rest Off Early WP 12
463 20 September 1 1 14:25 14:35 0.17 S20 ST Pit Problem Hopper Kosong WP 12
464 20 September 1 1 14:44 14:47 0.05 S08 ST Pit Problem Pindah Front Loading WP 12
465 20 September 1 1 15:29 17:00 1.52 S50 ST Dll Others WP 12
466 20 September 1 2 19:00 19:46 0.77 S33 ST Mine support Waiting Unit WP 12
467 20 September 1 2 23:55 24:00 0.08 S13 ST O.time Rest Off Early WP 12
468 20 September 1 2 01:00 01:10 0.17 S33 ST Mine support Waiting Unit WP 12
469 20 September 1 2 01:50 02:00 0.17 S08 ST Pit Problem Pindah Front Loading WP 12
470 20 September 1 2 02:00 05:00 3.00 S30 ST Mine support Produksi Slowly, Kekurangan DT Problem Screen Trommol Primmary
471 20 September 2 1 07:00 07:13 0.22 S33 ST Mine support Waiting Unit WP 12
472 20 September 2 1 08:23 08:31 0.13 S14 ST BPP Problem Boulder WP 12
473 20 September 2 1 09:47 10:04 0.28 S02 ST BPP Problem Chute Penuh (No A2B) WP 12
474 20 September 2 1 10:35 10:49 0.23 S14 ST BPP Problem Boulder WP 12
475 20 September 2 1 11:56 12:00 0.07 S13 ST O.time Rest Off Early WP 12
476 20 September 2 1 13:03 13:08 0.08 S06 ST Pit Problem Front Preparation WP 12
477 20 September 2 1 13:34 13:50 0.27 S14 ST BPP Problem Boulder WP 12
478 20 September 2 1 15:31 15:42 0.18 S14 ST BPP Problem Boulder WP 12
479 20 September 2 1 16:10 16:21 0.18 S14 ST BPP Problem Boulder WP 12
480 20 September 2 1 16:53 17:00 0.12 S13 ST O.time Rest Off Early WP 12
481 20 September 2 2 19:00 19:46 0.77 S06 ST Pit Problem Front Preparation WP 12
482 20 September 2 2 23:45 24:00 0.25 S13 ST O.time Rest Off Early WP 12
483 20 September 3 1 07:00 08:00 1.00 S31 ST BPP Problem Produksi Slowly, Material Lengket/Halus WP 34
484 20 September 3 1 16:55 17:00 0.08 S13 ST O.time Rest Off Early WP 34
485 20 September 3 2 19:00 19:45 0.75 S33 ST Mine support Waiting Unit WP 34
486 20 September 3 2 01:00 01:10 0.17 S33 ST Mine support Waiting Unit WP 34
487 20 September 3 2 03:30 03:42 0.20 S08 ST Pit Problem Pindah Front Loading WP 34
488 20 September 4 1 07:00 08:00 1.00 S31 ST BPP Problem Produksi Slowly, Material Lengket/Halus WP 34
489 20 September 4 1 16:55 17:00 0.08 S13 ST O.time Rest Off Early WP 34
490 20 September 4 2 19:00 19:40 0.67 S33 ST Mine support Waiting Unit WP 34
491 20 September 4 2 01:00 01:10 0.17 S33 ST Mine support Waiting Unit WP 34
492 20 September 4 2 04:45 05:00 0.25 S13 ST O.time Rest Off Early WP 34
493 21 September 1 1 07:00 07:50 0.83 S09 ST Pit Problem Maintenance Road WP 12
494 21 September 1 1 08:32 08:38 0.10 S08 ST Pit Problem Pindah Front Loading WP 12
495 21 September 1 1 10:51 10:57 0.10 S08 ST Pit Problem Pindah Front Loading WP 12
496 21 September 1 1 13:00 13:05 0.08 S33 ST Mine support Waiting Unit WP 12
497 21 September 1 1 14:01 14:10 0.15 B09 BD BPP Problem Mesin Conveyor Boulder WP 12
498 21 September 1 1 15:05 15:13 0.13 S20 ST Pit Problem Hopper Kosong WP 12
499 21 September 1 1 16:04 16:11 0.12 S20 ST Pit Problem Hopper Kosong WP 12
500 21 September 1 2 19:00 24:00 5.00 S27 ST Mine support OFF Produksi (Kurang DT) WP 12
501 21 September 1 2 01:00 05:00 4.00 S27 ST Mine support OFF Produksi (Kurang DT) WP 12
502 21 September 2 1 07:00 07:40 0.67 S09 ST Pit Problem Maintenance Road WP 12
503 21 September 2 1 08:31 08:37 0.10 S08 ST Pit Problem Pindah Front Loading WP 12
504 21 September 2 1 09:16 09:34 0.30 S14 ST BPP Problem Boulder WP 12
505 21 September 2 1 09:13 09:34 0.35 S08 ST Pit Problem Pindah Front Loading WP 12
506 21 September 2 1 09:50 09:59 0.15 B01 BD BPP Problem Mesin Pompa WP WP 12
507 21 September 2 1 10:28 10:38 0.17 S14 ST BPP Problem Boulder WP 12
508 21 September 2 1 10:40 10:50 0.17 S20 ST Pit Problem Hopper Kosong WP 12
509 21 September 2 1 11:06 11:20 0.23 S14 ST BPP Problem Boulder WP 12
510 21 September 2 1 13:00 13:07 0.12 S33 ST Mine support Waiting Unit WP 12
511 21 September 2 1 13:09 13:24 0.25 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 12
512 21 September 2 1 14:41 14:47 0.10 S20 ST Pit Problem Hopper Kosong WP 12
513 21 September 2 1 16:50 17:00 0.17 S13 ST O.time Rest Off Early WP 12
514 21 September 2 2 19:00 19:24 0.40 S33 ST Mine support Waiting Unit WP 12
515 21 September 2 2 19:10 19:24 0.23 S29 ST BPP Problem Produksi Slowly, Tekanan Air Waterspray Lemah WP 12
516 21 September 2 2 23:51 24:00 0.15 S13 ST O.time Rest Off Early WP 12
517 21 September 2 2 01:00 05:00 4.00 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 12
518 21 September 3 1 07:00 07:50 0.83 S09 ST Pit Problem Maintenance Road WP 34
519 21 September 3 1 09:25 09:51 0.43 S50 ST Dll Others WP 34
520 21 September 3 1 13:00 13:05 0.08 S33 ST Mine support Waiting Unit WP 34
521 21 September 3 2 19:00 19:15 0.25 S33 ST Mine support Waiting Unit WP 34
522 21 September 3 2 23:57 24:00 0.05 S13 ST O.time Rest Off Early WP 34
523 21 September 3 2 02:15 02:33 0.30 S13 ST O.time Rest Off Early WP 34
524 21 September 4 1 07:00 07:37 0.62 S06 ST Pit Problem Front Preparation WP 34
525 21 September 4 1 08:01 08:32 0.52 S50 ST Dll Others WP 34
526 21 September 4 1 09:00 10:00 1.00 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 34
527 21 September 4 1 10:05 10:30 0.42 S08 ST Pit Problem Pindah Front Loading WP 34
528 21 September 4 1 13:00 17:00 4.00 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 34
529 21 September 4 2 19:00 19:25 0.42 S13 ST O.time Rest Off Early WP 34
530 21 September 4 2 23:54 24:00 0.10 S13 ST O.time Rest Off Early WP 34
531 22 September 1 1 07:00 07:16 0.27 S33 ST Mine support Waiting Unit WP 12
532 22 September 1 1 09:30 09:32 0.03 S06 ST Pit Problem Front Preparation WP 12
533 22 September 1 1 11:55 12:00 0.08 S13 ST O.time Rest Off Early Produksi Slowly, Problem Front Loading
534 22 September 1 1 13:00 13:09 0.15 S33 ST Mine support Waiting Unit WP 12
535 22 September 1 1 14:31 14:40 0.15 S20 ST Pit Problem Hopper Kosong WP 12
536 22 September 1 2 19:00 24:00 5.00 S27 ST Mine support OFF Produksi (Kurang DT) WP 12
537 22 September 1 2 01:00 05:00 4.00 S27 ST Mine support OFF Produksi (Kurang DT) WP 12
538 22 September 2 1 07:00 12:00 5.00 S27 ST Mine support OFF Produksi (Kurang DT) WP 12
539 22 September 2 1 13:00 17:00 4.00 S33 ST Mine support Waiting Unit WP 12
540 22 September 2 2 23:50 24:00 0.17 S13 ST O.time Rest Off Early WP 12
541 22 September 2 2 01:52 02:02 0.17 S08 ST Pit Problem Pindah Front Loading WP 12
542 22 September 3 1 07:00 07:25 0.42 S33 ST Mine support Waiting Unit WP 34
543 22 September 3 1 07:30 08:06 0.60 S14 ST BPP Problem Boulder WP 34
544 22 September 3 1 09:14 09:15 0.02 S08 ST Pit Problem Pindah Front Loading WP 34
545 22 September 3 1 16:20 16:36 0.27 B11 BD BPP Problem Mesin Conveyor Wash WP 34
546 22 September 3 2 19:00 19:25 0.42 S33 ST Mine support Waiting Unit WP 34
547 22 September 3 2 23:55 24:00 0.08 S13 ST O.time Rest Off Early WP 34
548 22 September 3 2 01:00 01:15 0.25 S33 ST Mine support Waiting Unit WP 34
549 22 September 3 2 04:53 05:00 0.12 S13 ST O.time Rest Off Early WP 34
550 22 September 4 1 07:00 07:20 0.33 S33 ST Mine support Waiting Unit WP 34
551 22 September 4 1 07:58 08:00 0.03 S06 ST Pit Problem Front Preparation WP 34
552 22 September 4 1 08:48 08:53 0.08 S08 ST Pit Problem Pindah Front Loading WP 34
553 22 September 4 1 13:02 13:20 0.30 S08 ST Pit Problem Pindah Front Loading WP 34
554 22 September 4 1 14:17 14:20 0.05 S06 ST Pit Problem Front Preparation WP 34
555 22 September 4 1 16:30 16:40 0.17 S14 ST BPP Problem Boulder WP 34
556 22 September 4 2 19:00 19:20 0.33 S33 ST Mine support Waiting Unit WP 34
557 22 September 4 2 01:00 01:20 0.33 S33 ST Mine support Waiting Unit WP 34
558 22 September 4 2 03:47 03:50 0.05 S08 ST Pit Problem Pindah Front Loading WP 34
559 23 September 1 1 07:00 12:00 5.00 S27 ST Mine support OFF Produksi (Kurang DT) WP 12
560 23 September 1 1 13:00 17:00 4.00 S27 ST Mine support OFF Produksi (Kurang DT) WP 12
561 23 September 1 2 19:00 24:00 5.00 S27 ST Mine support OFF Produksi (Kurang DT) WP 12
562 23 September 1 2 01:00 05:00 4.00 S27 ST Mine support OFF Produksi (Kurang DT) WP 12
563 23 September 2 1 07:00 07:25 0.42 S33 ST Mine support Waiting Unit WP 12
564 23 September 2 1 08:00 10:00 2.00 S29 ST BPP Problem Produksi Slowly, Tekanan Air Waterspray Lemah WP 12
565 23 September 2 1 10:00 11:00 1.00 S31 ST BPP Problem Produksi Slowly, Material Lengket/Halus WP 12
566 23 September 2 1 11:00 11:50 0.83 S31 ST BPP Problem Produksi Slowly, Material Lengket/Halus WP 12
567 23 September 2 1 11:50 12:00 0.17 S13 ST O.time Rest Off Early WP 12
568 23 September 2 1 13:00 13:17 0.28 S08 ST Pit Problem Pindah Front Loading WP 12
569 23 September 2 1 16:40 17:00 0.33 S40 ST Rain & Slippery Rain and Slippery WP 12
570 23 September 2 2 23:50 24:00 0.17 S13 ST O.time Rest Off Early WP 12
571 23 September 2 2 01:00 04:55 3.92 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 12
572 23 September 2 2 04:55 05:00 0.08 S13 ST O.time Rest Off Early WP 12
573 23 September 3 1 07:00 07:20 0.33 S33 ST Mine support Waiting Unit WP 34
574 23 September 3 1 13:10 13:33 0.38 S22 ST Project Problem Reservoar WP 34
575 23 September 3 1 13:50 14:00 0.17 S08 ST Pit Problem Pindah Front Loading WP 34
576 23 September 3 1 14:00 14:10 0.17 S14 ST BPP Problem Boulder WP 34
577 23 September 3 1 16:30 17:00 0.50 S40 ST Rain & Slippery Rain and Slippery WP 34
578 23 September 3 2 19:00 19:20 0.33 S33 ST Mine support Waiting Unit WP 34
579 23 September 3 2 20:40 21:06 0.43 S14 ST BPP Problem Boulder WP 34
580 23 September 3 2 04:50 05:00 0.17 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 34
581 23 September 4 1 07:00 07:05 0.08 S33 ST Mine support Waiting Unit WP 34
582 23 September 4 1 13:05 13:25 0.33 S22 ST Project Problem Reservoar WP 34
583 23 September 4 1 14:30 14:35 0.08 S08 ST Pit Problem Pindah Front Loading WP 34
584 23 September 4 2 19:00 19:25 0.42 S33 ST Mine support Waiting Unit WP 34
585 23 September 4 2 19:51 20:37 0.77 S37 ST Pit Problem Broken Mineroad/Front loadingan WP 34
586 23 September 4 2 23:26 24:00 0.57 S14 ST BPP Problem Boulder WP 34
587 23 September 4 2 04:55 05:00 0.08 S13 ST O.time Rest Off Early WP 34
588 24 September 1 1 07:00 07:25 0.42 S33 ST Mine support Waiting Unit WP 12
589 24 September 1 1 09:45 09:50 0.08 S06 ST Pit Problem Front Preparation WP 12
590 24 September 1 1 11:05 12:00 0.92 S50 ST Dll Others WP 12
591 24 September 1 1 13:00 13:24 0.40 S33 ST Mine support Waiting Unit WP 12
592 24 September 1 1 16:52 17:00 0.13 S13 ST O.time Rest Off Early WP 12
593 24 September 1 2 19:00 24:00 5.00 S27 ST Mine support OFF Produksi (Kurang DT) WP 12
594 24 September 1 2 01:00 05:00 4.00 S27 ST Mine support OFF Produksi (Kurang DT) WP 12
595 24 September 2 1 07:00 07:30 0.50 S33 ST Mine support Waiting Unit WP 12
596 24 September 2 1 07:25 08:00 0.58 S29 ST BPP Problem Produksi Slowly, Tekanan Air Waterspray Lemah WP 12
597 24 September 2 1 09:00 10:00 1.00 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 12
598 24 September 2 1 11:00 12:00 1.00 S06 ST Pit Problem Front Preparation WP 12
599 24 September 2 1 13:00 13:05 0.08 S33 ST Mine support Waiting Unit WP 12
600 24 September 2 1 14:51 15:01 0.17 S08 ST Pit Problem Pindah Front Loading WP 12
601 24 September 2 1 16:50 17:00 0.17 S13 ST O.time Rest Off Early WP 12
602 24 September 2 2 19:00 19:18 0.30 S09 ST Pit Problem Maintenance Road WP 12
603 24 September 2 2 01:00 05:00 4.00 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 12
604 24 September 3 1 07:00 12:00 5.00 S50 ST Dll Others WP 34
605 24 September 3 1 13:00 17:00 4.00 S50 ST Dll Others WP 34
606 24 September 3 2 19:00 19:05 0.08 S33 ST Mine support Waiting Unit WP 34
607 24 September 3 2 20:30 20:41 0.18 S14 ST BPP Problem Boulder WP 34
608 24 September 3 2 19:45 20:30 0.75 S06 ST Pit Problem Front Preparation WP 34
609 24 September 3 2 01:00 05:00 4.00 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 34
610 24 September 4 1 07:00 07:50 0.83 S33 ST Mine support Waiting Unit WP 34
611 24 September 4 1 10:57 12:00 1.05 S50 ST Dll Others Off - Prepare Sholat Jumat
612 24 September 4 1 15:42 16:10 0.47 S14 ST BPP Problem Boulder WP 34
613 24 September 4 1 16:50 17:00 0.17 S13 ST O.time Rest Off Early WP 34
614 24 September 4 2 19:00 19:25 0.42 S33 ST Mine support Waiting Unit WP 34
615 24 September 4 2 20:46 21:00 0.23 S14 ST BPP Problem Boulder WP 34
616 24 September 4 2 01:00 02:00 1.00 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 34
617 24 September 4 2 03:00 05:00 2.00 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 34
618 25 September 1 2 07:00 07:10 0.17 S33 ST Mine support Waiting Unit WP 12
619 25 September 1 2 09:00 11:52 2.87 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 12
620 25 September 1 2 11:52 12:00 0.13 B06 BD BPP Problem Lounder WP 12
621 25 September 1 2 13:08 13:24 0.27 B06 BD BPP Problem Lounder WP 12
622 25 September 1 2 16:28 17:00 0.53 S11 ST Rain & Slippery Rain (No Production) WP 12
623 25 September 1 2 19:00 24:00 5.00 S40 ST Rain & Slippery Rain and Slippery WP 12
624 25 September 1 2 01:00 05:00 4.00 S40 ST Rain & Slippery Rain and Slippery WP 12
625 25 September 2 1 07:00 12:00 5.00 S27 ST Mine support OFF Produksi (Kurang DT) Off - Maintenanace BPP
626 25 September 2 1 13:00 17:00 4.00 S27 ST Mine support OFF Produksi (Kurang DT) Off - Maintenanace BPP
627 25 September 2 2 19:00 20:08 1.13 S11 ST Rain & Slippery Rain (No Production) WP 12
628 25 September 2 2 04:40 05:00 0.33 S10 ST Rain & Slippery Slippery WP 12
629 25 September 3 1 07:00 07:20 0.33 S33 ST Mine support Waiting Unit WP 34
630 25 September 3 1 10:11 10:37 0.43 B11 BD BPP Problem Mesin Conveyor Wash WP 34
631 25 September 3 1 10:51 10:56 0.08 S06 ST Pit Problem Front Preparation WP 34
632 25 September 3 1 12:55 13:00 0.08 S06 ST Pit Problem Front Preparation WP 34
633 25 September 3 2 19:00 24:00 5.00 S40 ST Rain & Slippery Rain and Slippery WP 34
634 25 September 3 2 01:00 05:00 4.00 S40 ST Rain & Slippery Rain and Slippery WP 34
635 25 September 4 1 07:00 07:35 0.58 S09 ST Pit Problem Maintenance Road WP 34
636 25 September 4 1 16:50 17:00 0.17 S13 ST O.time Rest Off Early WP 34
637 25 September 4 2 19:00 23:23 4.38 S11 ST Rain & Slippery Rain (No Production) WP 34
638 25 September 4 2 23:23 23:26 0.05 S12 ST BPP Problem Rewash (No Production) WP 34
639 25 September 4 2 23:53 24:00 0.12 S22 ST Project Problem Reservoar WP 34
640 26 September 4 2 01:00 05:00 4.00 S22 ST Project Problem Reservoar WP 34
641 26 September 1 1 07:00 12:00 5.00 S27 ST Mine support OFF Produksi (Kurang DT) WP 12
642 26 September 1 1 13:00 17:00 4.00 S27 ST Mine support OFF Produksi (Kurang DT) WP 12
643 26 September 1 2 19:00 24:00 5.00 S27 ST Mine support OFF Produksi (Kurang DT) WP 12
644 26 September 1 2 01:00 05:00 4.00 S27 ST Mine support OFF Produksi (Kurang DT) WP 12
645 26 September 2 1 07:00 07:30 0.50 S08 ST Pit Problem Pindah Front Loading WP 12
646 26 September 2 1 08:40 08:48 0.13 S08 ST Pit Problem Pindah Front Loading WP 12
647 26 September 2 1 15:37 16:00 0.38 S14 ST BPP Problem Boulder WP 12
648 26 September 2 2 19:00 19:09 0.15 S06 ST Pit Problem Front Preparation WP 12
649 26 September 2 2 01:00 05:00 4.00 S40 ST Rain & Slippery Rain and Slippery WP 12
650 26 September 3 1 07:00 08:05 1.08 S09 ST Pit Problem Maintenance Road WP 34
651 26 September 3 1 16:50 17:00 0.17 S13 ST O.time Rest Off Early WP 34
652 26 September 3 2 19:00 19:15 0.25 S33 ST Mine support Waiting Unit WP 34
653 26 September 3 2 20:34 23:37 3.05 S08 ST Pit Problem Pindah Front Loading WP 34
654 26 September 3 2 20:58 21:00 0.03 S08 ST Pit Problem Pindah Front Loading WP 34
655 26 September 3 2 01:00 01:18 0.30 S11 ST Rain & Slippery Rain (No Production) WP 34
656 26 September 3 2 04:56 05:00 0.07 S13 ST O.time Rest Off Early WP 34
657 26 September 4 1 07:00 07:35 0.58 S09 ST Pit Problem Maintenance Road WP 34
658 26 September 4 1 08:13 08:59 0.77 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 34
659 26 September 4 1 10:09 10:30 0.35 S14 ST BPP Problem Boulder WP 34
660 26 September 4 1 10:31 10:51 0.33 S14 ST BPP Problem Boulder WP 34
661 26 September 4 1 09:00 12:00 3.00 S31 ST BPP Problem Produksi Slowly, Material Lengket/Halus WP 34
662 26 September 4 1 13:00 16:50 3.83 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 34
663 26 September 4 1 16:50 17:00 0.17 S13 ST O.time Rest Off Early WP 34
664 26 September 4 2 19:00 19:10 0.17 S33 ST Mine support Waiting Unit WP 34
665 26 September 4 2 19:24 19:28 0.07 S14 ST BPP Problem Boulder WP 34
666 26 September 4 2 20:37 21:00 0.38 S08 ST Pit Problem Pindah Front Loading WP 34
667 26 September 4 2 23:01 23:56 0.92 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 34
668 26 September 4 2 01:00 05:00 4.00 S40 ST Rain & Slippery Rain and Slippery WP 34
669 27 September 1 2 07:00 07:25 0.42 S10 ST Rain & Slippery Slippery WP 12
670 27 September 1 2 07:45 07:50 0.08 S08 ST Pit Problem Pindah Front Loading WP 12
671 27 September 1 2 19:00 19:50 0.83 S11 ST Rain & Slippery Rain (No Production) WP 12
672 27 September 1 2 01:00 05:00 4.00 B07 BD Pit Problem Salary Pump WP 12
673 27 September 2 1 07:00 12:00 5.00 S27 ST Mine support OFF Produksi (Kurang DT) WP 12
674 27 September 2 1 13:00 17:00 4.00 S27 ST Mine support OFF Produksi (Kurang DT) WP 12
675 27 September 2 2 19:00 24:00 5.00 S40 ST Rain & Slippery Rain and Slippery WP 12
676 27 September 2 2 01:00 04:45 3.75 S40 ST Rain & Slippery Rain and Slippery WP 12
677 27 September 2 2 04:45 05:00 0.25 S10 ST Rain & Slippery Slippery WP 12
678 27 September 3 1 07:00 07:45 0.75 S09 ST Pit Problem Maintenance Road WP 34
679 27 September 3 1 09:40 09:43 0.05 S31 ST BPP Problem Produksi Slowly, Material Lengket/Halus WP 34
680 27 September 3 1 16:55 17:00 0.08 S27 ST Mine support OFF Produksi (Kurang DT) WP 34
681 27 September 3 2 19:00 24:00 5.00 S40 ST Rain & Slippery Rain and Slippery WP 34
682 27 September 3 2 01:00 05:00 4.00 S40 ST Rain & Slippery Rain and Slippery WP 34
683 27 September 4 1 07:00 07:40 0.67 S09 ST Pit Problem Maintenance Road WP 34
684 27 September 4 1 07:40 08:00 0.33 B09 BD BPP Problem Mesin Conveyor Boulder WP 34
685 27 September 4 1 08:33 08:56 0.38 S14 ST BPP Problem Boulder WP 34
686 27 September 4 1 10:24 10:27 0.05 S08 ST Pit Problem Pindah Front Loading WP 34
687 27 September 4 1 10:24 10:44 0.33 S09 ST Pit Problem Maintenance Road WP 34
688 27 September 4 1 11:56 12:00 0.07 S13 ST O.time Rest Off Early WP 34
689 27 September 4 1 07:40 12:00 4.33 S31 ST BPP Problem Produksi Slowly, Material Lengket/Halus WP 34
690 27 September 4 1 14:29 14:45 0.27 S14 ST BPP Problem Boulder WP 34
691 27 September 4 1 15:22 15:45 0.38 S14 ST BPP Problem Boulder WP 34
692 27 September 4 1 13:00 16:45 3.75 S31 ST BPP Problem Produksi Slowly, Material Lengket/Halus WP 34
693 27 September 4 1 16:45 17:00 0.25 S13 ST O.time Rest Off Early WP 34
694 27 September 4 2 19:00 24:00 5.00 S40 ST Rain & Slippery Rain and Slippery WP 34
695 27 September 4 2 01:00 05:00 4.00 S40 ST Rain & Slippery Rain and Slippery WP 34
696 28 September 1 1 07:00 07:50 0.83 S09 ST Pit Problem Maintenance Road WP 12
697 28 September 1 1 16:48 17:00 0.20 S40 ST Rain & Slippery Rain and Slippery WP 12
698 28 September 1 2 19:00 19:29 0.48 S09 ST Pit Problem Maintenance Road WP 12
699 28 September 1 2 20:49 20:51 0.03 S11 ST Rain & Slippery Rain (No Production) WP 12
700 28 September 1 2 22:55 23:00 0.08 S15 ST Pit Problem OFF, Out Of Stock Intermediate WP 12
701 28 September 2 1 07:00 07:37 0.62 S09 ST Pit Problem Maintenance Road WP 12
702 28 September 2 1 16:45 17:00 0.25 S11 ST Rain & Slippery Rain (No Production) WP 12
703 28 September 2 2 19:00 05:00 10.00 S11 ST Rain & Slippery Rain (No Production) WP 12
704 28 September 3 1 07:00 07:35 0.58 S09 ST Pit Problem Maintenance Road WP 34
705 28 September 3 1 08:15 08:18 0.05 S08 ST Pit Problem Pindah Front Loading WP 34
706 28 September 3 1 08:18 09:30 1.20 S14 ST BPP Problem Boulder WP 34
707 28 September 3 1 16:45 17:00 0.25 S11 ST Rain & Slippery Rain (No Production) WP 34
708 28 September 3 2 19:00 19:45 0.75 S09 ST Pit Problem Maintenance Road WP 34
709 28 September 3 2 20:00 00:00 4.00 S30 ST Mine support Produksi Slowly, Kekurangan DT WP 34
710 28 September 3 2 01:00 05:00 4.00 S31 ST BPP Problem Produksi Slowly, Material Lengket/Halus WP 34
711 28 September 4 1 07:00 12:00 5.00 B08 BD BPP Problem Conveyor Boulder WP 34
712 28 September 4 1 13:00 17:00 4.00 B08 BD BPP Problem Conveyor Boulder WP 34
713 28 September 4 2 19:00 24:00 5.00 S11 ST Rain & Slippery Rain (No Production) WP 34
714 28 September 4 2 01:00 05:00 4.00 S11 ST Rain & Slippery Rain (No Production) WP 34
715 29 September 1 1 07:00 08:18 1.30 S09 ST Pit Problem Maintenance Road WP 12
716 29 September 1 1 08:18 09:00 0.70 S27 ST Mine support OFF Produksi (Kurang DT) WP 12
717 29 September 1 1 09:51 10:19 0.47 B09 BD BPP Problem Mesin Conveyor Boulder WP 12
718 29 September 1 1 13:00 13:05 0.08 S06 ST Pit Problem Front Preparation WP 12
719 29 September 1 1 16:47 17:00 0.22 S27 ST Mine support OFF Produksi (Kurang DT) WP 12
720 29 September 1 2 19:00 24:00 5.00 S11 ST Rain & Slippery Rain (No Production) WP 12
721 29 September 1 2 01:00 05:00 4.00 S11 ST Rain & Slippery Rain (No Production) WP 12
722 28 September 2 1 07:00 12:00 5.00 S27 ST Mine support OFF Produksi (Kurang DT) WP 12
723 29 September 2 1 13:00 17:00 4.00 S27 ST Mine support OFF Produksi (Kurang DT) WP 12
724 29 September 2 2 19:00 24:00 5.00 S11 ST Rain & Slippery Rain (No Production) WP 12
725 29 September 2 2 01:00 05:00 4.00 S11 ST Rain & Slippery Rain (No Production) WP 12
726 29 September 3 1 07:00 07:55 0.92 S09 ST Pit Problem Maintenance Road WP 34
727 29 September 3 1 16:22 16:40 0.30 S32 ST Rain & Slippery Produksi Slowly, Hujan WP 34
728 29 September 3 1 16:45 17:00 0.25 S13 ST O.time Rest Off Early WP 34
729 29 September 3 2 19:00 24:00 5.00 S11 ST Rain & Slippery Rain (No Production) WP 34
730 29 September 3 2 01:00 05:00 4.00 S11 ST Rain & Slippery Rain (No Production) WP 34
731 29 September 4 1 07:00 12:00 5.00 S50 ST Dll Others WP 34
732 29 September 4 1 14:45 15:57 1.20 B08 BD BPP Problem Conveyor Boulder WP 34
733 29 September 4 1 16:22 16:40 0.30 S32 ST Rain & Slippery Produksi Slowly, Hujan Off - Maintenanace BPP
734 29 September 4 1 16:45 17:00 0.25 S13 ST O.time Rest Off Early WP 34
735 29 September 4 2 19:00 19:38 0.63 S40 ST Rain & Slippery Rain and Slippery WP 34
736 29 September 4 2 01:00 01:20 0.33 S50 ST Dll Others WP 34
737 29 September 4 2 04:40 05:00 0.33 S15 ST Pit Problem OFF, Out Of Stock Intermediate WP 34
738 30 September 1 1 07:00 12:00 5.00 S27 ST Mine support OFF Produksi (Kurang DT) WP 12
739 30 September 1 1 13:00 14:27 1.45 S27 ST Mine support OFF Produksi (Kurang DT) WP 12
740 30 September 1 1 14:28 14:42 0.23 S14 ST BPP Problem Boulder DT Wait Fuel
741 30 September 1 1 14:50 15:00 0.17 S40 ST Rain & Slippery Rain and Slippery WP 12
742 30 September 1 1 15:00 17:00 2.00 S27 ST Mine support OFF Produksi (Kurang DT) WP 12
743 30 September 1 2 19:00 24:00 5.00 S40 ST Rain & Slippery Rain and Slippery WP 12
744 30 September 1 2 01:00 05:00 4.00 S40 ST Rain & Slippery Rain and Slippery WP 12
745 30 September 2 1 07:00 08:00 1.00 S09 ST Pit Problem Maintenance Road WP 12
746 30 September 2 1 08:31 08:36 0.08 S14 ST BPP Problem Boulder WP 12
747 30 September 2 1 10:30 10:36 0.10 S08 ST Pit Problem Pindah Front Loading WP 12
748 30 September 2 1 14:15 15:30 1.25 S50 ST Dll Others WP 12
749 30 September 2 2 19:00 19:13 0.22 S10 ST Rain & Slippery Slippery WP 12
750 30 September 2 2 23:50 24:00 0.17 S40 ST Rain & Slippery Rain and Slippery WP 12
751 30 September 2 2 01:00 05:00 4.00 S40 ST Rain & Slippery Rain and Slippery Off - Maintenanace BPP
752 30 September 3 1 07:00 08:35 1.58 S09 ST Pit Problem Maintenance Road WP 34
753 30 September 3 1 08:35 09:16 0.68 B05 BD BPP Problem Mesin Tromol Primary WP 34
754 30 September 3 1 16:30 17:00 0.50 S40 ST Rain & Slippery Rain and Slippery WP 34
755 30 September 3 2 19:00 24:00 5.00 S40 ST Rain & Slippery Rain and Slippery WP 34
756 30 September 3 2 01:00 05:00 4.00 S40 ST Rain & Slippery Rain and Slippery Problem Engine Reservoir
757 30 September 4 1 07:00 08:30 1.50 S09 ST Pit Problem Maintenance Road WP 34
758 30 September 4 1 09:03 09:27 0.40 S14 ST BPP Problem Boulder WP 34
759 30 September 4 1 11:56 12:00 0.07 S13 ST O.time Rest Off Early WP 34
760 30 September 4 1 16:30 17:00 0.50 S40 ST Rain & Slippery Rain and Slippery WP 34
761 30 September 4 2 19:00 24:00 5.00 S40 ST Rain & Slippery Rain and Slippery WP 34
762 30 September 4 2 01:00 05:00 4.00 S40 ST Rain & Slippery Rain and Slippery WP 34

Problem Selang Monitor, Produksi Pindah Ke BPP 01


DAILY RECORD LOST TIME BPP 04/17/2024
DAILY RECORD LOST TIME BPP 04/17/2024
DAILY RECORD LOST TIME BPP 04/17/2024
DAILY RECORD LOST TIME BPP 04/17/2024
DAILY RECORD LOST TIME BPP 04/17/2024
DAILY RECORD LOST TIME BPP 04/17/2024
DAILY RECORD LOST TIME BPP 04/17/2024
DAILY RECORD LOST TIME BPP 04/17/2024
DAILY RECORD LOST TIME BPP 04/17/2024
DAILY RECORD LOST TIME BPP 04/17/2024
DAILY RECORD LOST TIME BPP 04/17/2024
DAILY RECORD LOST TIME BPP 04/17/2024
DAILY RECORD LOST TIME BPP 04/17/2024
DAILY RECORD LOST TIME BPP 04/17/2024
DAILY RECORD LOST TIME BPP 04/17/2024
DAILY RECORD LOST TIME BPP 04/17/2024
DAILY RECORD LOST TIME BPP 04/17/2024
DAILY RECORD LOST TIME BPP 04/17/2024
DAILY RECORD LOST TIME BPP 04/17/2024
DAILY RECORD LOST TIME BPP 04/17/2024

1 1 1 1 24:00 24:00 1 1 1 1 1 1
TOTAL LOST TIME 1346.73 JAM JAM
RECORD AVAILABILITY BPP
BULAN AGUSTUS 2021

BPP 4 WEEK1 WEEK2 WEEK3


START DATE ===> 01 September Rabu, 01 Jumat, 03 Sabtu, 04 Jumat, 10 Sabtu, 11 Jumat, 17
01/19/2021

DATE PA EU

01 September 18.00 0.00 0.00 18.00 0% 100% 0% 0%


02 September 18.00 0.00 0.00 18.00 0% 100% 0% 0%
03 September 18.00 0.00 0.00 18.00 0% 100% 0% 0%
04 September 18.00 0.00 0.00 18.00 0% 100% 0% 0%
05 September 18.00 0.00 0.00 18.00 0% 100% 0% 0%
06 September 18.00 0.00 0.00 18.00 0% 100% 0% 0%
07 September 18.00 0.00 0.00 18.00 0% 100% 0% 0%
08 September 18.00 11.92 0.00 6.08 100% 100% 66% 66%
09 September 18.00 14.00 1.03 2.97 93% 94% 83% 78%
10 September 18.00 11.98 0.00 6.02 100% 100% 67% 67%
11 September 18.00 10.17 0.00 7.83 100% 100% 56% 56%
12 September 18.00 3.52 0.18 14.30 95% 99% 20% 20%
13 September 18.00 4.77 0.00 13.23 100% 100% 26% 26%
14 September 18.00 4.85 0.55 12.60 90% 97% 28% 27%
15 September 18.00 13.03 0.22 4.75 98% 99% 73% 72%
16 September 18.00 15.00 0.00 3.00 100% 100% 83% 83%
17 September 18.00 13.32 0.00 4.68 100% 100% 74% 74%
18 September 18.00 6.23 0.00 11.77 100% 100% 35% 35%
19 September 18.00 13.28 0.00 4.72 100% 100% 74% 74%
20 September 18.00 15.83 0.00 2.17 100% 100% 88% 88%
21 September 18.00 10.93 0.00 7.07 100% 100% 61% 61%
22 September 18.00 16.32 0.00 1.68 100% 100% 91% 91%
23 September 18.00 15.67 0.00 2.33 100% 100% 87% 87%
24 September 18.00 11.83 0.00 6.17 100% 100% 66% 66%
25 September 18.00 12.70 0.00 5.30 100% 100% 71% 71%
26 September 18.00 -0.57 0.00 18.57 100% 100% -3% -3%
27 September 18.00 -1.82 0.33 19.48 122% 98% -10% -10%
28 September 18.00 0.00 9.00 9.00 0% 50% 0% 0%
29 September 18.00 9.95 1.20 6.85 89% 93% 59% 55%
30 September 18.00 6.53 0.00 11.47 100% 100% 36% 36%

73% 98% 41% 41%


Target PA BPP adalah 15.3 Jam( 85%) dari total 18 jam kerja tersedia
Target UA adalah 13 Jam (85%) dari total jam BPP dalam kondisi baik (dari total nilai PA target)
Efektif Kerja (UA) yaitu Jumlah waktu yang benar-benar digunakan untuk produksi, setelah dikurangi dengan kendala-kendala BPP
LOSSTIME PRODUCTION (HOUR) September 2021
Rain & Slippery BPP 1 - 2 BPP 3 - 4 BPP 1 - 2 BPP 3 - 4
0 20 40 60 80 100 120 140 160 180

Produksi Slowly, Hujan 1.22 1.27


Rain (No Production) 50.45 69.05
Rain and Slippery 71.62 82.80
Slippery 8.27 4.17
Pit Problem BPP 1 - 2 BPP 3 - 4 0 20
BPP 1 - 2
40 60
BPP 3 - 4
80 100 120

Broken Mineroad/Front loadingan 11.53 5.77


Front Preparation 6.82 3.82
Hopper Kosong 0.97
Maintenance Road 37.08 58.27
OFF, Out Of Stock Intermediate 0.08 0.33
Pindah Front Loading 5.57 7.23
Salary Pump 4.93
BPP Problem BPP 1 - 2 BPP 3 - 4 BPP 1 - 2 BPP 3 - 4
0 5 10 15 20 25
Boulder 8.67 10.40
Conveyor Boulder 0.58 16.10
Lounder 4.57
Mesin Conveyor Boulder 0.62 2.37
Mesin Conveyor Wash 5.70
Mesin Tromol Primary 0.90 3.65
Produksi Slowly, Material Lengket/Halus 4.83 18.13
Rewash (No Production) 1.48 4.18
PT. JUS BPP 1 - 2 BPP 3 - 4 BPP 1-2 BPP 3-4
0 100 200 300 400 500 600

Internal Problem 252.00 252.00


Project BPP 1 - 2 BPP 3 - 4 BPP 1 - 2 BPP 3 - 4
0 2 4 6 8 10 12 14 16 18 20

Kolam Tailing Jebol 18.00


Problem Reservoar 4.83

Mine support BPP 1 - 2 BPP 3 - 4 0 20


BPP 1 - 2
40 60
BPP 3 - 4
80 100 120

OFF Produksi (Kurang DT) 113.37 0.08


Produksi Slowly, Kekurangan DT 61.12 33.10
Waiting Unit 11.55 15.47
O.time Rest BPP 1 - 2 BPP 3 - 4 BPP 1-2 BPP 3-4
0 2 4 6 8 10 12 14

Off Early 4.75 8.32

BBM BPP 1 - 2 BPP 3 - 4 BPP 1-2 BPP 3-4


0 1 2 3

Refuel 1.02 1.67


MPE BPP 1 - 2 BPP 3 - 4 BPP 1-2 BPP 3-4
0 1 2 3 4

Standby (Plan Roster) 1.00 2.15


DLL BPP 1 - 2 BPP 3 - 4 BPP 1-2 BPP 3-4
0 5 10 15 20 25 30 35

Others 11.20 18.28


Top 5 Record Pareto Loss WP 1 (04-10 Septem
Waktu Kendala
) Loss Material (Ton)
[0]:00:31

[21]:36:30

[19]:12:30

[16]:48:30

[14]:24:30

[12]:00:30

[9]:36:30

[7]:12:30

[4]:48:30

[2]:24:30
0 0 0 0 0 0
[0]:00:30 [0]:00:30 [0]:00:30 [0]:00:30 [0]:00:30 [0]:00:30 [0]:00:30 [

BPP 5
04 September 10 September WEEK 2

KENDALA WAKTU

Internal Problem 0.00 [0]:00:30


OFF Produksi (Kurang DT) 0.00 [0]:00:30
Boulder 0.00 [0]:00:30
Produksi Slowly, Kekurangan DT 0.00 [0]:00:30
Maintenance Road 0.00 [0]:00:30
Kolam Tailing Jebol 0.00 [0]:00:30
Rain (No Production) 0.00 [0]:00:30
Slippery 0.00 [0]:00:30
Others 0.00 [0]:00:30
Waiting Unit 0.00 [0]:00:30
Salary Pump 0.00 [0]:00:30
Front Preparation 0.00 [0]:00:30
Produksi Slowly, Material Lengket/Halus 0.00 [0]:00:30
Mesin Pompa WP 0.00 [0]:00:30
Pindah Front Loading 0.00 [0]:00:30
Off Early 0.00 [0]:00:30
Produksi Slowly, Hujan 0.00 [0]:00:30
Standby (Plan Roster) 0.00 [0]:00:30
Conveyor Boulder 0.00 [0]:00:30
Hopper Kosong 0.00 [0]:00:30
Mesin Tromol Primary 0.00 [0]:00:30
Refuel 0.00 [0]:00:30
Lounder 0.00 [0]:00:30
Chute Penuh (No A2B) 0.00 [0]:00:30
Mesin Conveyor Boulder 0.00 [0]:00:30
Broken Mineroad 0.00 [0]:00:30
Air Reservoir Keruh 0.00 [0]:00:30
Chute Penuh (Over Capacity) 0.00 [0]:00:30
Conveyor Ore Wash 0.00 [0]:00:30
Gearbox Tromol Baby 0.00 [0]:00:30
Gearbox Tromol Primary 0.00 [0]:00:30
Hopper Penuh (Material Lengket) 0.00 [0]:00:30
Hopper Penuh (Over Capacity) 0.00 [0]:00:30
Level Air Reservoir Kurang 0.00 [0]:00:30
Masalah Sosial 0.00 [0]:00:30
Mesin Conveyor Wash 0.00 [0]:00:30
Mesin Tromol Baby 0.00 [0]:00:30
No Operator Exca 0.00 [0]:00:30
No/Kurang Exca LA di Kanal 0.00 [0]:00:30
OFF Produksi (Manpower WP kurang) 0.00 [0]:00:30
OFF, Libur Hari Kemerdekaan 0.00 [0]:00:30
OFF, Out Of Stock Intermediate 0.00 [0]:00:30
OFF, Out Of Stock Shaft Ready 0.00 [0]:00:30
OFF, Pergantian Tromol Primary 0.00 [0]:00:30
Pergantian Exca Loading 0.00 [0]:00:30
Perrsiapan WP (P5m dll) 0.00 [0]:00:30
Produksi Slowly, Tekanan Air Waterspray Lemah 0.00 [0]:00:30
Rewash (No Production) 0.00 [0]:00:30
Tanggul Kolam Tailing Jebol 0.00 [0]:00:30
Monthly Record Kinerja
WP 1 (04-10 September 2021) (04-10 September 202
) Loss Material (Ton)
1

0 0 0 0 0
0:30 [0]:00:30 [0]:00:30 [0]:00:30 [0]:00:30 0 WORKING TIME; 54.00;
100%

WORKING TIME BREAKDOWN TIME STA

MONTHLY
01 September 30 September

LOST MATERIAL
KENDALA WAKTU
(TON)

1 Internal Problem 0.00


OFF Produksi (Kurang DT) 0.00
Boulder 0.00
2 Produksi Slowly, Kekurangan DT 0.00
4 Maintenance Road 0.00
3 Kolam Tailing Jebol 0.00
Rain (No Production) 0.00
Slippery 0.00
Others 0.00
Waiting Unit 0.00
Salary Pump 0.00
Front Preparation 0.00
5 Produksi Slowly, Material Lengket/Halus 0.00
Mesin Pompa WP 0.00
Pindah Front Loading 0.00
Off Early 0.00
Produksi Slowly, Hujan 0.00
Standby (Plan Roster) 0.00
Conveyor Boulder 0.00
Hopper Kosong 0.00
Mesin Tromol Primary 0.00
Refuel 0.00
Lounder 0.00
Chute Penuh (No A2B) 0.00
Mesin Conveyor Boulder 0.00
Broken Mineroad 0.00
Air Reservoir Keruh 0.00
Chute Penuh (Over Capacity) 0.00
Conveyor Ore Wash 0.00
Gearbox Tromol Baby 0.00
Gearbox Tromol Primary 0.00
Hopper Penuh (Material Lengket) 0.00
Hopper Penuh (Over Capacity) 0.00
Level Air Reservoir Kurang 0.00
Masalah Sosial 0.00
Mesin Conveyor Wash 0.00
Mesin Tromol Baby 0.00
No Operator Exca 0.00
No/Kurang Exca LA di Kanal 0.00
OFF Produksi (Manpower WP kurang) 0.00
OFF, Libur Hari Kemerdekaan 0.00
OFF, Out Of Stock Intermediate 0.00
OFF, Out Of Stock Shaft Ready 0.00
OFF, Pergantian Tromol Primary 0.00
Pergantian Exca Loading 0.00
Perrsiapan WP (P5m dll) 0.00
Produksi Slowly, Tekanan Air Waterspray Lemah 0.00
Rewash (No Production) 0.00
Tanggul Kolam Tailing Jebol 0.00
TIME WORKING TIME BREAKDOWN TIME STANDBY TIME
Monthly Record Kinerja WP 1
(04-10 September 2021)
54.00 54.00 0.00 0.00

54.00 54.00 0.00 0.00


126.00 126.00 0.00 0.00
126.00 126.00 0.00 0.00
126.00 126.00 0.00 0.00
108.00 108.00 0.00 0.00

TOTAL 540.00 0.00 0.00

PRARETTO LOSS BPP 1


WEEK 1 12,150 0 0
WEEK 2 28,350 0 0
WEEK 3 28,350 0 0
WORKING TIME; 54.00;
100% WEEK 4 28,350 0 0
WEEK 5 24,300 0 0
WORKING TIME BREAKDOWN TIME STANDBY TIME
TOTAL 121,500 0 0
LY
30 September PRODUCTIVITY WP 225 WBX/HR
WEEK 1 WEEK 2 WEEK 3
LOST MATERIAL
WAKTU
(TON) Jumat, 03 Sabtu, 04 Jumat, 10 Sabtu, 11

[0]:00:30 504.0
[0]:00:30 113.5
[0]:00:30 19.1
[0]:00:30 94.2
[0]:00:30 95.3
[0]:00:30 18.0
[0]:00:30 119.5
[0]:00:30 12.4
[0]:00:30 29.5
[0]:00:30 27.0
[0]:00:30 4.9
[0]:00:30 10.6
[0]:00:30 23.0
[0]:00:30 5.7
[0]:00:30 12.8
[0]:00:30 13.1
[0]:00:30 2.5
[0]:00:30 3.2
[0]:00:30 16.7
[0]:00:30 1.0
[0]:00:30 4.6
[0]:00:30 2.7
[0]:00:30 4.6
[0]:00:30 0.9
[0]:00:30 3.0
[0]:00:30 0.0
[0]:00:30 0.0
[0]:00:30 0.5
[0]:00:30 9.0
[0]:00:30 1.1
[0]:00:30 0.4
[0]:00:30 0.0
[0]:00:30 2.6
[0]:00:30 0.0
[0]:00:30 0.0
[0]:00:30 5.7
[0]:00:30 0.3
[0]:00:30 0.0
[0]:00:30 0.0
[0]:00:30 0.0
[0]:00:30 0.0
[0]:00:30 0.4
[0]:00:30 0.0
[0]:00:30 0.0
[0]:00:30 0.0
[0]:00:30 0.0
[0]:00:30 2.8
[0]:00:30 5.7
[0]:00:30 0.0
WEEK 3 WEEK 4 WEEK 5

Jumat, 17 Sabtu, 18 Jumat, 24 Sabtu, 25 Kamis, 30


DATE
LOSSTIME MINING
Weekly BPP Aloc Start Stop Total Category Remark Parts/Cond

09 September WEEK 2 BPP 3 JUS 16:31 17:00 0.48 Rain & Slippery Rain (No Production)
10 September WEEK 2 BPP 1 JUS 20:50 22:14 1.40 Rain & Slippery Rain (No Production)
10 September WEEK 2 BPP 2 JUS 20:35 21:20 0.75 Rain & Slippery Rain (No Production)
10 September WEEK 2 BPP 3 JUS 21:45 24:00 2.25 Rain & Slippery Rain (No Production)
10 September WEEK 2 BPP 3 JUS 01:00 05:00 4.00 Rain & Slippery Rain (No Production)
11 September WEEK 3 BPP 1 JUS 07:00 12:00 5.00 Rain & Slippery Rain (No Production)
11 September WEEK 3 BPP 2 JUS 19:00 19:07 0.12 Mine support Waiting Unit
11 September WEEK 3 BPP 3 JUS 14:35 14:50 0.25 BPP Problem Mesin Conveyor Boulder
11 September WEEK 3 BPP 4 JUS 19:00 19:39 0.65 Pit Problem Front Preparation
11 September WEEK 3 BPP 4 JUS 07:00 07:48 0.80 Mine support Waiting Unit
12 September WEEK 3 BPP 2 JUS 04:35 05:00 0.42 Rain & Slippery Slippery
12 September WEEK 3 BPP 3 JUS 19:00 24:00 5.00 Rain & Slippery Rain (No Production)
12 September WEEK 3 BPP 3 JUS 01:00 05:00 4.00 Rain & Slippery Rain (No Production)
12 September WEEK 3 BPP 4 JUS 19:00 24:00 5.00 Rain & Slippery Rain (No Production)
12 September WEEK 3 BPP 4 JUS 01:00 05:00 4.00 Rain & Slippery Rain (No Production)
13 September WEEK 3 BPP 1 JUS 21:55 21:56 0.02 Rain & Slippery Rain (No Production)
13 September WEEK 3 BPP 2 JUS 19:00 24:00 5.00 Rain & Slippery Rain (No Production)
13 September WEEK 3 BPP 2 JUS 01:00 05:00 4.00 Rain & Slippery Rain (No Production)
13 September WEEK 3 BPP 3 JUS 20:21 24:00 3.65 Rain & Slippery Rain (No Production)
13 September WEEK 3 BPP 3 JUS 01:00 05:00 4.00 Rain & Slippery Rain (No Production)
13 September WEEK 3 BPP 4 JUS 20:21 24:00 3.65 Rain & Slippery Rain (No Production)
13 September WEEK 3 BPP 4 JUS 01:00 05:00 4.00 Rain & Slippery Rain (No Production)
PENCATATAN KENDALA BPP
PT. JAGA USAH SANDAI

TANGGAL :
SHIFT :

NO START FINISH KENDALA

Diketahui oleh, Diperiksa oleh, Dibuat oleh,

................................... ................................... ...................................


SPV BPP Foreman BPP Checker BPP
................................... ................................... ...................................
SPV BPP Foreman BPP Checker BPP