Professional Documents
Culture Documents
JSA CABLE Tagging
JSA CABLE Tagging
JSA CABLE Tagging
DESCRIPTION OF ACTIVITY
SIGNATURE
NAME (for participation
and field visit)
(concurrence)
o Notify the Safety Compliance Team and Loss o Safety Compliance Team representative may conduct unannounced
Prevention representatives prior commencing the job audits or spots checks as per procedure
References(GI, SMS): Special safety equipment required:
NOTE: Any deviation from the agreed on steps and/ or controls will require reevaluation and further assessment of the JSA and the
corresponding job.
Responsible Party
Sequence of Potential Hazards Required Hazard Controls Responsible Party Completion
Basic Job Steps Signature