Method Statement-Plant Infrastucture Technical Investigation
Method Statement-Plant Infrastucture Technical Investigation
1. Site Establishment Transportation and Rigger ( 14.2) 1. Property damage 1. Pre use inspections
offloading of containers at Semi-skilled workers X due to equipment of tools and
site 5 failure –crane or equipment
Putting signage Container sling 2. Only competent
Installing Shade Crane truck 10t 2. Property damage persons (
Slings x4 ( 2.5t) due to incorrect use appointed rigger/
of equipment crane operator) to
lead and direct the
activity
3. Be vigilant - SLAMS
METHOD STATEMENT GUIDELINES
2.Housekeeping Loading , Crane Property damage Pre use inspections
removing existing debris transportation and Hiab Truck due to equipment of tools and
on work area offloading to salvage Slings failure –crane or equipment
yard Chain blocks sling Only competent
Supervisor Property damage persons (
Artisans due to incorrect use appointed rigger/
SHE Officer of equipment crane operator) to
lead and direct the
Assistants
activity
Be vigilant - SLAMS
5.Stripping of Old Inspect tools and Tools Property damage Pre use inspections
Extraction Chutes equipment before Slings due to equipment of tools and
use Chain blocks failure –crane or equipment
Cut bolts first Supervisor sling Only competent
Use a copper Artisan Property damage persons (
hammer to enable SHE Officer due to incorrect use appointed rigger/
the chute to loosen Assistants of equipment crane operator) to
Use chain blocks to Falling from heights lead and direct the
also enable the Finger cuts activity
chutes to loosen and Be vigilant –
lift SLAMS
Wear proper PPE
Ensure proper safe
working conditions
METHOD STATEMENT GUIDELINES
6.Stacking at Laydown Inspect tools and Tools Property damage Pre use inspections
Area equipment before Slings due to equipment of tools and
use Chain blocks failure –crane or equipment
Supervisor sling Only competent
Artisan Property damage persons (
SHE Officer due to incorrect use appointed rigger/
Assistants of equipment crane operator) to
Falling from heights lead and direct the
Finger cuts activity
Be vigilant –
SLAMS
Wear proper PPE
Ensure proper safe
working conditions
7.Installation of Liners Ensure scaffold is Tools Property damage Pre use inspections
erected and safe to Slings due to equipment of tools and
work Supervisor failure –crane or equipment
Use hook and nylon Artisan sling Only competent
sling to drop the SHE Officer Property damage persons (
liners in the Bin Assistants due to incorrect use appointed rigger/
Bolt the liner to Liners and bolts of equipment crane operator) to
position and ensure Falling from heights lead and direct the
Impact range
the bolt is tight Finger cuts activity
Be vigilant –
SLAMS
Wear proper PPE
Ensure proper safe
working conditions
METHOD STATEMENT GUIDELINES
8.Installation of new Ensure scaffold is Tools Property damage Pre use inspections
Chutes erected and safe to Slings due to equipment of tools and
work Supervisor failure –crane or equipment
Use hook and nylon Artisan sling Only competent
sling to drop the SHE Officer Property damage persons (
liners in the Bin Assistants due to incorrect use appointed rigger/
Bolt the liner to Liners and bolts of equipment crane operator) to
position and ensure Falling from heights lead and direct the
Impact range
the bolt is tight Finger cuts activity
Be vigilant –
SLAMS
Wear proper PPE
Ensure proper safe
working conditions
11.Testing and Inspect the job and Supervisor Falling from heights Be vigilant –
Commissioning hand over the project Site manager Finger cuts SLAMS
Project Trip and fall Wear proper PPE
Manager
Host/ Client
Eliminate
The complete elimination of the hazard
Substitute
Replacing the process with a less hazardous one
Redesign
Redesign the equipment or work process
Separate
Isolate the hazard by guarding or enclosing
Administrate
Provide control – Training, Procedures and Instructions