Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

LEVEL 3 – FMP - Production Schedule/Plan

Write down a ‘shopping list’ of tasks, jobs, things to do, with a start date and a completion date:

Student Name: El Barnett Sheet

Production Title: Trinkets 0 of 0

TO BE COMPLETED BY?
DATE / LESSON: PRE / PROD / POST TASK (Highlight in GREEN when TO BE RESCHDULED?
completed

25/03/2024 Pre Create loose script with actor 7/04/24 10/04/24

Set a date to film and fill out paperwork


25/03/2024 Pre 7/04/24 10/04/24
accordingly

25/03/2024 Pre Practice handheld camera motions prior to filming 7/04/24 10/04/24

Ensure I have all needed equipment, ensure it is


25/03/2024 Pre 10/04/24 N/A
charged and SD card has space etc.
Ensure production diary is up to date and all pre-
25/03/2024 Pre 10/04/24 N/A
production work finished and of good quality

25/03/2024 Prod Arrive to Maya’s in daytime. 11/04/24 19/04/24


Prior to filming take photos for in-video and for
25/03/2024 Prod 11/04/24 19/04/24
display.
Go over script, film establishing shot and other
25/03/2024 Prod 11/04/24 19/04/24
ambient shots.
Filming main body. Aim for lots of long shots with
25/03/2024 Prod 11/04/24 19/04/24
handheld motion.
Check storyboard throughout and go off it for shot
25/03/2024 Prod 11/04/24 19/04/24
ideas.
Safely put equipment away and check over
25/03/2024 Prod 11/04/24 19/04/24
content in camera.
Print out photos, move footage into
28/03/2024 Post 19/04/24 22/04/24
Premiere/After Effects.
28/03/2024 Post Write up production process prior to editing 19/04/24 22/04/24

28/03/2024 Post Edit, with write-up of the process. 9/05/24 22/04/24

28/03/2024 Post Purchase all objects for display. 9/05/24 22/04/24

28/03/2024 Post Edit thoroughly, involving transitions. 9/05/24 22/04/24

You might also like