Project Name :-

Contractor :-
Client :-
Consultant :-
CHECKLIST FOR DOOR SHUTTER
Block :- Date :-
Unit No / Location :- Floor :-
Ref Dwg No. :
Sl Description of Items Required Actual Conformity Remarks
No (Checked by (Random Sampling
Contractor) by C&W/ Client)

PRE INSTALLATION CHECKLIST


1 Check whether the MTC for Door Verified & Found YES / NO
Shutter is available at site. OK / NOT OK

2 Approved Shop Drawing is available. Verified & Found YES / NO


OK / NOT OK

3 Door shutter is of approved brand Verified & Found YES / NO


OK / NOT OK

4 Design , Dimension and specification of Verified & Found YES / NO


shutter is according to drawing and OK / NOT OK
Specification.
5 Timber/ Wood used in door shutters are free Verified & Found YES / NO
from sapwood, decay, cracks, shakes and OK / NOT OK
dead knots.
6 The finishing of shutter is up to the mark i.e. Verified & Found YES / NO
line, level, smoothness . OK / NOT OK

7 Hinges are of ISI / Approved Brand Verified & Found YES / NO


OK / NOT OK

8 Tower Bolt are of ISI / Approved Brand Verified & Found YES / NO
OK / NOT OK

9 Door Handle are of ISI / Approved Brand Verified & Found YES / NO
OK / NOT OK

10 Door Lock are of ISI / Approved Brand Verified & Found YES / NO
OK / NOT OK

11 Door Stopper are of ISI / Approved Brand Verified & Found YES / NO
OK / NOT OK

12 Primer & Paint are of ISI / Approved Brand Verified & Found YES / NO
OK / NOT OK

13 Check the Moisture Content 12% Verified & Found YES / NO


OK / NOT OK

14 Flush Door Shutter confirm to the 1. End Verified & Found YES / NO
Immersion Test.2. Knife Test 3. Glue OK / NOT OK
Adhesion Test
DURING INSTALLATION CHECKLIST
13 Number of Hinges are as per drawing. Verified & Found YES / NO
OK / NOT OK

14 The door Shutter is in plumb and line after Verified & Found YES / NO
Installation. OK / NOT OK

Page 1 of 2
15 The fitting of hinges with screws in such a Verified & Found YES / NO
fashion that all the screws are fixed with OK / NOT OK
Frame & Shutter.
16 Location, Dimension & Alignment of Tower Verified & Found YES / NO
Bolt are as per specification. OK / NOT OK

17 Location, Dimension & Alignment of Door Verified & Found YES / NO


Handle are as per specification. OK / NOT OK

18 Location, Dimension & Alignment of Door Verified & Found YES / NO


Lock are as per specification. OK / NOT OK

19 Location, Dimension & Alignment of Door Verified & Found YES / NO


Stopper are as per specification. OK / NOT OK

20 Door Shutter is laminated on Main Door Verified & Found YES / NO


(Front Side) OK / NOT OK

21 Polishing at the sides of Door Shutter. Verified & Found YES / NO


OK / NOT OK

22 Gap between Frame and shutter are within Verified & Found YES / NO
acceptable limit. OK / NOT OK

23 Surface alignment of Door & Frame are within Verified & Found YES / NO
acceptable limit. OK / NOT OK

24 Surface Preparation of Frame and Shutter Verified & Found YES / NO


prior to Painting OK / NOT OK

25 Check the Primer Mix (Primer : Thinner) Mixing should be done


as per manufacturer's
literature.
26 Application of Primer Coat as per Mixing should be done Verified & Found YES / NO
Specification. as per manufacturer's OK / NOT OK
literature
27 Application of First Coat of Paint as per Verified & Found YES / NO
Specification. OK / NOT OK

28 Check the 1st coat is sufficiently dry 6-8 hours Verified & Found YES / NO
before application of the 2nd coat. OK / NOT OK

29 Application of Second Coat of Paint as Verified & Found YES / NO


per Specification. OK / NOT OK

30 Additional coat over 2nd coat is Verified & Found YES / NO


required. OK / NOT OK

POST INSTALLATION CHECKLIST


31 Check the doors with regard to proper Verified & Found YES / NO
and correct installation, accessories, OK / NOT OK
clearances and smooth working

32 Check door should be left clean and Verified & Found YES / NO
free from dirt, putty and other adhering OK / NOT OK
material after the work is over

33 Others ( If Any) Verified & Found YES / NO


OK / NOT OK

REMARKS: Approved for next stage of work / Not Approved

Note : Please record the quantities overleaf or in Joint Measurement Sheet

Page 2 of 2