Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

CONSULTANT'S VERIFICATION STAMP

A WE, [KHATIB & ALAMI - MISR], VERIFY THAT THIS A


CONSULTANT'S DOCUMENT

· HAS BEEN PRODUCED AND CHECKED IN ACCORDANCE


WITH CONSULTANT'S QUALITY ASSURANCE PLAN
· IS OF A STANDARD THAT WILL ENABLE THE EMPLOYER
TO ACCEPT IT IN ACCORDANCE WITH THE CONTRACT
P1 · COMPLIES WITH ALL REQUIREMENTS OF THE CONTRACT
FOLLOWING DEVIATIONS TO CONTRACT ARE REFERENCED
FOR WHICH A DISPENSATION HAS BEEN ACCEPTED BY THE
EMPLOYER:

B B

OTHER RELATED LETTERS / RFI WHICH DOCUMENT


CLARIFICATIONS ASSOCIATED WITH THIS DOCUMENT ARE
LISTED BELOW:

CONSULTANT'S PROJECT MANAGER:

C Chadi Sabra
__________ __________ 30.11.2023
________ C
PRINT NAME SIGNATURE DATE

DOCUMENT STATUS STAMP

CODE 1 WORK MAY PROCEED

CODE 2 REVISE & RESUBMIT. WORK MAY PROCEED


SUBJECT TO INCORPORATION OF
COMMENTS INDICATED

CODE 3 REVISE & RESUBMIT. WORK MAY NOT


D PROCEED D
CODE 4 REVIEW NOT REQUIRED. WORK MAY
PROCEED

THE STATEMENT "WORK MAY PROCEED" APPLIES TO THE


FOLLOWING WORK ACTIVITIES ASSOCIATED WITH THE
MATTERS CONTAINED WITHIN THE CONSULTANT'S
DOCUMENT:
DESIGN / PROCUREMENT / CONSTRUCTION / ALL * ACTIVITIES
LEGEND:
ANY REVIEW, COMMENT OR ACCEPTANCE BY EMPLOYER
UNDER THIS CONTRACT WITH RESPECT TO ANY OF
E FUTURE EXPANSION CONSULTANT'S DOCUMENTS SHALL NOT IN ANY WAY BE, OR
DEEMED TO BE, AN APPROVAL OF ANY WORKS OR AN
E
(UN PAVED SECTION) ACCEPTANCE THAT THE CONSULTANT'S DOCUMENTS MEET
THE REQUIREMENTS OF THE CONTRACT, AS CONSULTANT
HAS THE SOLE RESPONSIBILITY FOR PERFORMING THE
WORKS IN ACCORDANCE WITH THE REQUIREMENTS OF THIS
CONTRACT.

----------------------------- --------------- ------------------


AD PORTS GROUP APPROVAL CODE DATE

F F

005 01.02.24 Issued for Approval/PD AM AO AN

PO 004 15.01.24 Issued for Approval/PD AM AO AN

003 03.01.24 Issued for Approval/PD AM AO AN

002 30.11.23 Issued for Approval/PD AM AO AN

001 10.09.23 Issued for Approval/CD AM AO AN


G Rev Date Description Drawn Chkd Appr
G
NOTES:
-NO. OF CABLE DUCTS AND MANHOLE SIZE ARE GUIDANCE ONLY AND THE FINAL Drawn by / Date Checked by / Date Approved by / Date
-NO. & SIZING ARE SUBJECT TO THE FINAL CALCULATIONS IN THE NEXT STAGE
-THE UNIT OF ALL DUCTS ARE IN mm AM AO AN
4W-Ø150 Client

H H
Contract No. & Project Title

SAFAGA PORT
CONTRACT NO. 2800-106

Independent Checking Engineer


J J
Signature
Contractor
DO NOT SCALE FROM THIS DRAWING

Signature
Consultant
K CD-12 K
4W-Ø150
8 Sebaweih El-Masry St., Cairo, Egypt
T el: (202)-24035548 / 22610540
4W-Ø150 P.O. Box: 11371 - 8101 Nasr City
CD-53 www.Khatibalami.com
4W-Ø150 CD-52
4W-Ø150 Drawing Title
CD-48
4W-Ø150
REF-05
INFRASTRUCTURE - DRY UTILITIES
REF-08 CD-51 ELECTRICAL
CD-50 4W-Ø150
L 4W-Ø150 CD-54 MEDUIM VOLTAGE CABLE ROUTING LAYOUT L

FILE NAME :12_2800-106-VE-7100-00002,..00005_005


4W-Ø150
REF-07
REF-06
Sheet Scale Paper Size

Truck Lane CD-55


Truck Lane 02 OF 04 1 : 1000 A1
4W-Ø150
Drawing Status
Over
taking Lan
e Over
taking Lan
e
PRELIMINARY DESIGN
Truck Lane Truck Lane
M Drawing No. Revision M
UNCONTROLLED IF PRINTED 2800-106-VE- 7100-00003 005
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 V6

Feb 01, 2024 - 2:11pm Ahmed.Marzouk File Location: X:\CA32002\Elec\00-WIP\02-DWG\01_Sheet\12_2800-106-VE-7100-00002,..00005_005.dwg


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
CONSULTANT'S VERIFICATION STAMP

A WE, [KHATIB & ALAMI - MISR], VERIFY THAT THIS A


CONSULTANT'S DOCUMENT

· HAS BEEN PRODUCED AND CHECKED IN ACCORDANCE


WITH CONSULTANT'S QUALITY ASSURANCE PLAN
· IS OF A STANDARD THAT WILL ENABLE THE EMPLOYER
TO ACCEPT IT IN ACCORDANCE WITH THE CONTRACT
P1 · COMPLIES WITH ALL REQUIREMENTS OF THE CONTRACT
FOLLOWING DEVIATIONS TO CONTRACT ARE REFERENCED
FOR WHICH A DISPENSATION HAS BEEN ACCEPTED BY THE
EMPLOYER:

B B

OTHER RELATED LETTERS / RFI WHICH DOCUMENT


CLARIFICATIONS ASSOCIATED WITH THIS DOCUMENT ARE
LISTED BELOW:

CONSULTANT'S PROJECT MANAGER:

C Chadi Sabra
__________ __________ 30.11.2023
________ C
PRINT NAME SIGNATURE DATE

Refer to the applicable comments in the drawing no.2800-106-VE-7100-00001_004_C2 DOCUMENT STATUS STAMP

CODE 1 WORK MAY PROCEED

K&A REPLY:- CODE 2 REVISE & RESUBMIT. WORK MAY PROCEED


SUBJECT TO INCORPORATION OF
-Noted. COMMENTS INDICATED

CODE 3 REVISE & RESUBMIT. WORK MAY NOT


D PROCEED D
CODE 4 REVIEW NOT REQUIRED. WORK MAY
PROCEED

THE STATEMENT "WORK MAY PROCEED" APPLIES TO THE


FOLLOWING WORK ACTIVITIES ASSOCIATED WITH THE
MATTERS CONTAINED WITHIN THE CONSULTANT'S
DOCUMENT:
DESIGN / PROCUREMENT / CONSTRUCTION / ALL * ACTIVITIES
LEGEND:
ANY REVIEW, COMMENT OR ACCEPTANCE BY EMPLOYER
UNDER THIS CONTRACT WITH RESPECT TO ANY OF
E FUTURE EXPANSION CONSULTANT'S DOCUMENTS SHALL NOT IN ANY WAY BE, OR
DEEMED TO BE, AN APPROVAL OF ANY WORKS OR AN
E
(UN PAVED SECTION) ACCEPTANCE THAT THE CONSULTANT'S DOCUMENTS MEET
THE REQUIREMENTS OF THE CONTRACT, AS CONSULTANT
HAS THE SOLE RESPONSIBILITY FOR PERFORMING THE
WORKS IN ACCORDANCE WITH THE REQUIREMENTS OF THIS
CONTRACT.

----------------------------- --------------- ------------------


AD PORTS GROUP APPROVAL CODE DATE

F F

PO 004 15.01.24 Issued for Approval/PD AM AO AN

003 03.01.24 Issued for Approval/PD AM AO AN

002 30.11.23 Issued for Approval/PD AM AO AN

001 10.09.23 Issued for Approval/CD AM AO AN


G Rev Date Description Drawn Chkd Appr
G
NOTES:
-NO. OF CABLE DUCTS AND MANHOLE SIZE ARE GUIDANCE ONLY AND THE FINAL Drawn by / Date Checked by / Date Approved by / Date
-NO. & SIZING ARE SUBJECT TO THE FINAL CALCULATIONS IN THE NEXT STAGE
-THE UNIT OF ALL DUCTS ARE IN mm AM AO AN
4W-Ø150 Client

H H
Contract No. & Project Title

SAFAGA PORT
CONTRACT NO. 2800-106

Independent Checking Engineer


J J
Signature
Contractor
DO NOT SCALE FROM THIS DRAWING

Signature
Consultant
K CD-12 K
4W-Ø150
8 Sebaweih El-Masry St., Cairo, Egypt
T el: (202)-24035548 / 22610540
4W-Ø150 P.O. Box: 11371 - 8101 Nasr City
CD-53 www.Khatibalami.com
4W-Ø150 CD-52
4W-Ø150 Drawing Title
CD-48
4W-Ø150
REF-05
INFRASTRUCTURE - DRY UTILITIES
REF-08 CD-51 ELECTRICAL
CD-50 4W-Ø150
L 4W-Ø150 CD-54 MEDUIM VOLTAGE CABLE ROUTING LAYOUT L

FILE NAME :12_2800-106-VE-7100-00002,..00005_004


4W-Ø150
REF-07
REF-06
Sheet Scale Paper Size

Truck Lane CD-55


Truck Lane 02 OF 04 1 : 1000 A1
4W-Ø150
Drawing Status
Over
taking Lan
e Over
taking Lan
e
PRELIMINARY DESIGN
Truck Lane Truck Lane
M Drawing No. Revision M
UNCONTROLLED IF PRINTED 2800-106-VE- 7100-00003 004
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 V6

Jan 15, 2024 - 1:31pm Ahmed.Marzouk File Location: X:\CA32002\Elec\00-WIP\02-DWG\01_Sheet\12_2800-106-VE-7100-00002,..00005_004.dwg


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
CONSULTANT'S VERIFICATION STAMP

A WE, [KHATIB & ALAMI - MISR], VERIFY THAT THIS A


CONSULTANT'S DOCUMENT

· HAS BEEN PRODUCED AND CHECKED IN ACCORDANCE


TIE
INWIT
H EX
IST
INGROA
D WITH CONSULTANT'S QUALITY ASSURANCE PLAN
L.O
.W · IS OF A STANDARD THAT WILL ENABLE THE EMPLOYER
TO ACCEPT IT IN ACCORDANCE WITH THE CONTRACT
P1

DA OR GNI T
· COMPLIES WITH ALL REQUIREMENTS OF THE CONTRACT
FOLLOWING DEVIATIONS TO CONTRACT ARE REFERENCED
FOR WHICH A DISPENSATION HAS BEEN ACCEPTED BY THE

HTI W NI EI
EMPLOYER:

B B

SI XE
W
OTHER RELATED LETTERS / RFI WHICH DOCUMENT

. O. L

T
CLARIFICATIONS ASSOCIATED WITH THIS DOCUMENT ARE
LISTED BELOW:

CONSULTANT'S PROJECT MANAGER:

C Chadi Sabra
__________ __________ 30.11.2023
________ C
PRINT NAME SIGNATURE DATE

DOCUMENT STATUS STAMP

CODE 1 WORK MAY PROCEED

CODE 2 REVISE & RESUBMIT. WORK MAY PROCEED


SUBJECT TO INCORPORATION OF
COMMENTS INDICATED

CODE 3 REVISE & RESUBMIT. WORK MAY NOT


D PROCEED D
CODE 4 REVIEW NOT REQUIRED. WORK MAY
PROCEED

THE STATEMENT "WORK MAY PROCEED" APPLIES TO THE


FOLLOWING WORK ACTIVITIES ASSOCIATED WITH THE
MATTERS CONTAINED WITHIN THE CONSULTANT'S
DOCUMENT:
DESIGN / PROCUREMENT / CONSTRUCTION / ALL * ACTIVITIES
LEGEND:
ANY REVIEW, COMMENT OR ACCEPTANCE BY EMPLOYER
UNDER THIS CONTRACT WITH RESPECT TO ANY OF
E FUTURE EXPANSION CONSULTANT'S DOCUMENTS SHALL NOT IN ANY WAY BE, OR
DEEMED TO BE, AN APPROVAL OF ANY WORKS OR AN
E
(UN PAVED SECTION) ACCEPTANCE THAT THE CONSULTANT'S DOCUMENTS MEET
THE REQUIREMENTS OF THE CONTRACT, AS CONSULTANT
HAS THE SOLE RESPONSIBILITY FOR PERFORMING THE
WORKS IN ACCORDANCE WITH THE REQUIREMENTS OF THIS
CONTRACT.

Riyas Kunjumuhammad Code 2 12-01-2024


Drawing
2800-106-VE-7100-00001_003
----------------------------- --------------- ------------------
comments are applicable AD PORTS GROUP APPROVAL CODE DATE

F K&A REPLY:- F
-Noted .

PO

003 03.01.24 Issued for Approval/PD AM AO AN

002 30.11.23 Issued for Approval/PD AM AO AN

001 10.09.23 Issued for Approval/CD AM AO AN


G Rev Date Description Drawn Chkd Appr
G
NOTES:
-NO. OF CABLE DUCTS AND MANHOLE SIZE ARE GUIDANCE ONLY AND THE FINAL Drawn by / Date Checked by / Date Approved by / Date
-NO. & SIZING ARE SUBJECT TO THE FINAL CALCULATIONS IN THE NEXT STAGE
-THE UNIT OF ALL DUCTS ARE IN mm AM AO AN
4W-Ø150 Client

H H
Contract No. & Project Title

SAFAGA PORT
CONTRACT NO. 2800-106

Independent Checking Engineer


J J
Signature
Contractor
DO NOT SCALE FROM THIS DRAWING

Signature
Consultant
K CD-12 K
4W-Ø150
8 Sebaweih El-Masry St., Cairo, Egypt
T el: (202)-24035548 / 22610540
4W-Ø150 P.O. Box: 11371 - 8101 Nasr City
CD-53 www.Khatibalami.com
4W-Ø150 CD-52
4W-Ø150 Drawing Title
CD-48
4W-Ø150
REF-05
INFRASTRUCTURE - DRY UTILITIES
REF-08 CD-51 ELECTRICAL
CD-50 4W-Ø150
L 4W-Ø150 CD-54 MEDUIM VOLTAGE CABLE ROUTING LAYOUT L

FILE NAME :11_2800-106-VE-7100-00002,..00005_003


4W-Ø150
REF-07
REF-06
Sheet Scale Paper Size

Truck Lane CD-55 Truck Lane 02 OF 04 1 : 1000 A1


4W-Ø150
Drawing Status
Over
taking Lan
e Over
taking Lan
e
PRELIMINARY DESIGN
Truck Lane Truck Lane
M Drawing No. Revision M
UNCONTROLLED IF PRINTED 2800-106-VE- 7100-00003 003
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 V6

Jan 03, 2024 - 6:38pm Ahmed.Marzouk File Location: X:\CA32002\Elec\00-WIP\02-DWG\01_Sheet\11_2800-106-VE-7100-00002,..00005_003.dwg


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
CONSULTANT'S VERIFICATION STAMP

A WE, [KHATIB & ALAMI - MISR], VERIFY THAT THIS A


CONSULTANT'S DOCUMENT

· HAS BEEN PRODUCED AND CHECKED IN ACCORDANCE


WITH CONSULTANT'S QUALITY ASSURANCE PLAN
· IS OF A STANDARD THAT WILL ENABLE THE EMPLOYER
TO ACCEPT IT IN ACCORDANCE WITH THE CONTRACT
· COMPLIES WITH ALL REQUIREMENTS OF THE CONTRACT
FOLLOWING DEVIATIONS TO CONTRACT ARE REFERENCED
FOR WHICH A DISPENSATION HAS BEEN ACCEPTED BY THE
EMPLOYER:

B B

OTHER RELATED LETTERS / RFI WHICH DOCUMENT


CLARIFICATIONS ASSOCIATED WITH THIS DOCUMENT ARE
LISTED BELOW:

CONSULTANT'S PROJECT MANAGER:

C Chadi Sabra
__________ __________ 30.11.2023
________ C
PRINT NAME SIGNATURE DATE

DOCUMENT STATUS STAMP

CODE 1 WORK MAY PROCEED

Refer to the applicable comments in the drawing no.2800-106-VE-7100-00001_002_


CODE 2 REVISE & RESUBMIT. WORK MAY PROCEED
SUBJECT TO INCORPORATION OF
K&A REPLY:- COMMENTS INDICATED
-Noted . CODE 3 REVISE & RESUBMIT. WORK MAY NOT
D PROCEED D
CODE 4 REVIEW NOT REQUIRED. WORK MAY
PROCEED

THE STATEMENT "WORK MAY PROCEED" APPLIES TO THE


FOLLOWING WORK ACTIVITIES ASSOCIATED WITH THE
MATTERS CONTAINED WITHIN THE CONSULTANT'S
DOCUMENT:
DESIGN / PROCUREMENT / CONSTRUCTION / ALL * ACTIVITIES

ANY REVIEW, COMMENT OR ACCEPTANCE BY EMPLOYER


UNDER THIS CONTRACT WITH RESPECT TO ANY OF
CONSULTANT'S DOCUMENTS SHALL NOT IN ANY WAY BE, OR
E LEGEND: DEEMED TO BE, AN APPROVAL OF ANY WORKS OR AN
E
ACCEPTANCE THAT THE CONSULTANT'S DOCUMENTS MEET
THE REQUIREMENTS OF THE CONTRACT, AS CONSULTANT
HAS THE SOLE RESPONSIBILITY FOR PERFORMING THE
WORKS IN ACCORDANCE WITH THE REQUIREMENTS OF THIS
CONTRACT.

Riyas Kunjumuhammad Code 3 29-12-2023

----------------------------- --------------- ------------------


AD PORTS GROUP APPROVAL CODE DATE

F F

F-DUCT

NOTES:
NO. OF CABLE DUCTS AND MANHOLE SIZE ARE GUIDANCE ONLY AND THE FINAL
NO. & SIZING ARE SUBJECT TO THE FINAL CALCULATIONS IN THE NEXT STAGE 002 30.11.23 Issued for Approval/PD AM AO AN

001 10.09.23 Issued for Approval/CD AM AO AN


G Rev Date Description Drawn Chkd Appr
G
Drawn by / Date Checked by / Date Approved by / Date

AM AO AN
Client

H H
Contract No. & Project Title

SAFAGA PORT
CONTRACT NO. 2800-106

Independent Checking Engineer


J J
Signature
Contractor
DO NOT SCALE FROM THIS DRAWING

Signature
Consultant
K CD-12 K
8 Sebaweih El-Masry St., Cairo, Egypt
T el: (202)-24035548 / 22610540
P.O. Box: 11371 - 8101 Nasr City
CD-53 www.Khatibalami.com
CD-52

Drawing Title

CD-48

REF-05 INFRASTRUCTURE - DRY UTILITIES


REF-08
ELECTRICAL
CD-50 CD-51
L CD-54 MEDUIM VOLTAGE CABLE ROUTING LAYOUT L

FILE NAME :10_2800-106-VE-7100-00002,..00005_001


REF-07 CD-55
REF-06
Sheet Scale Paper Size

02 OF 04 1 : 1000 A1
Drawing Status

PRELIMINARY DESIGN
M Drawing No. Revision M
UNCONTROLLED IF PRINTED 2800-106-VE- 7100-00003 002
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 V6

Dec 06, 2023 - 8:25pm Ahmed.Marzouk File Location: X:\CA32002\Elec\00-WIP\02-DWG\01_Sheet\10_2800-106-VE-7100-00002,..00005_001.dwg


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
CONSULTANT'S VERIFICATION STAMP

A WE, [KHATIB & ALAMI - MISR], VERIFY THAT THIS A


CONSULTANT'S DOCUMENT

· HAS BEEN PRODUCED AND CHECKED IN ACCORDANCE


WITH CONSULTANT'S QUALITY ASSURANCE PLAN
· IS OF A STANDARD THAT WILL ENABLE THE EMPLOYER
TO ACCEPT IT IN ACCORDANCE WITH THE CONTRACT
· COMPLIES WITH ALL REQUIREMENTS OF THE CONTRACT
FOLLOWING DEVIATIONS TO CONTRACT ARE REFERENCED
FOR WHICH A DISPENSATION HAS BEEN ACCEPTED BY THE
EMPLOYER:

B 92 B

OTHER RELATED LETTERS / RFI WHICH DOCUMENT


CLARIFICATIONS ASSOCIATED WITH THIS DOCUMENT ARE
LISTED BELOW:

CONSULTANT'S PROJECT MANAGER:

C LEGEND:
Chadi Sabra
__________ __________ 20.8.2023
________ C
PRINT NAME SIGNATURE DATE
Proposed MV layout acceptable
for concept level however still DOCUMENT STATUS STAMP
below ground MV connectivity is
require, ref our comments and CODE 1 WORK MAY PROCEED
update accordingly
CODE 2 REVISE & RESUBMIT. WORK MAY PROCEED
Ref SUBJECT TO INCORPORATION OF
2800-106-VE-0000-00002_001 for COMMENTS INDICATED
more comments CODE 3 REVISE & RESUBMIT. WORK MAY NOT
D PROCEED D
CODE 4 REVIEW NOT REQUIRED. WORK MAY
PROCEED
K&A REPLY:-
THE STATEMENT "WORK MAY PROCEED" APPLIES TO THE
-Noted. FOLLOWING WORK ACTIVITIES ASSOCIATED WITH THE
MATTERS CONTAINED WITHIN THE CONSULTANT'S
DOCUMENT:
DESIGN / PROCUREMENT / CONSTRUCTION / ALL * ACTIVITIES

ANY REVIEW, COMMENT OR ACCEPTANCE BY EMPLOYER


UNDER THIS CONTRACT WITH RESPECT TO ANY OF
CONSULTANT'S DOCUMENTS SHALL NOT IN ANY WAY BE, OR
E DEEMED TO BE, AN APPROVAL OF ANY WORKS OR AN
E
ACCEPTANCE THAT THE CONSULTANT'S DOCUMENTS MEET
THE REQUIREMENTS OF THE CONTRACT, AS CONSULTANT
HAS THE SOLE RESPONSIBILITY FOR PERFORMING THE
WORKS IN ACCORDANCE WITH THE REQUIREMENTS OF THIS

93 CONTRACT.

Riyas Kunjumuhammad Code 2 18-09-2023

----------------------------- --------------- ------------------


AD PORTS GROUP APPROVAL CODE DATE

F F

001 07.09.23 Issued for Approval/CD AM AO AN


G G
TO ELECTRICAL Rev Date Description Drawn Chkd Appr

Drawn by / Date Checked by / Date Approved by / Date


TIE IN POINT
AM AO AN
Client

CD-17
CD-16

H CD-18 H

63 70 66 36 Contract No. & Project Title

60
69 SAFAGA PORT
CONTRACT NO. 2800-106
CD-15

Independent Checking Engineer


J S/S 2 J

4 65 Signature
Contractor

67 68 CD-14
DO NOT SCALE FROM THIS DRAWING

Signature
CD-12
CD-13 Consultant
K CD-11 K
8 Sebaweih El-Masry St., Cairo, Egypt
T el: (202)-24035548 / 22610540
P.O. Box: 11371 - 8101 Nasr City
www.Khatibalami.com

Drawing Title

INFRASTRUCTURE - DRY UTILITIES


ELECTRICAL
L MEDUIM VOLTAGE CABLE ROUTING LAYOUT L
CD-56

Sheet Scale Paper Size

NOTES: 02 OF 04 1 : 1000 A1
CD-55 CD-54 NO. OF CABLE DUCTS AND MANHOLE SIZE ARE GUIDANCE ONLY AND THE FINAL
Drawing Status
NO. & SIZING ARE SUBJECT TO THE FINAL CALCULATIONS IN THE NEXT STAGE
CONCEPT DESIGN
M Drawing No. Revision M
UNCONTROLLED IF PRINTED CD-53 CD-52
2800-106-VE- 7100-00003 001
1 752 76 3 4 5 6 7 8 9 10 11 12 13 14 15 16 V6

Sep 07, 2023 - 8:18pm Ahmed.Marzouk File Location: X:\CA32002\Elec\00-WIP\02-DWG\01_Sheet\7_2800-106-VE-7100-00002,..00005.dwg

You might also like