Factory Acceptance Test (FAT) for Cisco Catalyst 1000

Objective: The Factory Acceptance Test (FAT) for the Cisco Catalyst 1000 series switches aims to verify
the operational status and functionality of the switch according to the specified requirements outlined in
the contract agreement. This test ensures that the switch meets the standards set forth by the customer and
can be successfully deployed in subsequent installations.
Test Procedure:
1. Inventory Check:
• Perform a thorough inventory of all components included with the Cisco Catalyst 1000 series
switch shipment.
• Verify that all components listed in the equipment inventory are present and accounted for.
• Document any discrepancies or missing items for resolution.
2. Functional Demonstration:
• Simulate normal operational conditions by powering on the Cisco Catalyst 1000 switch.
• Execute a comprehensive verification of the operational status and functionality of the switch.
• Utilize traffic simulation tools to generate test traffic, ensuring that the switch handles traffic
appropriately.
• Confirm that all contracted functions are available and operational as per the specifications
outlined in the contract agreement.
• Ensure that accompanying documentation, including manuals and setup guides, are provided and
are accurate.
3. Hardware Configuration Verification:
• Verify the hardware configuration of the Cisco Catalyst 1000 switch to ensure alignment with the
specified requirements.
• Confirm that the hardware components are installed correctly and securely.
• Check for any physical damages or defects in the hardware components.
4. Traffic Data Validation:
• Validate the traffic data handling capabilities of the Cisco Catalyst 1000 switch.
• Ensure that the switch can handle varying levels of traffic load without performance degradation.
• Verify that traffic data is processed accurately and efficiently, without packet loss or latency
issues.
5. Test Protocol Inspection:
• Provide the customer with the test protocol from the Factory Acceptance Test for review and
inspection.
• Allow the customer to verify the completeness and accuracy of the test results as per the agreed-
upon criteria.
6. Optional Tests:
• Conduct any optional tests that the customer has determined must be performed prior to system
hand-over.
• Ensure that these optional tests are conducted in accordance with the negotiated terms outlined in
the contract agreement.
7. Documentation and Reporting:
• Document all test procedures, results, and observations in a comprehensive report.
• Provide the customer with a detailed FAT report, including any discrepancies found during testing
and their resolutions.
• Obtain sign-off from the customer acknowledging acceptance of the Cisco Catalyst 1000 switch
for subsequent installations.
Conclusion: Upon successful completion of the Factory Acceptance Test (FAT) for the Cisco Catalyst
1000 series switch and acceptance by the customer, the switch is considered ready for deployment in
subsequent installations as per the terms of the contract agreement.
8. Equipment Check and Setup:
• Perform a quantity check of all delivered equipment against the provided inventory.
• Set up the Cisco Catalyst 1000 switch according to the manufacturer's specifications.
9. Test Preparation:
• Connect PCM-links, I/O-equipment, and other relevant components to the switch.
• Ensure proper power supply to the switch.
10. Loading/Start:
• Check the trimming of GJU-L/G for accuracy.
• Perform configuration and test of the PABX-operator console.
• Load and start the exchange data, ensuring successful initialization.
• Perform dumping of data as necessary.
• Test PCM-links using a Service PC.
11. Monitoring Functions:
• Print out operational status to verify proper functioning.
12. Hardware Test/Verification:
• Test digital extension boards to ensure compatibility with PABX-operator console and digital
system telephones.
• Test analogue extension boards for functionality.
• Verify exchange line board functionality, both digital and analogue.
• Perform function tests for extensions using a Service PC.
• Test tie line board functionality.
• Verify data extension and service modem operation.
• Test recorded announcement, conference, alarm indications, music on hold, and text message
system in English.
13. Documentation:
• Complete a check list to ensure all required tests have been conducted.
• Generate a comprehensive test protocol documenting all test procedures, results, and
observations.
Conclusion: Upon successful completion of the Factory Acceptance Test (FAT) for the Cisco Catalyst
1000 series switch and verification of acceptance criteria, the switch is considered ready for deployment.
The FAT documentation, including the test protocol and check list, should be provided to the customer for
inspection and approval prior to system hand-over.