Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

About The Template

Use this template to keep record of your best conversational icebreakers.

Enter icebreakers and other details in table.

Note:

Additional instructions have been provided in column A in ICE BREAKER TRACKER worksheet. This text
has been intentionally hidden. To remove text, select column A, then select DELETE. To unhide text,
select column A, then change font color.

To learn more about table, press SHIFT and then F10 within a table, select the TABLE option, and then
select ALTERNATIVE TEXT
Organization: Mitsubishi Chemicals America Template Name: Inspection Test Plan (ITP)
Project: CE1 Project - Memphis Form Created: Tuesday, 03 October 2024
Inspection Test Plan (ITP) for Piping Fabrication

Created By Date Created Last Updated By Date Updated

Activity Item Piping Tie-in Spool Fabrication

Project Code
Project Title CE1 Project - MEMPHIS TN

Surveilance/Inspection l Hold point (H): nominated point beyond which work shall not proceed without verified acceptance by nominee.
Key l Witness Point (W): points at which the nominee shall be notified and invited to witness an activity but further work may proceed without the presence of the nominee.
l Review (R): verify by examination of documentary evidence that inspection / test have been satisfactorily conducted.
l Surveillance (S): continuing evaluation of the status of methods, analysis of records and monitoring of activities on a random basis to ensure quality requirements will be met.
l Visual (V): 100% visual inspection of work / item to ensure compliance with code / specification.
l Dimensional (D): measurement of critical dimensions to ensure work / item is within tolerance.

Position Abbreviation l Project Manager - PM


l Project Engineer - PE
l Quality Manager - QM
l Welding Technician - WT
l Welding Supervisor - WS
l Superimtendent - AS
l Supervisor - SS
l Qualtiy Control Inspector - QC
l Dimensional Inspector - DI
l Document Controller - DC
l Material Controller - MC
l Tradesman - TM
l Storeperson - SP
l Subcontractor - SC
l Client - CL

1. Submission/Approval of Documentation

Acceptance Criteria Surveilance/Inspection Act Surveilance/Inspection Act


Description Method / References Inspection / Test Freq Sign-off (Company) Sign-off (Contractor)
(Specs / Standard) (Company) (Contractor)
1.1 ITP & Quality Plan to VA - MCA and MEC to review ITP &
approved by all parties before Quality Plan and make sure all codes are
considered by PPM and Marubeni
work commences

MCA, MEC, Piping Fabrication


V- Contractor (PPM) and Marubeni
l ASME B31.3 Process Piping
l American Welding Society
(AWS)
l American Iron and Steel
Institute (AISI)
l ASTM E165: Standard
1.2 Submit WPS & WPQR for Practice for Liquid Penetrant VA - Marubeni to review WPS and
Approval Examination for General Industry WPQR from PPM, make sure all codes
l ASTM E1417: Standard and standard are considered.
Piping Fabrication Contractor
Practice for Liquid Penetrant (PPM) and Marubeni
Testing
l Local Permits (Millington
Memphis, TN, USA)
1.3 Site acceptance of Piping VA - Marubeni to review WPS and
Fabrication Procedure WPQR from PPM, make sure all codes
and standard are considered.
MCA,MEC, and Marubeni to check

2. Material Control
Acceptance Criteria Surveilance/Inspection Act Surveilance/Inspection Act
Description Method / References Inspection / Test Freq Sign-off (Company) Sign-off (Contractor)
(Specs / Standard) (Company) (Contractor)

Page 2 of 4 04/17/202413:39:31
Organization: Mitsubishi Chemicals America Template Name: Inspection Test Plan (ITP)
2.1 Receive and Inspect l ASME B31.3 Process Piping PPM and Marubeni to ensure material
Project: CE1 Project - Memphis
Material Status Report
Form Created: Tuesday, 03 October 2024
l American Welding Society (AWS) delivered on site is complete and as per Packing List
Materials; Shipping and Packing Procedure
l American Iron and Steel Institute verifying document
l Quantities & Transport
(AISI)
damage. l ASTM E165: Standard Practice for
l Verify correct materials Liquid Penetrant Examination for
l Conformance to General Industry
Requirements l ASTM E1417: Standard Practice for
l MSDS available for all Liquid Penetrant Testing
hazardous substance l Local Permits (Millington Memphis,
TN, USA)

2.2 Handling and Storage of


Materials
PPM and Marubeni to store Piping
Materials in safe area

3. Fabrication and Component Assembly


Acceptance Criteria Surveilance/Inspection Act Surveilance/Inspection Act
Description Method / References Inspection / Test Freq Sign-off (Company) Sign-off (Contractor)
(Specs / Standard) (Company) (Contractor)
3.1 Material Preparation,
bevelling, cutting, drilling and
grinding

3.2 Assembly of components


prior to welding, Check;
l Fit-up & alignment &
Dimensional check
l Root Gap & Landing

4. Welding
Acceptance Criteria Surveilance/Inspection Act Surveilance/Inspection Act
Description Method / References Inspection / Test Freq Sign-off (Company) Sign-off (Contractor)
(Specs / Standard) (Company) (Contractor)
4.1 Welding to be performed by
qualified welder in accordance
with approved welding
procedure specification.

4.2 Welding visual inspection,


Check;
l Root pass/weld
size/profile & finish
l Closing weld size/profile
& finish

4.3 Weld repairs (if any),


Remove defect and re-weld in
accordance with qualified
procedure

5. Inspection Testing

Acceptance Criteria Surveilance/Inspection Act Surveilance/Inspection Act


Description Method / References Inspection / Test Freq Sign-off (Company) Sign-off (Contractor)
(Specs / Standard) (Company) (Contractor)
5.1 Dimension check of
assembly after welding.

Page 3 of 4 04/17/202413:39:31
Organization: Mitsubishi Chemicals America Template Name: Inspection Test Plan (ITP)
Project: CE1 Project - Memphis Form Created: Tuesday, 03 October 2024

5.2 100% Final visual


inspection of all welds

5.3 Non Destructive


Examination (if required)

6. Finalize Documentation

Acceptance Criteria Surveilance/Inspection Act Surveilance/Inspection Act


Description Method / References Inspection / Test Freq Sign-off (Company) Sign-off (Contractor)
(Specs / Standard) (Company) (Contractor)
6.1 Check all test reports are
correct

6.2 Final Inspection Review all relevant documentation


l Documentation on and ensure complete or about to be
Inclusions completed and include with the
MDR Review works and confirm if
Final review and acceptance of satisfactory
workmanship

Prepared By

Approved By

Page 4 of 4 04/17/202413:39:31