Professional Documents
Culture Documents
Inspection Test Plan For Welding and Fabrication
Inspection Test Plan For Welding and Fabrication
Note:
Additional instructions have been provided in column A in ICE BREAKER TRACKER worksheet. This text
has been intentionally hidden. To remove text, select column A, then select DELETE. To unhide text,
select column A, then change font color.
To learn more about table, press SHIFT and then F10 within a table, select the TABLE option, and then
select ALTERNATIVE TEXT
Organization: Mitsubishi Chemicals America Template Name: Inspection Test Plan (ITP)
Project: CE1 Project - Memphis Form Created: Tuesday, 03 October 2024
Inspection Test Plan (ITP) for Piping Fabrication
Project Code
Project Title CE1 Project - MEMPHIS TN
Surveilance/Inspection l Hold point (H): nominated point beyond which work shall not proceed without verified acceptance by nominee.
Key l Witness Point (W): points at which the nominee shall be notified and invited to witness an activity but further work may proceed without the presence of the nominee.
l Review (R): verify by examination of documentary evidence that inspection / test have been satisfactorily conducted.
l Surveillance (S): continuing evaluation of the status of methods, analysis of records and monitoring of activities on a random basis to ensure quality requirements will be met.
l Visual (V): 100% visual inspection of work / item to ensure compliance with code / specification.
l Dimensional (D): measurement of critical dimensions to ensure work / item is within tolerance.
1. Submission/Approval of Documentation
2. Material Control
Acceptance Criteria Surveilance/Inspection Act Surveilance/Inspection Act
Description Method / References Inspection / Test Freq Sign-off (Company) Sign-off (Contractor)
(Specs / Standard) (Company) (Contractor)
Page 2 of 4 04/17/202413:39:31
Organization: Mitsubishi Chemicals America Template Name: Inspection Test Plan (ITP)
2.1 Receive and Inspect l ASME B31.3 Process Piping PPM and Marubeni to ensure material
Project: CE1 Project - Memphis
Material Status Report
Form Created: Tuesday, 03 October 2024
l American Welding Society (AWS) delivered on site is complete and as per Packing List
Materials; Shipping and Packing Procedure
l American Iron and Steel Institute verifying document
l Quantities & Transport
(AISI)
damage. l ASTM E165: Standard Practice for
l Verify correct materials Liquid Penetrant Examination for
l Conformance to General Industry
Requirements l ASTM E1417: Standard Practice for
l MSDS available for all Liquid Penetrant Testing
hazardous substance l Local Permits (Millington Memphis,
TN, USA)
4. Welding
Acceptance Criteria Surveilance/Inspection Act Surveilance/Inspection Act
Description Method / References Inspection / Test Freq Sign-off (Company) Sign-off (Contractor)
(Specs / Standard) (Company) (Contractor)
4.1 Welding to be performed by
qualified welder in accordance
with approved welding
procedure specification.
5. Inspection Testing
Page 3 of 4 04/17/202413:39:31
Organization: Mitsubishi Chemicals America Template Name: Inspection Test Plan (ITP)
Project: CE1 Project - Memphis Form Created: Tuesday, 03 October 2024
6. Finalize Documentation
Prepared By
Approved By