PROYEK

PEKERJAAN PEMBANGUNAN JALAN TOL


KAYU AGUNG - PALEMBANG - BETUNG
PAKET II SEKSI 1;
GENERATOR FINISH GRADE PEKERJAAN JALAN DAN JEMBATAN
FINISH GRADE PANEL LISTRIK GEOTEXTILE NON WOVEN
GEOTEXTILE NON WOVEN GEOTEXTILE NON WOVEN (STA. 13+400 ~ STA. 33+500)
VACUUM PUMPS
+3.500 GEOMEMBRANE GEOMEMBRANE
+3.500
PHD (FILTER PIPE Ø50MM) PEMILIK PROYEK
GEOTEXTILE NON WOVEN
PHD (FILTER PIPE Ø50MM) PT. WASKITA SRIWIJAYA TOL

GEOMEMBRANE
GEOMEMBRANE
EKSTENSI 4m MENGETAHUI
EKSTENSI 4m
PREFABRICATED VERTICAL DRAIN (PVD) 0.9M X 0.9M
PREFABRICATED VERTICAL
DRAIN (PVD) 0.9M X 0.9M I . B.E.KUNTJORO TARMEDI
T . P mm P T . E

KONSULTAN PERENCANA
DETAIL 2 DETAIL 4
SKALA : NTS SKALA : NTS

FINISH GRADE
SETTLEMARK KONSULTAN SUPERVISI
LAYERED SETTLEMENT PT. PERENTJANA DJAJA
PIEZOMETER @5M
VACUUM METER
GEOTEXTILE NON WOVEN
GEOMEMBRANE
GEOTEXTILE NON WOVEN DISETUJUI

PHD (FILTER PIPE Ø50MM)


PLATFORM PASIR T=0.5M
I . NURSALIM NURHADI
T . R E T . S M E

KONTRAKTOR
PT. WASKITA KARYA

DETAIL 3 DIAJUKAN
SKALA : NTS

GUNAWAN JOKO P. S.T MULYONO WRAHARJO S.T.


T . P M T . S E M
STATUS

SIGNALCABLE AS BUILT DRAWING


JUDUL GAMBAR

DETAIL PVD & VACUUM


STEELBARØ20MM~22
VARIASI

RAMP 03 - STA 00+000 - 00+594.95

5.0m
5.0m

STEELPLANTSIZE0.5MX0.5M
THICKNESS5MM NO. GAMBAR

WK/ABD/KAPB1/M.III.R3-21 00
REV.
MAGNETICRING REFERENSI RTA TANGGAL
NTS
0.5m PIEZOMETER 16/03/2020 SKALA

A3
CAD FILE
ZONA 45 STA 1 + 00 -- 1 +100 AS-BUILT LEMBAR 1. 21
ORIG. SIZE LEMBAR
ODNER ANALISIS METODE REFERENSI DOKUMEN : SEBAGAI DASAR ACUAN
- 1 3 0 0 DOK. 01 WST-PD-WSKT.S1 0 0 AS BUILT DRAWING
DOK. 0 WST-PD-WSKT.S1 0 0
LAMPIRAN TAMBAHAN SEBAGAI DASAR ACUAN
- 1 3 0 0
N .D m .1 .
AS BUILT DRAWING

DETAIL SETTLEMENT MARK DETAIL PORE WATER PRESSURE DETAIL LAYERED SETTLEMENT
SKALA : NTS SKALA : NTS SKALA : NTS

CATATAN UMUM REV. TGL. DESKRIPSI ULASAN DIPERIKSA DISETUJUI