Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

CONSULTANT'S VERIFICATION STAMP

A WE, [KHATIB & ALAMI - MISR], VERIFY THAT THIS A


CONSULTANT'S DOCUMENT

· HAS BEEN PRODUCED AND CHECKED IN ACCORDANCE


WITH CONSULTANT'S QUALITY ASSURANCE PLAN
· IS OF A STANDARD THAT WILL ENABLE THE EMPLOYER
TO ACCEPT IT IN ACCORDANCE WITH THE CONTRACT
· COMPLIES WITH ALL REQUIREMENTS OF THE CONTRACT
FOLLOWING DEVIATIONS TO CONTRACT ARE REFERENCED
FOR WHICH A DISPENSATION HAS BEEN ACCEPTED BY THE
EMPLOYER:

B B

OTHER RELATED LETTERS / RFI WHICH DOCUMENT


CLARIFICATIONS ASSOCIATED WITH THIS DOCUMENT ARE
LISTED BELOW:

CONSULTANT'S PROJECT MANAGER:

C Chadi Sabra
__________ __________ 30.11.2023
________ C
PRINT NAME SIGNATURE DATE

DOCUMENT STATUS STAMP

CODE 1 WORK MAY PROCEED

CODE 2 REVISE & RESUBMIT. WORK MAY PROCEED


SUBJECT TO INCORPORATION OF
COMMENTS INDICATED

CODE 3 REVISE & RESUBMIT. WORK MAY NOT


D PROCEED D
CODE 4 REVIEW NOT REQUIRED. WORK MAY
PROCEED

QW4
THE STATEMENT "WORK MAY PROCEED" APPLIES TO THE
FOLLOWING WORK ACTIVITIES ASSOCIATED WITH THE
MATTERS CONTAINED WITHIN THE CONSULTANT'S
DOCUMENT:
CD-61 4W-Ø150 DESIGN / PROCUREMENT / CONSTRUCTION / ALL * ACTIVITIES

6W-Ø200 ANY REVIEW, COMMENT OR ACCEPTANCE BY EMPLOYER


UNDER THIS CONTRACT WITH RESPECT TO ANY OF
CONSULTANT'S DOCUMENTS SHALL NOT IN ANY WAY BE, OR
E DEEMED TO BE, AN APPROVAL OF ANY WORKS OR AN
E
ACCEPTANCE THAT THE CONSULTANT'S DOCUMENTS MEET
THE REQUIREMENTS OF THE CONTRACT, AS CONSULTANT
HAS THE SOLE RESPONSIBILITY FOR PERFORMING THE
WORKS IN ACCORDANCE WITH THE REQUIREMENTS OF THIS
CONTRACT.

----------------------------- --------------- ------------------


AD PORTS GROUP APPROVAL CODE DATE

F F

004 01.02.24 Issued for Approval/PD AM AO AN

003 15.01.24 Issued for Approval/PD AM AO AN

002 03.01.24 Issued for Approval/PD AM AO AN

QW3
001 30.11.23 Issued for Approval/CD AM AO AN
G Rev Date Description Drawn Chkd Appr
G
Drawn by / Date Checked by / Date Approved by / Date

AM AO AN
Client

H H
Contract No. & Project Title

POTENTIAL 5th SAFAGA PORT


STS CRANE CONTRACT NO. 2800-106

Independent Checking Engineer


J J
Signature

CRANE 5 Contractor
DO NOT SCALE FROM THIS DRAWING

LEGEND:

Signature
Consultant
NOTES:
K -NO. OF CABLE DUCTS AND MANHOLE SIZE ARE GUIDANCE ONLY AND THE FINAL K
-NO. & SIZING ARE SUBJECT TO THE FINAL CALCULATIONS IN THE NEXT STAGE 8 Sebaweih El-Masry St., Cairo, Egypt
T el: (202)-24035548 / 22610540
-THE UNIT OF ALL DUCTS ARE IN mm P.O. Box: 11371 - 8101 Nasr City
www.Khatibalami.com

Drawing Title

INFRASTRUCTURE - DRY UTILITIES


ELECTRICAL
L MEDUIM VOLTAGE CABLE ROUTING LAYOUT L

FILE NAME :14_2800-106-VE-7100-00009,...00012_004


FOR QUAY WALL

PO Sheet Scale Paper Size

04 OF 04 1 : 500 A1
Drawing Status

PRELIMINARY DESIGN
M Drawing No. Revision M
UNCONTROLLED IF PRINTED 2800-106-VE- 7100-00012 004
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 V6

Feb 01, 2024 - 2:12pm Ahmed.Marzouk File Location: X:\CA32002\Elec\00-WIP\02-DWG\01_Sheet\14_2800-106-VE-7100-00009,...00012_004.dwg

You might also like