➢ Revision Of WC Limits ➢ Consortium Lending ➢ Negative convenants ➢ Multiple Banking Agreement ➢ Fund Based Non fund Based ➢ FFR – Federal financial report ➢ Material Adverse Effect ➢ Permitted Indebtedness ➢ Permitted Security Interest ➢ Non-Compliance Interest ➢ Right To Set Off ➢ Drawing Power ➢ Cycle In the Power Sector ➢ Future Of Thermal Power Sector ➢ Can Renewable Energy Replace Thermal Energy ➢ Uttar Pradesh Electricity Regulatory Commission (UPERC 2019) ➢ 100% Benefits In First Year To Project Developer ➢ 10% increases every Year Till It Reaches 50%, Then Benefits In Equal proportion to Generating Company And Beneficiaries ➢ Prudence Check Of Plants ➢ Power Purchase Agreement ➢ Availability Based Tariff ➢ Auxiliary Energy Consumption ➢ Gross Calorific Value ➢ Gross Station Heat Rate = 1.045 * Design Heat Rate ➢ Landed Fuel Cost a. LFC Of Primary Fuel b. LFC Of Secondary Fuel ➢ Max Continuous Rating ➢ Plant Load Factor ➢ Scheduled Commercial Operation Date ➢ Interest During Construction ➢ Incremental Expenditure During Construction ➢ Renovation, Change In Useful Life ➢ Normative Annual Plant Availability Factor ➢ Percent Station Availability Factor – Monthly ➢ Percent Station Avail;Ability Factor – Year ➢ Calorific Value Of Secondary Fuel ➢ Energy Charge Sector ➢ Normative Gross Station Heat Rate ➢ Weighted Average Landed Price ➢ Weighted Average Landed Price Of Primary Fuel ➢ Specified Fuel Oil Consumption ➢ Weighted Average Landed Price Of Secondary Fuel