Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Learnings

➢ SBI Loan T&C


➢ Revision Of WC Limits
➢ Consortium Lending
➢ Negative convenants
➢ Multiple Banking Agreement
➢ Fund Based Non fund Based
➢ FFR – Federal financial report
➢ Material Adverse Effect
➢ Permitted Indebtedness
➢ Permitted Security Interest
➢ Non-Compliance Interest
➢ Right To Set Off
➢ Drawing Power
➢ Cycle In the Power Sector
➢ Future Of Thermal Power Sector
➢ Can Renewable Energy Replace Thermal Energy
➢ Uttar Pradesh Electricity Regulatory Commission (UPERC 2019)
➢ 100% Benefits In First Year To Project Developer
➢ 10% increases every Year Till It Reaches 50%, Then Benefits In Equal
proportion to Generating Company And Beneficiaries
➢ Prudence Check Of Plants
➢ Power Purchase Agreement
➢ Availability Based Tariff
➢ Auxiliary Energy Consumption
➢ Gross Calorific Value
➢ Gross Station Heat Rate = 1.045 * Design Heat Rate
➢ Landed Fuel Cost
a. LFC Of Primary Fuel
b. LFC Of Secondary Fuel
➢ Max Continuous Rating
➢ Plant Load Factor
➢ Scheduled Commercial Operation Date
➢ Interest During Construction
➢ Incremental Expenditure During Construction
➢ Renovation, Change In Useful Life
➢ Normative Annual Plant Availability Factor
➢ Percent Station Availability Factor – Monthly
➢ Percent Station Avail;Ability Factor – Year
➢ Calorific Value Of Secondary Fuel
➢ Energy Charge Sector
➢ Normative Gross Station Heat Rate
➢ Weighted Average Landed Price
➢ Weighted Average Landed Price Of Primary Fuel
➢ Specified Fuel Oil Consumption
➢ Weighted Average Landed Price Of Secondary Fuel

You might also like