The data noes only that the fibre is mineral but does not specify whether it is rock or
glass wool, in our specification we need rock wool the ultrasonic R model is used for
internal walls only and the technical data sheet is old, which means that a new model is
currently on the market.therefore, please update the technical data sheet as shown in the
footer of the technical data sheet.
22009-MAR-CV-0076
MOKHTAR
A 02/03/2024 Issued For Approval HALLOU SAID ZIANI LARBI
MHAMED
Rev Date Reason for Issue Prepared By Checked By Approved by Project
Approval
DEVELOPMENT OF TINRHERT GAS FIELDS
TOWARDS ALRAR “FULL DEVELOPMENT”
EPC2 – LOT1
REVISION HISTORY
HOLDS
CA Response :
Replied by:
CA Engineer: Date:
CA Manager: Date:
BUILDING GENERAL SPECIFICATION
22009-TRHT-ST-CV-09-BE-401_Rev 0
__________________________________________________________________________________________________
- First floor, where equipment of the building are located, considering airlocks at the personnel
entrances to avoid sand ingress and possible damage to electrical and instrumentation equipment.
Within the design shall be included: Battery room, Diesel generator room and HVAC room. Transformers shall
be located outside, adjacent to the building, separated with fire walls and fenced.
Concerning to the foundation system of this building, it shall be designed according to the results that must be
obtained from the Site Survey Geotechnical Report by EPC contractor. Therefore, this system shall be defined
in the phase of detail engineering of the project.
Building shall be air-conditioned as indicated in HVAC DESIGN BASIS AND PHILOSOPHY and HVAC SYSTEM
SPECIFICATION.
The exterior finishing of the facades shall be performed by application of waterproof system consisting of a
cement rendering and exterior treatment paint.
The interior side of roof in the others rooms, will be finished with cement-sand mortar first coat, fine gypsum
plaster and finally plastic painting.
Regarding to finishes of the floor of the building, will be sealed concrete screed layer finished with resin based
paint, antistatic and dust repellent and acid-resistant tiles for battery room. The roof building is a reinforced
concrete slab, with flat shape, provided with a waterproofing protection comprising:
19
PLOT PLAN:
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
PLANT
X
X X X X X X X X X X X X X X X X
X
1 2 3 3' 4 4' 5 6 7 8 8' 9 10 11 12
X
X
X X X X X X X X X X X X X X X X X
X
X
X
NORTH
X
X
X
X
X
X
TRUE
X
30°
X
X
X
X
X
X
X
NORTH
X
X
9000 8000 4300 5050 5575 6000 6000 5375 5000 6000 6000 6000
X
X
X
X
X
X
X
6°
X
X
X
X
X
X
X
X
X
10
X
X
X X X X X X X X X X X X X X X X
X
X
X
X
DRESSING PARAPET BORDERS
X
X
X
X
X
X
X
X X X
X
SUBSTATION AREA
X
X
X
IN COVERED SHEET METAL.
X
X
X
EL. 111.050
X X
X
X
X
X
X
X
X
X
X
X
(TOP)
X
X
X
X
X
X
EL.110.250
X
DRESSING PARAPET BORDERS
X
X
X
ACID RESISTANT VITREOUS CERAMIC TILES UP TO
X
X
X
1800
XX XX XX XX XX XX XX X
(TYP)
X
800
IN COVERED SHEET METAL.
X
(TOC)
600
X
DOOR FRAME HEIGHT.
X
X
X
EL. 109.600
X
X
X
X
PAINTED PLASTER FROM TOP OF DOOR TO CEILING PREVALING
X
X
X
(TOP)
X
X
X
X
WIND
X
650
EL.108.800
X
X X X X X X X X X X X X X X X X
X
800
X
X
X
(TOC)
X
X
X
X
X
CAPACITY 3.5T
X
X
X
X
800
R.C.C
X
X
X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X
STIFFENER
X
X
X
(TYP)
500
X
BATTERY
X
X
X
ROOM
5150
X
THIS DRAWING
X
X
X
SOLIDE
X
AIR LOCK
X
(TYP)
6550
FALSE CEILING BRICK WALL
X
DETAIL ROOM
==
X
GIS ROOM 08 SWITCHGEAR ROOM SWITCHGEAR ROOM
X
X
X
5000
4850
X
X
X
X
X
3765
D1 D1 D1 D1
X
PMS ROOM
X
X
X
2800
2500
X
X
X
X
X
X
X
EL.102.800
X
X
X
X
X
(TOC)
X X X X X X X X X X X X X X X X X X X X
X
X
X
X
X
X
X
X
X
CONCRETE
X
X
X
X
APRON (TYP)
X
X
2700
NAME
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
EL.100.150 EL.100.150
2200
EL.100.000 EL.100.000
(FFL) (FFL)
(FGL) (FGL)
150
(TYP)
(TYP)
2200
150
CHAIN LINK FENCE ELECTRO-WELDED CABLE CELLAR
MESH WITH COATED PVC (REMOVABLE) SHALL BE FILLED WITH 150 THK
WITH ACCESS GATES TO CABLE CELLAR GRAVELLAYER OF SIZE 15/25 MM
ON COMPACTED EARTH
NOTES:
LEGEND :
- 200 THK. SOLID BLOCK WALL
CAT LADDER 2100MM HIGH
STARTED 108.800 EL. - 50 THK. EXPANDED POLYURETHANE BOARD
- 100 THK. SOLID BLOCK WALL
A B C C2 C3 A B C C1 D
DRESSING PARAPET BORDERS - R.C.C STIFFENER, (350x200)
CAGE LADDER
7500MM HIGH IN COVERED SHEET METAL. - R.C.C STIFFENER, (200x200)
FROM 102.800 EL. 5400 5400 5625 5625
5400 5400 3000 10100 - R.C.C WALL
EL.111.050 ROOF CONCEPTUAL GA FOR TRANSFORMERS
(TOP) SHED REF (22009-TRHT-DG-CV-09-BY-409/410) EL.110.000 - PAINTED PLASTER ON RCC
ROOF CONCEPTUAL GA FOR TRANSFORMERS EL.110.250 (TOP)
SHED REF (22009-TRHT-DG-CV-09-BY-409/410)
1700
1450
(TOC) CORRUGATED STEEL
EL.108.800 - PAINTED PLASTER ON MASONRY
1200
EL.109.600 SHEETING 0.75MM THK
CORRUGATED STEEL (TOC) CAGE LADDER
(TOP)
SHEETING 0.75MM THK 7700MM HIGH - CHAIN LINK FENCE
200
EL.108.800 ELW. 106.850 ELW. 107.770
1600
800
900
DRESSING PARAPET BORDERS (TOC) (TOC)
EL.107.150
FGL - FINISHED GRADE LEVEL
ELW. 106.850 ELW. 107.770
IN COVERED SHEET METAL. 6
(TOC) (TOC) (TOP) FFL - FINISHED FLOOR LEVEL
650
6 EL.107.150 1
800 1050
1 ELW. 106.400 EL.106.350
1150
(TOP) (TOC) (TOC) EL.105.800
TOC - TOP OF CONCRETE
1600
800
4850
(TOW) (TOC)
- WALL CUTOUT
1100
ELW. 105.600
SWITCHGEAR ROOM POWER
4850
(TOW)
TRANSFORMER BAY
2950
ELW. 103.250
DETAIL
(TOW)
2
10
DETAIL
50
EL.102.800 EL.102.800 D4
08
15MM INTERNAL PLASTER BOARD CLADDING
EL.102.800 FALSE CEILING
400
3000
POWER 09 EQUIPMENT
SOLIDE
5050
2050
BRICK WALL RC SLAB
2050 200
150
(FGL) (FGL)
PLINTH BEAM
150
EL.99.200
(TYP) HOLD 03 TECHNICAL FALSE (TOC)
ISOLATION JOINT (TYP)
FLOOR DETAIL
PLINTH BEAM (TYP)
22009 - TRHT - DD - CV - 00 - ZO - 403 STANDARD DETAILS OF ANCHOR BOLT ASSEMBLIES
GRADE SLAB ON GRADE SLAB ON
COMPACTED EARTH COMPACTED EARTH 22009 - TRHT - ST - CV - 00 - ZS - 401 SITE PREPARATION SPECIFICATION
22009 - TRHT - ST - CV - 00 - OO - 401 CONCRETE SPECIFICATION
22009 - TRHT - DF - PI - 00 - OO - 401 OVERALL PLOT PLAN - TINRHERT ALRAR CPF
22009 - TRHT - ST - CV - OO - 402 GENERAL NOTES, ABBREVIATIONS AND LEGENDS FOR CONCRETE WORKS
22009 - TRHT - ST - CV - OO - 401 GENERAL NOTES, ABBREVIATIONS AND LEGENDS FOR CONCRETE WORKS
SECTION B SECTION C
2 SCALE 1:100 3 SCALE 1:100
FOR CONSTRUCTION
ROCK WOOL INSULATION 16 MM THICK CEMENT PLASTER (TYP) PLASTER BOARD CLADDING 16 MM THICK CEMENT SOLID BRICK WALL 16 MM THICK CEMENT
PLASTER (TYP) 16 MM THICK CEMENT PLASTER (TYP) PLASTER (TYP)
PLASTER 50 MM THICK EXPANDED 50 MM THICK EXPANDED
16 MM THICK CEMENT PAINTED FINISH ROCK WOOL INSULATION ROCK WOOL INSULATION
PLASTER (TYP) PAINTED FINISH PAINTED FINISH PAINTED FINISH
PAINTED FINISH 16 MM THICK CEMENT 16 MM THICK CEMENT
PLASTER (TYP) FLOOR PANNEL PLASTER (TYP)
INSIDE OUTSIDE INSIDE INSIDE PAINTED FINISH INSIDE PAINTED FINISH INSIDE
OUTSIDE
OUTSIDE
ADJUSTABLE JACKING
..\Signature\Signature KOHIL.png
..\Signature\Signature KOHIL.png
EXTERNAL & INTERNAL SOLID BRICK WALL SECTION EXTERNAL RCC WALL & PLASTER BOARD INSULATION EXTERNAL RCC WALL & SOLID BRICK INSULATION
8 SCALE 1:20 9 SCALE 1:20 10 SCALE 1:20
FLOOR PANELS
D C1 12 10
CRINOLINE LADDER N°01
6350MM HIGH
TINRHERT FIELDS DEVELOPMENT EPC2 LOT 1
10400 12000
STARTED FROM 100.200 EL EL.105.800 EL.105.800 CONSTRUCTION OF SEPARATION AND DECARBONATION UNITS AT ALRAR
(TOP)
EL.105.000
(TOP)
EL.105.000
TECHNICAL FALSE FLOOR DETAIL
800
800
(TOC) (TOC)
40mm
40mm
5mm
D1a
LOCAL
PEDESTAL
1000 EQUIPMENT 1000
2000 2000
3000
3000