ON THE GUIDELINES

Comments
All necessary permits for the implementation of the works for the project, shall be secured by the
contractor and the costs incurred thereof shall be for the contractor’s account.
Christopher Cortez
• 5:00 PM, Mar 13 (PST)
New
@don.orido@aboitiz.com currently BP and OP for Housing are being handled by Aland c/o
EA. Let me know if we are going to revise this policy.
Assigned to you
Open
- TRM must not proceed with the awarding of contract without the above cited provisions.
Christopher Cortez
• 5:03 PM, Mar 13 (PST)
New
@don.orido@aboitiz.com Sir Don, can we please request these in particular? 6.1.1?
Assigned to you
Open

2 comments
25%
Christopher Cortez
• 5:04 PM, Mar 13 (PST)
New
We are currently requiring 20%. If this is approved, we will change it accordingly.
Open
3
Christopher Cortez
• 5:05 PM, Mar 13 (PST)
New
Item 4
ade Garzon

• 8:28 AM, Mar 14 (PST)


New

how can this be guaranteed?

Open

certain that contractors’ supplier

Jade Garzon

• 8:29 AM, Mar 14 (PST)


New

Same comment as above. The affidavit is only our guarantee

Please review the general condition of contract since many of the clause you mentioned in the guidelines are already there, and in effect since
it's legally binding

This should retain to Aland for us to have more control over the application of BP and OP

Open

5 comments

25%

Christopher Cortez

• 5:04 PM, Mar 13 (PST)

We are currently requiring 20%. If this is approved, we will change it accordingly.

Jade Garzon

• 8:44 AM, Mar 14 (PST)


New

20% performance bond is to warrant workmanship for billed items in case contractors be
defaulted and its the industry standard. Any reason on increasing to 25%?

Open
Jade Garzon

• 8:40 AM, Mar 14 (PST)


New

Please revisit the GCC for alignment to this clause as there are instances there where
change orders and time extension are allowed

Open

Security and Safety Team must not allow the contractor to mobilize in the project site without the
document listed in item 4.

Jade Garzon

• 8:46 AM, Mar 14 (PST)


New

This will further delay the start of the construction.Suggest that this be complied instead
within a certain time frame after mobilization (say 1 month)

Open

Down payment is usually 10% of the total project cost.

Jade Garzon

• 8:48 AM, Mar 14 (PST)


New

I dont know if you can attract contractor with 10% dp. Industry standard is 20-30%. Any
basis on the 10%?

must not be lower than 3% of the total project cost

Rollyn Pacaldo

• 9:08 AM, Mar 14 (PST)


New

@don.orido@aboitiz.com will this be applied to all packages?

Assigned to you

Rollyn Pacaldo

• 9:09 AM, Mar 14 (PST)


New

It seems too high for site dev and other horizontal packages.

here are my comments on the OSH Manual:


1. These are just for residential, commercial and industrial buildings as
stated in the introduction. What about land devt works, amenities, landscaping
and head office?
2. Do you still need to have the commercial and industrial BUs in this OHSM?
3. How do you intend to roll this out?
4. What are the budget constraints? Where will you get the budget to implement
this? its better that you prepare a budgetary program to initiate this.
5. What are the comments of the other departments, specifically the people on
the ground?
6. This is similar to the OSH Program/Manual submitted to DOLE
7. Can you prepare or do you have a short version of this wherein all the key
points and elements are listed down and for immediate compliance?
8. What will be the effect on manpower if this will be implemented across all
projects? who will shoulder the additional cost for overhead? will these
people be under Aboitizland as an organic member or project hired?
9. Costs of PPEs for contractors? What about the costs of PPEs of our own
personnel?
10. I didn't see Covid Protocols in the manual.