3B Signage Trading Ms. Jane

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

June 5, 2023

MR. & MRS. BERNIE LEANILLO


BLOCK 22 LOT 9 VELMIRO
CAGAYAN DE ORO CITY

Good day Sir,


This is the quotation for the renovation works. We can discuss further if you have concerns.
Thank you for considering us for this project. You may contact me directly at 09066203347.

Ite
m
No. Description Qty Unit Unit rate Total
GENERAL REQUIREMENTS 22,788.36
Mobilization/Demobilization including hauling
of materials and disposal of waste 1 lot 22,788.36 22,788.36
EXTERIOR AREA 268,738.00
1 Earthworks
a. Soil compaction 91.75 sqm 100.00 9,175.00
b. Gravel bedding 5 cu.m 900.00 4,500.00
Structural works (Supply of materials and
2 labor for floor concreting)
a. Parking area 4.44 cu.m 10,000.00 44,400.00
b. Laundry area/dirty kitchen 3.58 cu.m 10,000.00 35,800.00
c. Path walk 0.82 cu.m 10,000.00 8,200.00
d. Patio (below balcony) 1.63 cu.m 10,000.00 16,300.00

3 Masonry works (CHB wall & plastering)


a. Laundry area 2.35 sqm 1,450.00 3,407.50
b. Dirty kitchen 1.95 sqm 1,450.00 2,827.50
c. Plant box 1.93 sqm 1,450.00 2,798.50
d. Patio (below balcony) 3 sqm 1,450.00 4,350.00
4 Tile works
a. Path walk 3.44 sqm 1,350.00 4,644.00
b. Patio (below balcony) 13.52 sqm 1,350.00 18,252.00
Fence (front side only) - CHB wall &
5 plastering
a. Columns (6pcs) 1.3 cu.m 10,000.00 13,000.00
b. Concrete hollow blocks (wall) 2.1 sq.m 1,350.00 2,835.00
c. Fence (rectangular tube) 212.46 m 350.00 74,361.00
d. Painting 6.75 sq.m 650.00 4,387.50
e. Lights 2 pcs 1,500.00 3,000.00
Landscaping (using white & orange stones,
6 bermuda) 1 lot 16,500.00 16,500.00
INTERIOR AREA 870,680.00
GROUND FLOOR 472,120.00

Modular kitchen (Supply of materials and


labor including countertop granite, sink &
faucet, overhead cabinets) - supply of 180,000.0
1 rangehood & cooktop not included 1 lot 0 180,000.00
a. Kitchen pull-out basket trays (cutlery
organizer, cups&glass, plates, gas cylinder,
garbage can) 1 lot 17,500.00 17,500.00
b. Bar stools (solid wood) 4 pcs 2,500.00 10,000.00
3 TV rack/cabinet 1 lot 60,000.00 60,000.00
a. WPC panel (behind TV stand) 1 lot 39,500.00 39,500.00
4 Pull out cabinet under stairs 1 lot 67,200.00 67,200.00
a. WPC panel (beside stairs) 1 lot 36,000.00 36,000.00
5 Medicine & Bathroom Base Sink 1 lot 16,800.00 16,800.00
6 Toilet glass partition 1 lot 15,000.00 15,000.00
7 Ceiling
a. Cove design ceiling 5.8 lot 1,400.00 8,120.00
b. Electrical (strip lights, pin lights, chandelier
& wirings) 1 lot 22,000.00 22,000.00
c. Painting 5.8 sq.m 650.00 3,770.00
SECOND FLOOR 398,560.00
Master's bedroom

a. Queen-size bed frame with headboard 1 lot 39,000.00 39,000.00


b. Wardrobe 1 lot 66,000.00 66,000.00
c. Vanity table 1 lot 4,500.00 4,500.00
d. Medicine & Bathroom Base Sink 1 lot 16,800.00 16,800.00
e. Toilet glass partition 1 lot 15,000.00 15,000.00
f. WPC panel (behind bed) 1 lot 28,500.00 28,500.00
g. Split type aircon 1HP (supply and
installation) 1 lot 35,000.00 35,000.00
Bedroom 2
a. Single bed frame 1 lot 22,400.00 22,400.00
b. Wardrobe 1 lot 41,800.00 41,800.00

c. Medicine & Bathroom Base Sink (common) 1 lot 16,800.00 16,800.00


d. Toilet glass partition 1 lot 15,000.00 15,000.00
Bedroom 3
a. Single bed frame 1 lot 22,400.00 22,400.00
b. Wardrobe 1 lot 44,000.00 44,000.00
Living area
a. Hanging cabinet 1 lot 31,360.00 31,360.00
OTHERS 138,000.00
Korean blinds
a. Bedrooms 1 lot 25,000.00 25,000.00
b. Living area and kitchen 1 lot 52,000.00 52,000.00
c. Bathroom 1 lot 5,000.00 5,000.00
Screendoors & screen windows 1 lot 56,000.00 56,000.00
TOTAL AMOUNT 1,300,206.36

Payment terms:
PRICE STILL NEGOTIABLE
Respectfully yours,
50% DOWN PAYMENT
40% PROGRESS BILLING
10% PAYMENT UPON COMPLETION
Engr. Francis Jane O. Mejias
Duration: 20-30 days from the receipt of down payment Contractor