First Gulf Bank Basement1 Modification Report

Owner: First Gulf Bank Head Quarters, Abu Dhabi, UAE

Project: First Gulf Bank Basement 1 Wall Modification

Consultant:

First Gulf Bank Basement1 Modification


Report.
First Gulf Bank Head Quarters, Abu DESIGN REPORT REVISION 00
Dhabi, UAE
CONTENTS
1. Introduction

2. General

3. Design Codes

4. Project Descriptions

5. Structural System Descriptions

6. Analysis Design Methods

7. Analysis Design Tools

8. Design Loads

9. Design Calculation

10. Conclusion

First Gulf Bank Basement1 Modification


Report.
First Gulf Bank Head Quarters, Abu DESIGN REPORT REVISION 00
Dhabi, UAE
1.0 INTRODUCTION
This Report has been to check the structural design of above said structure. Therefore, it was essential to
verify the adequacy of structural design of vertical elements.

2.0 GENERAL
This section summarizes the design concept, criteria, assumptions and approaches that are adopted in Civil
and Structural Engineering services for the project. The proposed values have been established as being the
most appropriate for the project, in full compliance with international standards and excellent practice taking
into consideration constrains and limitations associated with the project.

3.0 PROJECT DESCRIPTION


The project consists of checking the capacity of an existing reinforced concrete wall for the proposed door
opening.

4.0 DESIGN CODES AND LOAD COMBINATIONS USED

The following standards will form the basis of the design.

ACI-318-08 Code of practice for concrete design


IBC-2009 International Building Code
ASCE-2005 Loads Imposed on Buildings
LIMIT STATE LOAD COMBINATION USED AS PER IBC 2009
1.4 DL
1.2 DL+1.6 LL.
1.2D+0.8W
1.2D+1.6W+LL
1.2D+LL
0.9D+1.6W
WORKING STRESS DESIGN COMBINATION USED AS PER IBC 2009
DL + LL
D+0.75W+0.75LL.
D+W.
0.6D+W.

First Gulf Bank Basement1 Modification


Report.
First Gulf Bank Head Quarters, Abu DESIGN REPORT REVISION 00
Dhabi, UAE
5.0 STRUCTURAL SYSTEM DESCRIPTION

Wall Thickness: 200mm

Wall Height: 5250mm

Concrete grade: C40

6.0 ANALYSIS & DESIGN METHODS

Design shall provide for the appropriate concrete thicknesses and steel reinforcement patterns for structural
members to resist bending moment, thrust and shear effects imposed by reasonable loads on the structure.

7.0 ANALYSIS & DESIGN TOOLS

The following computer software shall be used to develop the structural load analysis for both of lateral and
vertical loads, however, to ensure the validity and adequacy of the analysis, more hand spot check will be
performed based on the basic academic procedures of the structural analysis and the experience of the
designer, all as part of the quality assurance and quality control internal plan.

AUTOCAD 2012 CAD Drafting


ETABS 9.7.4 For analysis and design
PCA Column For column design

First Gulf Bank Basement1 Modification


Report.
First Gulf Bank Head Quarters, Abu DESIGN REPORT REVISION 00
Dhabi, UAE
3-D View of the structure

First Gulf Bank Basement1 Modification


Report.
First Gulf Bank Head Quarters, Abu DESIGN REPORT REVISION 00
Dhabi, UAE
8.0 LOADS

Imposed loads at ground floor level (above level of RC Wall being considered).

Super Imposed Deadload:

Floor Pressure: 3.0 KN/m^2

First Gulf Bank Basement1 Modification


Report.
First Gulf Bank Head Quarters, Abu DESIGN REPORT REVISION 00
Dhabi, UAE
Live loads:

Building Area = 5.0 KN/m^2

Open Area (Fire Truck) = 20.0 KN/m^2

First Gulf Bank Basement1 Modification


Report.
First Gulf Bank Head Quarters, Abu DESIGN REPORT REVISION 00
Dhabi, UAE
8.1 SEISMIC LOAD PARAMETERS:

Input data:
Ss = 0.6
S1 = 0.18
Site Class type : C
Response Modification Factor, R = 5.5
Importance Factor, I = 1.0

First Gulf Bank Basement1 Modification


Report.
First Gulf Bank Head Quarters, Abu DESIGN REPORT REVISION 00
Dhabi, UAE
9.0 CHECK FOR CAPACITY OF EXISTING R.C. WALL
By Etabs

Wall Flexural Capacity:

As provided:
Vertical: T16 @150mm
Horizontal: T12 @ 200mm

Etabs Design Results:


Capacity Ratio:
Top : 0.203 < 1.0 Hence sufficient!
Bottom: 0.227 < 1.0 Hence sufficient!

Required Shear Reinforcements: Provided:


Top and Bottom = 500 mm^2 T12 @ 200 = 1130 mm^2, hence sufficient!

First Gulf Bank Basement1 Modification


Report.
First Gulf Bank Head Quarters, Abu DESIGN REPORT REVISION 00
Dhabi, UAE
9.1 SPANDREL BEAM FLEXURAL CAPACITY

- By Etabs

Required steel areas : Provided:

Flexural Reinforcements:
Top = 233 mm^2, 3-T16 = 603 mm^2, hence sufficient!
Bottom = 48 mm^2 3-T16 = 603 mm^2, hence sufficient!

Shear Reinforcements:
Top and Bottom = 852 mm^2 T10 @ 150 = 1047 mm^2, hence sufficient!

First Gulf Bank Basement1 Modification


Report.
First Gulf Bank Head Quarters, Abu DESIGN REPORT REVISION 00
Dhabi, UAE
9.1.1 SPANDREL BEAM FLEXURAL CAPACITY

- By Manual Calculation

From analysis:
Moment required = 35 KN.m

Provided Moment Capacity > Moment Required, hence sufficient!

First Gulf Bank Basement1 Modification


Report.
First Gulf Bank Head Quarters, Abu DESIGN REPORT REVISION 00
Dhabi, UAE
9.1.2 SPANDREL BEAM SHEAR CAPACITY
- By Manual Calculation

From analysis:
Shear required = 186 KN

First Gulf Bank Basement1 Modification


Report.
First Gulf Bank Head Quarters, Abu DESIGN REPORT REVISION 00
Dhabi, UAE
9.1.3 Stiffiner Column Capacity
By PCA Column

From Analysis requirements:


Pu = 422 KN
Mu = 74 KN.m
Provided:
Column Section : 200 X 400
Reinforcement : 8T16

Capacity:

First Gulf Bank Basement1 Modification


Report.
First Gulf Bank Head Quarters, Abu DESIGN REPORT REVISION 00
Dhabi, UAE
9.1.4 Existing RC Wall Capacity
By PCA Column

From Analysis requirements:


Pu = 2450 KN
Mu = 1700 KN.m
Provided:
Effective Section : 200 X 4000
Existing Reinforcements: Vertical = T16 @ 150
Horizontal = T12 @ 200

Capacity:

First Gulf Bank Basement1 Modification


Report.
First Gulf Bank Head Quarters, Abu DESIGN REPORT REVISION 00
Dhabi, UAE
10.0 Conclusion and Recommendation:
Structural analysis and design of the said existing wall with the modification details
shown below has been checked of its flexural and shear capacity and proven
sufficient for the proposed door opening.

First Gulf Bank Basement1 Modification


Report.
First Gulf Bank Head Quarters, Abu DESIGN REPORT REVISION 00
Dhabi, UAE
First Gulf Bank Basement1 Modification
Report.
First Gulf Bank Head Quarters, Abu DESIGN REPORT REVISION 00
Dhabi, UAE