MAINTENANCE ASSESSMENT FORM - SEALED ROADS

Link :
Roads Number Road Type FROM
Start Kilometre Date TO
PAVEMENT TYPE
PAVEMENT WIDTH m
SHOULDER WIDTH m
SHOULDER TYPE
URGENT No.
SPOT IMPROVEMENT m
Grass sq.m
VEGETATION
Shrubs sq.m
Unlined - Clear m
Unlined - Re-dig m
Unlined - Construct m
DRAINAGE
Lined - Clear m
Lined - Re-dig m
Lined - Construct m
Drain lining m
Mitres m
SPECIAL DRAINAGE
Spillways No.
Re shape m
Fill cu. m.
Protection - height m
SLOPES
Protection - length m
Grade sq.m
Clear sq. m
Fill cu. m.
SHOULDER
Cut cu. m.
Concrete - construct cu. m.
Seal cracks sq.m
Edge repairs m
Fill potholes sq.m
Cut and patch sq.m
CARRIAGEWAY
Pavement replacement sq.m
Backlog Minim - Corrector m
Backlog Minim - Primerseal sq.m
Backlog Minim - Small Agg. sq.m
Number No.
CULVERTS Existing Clear No.
Repair aprons, h'walls No.
Provide No.
CULVERTS New Length m
Size cm
Inspect No.
Repair-deck, approach sq.m
BRIDGES Existing
Repair - safety rail m
River protection m
Provide No.
BRIDGES New Length m
Size cm
Missing/damaged furniture No.
SAFETY
Missing/damaged guardrail m
Page :

Remarks :
of :
FORMULIR PERHITUNGAN PEMELIHARAAN - JALAN ASPAL HALAMAN : DARI :

RUAS :

NOMOR RUAS TIPE JALAN DARI Koordinat GPS

AWAL KILOMETER TANGGAL KE

TIPE PERKERASAN JALAN

LEBAR PERKERASAN JALAN m

TIPE BAHU JALAN

LEBAR BAHU JALAN m

PEMELIHARAAN RUTIN
Rumput sq.m
TANAMAN
Semak sq.m

Tanah - Pembersihan (Sampah) m


DRAINASE
Ps Bt Mortar - Pembersihan (Sampah) m

BAHU JALAN Pembersihan - Pemerataan - Pemadatan sq.m

Aspal Retak (< 10% / 100m) sq.m

PERKERASAN JALAN Laburan Aspal (< 10% / 100m) sq.m

Aspal Lubang (< 40x40 cm) cu.m

GORONG-GORONG (Existing) Pembersihan (Sampah) m

Pembersihan - Drainase m

Pembersihan - Sambungan Muai m


JEMBATAN (Existing)
Pembersihan - Lantai, Oprit, Bwh Jbt sq.m

Perbaiki - Rel Pengaman m

Perbaiki - Marka Jalan sq.m

Perbaiki - Rambu Jalan No.

Perbaiki - Patok Pengarah No.


PERLENGKAPAN JALAN (Existing)
Perbaiki - Rel Pengaman m

Perbaiki - Patok Kilometer No.

Perbaiki - Patok Hektometer No.

BMW - BACKLOG & MINOR WORKS

Tanah - Galian (Sedimen) m

Tanah - Baru cu.m


DRAINASE
Ps Bt Mortar - Galian (Sedimen) m

Ps Bt Mortar - Baru cu.m

Panjang m

PROTEKSI LERENG Tebal m

Tinggi m

Timbunan cu.m

Panjang m
DINDING PENAHAN TANAH
Tebal m

Tinggi m

Timbunan cu.m

BAHU JALAN Galian cu.m

Beton - Rabat cu.m

Aspal Retak (> 10% / 100m) sq.m

Laburan Aspal (> 10% / 100m) sq.m


PERKERASAN JALAN
Aspal Tepi Perkerasan cu.m

Aspal Lubang (> 40x40 cm) cu.m

Pembersihan (Sedimen) cu.m


GORONG-GORONG (Existing)
Perbaiki - Lantai, Kepala cu.m

Panjang m

GORONG-GORONG (Baru) Lebar m

Tinggi m

Perbaiki - Lantai cu.m

Perbaiki - Oprit cu.m


JEMBATAN (Existing)
Perbaiki - Kepala cu.m

Proteksi Sungai cu.m

Panjang m

JEMBATAN (Baru) Lebar m

Tinggi m

Marka Jalan sq.m

Rambu Jalan No.

PERLENGKAPAN JALAN (Baru)


Patok Pengarah No.
PERLENGKAPAN JALAN (Baru)
Rel Pengaman m

Patok Kilometer No.

Patok Hektometer No.


DINAS PEKERJAAN UMUM BINA MARGA
KABUPATEN MALANG
BIDANG PEMELIHARAAN
Jl. Trunojoyo Kav. 6 Kepanjen Telp. & Fax (0341) 393930

DOKUMEN

HASIL PELAKSANAAN PEKERJAAN


PEMELIHARAAN RUTIN JALAN 13
PEKERJAAN : TTL, Lapen, Burtu

KONDISI JALAN KABUPATEN :


RUAS JALAN JLN SIDODADI KEC. KEPANJEN

BULAN : MEI

TAHUN ANGGARAN 2022


KEGIATAN PEMELIHARAAN RUTIN JALAN
FORMULIR SURVEI
01 KONDISI PERKERASAN HAL : /

NOMOR RUAS : RUAS JALAN : DARI

AWAL KM : TANGGAL : GIS KUANTITAS & NO. ITEM


SATUAN
KOORDINAT GIS KM AWAL : KE

KOORDINAT GIS KM AKHIR : GIS SUB TOTAL NO. ITEM

TIPE PERKERASAN JALAN Perkerasan lentur ( Aspal ) / Perkerasan Kaku (Beton)

LEBAR PERKERASAN JALAN m

TIPE BAHU JALAN (Agregat Kelas S / Beton K-175)

LEBAR BAHU JALAN m

RM - PEMELIHARAAN RUTIN

Penambalan Lubang dengan Aspal / Patching (≤ 40x40 cm) m3 10.1.(1a)

Penambalan Lubang dengan Agregat Kelas A / Rekonstruksi ( ≤ 40x40 cm) m3 8.1.(1)

Penambalan Tepi Perkerasan dengan Aspal / Patching (≤ 40x40 cm) m3 10.1.(1a)


PERKERASAN JALAN
Penambalan Tepi Perkerasan dengan Agregat Kelas A/ Rekonstruksi (≤ 40x40 cm) m3 8.1.(1)

Laburan Aspal / seal coating / crack sealing (≤ 10% / 100m) m2 10.1.(1b)

Agregat Penutup BURTU m3 6,2,(1)

BMW - BACKLOG & MINOR WORKS

Penambalan Lubang dengan Aspal / Patching (> 40x40 cm) m3 SKh. 1.6.3.3a

Penambalan Lubang dengan Aspal / Patching Lapen (> 40x40 cm) m3 8.1.(7)

Penambalan Lubang dengan Agregat Kelas A / Rekonstruksi (> 40x40 cm) m3 8.1.(1)

PERKERASAN JALAN Galian Perkerasan berbutir m3 3.1.(8)

Penambalan Tepi Perkerasan dengan Aspal / Patching (> 40x40 cm) m3 8.1.(5)

Penambalan Tepi Perkerasan dengan Agregat Kelas A / Rekonstruksi (> 40x40 cm) m3 8.1.(1)

Laburan Aspal / seal coating / crack sealing (> 10% / 100m) m2 8.1.9

HT - HOLDING TREATMENT

Penyiapan Badan Jalan m2 3.3.(1)

PERKERASAN JALAN Agregat Tanpa Penutup Aspal m3 8.1.(3)

Lapis Resap Pengikat (Prime Coat) m2 6.1.(1a)

CATATAN :
REKAPITULASI KUANTITAS HASIL SURVEI

Nama Ruas :
Panjang Ruas :
Tanggan SurveI :
Tim SurveI :

No. Mata Uraian Satuan


Pembayaran

a b c

DIVISI 1. UMUM
1.2 Mobilisasi LS
1.8.(1a) Rangka Rambu Multi Pesan Buah
1.8.(3) Rambu Multi Pesan Buah
1.8.(4) Traffic Cone Buah
1.8.(5) Pagar Keselamatan dari Anyaman Plastik (Barrier Mesh) M1
1.8.(6) Pagar Keselamatan Buah
1.8.(7) Rambu Jalan Stop / Pelan-Pelan (Lolypop) Buah
1.8.(8) Bendera Oranye dengan Tali (Orange Bunting) M1
1.8.(9) Kendaraan untuk Pemeliharaan Jalan Buah
1.17 Pengamanan Lingkungan Hidup LS

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3
2.2.(1) Pasangan Batu dengan Mortar M3

Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 3. PEKERJAAN TANAH


3.2.(2a) Timbunan Pilihan dari sumber galian M3
3.3.(1) Penyiapan Badan Jalan M2

Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN


4.2.(1) Lapis Pondasi Agregat Kelas A M3
4.2.(2a) Lapis Pondasi Agregat Kelas B M3
4.2.(2b) Lapis Pondasi Agregat Kelas S M3
4.2.(3) Semen untuk Lapis Pondasi Semen Tanah Ton
4.2.(4) Lapis Pondasi Semen Tanah M3
4.2.(5) Agregat Penutup BURTU M2
4.2.(6) Bahan Aspal untuk Pekerjaan Pelaburan Liter
4.2.(7) Lapis Resap Pengikat Liter
4.2.(8) Lapis Resap Perekat Liter
4.2.(9) Laston Lapis Antara (AC-BC) Ton
4.2.(10) Laston Lapis Antara Modifikasi (AC-BC Mod) Ton
4.2.(11) Laston Lapis Pondasi (AC-Base) Ton
4.2.(12) Laston Lapis Pondasi Modifikasi (AC-Base Mod) Ton
4.2.(13) Bahan anti pengelupasan Kg
4.2.(14) Perkerasan Beton Semen M3
4.2.(15) Perkerasan Beton Semen dengan anyaman Tulangan Tunggal M3
4.2.(16) Lapis Pondasi Bawah Beton Kurus M3

Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 5. PERKERASAN BERBUTIR


5.1.(1) Lapis Pondasi Agregat Kelas A M3
5.1.(2) Lapis Pondasi Agregat Kelas B M3
5.2,(1) Lapis Permukaan Agregat Tanpa Penutup Aspal M3
5.2,(2) Lapis Pondasi Agregat Tanpa Penutup Aspal M3
5.3.(1) Perkerasan Beton Semen M3
5.3.(2) Perkerasan Beton Semen dengan Anyaman Tulangan Tunggal M3
5.3.(3) Lapis Pondasi Bawah Beton Kurus M3
5.4.(1) Semen untuk Lapis Pondasi Semen Tanah Ton
5.4.(2) Lapis Pondasi Semen Tanah M3
5.5.(1) Lapis Pondasi Agregat Semen Kelas A (Cement Treated Base) (CTB) M3
5.5.(2) Lapis Pondasi Agregat Semen Kelas B (Cement Treated Sub Base) (CTSB) M3

Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 6. PERKERASAN ASPAL


6.1.(1a) Lapis Resap Pengikat - Aspal Cair Liter
6.1.(1b) Lapis Resap Pengikat - Aspal Emulsi Liter
6.1.(2a) Lapis Perekat - Aspal Cair Liter
6.1.(2b) Lapis Perekat - Aspal Emulsi Liter
6.1.(2c) Lapis Perekat - Aspal Emulsi Modifikasi Liter
6.2 (1) Agregat Penutup BURTU M2
6.2 (2) Agregat Penutup BURDA M2
6.2 (3a) Bahan Aspal untuk Pekerjaan Pelaburan Liter
6.2 (3b) Bahan Aspal Modifikasi untuk Pekerjaan Pelaburan Liter
6.2 (4a) Aspal Cair Emulsi untuk Precoated Liter
6.2 (4b) Aspal Emulsi untuk Precoated Liter
6.2 (4c) Aspal Emulsi Modifikasi untuk Precoated Liter
6.2 (4d) Bahan Anti Pengelupasan Kg
6.3 (1) Latasir Kelas A (SS-A) Ton
6.3 (2) Latasir Kelas B (SS-B) Ton
6.3(3a) Lataston Lapis Aus (HRS-WC) (gradasi senjang/semi senjang) Ton
6.3(3b) Lataston Lapis Aus Perata (HRS-WC(L)) (gradasi senjang/semi senjang) Ton
6.3.(4a) Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang) Ton
6.3.(4b) Lataston Lapis Pondasi Perata (HRS-Base(L)) (gradasi senjang/semi senjang) Ton
6.3(5a) Laston Lapis Aus (AC-WC) Ton
6.3(5b) Laston Lapis Aus Modifikasi (AC-WC Mod) Ton
6.3(5c) Laston Lapis Aus Perata (AC-WC(L)) Ton
6.3(5d) Laston Lapis Aus Modifikasi Perata (AC-WC(L)Mod) Ton
6.3(6a) Laston Lapis Antara (AC-BC) Ton
6.3(6b) Laston Lapis Antara Modifikasi (AC-BC Mod) Ton
6.3(6c) Laston Lapis Antara Perata (AC-BC(L) Ton
6.3(6d) Laston Lapis Antara Modifikasi Perata (AC-BC(L)Mod) Leveling Ton
6.3(7a) Laston Lapis Pondasi (AC-Base) Ton
6.3(7b) Laston Lapis Pondasi Modifikasi (AC-Base Mod) Ton
6.3(7c) Laston Lapis Pondasi Perata (AC-Base(L)) Ton
6.3(7d) Laston Lapis Pondasi Modifikasi Perata (AC-Base(L)Mod) Ton
6.3.(8) Bahan Anti Pengelupasan Kg
6.5.(1) Campuran Aspal Dingin untuk Pelapisan M3
6.6.(1) Lapis Permukaan Penetrasi Macadam M3
6.6.(2) Lapis Pondasi/Perata Penetrasi Macadam M3

Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 7. STRUKTUR
7.1 (1) Beton mutu tinggi fc’50 Mpa M3
7.1 (2) Beton mutu tinggi fc’45 Mpa M3
7.1 (3) a Beton mutu tinggi fc’40 Mpa dengan traveler M3
7.1 (3) b Beton mutu tinggi fc’40 Mpa perancah M3
7.1 (4) Beton mutu tinggi fc’35 Mpa M3
7.1 (5) a Beton mutu sedang fc’30 MPa lantai jembatan M3
7.1 (5) b Beton mutu sedang fc’30 MPa untuk Slab Culvert M3
7.1 (6) Beton mutu sedang fc’25 Mpa (K-300) M3
7.1 (7) a Beton mutu sedang fc’20 MPa (K-250) M3
7.1 (7) b Beton mutu sedang fc’20 MPa yang dilaksanakan di air M3
7.1 (8) Beton mutu rendah fc’15 MPa (K-175) M3
7.1 (9) Beton Siklop fc’15 Mpa M3
7.1 (10) Beton mutu rendah fc’10 Mpa (K-125) M3
7.2 (1a) Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter Buah
7.2 (1b) Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter Buah
7.2 (1c) Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang … meter Buah
7.2 (2a) Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter Buah
7.2 (2b) Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter Buah
7.2 (2c) Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang … meter Buah
7.2 (3)a Penyediaan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah
7.2 (3)b Penyediaan Unit Pracetak Gelagar Tipe U Bentang … meter Buah
7.2 (4)a Pemasangan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah
7.2 (4)b Pemasangan Unit Pracetak Gelagar Tipe U Bentang … meter Buah
7.2.(5) Penyediaan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter Buah
7.2.(6) Pemasangan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter Buah
7.2.(7) Baja Prategang Kg
7.2.(8) Penyediaan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter Buah
7.2.(9) Pemasangan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter Buah
7.2.(10) Beton Diafragma fc’ 30 MPa termasuk pekerjaan penegangan setelah pengecoran (post tensi m3
7.2.(11).a Penyediaan balok gelagar Tee Beam bentang 60 m Buah
7.2.(11).b Pemasangan balok gelagar Tee Beam bentang 60 m Buah
7.2.(12).a Penyediaan panel full deph slab Buah
7.2.(12).b Pemasangan panel full deph slab Buah
7.3 (1) Baja Tulangan U 24 Polos Kg
7.3 (2) Baja Tulangan U 32 Polos Kg
7.3 (3) Baja Tulangan U 32 Ulir Kg
7.3 (4) Baja Tulangan U 39 Ulir Kg
7.3 (5) Baja Tulangan U 48 Ulir Kg
7.3 (6) Anyaman Kawat Yang Dilas (Welded Wire Mesh) Kg
7.4 (1) a Penyediaan Baja Struktur BJ 34 (Titik Leleh 210 MPa) Kg
7.4 (1) b Penyediaan Baja Struktur BJ 37 (Titik Leleh 240 MPa) Kg
7.4 (1) c Penyediaan Baja Struktur BJ …. (Titik Leleh ….. MPa) Kg
7.4 (2) a Pemasangan Baja Struktur BJ 34 (Titik Leleh 210 MPa) Kg
7.4 (2) b Pemasangan Baja Struktur BJ 37 (Titik Leleh 240 MPa) Kg
7.4 (2) c Pemasangan Baja Struktur BJ …. (Titik Leleh ….. MPa) Kg
7.4 (3) a Pengadaan Struktur Jembatan Rangka Baja Panjang 40 m, Lebar 9 m Buah
7.4 (3) b Pengadaan Struktur Jembatan Rangka Baja Panjang 50 m, Lebar 9 m Buah
7.4 (3) c Pengadaan Struktur Jembatan Rangka Baja Panjang 60 m, Lebar 9 m Buah
7.4 (3) d Pengadaan Struktur Jembatan Rangka Baja Panjang .... m, Lebar .. m Buah
7.4.(4).a Pemasangan jembatan rangka baja standar panjang 40 m, lebar 9 m Buah
7.4.(4).b Pemasangan jembatan rangka baja standar panjang 50 m, lebar 9 m Buah
7.4.(4).c Pemasangan jembatan rangka baja standar panjang 60 m, lebar 9 m Buah
7.4.(4).d Pemasangan jembatan rangka baja standar panjang …. m, lebar …. m Buah
7.5 (1) Pemasangan jembatan Rangka Baja Kg
7.5 (2) Pengangkutan Bahan Jembatan Kg
7.6 (1) Fondasi Cerucuk Penyedian dan Pemancangan Cerucuk M1
7.6 (2) Dinding Turap Kayu Tanpa Pengawetan M2
7.6 (3) Dinding Turap Kayu Dengan Pengawetan M2
7.6 (4) Dinding Turap Baja M2
7.6 (5) Dinding Turap Beton M2
7.6 (6) Penyediaan Tiang Pancang Kayu Tanpa Pengawetan Ukuran …. Mm M1
7.6 (7) Penyediaan Tiang Pancang Kayu dengan Pengawetan Ukuran …. mm M1
7.6 (8) a Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal 10 mm M1
7.6 (8) b Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal … mm M1
7.6 (8) c Penyediaan Tiang Pancang Baja Diameter ….. mm dengan tebal ... mm M1
7.6 (9) a Penyediaan Tiang Pancang Baja H Beam Ukuran 300 mm x 300 mm x 10 mm x 15 mm M1
7.6 (9) b Penyediaan Tiang Pancang Baja H Beam Ukuran …... mm x ….. mm x …. mm x …. mm M1
7.6 (10) a Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm x 350 mm M1
7.6 (10) b Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran ….. mm x …... mm M1
7.6 (11) a Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 400 mm M1
7.6 (11) b Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran ….. mm x …... mm M1
7.6 (12) a Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter 450 mm M1
7.6 (12) b Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter ……mm M1
7.6 (13) Pemancangan Tiang Pancang Kayu Ukuran …. mm M1
7.6 (14) a Pemancangan Tiang Pancang Baja Diameter 500 mm M1
7.6 (14) b Pemancangan Tiang Pancang Baja Diameter ..… mm M1
7.6 (15) a Pemancangan Tiang Pancang Baja H Beam Ukuran 300 mm x 300 mm x 10 mm x 15 mm M1
7.6 (15) b Pemancangan Tiang Pancang Baja H Beam Ukuran …... mm x ….. mm x …. mm x …. mm M1
7.6 (16) a Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm x 350 mm M1
7.6 (16) b Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran ….. mm x …... mm M1
7.6 (17) a Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 400 mm M1
7.6 (17) b Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran ….. mm x …... mm M1
7.6 (18) a Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter 450 mm M1
7.6 (18) b Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter …... mm M1
7.6 (19) a Tiang Bor Beton, diameter 800 mm M1
7.6 (19) b Tiang Bor Beton, diameter ….. mm M1
7.6 (20) Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(13) s/d 7.6.(18) bila Tiang Pancang dik M1
di Tempat Yang Berair.
7.6 (21) Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(19) bila Tiang Bor Beton dikerjakan M1
di Tempat Yang Berair.
7.6 (22) Pengujian Pembebanan Pada Tiang Dengan Diameter sampai 600 mm buah
7.6 (23) Pengujian Pembebanan Pada Tiang Dengan Diameter diatas 600 mm buah
7.6 (24) Tiang Uji jenis …… ukuran ……. M1
7.6 (25) a Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan beban hidrolik Cara B buah
7.6 (25) b Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan beban hidrolik Cara buah
7.6 (26) a Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan meja beban statis buah
Cara Beban Siklik
7.6 (26) b Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan meja beban statis buah
Cara Beban Bertahap
7.6 (27) a Pengujian Crosshole sonic logging (CSL) pada Tiang bor beton diameter .... buah
7.6 (27) b Pengujian Pembebanan Dinamis Jenis PDLT (Pile Dynamic Load Testing) pada Tiangukuran / buah
7.6 (28) Pengujian Keutuhan Tiang dengan Pile Integrated Test (PIT) buah
7.7.(1) Dinding Sumuran Silinder terpasang, Diameter ……………. M1
7.9.(1) Pasangan Batu M3
7.10.(1) Pasangan Batu Kosong yang Diisi Adukan M3
7.10.(2) Pasangan Batu Kosong M3
7.10.(3) a. Bronjong dengan kawat yang dilapisi galvanis M3
7.10.(3) b. Bronjong dengan kawat yang dilapisi PVC M3
7.10.(3) c. Tambahan Biaya untuk Anyaman Penulangan Tanah dengan Kawat yang Dilapisi PVC M2
7.11.(1) a. Expansion Joint Tipe Asphaltic Plug, Fixed M1
7.11.(1) b. Expansion Joint Tipe Asphaltic Plug, Moveable M1
7.11.(2) Expansion Joint Tipe Rubber 1 M1
7.11.(3) Expansion Joint Tipe Rubber 2 M1
7.11.(4) Expansion Joint Tipe Rubber 2 M1
7.11.(5) Joint Filler untuk Sambungan Konstruksi M1
7.11.(6) Expansion Joint Tipe Baja Bersudut M1
7.11.(7) Expansion Joint Tipe Modular Lebar …… M1
7.12.(1a) Perletakan Logam Tipe Fixed 150 Ton buah
7.12.(1b) Perletakan Logam Tipe Moveable 150 Ton buah
7.12.(1c) Perletakan Logam Tipe ….. buah
7.12.(2) Perletakan Elastomerik Alam Ukuran ……mm x ……. mm x ……. mm buah
7.12.(3) Perletakan Elastomerik Sintetis Ukuran ……mm x ……. mm x ……. mm buah
7.12.(4) Perletakan Strip M1
7.13.(1) Sandaran (Railing) M1
7.14.(1) Papan Nama Jembatan buah
7.15.(1) Pembongkaran Pasangan Batu M3
7.15.(2) Pembongkaran Beton M3
7.15.(3) Pembongkaran Beton Pratekan M3
7.15.(4) Pembongkaran Bangunan Gedung M2
7.15.(5) Pembongkaran Rangka Baja M2
7.15.(6) Pembongkaran Balok Baja (Steel Stringers) M'
7.15.(7) Pembongkaran Lantai Jembatan Kayu M2
7.15.(8) Pembongkaran Jembatan Kayu M2
7.15.(9) Pengangkutan Hasil Bongkaran yang melebihi 5 km M3 per Km
7.16.(1) Deck drain Unit
7.16.(2).a Pipa Drainase Baja diameter 75 mm M'
7.16.(2).b Pipa Drainase Baja diameter ….. mm M'
7.16.(3).a Pipa Drainase PVC diameter 75 mm M'
7.16.(3).a Pipa Drainase PVC diameter …. mm M'
7.16.(4) Pipa Penyalur PVC M'

Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1 (1) Lapis Pondasi Agregat Kelas A untuk Pekerjaan Minor M3
8.1 (2) Lapis Pondasi Agregat Kelas B untuk Pekerjaan Minor M3
8.1 (3) Agregat untuk Perkerasan Tanpa Penutup Aspal untuk Pekerjaan Minor M3 (vol. gembur)
8.1 (4) Waterbound Macadam untuk Pekerjaan Minor M3
8.1 (5) Campuran Aspal Panas untuk Pekerjaan Minor M3
8.1 (6) Lasbutag atau Latasbusir untuk Pekerjaan Minor M3
8.1 (7) Penetrasi Macadam untuk Pekerjaan Minor M3
8.1 (8) Campuran Aspal Dingin untuk Pekerjaan Minor M3
8.1 (9) Residu Bitumen untuk Pekerjaan Minor Liter
8.2.(1) Galian untuk Bahu Jalan dan Pekerjaan Minor Lainnya M3
8.3.(1a) Stabilisasi dengan Tanaman M2
8.3.(1b) Stabilisasi dengan Tanaman VS M2
8.3.(2) Semak / Perdu…………………. M2
8.3.(3) Pohon Jenis ……………………. Buah
8.4.(1) Marka Jalan Termoplastik M2
8.4.(2) Marka Jalan Bukan Termoplastik M2
8.4.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineer Grade Buah
8.4.(3b) Rambu Jalan Ganda dengan Permukaan Pemantul Engineer Grade Buah
8.4.(4a) Rambu Jalan Tunggal dengan Pemantul High Intensity Grade Buah
8.4.(4b) Rambu Jalan Ganda dengan Pemantul High Intensity Grade Buah
8.4.(5) Patok Pengarah Buah
8.4.(6a) Patok Kilometer Buah
8.4.(6b) Patok Hektometer Buah
8.4.(7) Rel Pengaman M1
8.4.(7) a Perbaikan Rel Pengaman M1
8.4.(8) Paku Jalan Buah
8.4.(9) Mata Kucing Buah
8.4.(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1
8.4.(10b) Kerb Pracetak Jenis 2 (Penghalang/Barrier) M1
8.4.(10c) Kerb Pracetak Jenis 3 (Kerb Berparit/Gutter) M1
8.4.(10d) Kerb Pracetak Jenis 4 (Penghalang Berparit / Barrier Gutter) t = 20 cm M1
8.4.(10e) Kerb Pracetak Jenis 5 (Penghalang Berparit / Barrier Gutter) t = 30 cm M1
8.4.(10f) Kerb Pracetak Jenis 6 (Kerb dengan Bukaan) Buah
8.4.(10g) Kerb Pracetak Jenis 7a (Kerb pada Pelandaian Trotoar) Buah
8.4.(10h) Kerb Pracetak Jenis 7b (Kerb pada Pelandaian Trotoar) Buah
8.4.(10i) Kerb Pracetak Jenis 7c (Kerb pada Pelandaian Trotoar) Buah
8.4.(11) Kerb yang digunakan kembali M1
8.4.(12) Perkerasan Blok Beton pada Trotoar dan Median M2
8.4.(13) Beton Pemisah Jalur (Concrete Barrier) Buah
8.4.(14) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe LED Buah
8.4.(15) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe LED Buah
8.4.(16) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 250 Watt Buah
8.4.(17) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 250 Watt Buah
8.4.(18) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 400 Watt Buah
8.4.(19) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 400 Watt Buah
8.4.(20) Pagar Pemisah Pedestrian Carbon Steel M'
8.4.(21) Pagar Pemisah Pedestrian Galvanised M'
8.4.(22) Pagar Pemisah Pedestrian Carbon Steel M'
8.4.(23) Pagar Pemisah Pedestrian Galvanisasi M'
8.5(1) Pengembalian Kondisi Lantai Jembatan Beton M2
8.5(2) Pengembalian Kondisi Lantai Jembatan Kayu M2
8.5(3) Pengembalian Kondisi Pelapisan Permukaan Baja Struktur M2

Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 9. PEKERJAAN HARIAN


9.1.(1) Mandor Jam
9.1.(2) Pekerja Biasa Jam
9.1.(3) Tukang Kayu, Tukang Batu, dsb Jam
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam
9.1.(4) b Dump Truck, kapasitas 6 - 8 m³ Jam
9.1.(5) a Truk Bak Datar 3 - 4 ton Jam
9.1.(5) b Truk Bak Datar 6 - 8 ton Jam
9.1.(6) Truk Tangki 3000 - 4500 Liter Jam
9.1.(7) Bulldozer 100 - 150 PK Jam
9.1.(8) Motor Grader min 100 PK Jam
9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam
9.1.(10) Loader Roda Berantai 75 - 100 PK Jam
9.1.(11) Alat Penggali (Excavator) 80 - 140 PK Jam
9.1.(12) Crane 10 - 15 Ton Jam
9.1.(13) Penggilas Roda Besi 6 - 9 Ton Jam
9.1.(14) Penggilas Bervibrasi 5 - 8 Ton Jam
9.1.(15) Pemadat Bervibrasi 1.5 - 3.0 PK Jam
9.1.(16) Penggilas Roda Karet 8 - 10 Ton Jam
9.1.(17) Kompresor 4000 - 6500 Ltr/mnt Jam
9.1.(18) Mesin Pengaduk beton (Molen) 0.3 - 0.6 M 3 Jam
9.1.(19) Pompa Air 70 - 100 mm Jam
9.1.(20) Jack Hammer Jam

Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN


10.1.(1) Pemeliharaan Rutin Perkerasan
10.1.(1a) Campuran aspal panas untuk pekerjaan rutin (ukuran lubang < 40x40 cm). M3
10.1.(1b) Residu Bitumen (crack sealing / seal coating) dengan luasan lebih kecil 10% per 100 meter. Liter

10.1.(2) Pemeliharaan Rutin Bahu Jalan


10.1.(2a) 1. Pembersihan / perataan / pemadatan bahu jalan M2

10.1.(3) Pemeliharaan Rutin Selokan, Saluran Air, Galian dan Timbunan


10.1.(3a) Pembersihan dan pembuangan lumpur pada selokan samping diperkeras. M'
10.1.(3b) Pemotongan rumput / semak pada RUMAJA M2
10.1.(3c) Pembersihan gorong - gorong / slab culvert. M'

10.1.(4) Pemeliharaan Rutin Perlengkapan Jalan


10.1.(4a) Perawatan rambu lalu lintas. Buah
10.1.(4b) Perawatan patok pengarah. Buah

10.1.(5) Pemeliharaan Rutin Jembatan


10.1.(5a) Pemeliharaan Jembatan (Pengecatan railing dan headwall). M'
10.1.(5b) Pembersihan Drainase / Lubang Drainase pada Lantai Jembatan. M'
10.1.(5c) Pembersihan / Pemotongan Rumput dan Semak disekitar Jembatan (Oprit, Jembatan, Bawah M2
10.1.(5d) Pemeliharaan / Pembersihan expansion joint M'
Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Perkiraan Keterangan
Kuantitas

d e

1,269.40
716.40

0.00
0.00

0.00
0.00 ( x 0.8 Liter/M2)
0.00

0.00

705.51

0.00
377.10

2.00

M3 per Km
1.95

0.00

9.74

100.80 ( x 1.2 Liter/M2)


61.50

2.00

9.00

0.00
0.00
0.06
44.23 ( x 1.2 Liter/M2)

25.00

990.00
1,137.15
( x 3 putaran selama pelaksanaan)
98.00

4.00
56.00

73.00
92.00
477.00
( x 3 putaran selama pelaksanaan)
0.00
KEGIATAN PEMELIHARAAN JALAN 50
RUAS JALAN : JLN SIDODADI
KECAMATAN : KEPANJEN
STA PENANGANAN : 0+000 s/d 0+900
PANJANG : 0+900 M
LEBAR : 3,50 M

STREET MAP PELAKSANAAN

STA 0+000 0+100 0+200 0+300 0+400 0+500 0+600 0+700 0+800 0+900 1+000

Saluran
Kiri
Bahu Jalan

Bahu Jalan
Kanan
Saluran

URAIAN JUMLAH SATUAN


Galian Perkerasan Jalan ( Alat Milik Sendiri ) 3.50 2.50 3.00 3.00 2.50 3.50 18.00 M3
Burtu ( Memakai Aspal pen 60/70 ) ( Alat Milik Sendiri ) 3.00 2.50 3.00 3.00 2.50 3.00 17.00 M2
Penambalan Lubang Jalan dengan Lapen ( Alat Milik Sendiri ) 5.00 5.00 5.00 5.00 5.00 5.00 30.00 M3
- -

Malang, Mei 2022


Tim Pelaksana

PAMUJINOTO
NIP. 196907052007011045
KEGIATAN PEMELIHARAAN JALAN 50
RUAS JALAN : JLN SIDODADI
KECAMATAN : KEPANJEN
STA PENANGANAN : 0+000 s/d 0+900
PANJANG : 0+900 M
LEBAR : 3,50 M

STREET MAP PERENCANAAN

STA 0+000 0+100 0+200 0+300 0+400 0+500 0+600 0+700 0+800 0+900 1+000

Saluran
Kiri
Bahu Jalan

Bahu Jalan
Kanan
Saluran

URAIAN JUMLAH SATUAN


Galian Perkerasan Jalan ( Alat Milik Sendiri ) 3.50 0.00 2.50 0.00 3.00 0.00 3.00 2.50 0.00 3.50 18.00 M3
Burtu ( Memakai Aspal pen 60/70 ) ( Alat Milik Sendiri ) 3.00 2.50 0.00 3.00 0.00 3.00 2.50 0.00 3.00 17.00 M2
Penambalan Lubang Jalan dengan Lapen ( Alat Milik Sendiri ) 5.00 5.00 0.00 5.00 0.00 5.00 5.00 0.00 5.00 30.00 M3
0.00 0.00 - -

Malang, Mei 2022


Tim Perencana

FIRMAN MOCHTAR
NIP. 19730823 200701 1 012
KEGIATAN PEMELIHARAAN RUTIN JALAN DAN JEMBATAN
BIDANG PEMELIHARAAN DINAS PEKERJAAN UMUM BINA MARGA KABUPATEN MALANG
TAHUN ANGGARAN 2022

FOTO DOKUMENTASI SURVEY RENCANA PEKERJAAN PEMELIHARAAN RUTIN

Foto Dokumentasi Survey


Rencana Pekerjaan
7,76 X 11,88 Penambalan Lubang
dengan HRS
Ruas Jalan
Jln Sidodadi
Kec. Kepanjen
STA. 0+000 s/d 0+900

0%

Foto Dokumentasi Survey


Rencana Pekerjaan
Penambalan Lubang
dengan HRS
Ruas Jalan
Jln Sidodadi
Kec. Kepanjen
STA. 0+000 s/d 0+900

0%

Foto Dokumentasi Survey


Rencana Pekerjaan
Penambalan Lubang
dengan HRS
Ruas Jalan
Jln Sidodadi
Kec. Kepanjen
STA. 0+000 s/d 0+900

0%