PR E-F I NA L INSPECTION REPORT

Name of Subproject Construction of Kuden Post-Harvest Facilities


(Warehouse & Solar Dryer)
Subproject No. 15-5010104001-006
Settlement Area Sultan Kudarat Resettlement Area 2
Location Brgy. Kuden, Senator Ninoy Aquino, Sultan Kudarat
Date of Inspection June 8, 2017

The following are the findings and recommendations from the Inspection Team on the status of Kuden
Post-Harvest Facilities (Warehouse & Solar Dryer).

WORK ITEMS FINDINGS RECOMMENDATION PICTURES

SITE Incomplete Completion of berm


DEVELOPMENT construction fill with a minimum
WORKS of berm width of 40 cm, level
along the to the top of the
perimeter of drainage.
the solar
dryer

BUILDING Uninstalled Provide insect wire


WORKS wire mesh at mesh into the air
the roof air vent
vent

Mindanao Sustainable Agrarian and Agriculture Development Project Pre-Final Inspection Report
PAGE 1 OF 4
Gutter joint Firm the gutter joint
not on and provide
standard necessary seal
workmanship compound per joint

No opening Provide the


of drainage necessary outlet
canal outlet opening to
discharge the water
storm run off

PLUMBING
WORKS

SOLAR DRYER Eroded soil Provide stable back


& CANAL from the slope to prevent
unstable side eroded materials
cut adjacent from the side cut
to line canal

Hardened Remove the


mortar paste hardened mortar
paste in the
pavement as to its
required
smoothness

Mindanao Sustainable Agrarian and Agriculture Development Project Pre-Final Inspection Report
PAGE 2 OF 4
Presents of Rectify cracks using
concrete the concrete epoxy
shrinkage method
cracks at the
slab

ELECTRICAL
WORKS

PROJECT Uninstalled Installed permanent


SIGNBOARD & permanent project marker
PERMANENT project
PROJECT marker
MARKER

OTHER
FINDINGS:

REMARKS:

INSPECTORATE TEAM

ROGER B. TABAÑAG MUSTAFA BITUANAN


Infra Component Manager RPMO Infrastructure Coordinator
MinSAAD Project Management Office Region XII

CHARISMA D. VALDEZ CHRISTIAN RAY S. REVILLA


PPMO Infra Coordinator Rural Infra Specialist
Sultan Kudarat MinSAAD Project Management
Office

CRISPIN JASMIN
Irrigation/PHF Consultant
Mindanao Sustainable Agrarian and Agriculture Development Project Pre-Final Inspection Report
PAGE 3 OF 4
MinSAAD Consultant

Mindanao Sustainable Agrarian and Agriculture Development Project Pre-Final Inspection Report
PAGE 4 OF 4