Instrument calibration
H‐W020‐600‐E‐QC‐GN‐
For approval D Parmar A1 - Approved plan verified and
036
approved.
https://asia2.aconex.com/hub/index.html 1/1
DHAMRA PORT COMPANY LIMITED (DPCL)
TITLE OF DOCUMENT
Laboratory Instrument Calibration Control Plan
INDEPENDENT ENGINEER NA
EPC CONTRACTOR
KEC INTERNATIONAL LTD.
This Document is the property of HOWE. It should not be used, copied or reproduced without their written permission.
Page 1 of 4
Instrument Calibration Control Plan
Doc no- H‐W020‐600‐E‐QC‐GN‐036
Rev-B Dt-30-09-2023
Revision-0 Details
Calibration and Validation Plan for Testing and Measuring Equipment Doc no-H-W020-600-E-QC-GN-036 REV.0
Project: DHAMRA RAILWAY DOUBLING -PHASE-2 AND TRACK LINKING AND OHE WORK FOR PHASE- 1B Date: 30-09-2023
Client: HOWE ENGINEERING PROJECTS (I) PVT. LTD KECSILINTERNATIONAL
EPC Contractor : GIL- (JV) LIMITED
Responsible
Calibrated By Verifying Document
SI.No. Inspection and Testing Description Controlling Specification. Acceptance Criteria Frequency
(Third-party/Internal) / Test Record KEC-Quality HOWE
A CALIBRATION PLAN
2 Pressure gauge of rapid moisture meter IS:12175-1987 0 - 50% with 1% Least Count Internal Calibration Report Once in 6 months CP WP
Dimension,Distance b/w
opposite faces,Height of Once in 6 months / site mobilization / new
5 cube moulds IS:10086 Internal Calibration Report CP WP
MouldAngle b/w adjacent purchase whichever is earlier.
faces