BILL TO
Excecutive Group Inc
30 East 39th Street #5th Floor
New York, NY 10016 USA
J O B A D D R ES S Job:
MEPA REALTY LLC
44 9th Avenue
New York, NY 10011 USA
E S T I M AT E D E TA I L S
TA S K D ES C R I P T I O N QT Y PRICE T O TA L
5 Storefront Wood Trims, sill, moldings, and mull cover 1.00 $28,184.00 $28,184.00
9 > Payment Terms: Supply & Install of Windows and Doors 1.00 $0.00 $0.00
- 50% of total price deposit are required upon signing/acceptance of
quote.
- 25% of total price is due once materials are ready to install, prior to
scheduling installation.
- 25% of total price is DUE UPON COMPLETION
* Window Fix reserves the right to collect partial payments based on
the percentage of work completed at any time*
- Interest charges to aged accounts - Any outstanding balances not
paid when due as agreed will accrue an interest charge of 1 and 1/2
percent per month from the due date until paid. Window-Fix shall be
entitled to payment of reasonable attorney fees incurred in collection
of any and all delinquent accounts of buyer or necessitated by buyer's
breach of contract. *Once job are complete accounts will begin to
age*
- Any payment obligations by third parties to pay balance will not
impact this agreement and payment will be the responsibility of the
party listed in this agreement.
- All of our prices reflect our cash, check, wire discount. Any use of a
credit or debit card will incur a 3.95% surcharge that is forwarded
directly to the credit card processing company. Window-Fix, Inc. does
not keep any portion of the surcharge
- Client must provide a clear path to the area with a Minimum space
required is at least 3 feet.WindowFix is required to work both interior
and exterior. If WindowFix cannot access the site in question, your
appointment will be canceled and you will incur a charge of $250.
- Removal and reinstallation of furniture, and any other obstructions
including window treatments, bars, fans, alarms, electrical
conduit/wires, cable/phone wires, and air conditioner.
- Scaffolding, Sidewalk Bridge, Aerial Lifts
- Hoisting and or rigging, if required .
- All Exterior finish work such as masonry, siding, EFS
- Lead Safety Practices available upon request fees may apply
- Hazardous demolition and/abatement, if any
- After Hour/ Overtime, Holiday, or Weekend Labor Excluded,
additional fees may apply if required.
SUB-TOTAL $473,498.90
NY - - - (8.875%) 8.875% $42,023.03
TOTAL $515,521.93
Thank you for choosing Window-Fix, Inc.
CUSTOMER AUTHORIZATION
Prices are ONLY Valid for 15 days due to fluctuations in material cost. Industry wide price increases on raw materials are
driving up prices daily.
Lead times are unpredictable due to a ripple effect of delays across all supply chains. The lead times we present are
guestimates and subject to change daily. Please expect delays with your order.
LINE ITEM: QTY. Tag A - Fixed Panel Unit Unit Price Total
1 2 Frame: Solid hardwood (Mahogany) Overall Frame: W = 17.75 in; H = 78.25 in $2,823.09 $5,646.17
Frame Thickness = 1 1/8"
Stiles and Rails: Solid hardwood (Mahogany)
Stile Width = 2.375", Top & Bottom Rail Width = 2.375", Thickness = 2 1/4"
Glazing: 1"thk. IGU Double Pane Glass (1/4" - Outer Lites, 1/2"-Air Space)
Exterior finish: Primed and Painted Finish:TBD
Interior finish: Primed
1 of 1
Stile Width = 2.375", Top & Bottom Rail Width = 2.375", Thickness = 2 1/4"
Glazing: 1"thk. IGU Double Pane Glass (1/4" - Outer Lites, 1/2"-Air Space)
Exterior finish: Primed and Painted Finish:TBD
Interior finish: Primed
2 of 2
13 Tag M- Fixed Panel Unit Unit Price Total
1 Frame: Solid hardwood (Mahogany) Overall Frame: W = 7.25 in; H = 13.75 in $2,039.12 $2,039.12
Frame Thickness = 1 1/8"
Stiles and Rails: Solid hardwood (Mahogany)
Stile Width = 2.375", Top & Bottom Rail Width = 2.375", Thickness = 2 1/4"
Glazing: 1"thk. IGU Double Pane Glass (1/4" - Outer Lites, 1/2"-Air Space)
Exterior finish: Primed and Painted Finish:TBD
Interior finish: Primed
3 of 3
2 Frame: Solid hardwood (Mahogany) Overall Frame: W = 56 in; H = 72.25 in $3,444.93 $6,889.85
Frame Thickness = 1 1/8"
Stiles and Rails: Solid hardwood (Mahogany)
Stile Width = 2.375", Top & Bottom Rail Width = 2.375", Thickness = 2 1/4"
Glazing: 1"thk. IGU Double Pane Glass (1/4" - Outer Lites, 1/2"-Air Space)
Exterior finish: Primed and Painted Finish:TBD
Interior finish: Primed
4 of 4
Stiles and Rails: Solid hardwood (Mahogany)
Stile Width = 2.375", Top & Bottom Rail Width = 2.375", Thickness = 2 1/4"
Glazing: 1"thk. IGU Double Pane Glass (1/4" - Outer Lites, 1/2"-Air Space)
Exterior finish: Primed and Painted Finish:TBD
Interior finish: Primed
5 of 5
32 Tag 08 - Fixed Panel Unit Unit Price Total
4 Frame: Solid hardwood (Mahogany) Overall Frame: W = 41.5 in; H = 98.25 in $3,542.61 $14,170.45
Frame Thickness = 1 1/8"
Stiles and Rails: Solid hardwood (Mahogany)
Stile Width = 2.375", Top & Bottom Rail Width = 2.375", Thickness = 2 1/4"
Glazing: 1"thk. IGU Double Pane Glass (1/4" - Outer Lites, 1/2"-Air Space)
Exterior finish: Primed and Painted Finish:TBD
Interior finish: Primed
6 of 6
Stile Width = 2.375", Top & Bottom Rail Width = 2.375", Thickness = 2 1/4"
Glazing: 1"thk. IGU Double Pane Glass (1/4" - Outer Lites, 1/2"-Air Space)
Exterior finish: Primed and Painted Finish:TBD
Interior finish: Primed
7 of 7
Door Hardware: (from Specs)
A - Rixson SC2790N-CWF 3/4 Offset Floor Closer
B -Rixson M19 Intermediate Pivots
C- Push/Pull (back to back) T.B.D
D- Deadlock L462HD Cyl x Cyl
E- Schlage Core 8037
F- Ives Manual Flush Bolts FB458
G- Ives DP2 Dustproof Strike
Hardware:(WindowFix standard)
Weather-strip
Threshold
Hinges
Exterior finish: Primed and Painted
Interior finish: clear finish
8 of 8
49 Installation Cost of All Items Total
1 Labor Cost $72,000.00
Fixed Panel w/ transom on top
Doors
9 of 9
2 Nos.
Fixed Panel U (24 1/2 x 78 1/4)
Fixed Panel V (24 1/2 x 18 1/2)
V
Provide dimensioned
and annotated plan
sections of typical
details at a legible
0'-1 3/4"
scale 0'-3/4"
40" 17 3/4"
18 1/2" 47 1/4" 47 1/4" 47 1/2" 47 1/2" 40" 40" 17 1/2" 47 1/4" 47 1/4"
18 1/2"
B B
13 3/4"
D D D D
F H H
D-107
D-106
D-105
110 3/4"
A C C A G
C C G
119 3/4"
119 3/4"
72 1/4"
78 1/4"
78 1/4"
E
109"
54"
13 3/4"
ALL DIMENSIONS & SPACINGS J
OF EXISTING CAST-IRON
COLUMNS, HEIGHTS OF
HEADER BEAMS FROM SLAB
TO BE VERIFIED IN FIELD, CM
I
TO COORDINATE, TYP.
72"
ALL DIMENSIONS & SPACINGS
OF EXISTING CAST-IRON
COLUMNS, HEIGHTS OF
HEADER BEAMS FROM SLAB
TO BE VERIFIED IN FIELD, CM
TO COORDINATE, TYP.
Provide
See revised dims in dimensioned and
bulletin #4 noted plan
sections of typical
details at a
legible scale
? ?
13 3/4"
13 3/4"
13 3/4"
13 3/4"
13 3/4"
P T
J J L L N R R
I I K K M
72 1/4"
72 1/4"
72 1/4"
72 1/4"
O Q S
72"
72"
56"
S
REFERENCE ONLY
4 Nos.
Fixed Panel 12 (16 1/2 x 98 1/4)
Fixed Panel 13 (16 1/2 x 24 3/4)
13
12
1 No.
Fixed Panel 14 (24 x 98 1/2)
Provide dimensioned Fixed Panel 15 (24 x 24 3/4)
and annotated plan
sections of typical
details at a legible
scale
? ? ?
24 3/4"
24 3/4"
07 02 02 04 07 11
06 04 02 02 09 09 09 09 06 11 11
05 08 08 08 10 10 10
D-103 08 05
01 01 03
98 1/4"
98 1/4"
98 1/2"
03 01 01 D-102
72 1/4" 13 3/4"
17
16
113"
D-104
19
18
72 1/4" 13 3/4"