Project INSTALASI RESERVOIR KOMUNAL & POMPA Type of Drilling Wash Boring Coordinates:
TEKAN
Location Jl. Rorotan-Marunda, Rorotan, Kec. Cilincing, Jakarta Driller Ilham E
Utara
Date 26 - 28 Agustus 2023 Supervisor Juni N
GWL 2 m
N2 (15-30CM)
N3 (30-45CM)
SPT Curve
N1 (0-15CM)
Depth
N-SPT
Sampling Symbol Soil Description
c c' qu Cu
gw (t/m³) Gs W (%) LL (%) PL (%) Type () ' ()
0 10 20 30 40 50 60 (kg/cm²) (kg/cm²) (kg/cm² (kg/cm²)
0,0
1,0
1,5
3,0
5,0
5,5
7,0
7,5
9,0
11,0
11,5
13,0
13,5
15,0
15,5
17,0
19,0
19,5
N2 (15-30CM)
N3 (30-45CM)
SPT Curve
N1 (0-15CM)
Depth
N-SPT
Sampling Symbol Soil Description
c' qu Cu
gw (t/m³) Gs W (%) LL (%) PL (%) Type c (kg/cm²) () ' ()
0 10 20 30 40 50 60
(kg/cm²) (kg/cm² (kg/cm²)
21,0
21,5
23,0
23,5
25,0
25,5
27,0
27,5
29,0
29,5
31,0
31,5
33,0
33,5
35,0
35,5
37,0
37,5
39,0
39,5
Drilling stopped at 40,0m depth
40,0 SPT 20 grades stiff to very stiff consistancy 6 8 8 16
40.00-40.45