Professional Documents
Culture Documents
1 LaborProcess
1 LaborProcess
1
KEY TOPICS
• Upper Preparation
• Upper Construction
• Upper Embellishment
• Bottom Making
• Bottom Embellishment
• Stockfitting
• Assembly
Leather Auto Folding Hot Melt Hammering Embroidery - Tape Upper Spray Painting
Synthetic/Textile 1 Layer Manual Folding Sticker Fold/Turn Embroidery - Pins
Manual Painting
Synthetic/Textile 2 Heating Heat Press Punching
Layers
Painting Heat Gun
Synthetic/Textile 4 7
Layers 2 Upper Waterproofing
Trimming Upper Apparatus Screen Printing (DWRS)
Synthetic/Textile 6 4
No Sew
Layers Lacing
Screen Print - Small Upper Waterproofing
Synthetic/Textile 8 No Sew - Stacking (DWRS)
5 Upper Stacking
Layers Flyknit Preparation Screen Print - Medium
Press (Component)
Webbing
Part Aligned - Large Screen Print - Large
Knit Ironing 8
Toggle Lace Press (Full Vamp) Vac Tech
Part Aligned - Medium
Knit Cuff
BOA Vac Tech (Eco-Fill)
Part Aligned - Small
3 Vac Tech (Attaching)
HF Welding
Pair Matching 6 5
Counter Shaping Dynamic Flywire
Laser Final Trim 2 HF Welding
EXERCISE Stitching 9
Counter Shaping Dynamic Flywire - Foamposite
Manual Winding
Short (<20cm)
Foamposite
2 Dynamic Flywire -
Skiving 7 Medium (20-40cm) Machine Winding
Sock-Gauge Checking 4 Upper Compression
Molding
Manual Skiving Long Straight (>40 cm) 10
Sublimation
Sock-Gauge Checking Upper Compression
Long Curve (40-60 cm)
Matrix Skiving Molding
6 Sublimation
Xtra Long Curve(>60cm) Sockliner Making
Pre-Buffing
Closed Seam Molded Sockliner Factory Observed Minutes
5
Computer w/ Pallet Die Cut Sockliner Laser Etching
3 Standard Minutes
Stitch Marking
Computer w/ Fixed Jig Laser Etching With Pins
Stitch Marking - Screen Upper Stamping 7 MM Option
Weaving
Laser Etching Without Pins
Stitch Marking - Pen
Weaving
3
UPPER PROCESSES—OVERVIEW 中
鞋面部件準備/處理 (25) 鞋面製程 (29) 面部二次加工 (16)
毛邊處理 貼合處理 定型 電繡
1
裁斷 面部噴漆
4 1 3 1 6
針車記號線-手工劃線
編織
4
UPPER
PREPARATION
5
UPPER PROCESSES
Upper Preparation (25) Upper Construction (29) Upper Embellishment (16)
1 3 1 6
1 4 Attaching Shaping Embroidery Upper Painting
Cutting Edge Treatment
Hot Melt Hammering
Auto Folding Embroidery - Tape Upper Spray Painting
Leather
Sticker Fold/Turn
Manual Folding Embroidery - Pins
Synthetic/Textile 1 Layer Manual Painting
Heat Press Punching
Synthetic/Textile 2 Heating
Layers Heat Gun
Painting 7 Upper Waterproofing
Synthetic/Textile 4 (DWRS)
Apparatus 2
Layers Trimming Upper Screen Printing
4 Upper Waterproofing
No Sew
Synthetic/Textile 6 Lacing (DWRS)
Screen Print - Small
Layers
No Sew - Stacking
Upper Stacking
Synthetic/Textile 8 Screen Print - Medium
5 8
Layers Flyknit Preparation Press (Component) Vac Tech
Toggle Lace
Screen Print - Large
Part Aligned - Large Press (Full Vamp)
Knit Ironing BOA Vac Tech (Eco-Fill)
塗邊 熱熔膠槍 7
人造皮/紡織品 4 層
2 面部防水處理
修邊 金屬眼扣
4 網版印刷 (DWRS)
人造皮/紡織品 6 層 穿鞋帶
No Sew 網印面積-小 鞋面防水膜噴漆(DWRS)
No Sew – 堆疊
鞋面堆疊 (二加用) 網印面積-中
人造皮/紡織品 8 層 5
Flyknit 準備
熱壓 (部件)
網印面積-大
對位斬-大部件 穿織帶
Knit 燙平處理
熱壓 (一片式鞋頭)
8 Vac Tech
鞋帶束緊器
對位斬-中部件 Knit Cuff 熱壓填補
BOA ®鞋帶系統 PU 料填補
對位斬-小部件
3
配雙 5
高週波 補強料填補
後襯定型
6
Dynamic Flywire
2 高週波
Laser Final Trim (LFT)
EXERCISE
後襯定型 針車 Dynamic Flywire
9
Foamposite
-手工繞線
車縫長度:短 (< 20cm) Foamposite
Dynamic Flywire
削皮
2
7 車縫長度:中 (20-40cm) -機械輔助繞線
確認襪套位置 4 面部模壓
削皮 車縫長度:長-直線 (>40 cm)
昇華轉印
10
確認襪套位置 面部模壓
片薄 車縫長度:長-弧線 (40-60 cm)
6 昇華轉印
車縫長度:超長-弧線 (>60cm)
鞋墊製作
預磨打粗
接合 模壓鞋墊
工廠提供實際測得的時間
5
3
電腦針車 (交換式模板) 刀斬鞋墊 傳統雷射
劃針車記號線(網印/手工) 標準秒值
電腦針車 (固定式模板) 加掛釘
針車記號線-網印 鞋面-蓋日期章 7
編織 不加掛釘
MM Option
針車記號線-手工劃線
編織
7
UPPER PREPARATION—CUTTING SYN/LEA VS PART ALIGN
pattern graphic.
• Potongan ke-1 • Potongan ke-2 (Diindikasikan dari Thompson /
• Pemosisian Normal Pisau pada bahan Upper. Hybrid Dies)
8 • Rekayasa Bahan (Mesh) perlu memiliki
keselarasan ekstra mengikuti grafik pola atas.
中
鞋面部件準備/處理-裁斷 人造皮/皮革 vs. 對位斬
人造皮/皮革 對位斬
• 1st 裁斷 • 2nd 裁斷 (指使用 湯姆遜斬刀/複合式斬刀)
• 於面部材料上正常放置斬刀進行裁斷 • 工程網布 (Engineering Mesh) 需要依照鞋面圖
樣另外進行對位裁斷
9
UPPER PREPARATION—CUTTING: SYNTHETIC & LEATHER
Labor Process Description Standard Assumptions
Minutes
Leather Cutting a SINGLE layer of leather .599 Increments per COMPONENT.
material using conventional or precision Average
Considerations:
cutting dies. Material Type: Leather, Leather (Wool), Leather (Kip)
Cutting Method: Swing Beam or Travelling Head
Material releases freely and is cleared after 1 cut.
Frequency = Component per shoes/ Component per dies **IE PMTS BP CT-02-Cutting-Leather
Synthetic/Textile 6 Cutting 6 layers of roll material using .076 Material releases freely and is cleared after 1 cut
Gang Dies count as 1 cut or 1 component
Layer conventional or precision cutting dies. Average Combined Dies are not relevant
**IE PMTS BP
Synthetic/Textile 8 Cutting 8 layers of roll material using .059 CT-01 Cutting-Synthetic (Roll)
Layer conventional or precision cutting dies. Average CT-03 Cutting Synthetic (Sheet)
10
中
鞋面部件準備/處理-裁斷 人造皮/皮革 次數=每只鞋的部件/每支斬刀的部件
條件說明:
材料種類:皮革、皮革(羊毛)、小牛皮(中級)
裁斷方式:使用搖臂裁斷機和龍門裁斷機進行第一刀裁切
後,須完全切斷
11
UPPER PREPARATION—CUTTING LEATHER/SYNTHETIC
PFC INFORMATION
Special Instructions
1. Indicates Material Type
• DO NOT USE this labor process
Leather Synthetic
for Cutting sockliners, EVA
Strobel, and silicon pad.
2. Part Name
Indicates component being cut. • EVA bed for sockliner making buy
4 from vendor and cut in-house can
cover by Cutting Synthetic.
3. Cutting Page Information
Pair Matching Information • If 3-layer cutting is indicated, use
2-layer.
2x Synthetic 2 Layer • If layers are> 8 (10, 12, etc.), then
Gang Dies
Component / Shoe < 2 : Count per component default to 8-layer.
Type of Dies--could indicate
the Part aligned (Thompson or • If ―IN/OUT‖ or ―LAT/MED” is
Labor Process Count Step Hybrid) indicated in one box, count as 2
1. Identified a Labor Process Type
# Of Layers
cuts.
2. Labor Process Counted based on criteria
12
中
鞋面部件準備/處理-裁斷 人造皮/皮革
PFC 資訊
特別說明
1. 辨識材料種類 (圖示)
• 此規則不可用於以下裁斷:鞋墊
皮革 人造皮 (Sockliner), EVA 中底布(Strobel) 與
矽膠墊(Silicon Pad)
2. 部位名稱
• 外購鞋墊EVA 材料並於廠內裁切時
指示要被裁斷的部件
4
可適用於上述:裁斷\人造皮規則
• 若層數設定為 3 層,則對應到 2 層的
3. 裁斷頁面的資訊 規則作業
配雙需求資訊 • 若層數超過 8 層以上(如 10, 12層),
則仍使用 8 層的規則作業
2x 人造皮 2 層 • 若一格裁斷部位中有分“IN/OUT”
連刀設定
部件/每只鞋 <2:依部位數量計算 或 “LAT/MED”,其裁斷次數則視
斬刀種類-指示是否需要對位
斬用刀 (湯姆遜斬刀或複合斬刀) 為2次
人工動作計算的步驟
1. 辨識人工動作的類型
裁斷層數
2. 依照準則計算人工動作
13
12
UPPER PREPARATION—CUTTING: COMMON PRACTICE
PFC INFORMATION
14
中
鞋面部件準備/處理-一般練習
PFC 資訊
15
UPPER PREPARATION—CUTTING: PART ALIGNED
Labor Process Description Standard Minutes Assumptions
Part Aligned – Small A cutting process that requires aligning a .136 Increments per CUT.
cutting die for the small component with 1 big Average ―count in either cutting page or
molding cutting page, not double
piece cut to get multi-component count‖
(logos, strap, label). **IE PMTS BP SF 10 Thompson
cutting
Part Aligned – Large A cutting process that requires aligning a .675 Increments per CUT.
Average ―count in either cutting page or
cutting die for the Large material molding cutting page, not double
(Engineering Mesh, Big Upper No count‖
Sew, etc.).
Part Aligned – A cutting process that requires aligning a .363 Increments per CUT.
Average ―count in either cutting page or
Medium cutting die for the Medium material molding cutting page, not double
(Quarter Overlay, Tongue, etc.). count‖
16
中
鞋面部件準備/處理- 裁斷:對位裁斷 (斬)
人工動作 描述 標準秒值 前提說明
對位斬-小部件 小型部件需要以對位裁段方式進行,用較 平 均 .136 依裁斷次數計算
裁斷部位於“裁斷” 或 “模壓裁斷”
大的刀模裁斷後來取得數個部件,如: 分頁擇一計算,不可重複計算
LOGO、束帶、鞋身標籤...等
**IE PMTS BP SF 10 Thompson
cutting
*裁斷面積大於鞋面¾,算大部件
17
16
UPPER PREPARATION—CUTTING: PART ALIGNED
PFC INFORMATION
Labor Process Count Step Follow PFC
1. Identified a Part Align, based on the dies or
actual component. (usually indicate from
Thompson/Hybrid Dies in Die Construction
box)
2. Identified a Size
Small : Multi component/ cut
Large : Single component per cut Full Upper/
Vamp
Medium : Single component per cut except Full
Part Aligned Small 1x Part Aligned Large 1x
Upper/ Full Vamp.
3. Labor Process Counted based on how many cut
18
中
鞋面部件準備/處理- 裁斷:對位裁斷(斬)
PFC 範例
依據 PFC 計算製造流程的步驟
1. 根據刀模或實際部件來辨識部位是否需要做對
位裁斷。(一般情況下,可從 PFC 每個部件的
刀模結構欄位看出湯姆遜斬刀或複合刀的設定)
2. 辨識裁斷尺碼
• 小部件:每一次裁斷以取得數個部位裁片
• 大部件:每一次裁斷以取得單一部位裁片:
全鞋面、鞋頭
• 中部件:每一次裁斷以取得單一部位裁片:
全鞋面、鞋頭以外的部件
3. 裁斷製造流程的計算是根據裁斷次數
對位裁斷 (小部件) 1x 對位裁斷 (大部件) 1x
對位裁斷 (中部件) 1x
對位裁斷 (大部件) 1x
19
UPPER PREPARATION—CUTTING: PAIR MATCHING
Labor Process Description Standard Minutes Assumptions
Pair Matching After cutting non-coated leather, .124 + .124*#component Increments per COMPONENT.
components must be matched for color and Pair matching labor process shall be applied
no more than once per component.
texture within a pair. Also required for the
**If no information is available on the PFC,
group of hides separated by color match. please check with the engineering team.
20
中
鞋面部件準備/處理- 裁斷: 配雙
人工動作 描述 標準秒值 前提說明
配雙做做應該依部位所示,備註在PFC的裁斷 條件說明:
頁面。 • 檢查部件
• 撕去標籤貼紙的離型紙 裁斷與
• 將標籤貼在部件上/將標籤貼從部 針車
件上移除
• 針車作業時掛吊牌標示配雙,並於 針車與
成型作業時移除吊牌 成型
21
20
UPPER PREPARATION—CUTTING: PAIR MATCHING
PFC INFORMATION
2x Cutting-Pair Matching
2x Cutting-Leather
22
中
鞋面部件準備/處理- 裁斷: 配雙
PFC 範例
計算製造流程的步驟
1. 辨識製造流程
2. 計算製造流程
2x 裁斷-需配雙
2x 裁斷-材質:牛皮
23
Upper Preparation-Modernization-LFT Revised: June 14nd 2018
24
中
鞋面部件準備/處理- 現代化製程-LFT Revised: June 14nd 2018
現階段無法取代對位裁斷
作業,但若特殊材料僅可
使用LFT裁切者,就以
LFT裁切規則計算
25
UPPER PROCESSES
Upper Preparation (25) Upper Construction (29) Upper Embellishment (16)
1 3 1 6
1 4 Attaching Shaping Embroidery Upper Painting
Cutting Edge Treatment
Hot Melt Hammering
Auto Folding Embroidery - Tape Upper Spray Painting
Leather
Sticker Fold/Turn
Manual Folding Embroidery - Pins
Synthetic/Textile 1 Layer Manual Painting
Heat Press Punching
Synthetic/Textile 2 Heating
Layers Heat Gun
Painting 7 Upper Waterproofing
Synthetic/Textile 4 (DWRS)
Apparatus 2
Layers Trimming Upper Screen Printing
4 Upper Waterproofing
No Sew
Synthetic/Textile 6 Lacing (DWRS)
Screen Print - Small
Layers
No Sew - Stacking
Upper Stacking
Synthetic/Textile 8 Screen Print - Medium
5 8
Layers Flyknit Preparation Press (Component) Vac Tech
Toggle Lace
Screen Print - Large
Part Aligned - Large Knit Ironing Press (Full Vamp)
BOA Vac Tech (Eco-Fill)
塗邊 熱熔膠槍 7
人造皮/紡織品 4 層
2 面部防水處理
修邊 金屬眼扣
4 網版印刷 (DWRS)
人造皮/紡織品 6 層 穿鞋帶
No Sew 網印面積-小 鞋面防水膜噴漆(DWRS)
No Sew – 堆疊
鞋面堆疊 (二加用) 網印面積-中
人造皮/紡織品 8 層 5
Flyknit 準備
熱壓 (部件)
網印面積-大
對位斬-大部件 穿織帶
Knit 燙平處理
熱壓 (一片式鞋頭)
8 Vac Tech
鞋帶束緊器
對位斬-中部件 Knit Cuff 熱壓填補
對位斬-小部件
BOA ®鞋帶系統 PU 料填補
3
配雙 5
高週波 補強料填補
後襯定型
6
Dynamic Flywire
Laser Final Trim (LFT) 2 高週波
EXERCISE
後襯定型 針車 Dynamic Flywire
9
Foamposite
-手工繞線
車縫長度:短 (< 20cm) Foamposite
Dynamic Flywire
削皮
2
7 車縫長度:中 (20-40cm) -機械輔助繞線
確認襪套位置 4 面部模壓
車縫長度:長-直線 (>40 cm)
昇華轉印
削皮 10
確認襪套位置 面部模壓
片薄 車縫長度:長-弧線 (40-60 cm)
6 昇華轉印
車縫長度:超長-弧線 (>60cm)
鞋墊製作
預磨打粗
接合 模壓鞋墊
工廠提供實際測得的時間
5
3
電腦針車 (交換式模板) 刀斬鞋墊 傳統雷射
劃針車記號線(網印/手工) 標準秒值
電腦針車 (固定式模板) 加掛釘
針車記號線-網印 鞋面-蓋日期章 7
編織 不加掛釘
MM Option
針車記號線-手工劃線
編織
27
UPPER PREPARATION—SKIVING
Labor Process Description Standard Assumptions
Minutes
Skiving: The reduction of material along a defined edge. Skiving is done to remove bulkiness, aid construction, and avoid wear
discomfort.
Manual Skiving Removal of material typically using a flat (disc) .130 Increments per COMPONENT, NOT
knife or a bell (drum) knife. Average per edge skived.
- PF-01 Prefit-Skiving & Pre buffing (Manual)
Pre-Buffing Removal of leather material typically using a .120 Increments per COMPONENT, NOT
flat (disc) knife or a bell (drum) knife. Average per edge skived.
PF-01 Prefit-Skiving & Pre buffing (Manual)
Matrix Skiving Allows all edges of the component to be .17 Increment per LOADING, Not per
skived at the same time using a matrix or Average edge Skived
template. - PF-02 Prefit-Skiving & Pre buffing (Matrix)
Manual Skiving Matrix Skiving Tuck Board Beveling = Matrix Skiving Pre-Buffing
28
中
鞋面部件準備/處理- 削皮
人工動作 描述 標準秒值 前提說明
削皮類:將材料指定的邊緣進行削薄處理,其目的在於去除太厚的區域、有利於鞋型結構與避免穿著不舒適
29
UPPER PREPARATION—SKIVING
PFC INFORMATION
1x 1x
1x 1x 1x
1x 1x 1x 1x 1x
計算製造流程的步驟
1. 辨識製造流程
2. 計算製造流程/部件數量
2x 1x
削皮 3x
1x 1x
1x 1x 1x
1x 1x 1x 1x 1x
預磨打粗 4x 片皮 6x
31
UPPER PROCESSES
Upper Preparation (25) Upper Construction (29) Upper Embellishment (16)
1 3 1 6
1 4 Attaching Shaping Embroidery Upper Painting
Cutting Edge Treatment
Hot Melt Hammering
Auto Folding Embroidery - Tape Upper Spray Painting
Leather
Sticker Fold/Turn
Manual Folding Embroidery - Pins
Synthetic/Textile 1 Layer Manual Painting
Heat Press Punching
Synthetic/Textile 2 Heating
Layers Heat Gun
Painting 7 Upper Waterproofing
Synthetic/Textile 4 (DWRS)
Apparatus 2
Layers Trimming Upper Screen Printing
4 Upper Waterproofing
No Sew
Synthetic/Textile 6 Lacing (DWRS)
Screen Print - Small
Layers
No Sew - Stacking
Upper Stacking
Synthetic/Textile 8 Screen Print - Medium
5 8
Layers Flyknit Preparation Press (Component) Vac Tech
Toggle Lace
Screen Print - Large
Part Aligned - Large Knit Ironing Press (Full Vamp)
BOA Vac Tech (Eco-Fill)
塗邊 熱熔膠槍 7
人造皮/紡織品 4 層
2 面部防水處理
修邊 金屬眼扣
4 網版印刷 (DWRS)
人造皮/紡織品 6 層 穿鞋帶
No Sew 網印面積-小 鞋面防水膜噴漆(DWRS)
No Sew – 堆疊
鞋面堆疊 (二加用) 網印面積-中
人造皮/紡織品 8 層 5
Flyknit 準備
熱壓 (部件)
網印面積-大
對位斬-大部件 穿織帶
Knit 燙平處理
熱壓 (一片式鞋頭)
8 Vac Tech
鞋帶束緊器
對位斬-中部件 Knit Cuff 熱壓填補
對位斬-小部件
BOA ®鞋帶系統 PU 料填補
3
配雙 5
高週波 補強料填補
後襯定型
6
Dynamic Flywire
Laser Final Trim (LFT) 2 高週波
EXERCISE
後襯定型 針車 Dynamic Flywire
9
Foamposite
-手工繞線
車縫長度:短 (< 20cm) Foamposite
Dynamic Flywire
削皮
2
7 車縫長度:中 (20-40cm) -機械輔助繞線
確認襪套位置 4 面部模壓
車縫長度:長-直線 (>40 cm)
昇華轉印
削皮 10
確認襪套位置 面部模壓
片薄 車縫長度:長-弧線 (40-60 cm)
6 昇華轉印
車縫長度:超長-弧線 (>60cm)
鞋墊製作
預磨打粗
接合 模壓鞋墊
工廠提供實際測得的時間
5
3
電腦針車 (交換式模板) 刀斬鞋墊 傳統雷射
劃針車記號線(網印/手工) 標準秒值
電腦針車 (固定式模板) 加掛釘
針車記號線-網印 鞋面-蓋日期章 7
編織 不加掛釘
MM Option
針車記號線-手工劃線
編織
33
UPPER PREPARATION—STITCH MARKING
Labor Process Description Standard Assumptions
Minutes
Stitch Marking: The identification of stitch lines or construction instructions used in the manufacturing process.
Stitch Marking - Screen The use of a silk-screen template to indicate .225 Increments per SURFACE
construction instructions or guidelines. Average Considerations:
Material is grasped in single pieces
**Labor Process is used for each component that Material movement both IN and OUT
needs to be marked regardless of the number of Operator wipes material twice
components which can be marked simultaneously. No rotation of material occurs
Multiple components can be placed into 1
screen
**IE PMTS BP Refer to PF-06 Pre fit Stitch
Marking (Screen)
Stitch Marking - Pen The use of a PVC gauge or template to indicate .235 Increments per Jig Placement
construction instructions or guidelines. Average Considerations:
Material is grasped in single pieces
**Labor Process is used for each component that Material movement both IN and OUT
needs to be marked regardless of the number of Place pen in slots according to PFC
components which can be marked simultaneously. No rotation of material
One component per jig/gauge
**IE PMTS BP Refer to PF-05 Pre fit Stitch
Marking (Manual)
Upper Stamping Stamping information onto a part to ensure further .130 Increments per STAMP.
processing is completed correctly. Average
34
中
鞋面部件準備/處理- 針車記號線
人工動作 描述 標準秒值 前提說明
針車記號線:將鞋面部件標示針車記號線或結構的記號點,便於量產作業
針車記號線-網印 使用網印方式將針車記號線標示在部件上 平 均 .225 以印刷平面的數量計算
**人工工序用於每個需劃線的部件, 條件說明:
不管多部件是否可同時作業 • 材料大小可單片被拿取
• 材料進行 “網印” 的移動有 “進” 與 “出”
• 作業員進行 2 次刮刀動作
• 材料不可轉動
• 一個網版下可放多個部件
**人工工序用於每個需劃線的部件, 條件說明:
不管多部件是否可同時作業 • 材料大小可單片被拿取
• 材料進行 “網印” 的移動有 “進” 與 “出”
• 根據 PFC 設定,將畫線筆依照線溝劃線
• 材料不可轉動
• 每一個製具/樣板只用於一個部件
35
UPPER PREPARATION—STITCH MARKING
PFC INFORMATION
PEN 1X STAMPING 1X
36
中
鞋面部件準備/處理- 針車記號線
PFC 範例
計算製造流程的步驟
1. 辨識製造流程 網印:4X
2. 計算製造流程 手工畫線:1X
鞋面蓋章:1X
網印 1X 網印 1X 網印 1X 網印 1X
手工畫線 1X 鞋面蓋章 1X
37
UPPER PROCESSES
Upper Preparation (25) Upper Construction (29) Upper Embellishment (16)
1 3 1 6
1 4 Attaching Shaping Embroidery Upper Painting
Cutting Edge Treatment
Hot Melt Hammering
Auto Folding Embroidery - Tape Upper Spray Painting
Leather
Sticker Fold/Turn
Manual Folding Embroidery - Pins
Synthetic/Textile 1 Layer Manual Painting
Heat Press Punching
Synthetic/Textile 2 Heating
Layers Heat Gun
Painting 7 Upper Waterproofing
Synthetic/Textile 4 (DWRS)
Apparatus 2
Layers Trimming Upper Screen Printing
4 Upper Waterproofing
No Sew
Synthetic/Textile 6 Lacing (DWRS)
Screen Print - Small
Layers
No Sew - Stacking
Upper Stacking
Synthetic/Textile 8 5 Screen Print - Medium
Flyknit Preparation 8
Layers Press (Component) Vac Tech
Toggle Lace
Screen Print - Large
Part Aligned - Large Knit Ironing
BOA Press (Full Vamp) Vac Tech (Eco-Fill)
塗邊 熱熔膠槍 7
人造皮/紡織品 4 層
2 面部防水處理
修邊 金屬眼扣
4 網版印刷 (DWRS)
人造皮/紡織品 6 層 穿鞋帶
No Sew 網印面積-小 鞋面防水膜噴漆(DWRS)
No Sew – 堆疊
鞋面堆疊 (二加用) 網印面積-中
人造皮/紡織品 8 層 5
Flyknit 準備
熱壓 (部件)
網印面積-大
對位斬-大部件 穿織帶
Knit 燙平處理
熱壓 (一片式鞋頭)
8 Vac Tech
鞋帶束緊器
對位斬-中部件 Knit Cuff 熱壓填補
對位斬-小部件
BOA ®鞋帶系統 PU 料填補
3
配雙 5
高週波 補強料填補
後襯定型
6
Dynamic Flywire
Laser Final Trim (LFT) 2 高週波
EXERCISE
後襯定型 針車 Dynamic Flywire
9
Foamposite
-手工繞線
車縫長度:短 (< 20cm) Foamposite
Dynamic Flywire
削皮
2
7 車縫長度:中 (20-40cm) -機械輔助繞線
確認襪套位置 4 面部模壓
車縫長度:長-直線 (>40 cm)
昇華轉印
削皮 10
確認襪套位置 面部模壓
片薄 車縫長度:長-弧線 (40-60 cm)
6 昇華轉印
車縫長度:超長-弧線 (>60cm)
鞋墊製作
預磨打粗
接合 模壓鞋墊
工廠提供實際測得的時間
5
3
電腦針車 (交換式模板) 刀斬鞋墊 傳統雷射
劃針車記號線(網印/手工) 標準秒值
電腦針車 (固定式模板) 加掛釘
針車記號線-網印 鞋面-蓋日期章 7
編織 不加掛釘
MM Option
針車記號線-手工劃線
編織
39
UPPER PREPARATION—EDGE TREATMENT
Labor Process Description Standard Assumptions
Minutes
Edge Treatment: A treatment applied to any visible edge of a component in order to improve its appearance.
Auto Folding Folding an edge of upper component by machine, including .150 Increments per FOLDING
application of cement, folding, and hammering operations at Average Includes hammering and cementing
the same time.
Considerations:
Turning over a component to perform a second stitch does Accounts for folding by Machine
NOT get counted as folding. Tool is fetched once per shoe (Hand)
Scissors fetched as needed (Machine)
Additional re grasps and rotations may apply
The range folding is in <20cm. With length
>20cm can apply Place Holder.
Manual Folding Folding an edge of upper component by hand. Factory Include Processes (Observed Minutes)
Observed 1. Cementing
Minutes 2. Folding
3. Hammering
40
中
鞋面部件準備/處理- 毛邊處理
人工動作 描述 標準秒值 前提說明
毛邊處理:處理部件外露邊緣以改善其外觀的作業方式
自動摺邊 以機器輔助翻摺鞋面部件的邊緣,含上膠、 平 均 .150 以摺邊段數計算,含 捶 平 及 上
摺邊、捶平同時完成 膠 條件說明:
部件以機器輔助摺邊
車翻前作業前的摺邊不列入此摺邊作業的計 (手工) 每只鞋可用工具一次
算 (機器) 視情況需求使用剪刀
可能需要額外將部件抓握或旋轉輔助
摺邊範圍< 20cm;若長度> 20cm,
則放入“Place Holder” 頁面另行討
論*
*IE 須提供秒數
41
UPPER PREPARATION—EDGE TREATMENT-FOLDING
AUTO FOLDING 2X
42
中
鞋面部件準備/處理- 毛邊處理-摺邊
計算製造流程的步驟
1. 辨識製造流程
2. 計算製造流程
自動摺邊 2X
43
UPPER PREPARATION—EDGE TREATMENT
Labor Process Description Standard Assumptions
Minutes
Heating The edge of the upper leather component is skived and .013 Increments per COMPONENT
then heat-treated, so that the edge contracts and curls over Average
forming a smooth, rounded edge. For Leather ONLY. Considerations:
• Length of heat treatment = perimeter of
Also known as Edging, Burnishing, Ironing, Setting, or component.
Searing. • Rotations/regrasps depend on component.
44
中
鞋面部件準備/處理- 毛邊處理
人工動作 描述 標準秒值 前提說明
烘邊 鞋面的真皮部件於削皮後,以熱處理方式將皮邊的 平 均 .013 以部件數量計算
組織纖維、細毛烘掉,使邊緣平順。
僅適用於真皮材料。 條件說明:
• 熱處理(烘邊) 的長度= 部件的周長
又稱Edging, Burnishing, Ironing, Setting, or • 部件旋轉或重新抓取定位
Searing.
** IE PMTS BP PF09 Edge Treatment-
Hot Blow (熱風處理)
塗邊 使用油墨(刷筆、海綿或噴塗) 處理部件邊緣。通常 平 均 .150 以部件數量計算
作業方式是一次性手握一把(捆) 部件,一起處理。
條件說明:
• 手握一把材料(假設一把數量為 12 片/次)
• 每把 (次) 刷一次
• 部件旋轉需要重新抓取
45
Labor Process Count Step
UPPER PREPARATION—EDGE TREATMENT
1. Identified a Labor Process
46 PAINTING 5X HEATING 6X
計算製造流程的步驟 中
鞋面部件準備/處理- 毛邊處理
1. 辨識製造流程
2. 計算製造流程
47 塗邊 5X 烘邊 6X
UPPER PREPARATION—EDGE TREATMENT: TRIMMING
Labor Process Description Standard Assumptions
Minutes
Trimming Upper The use of scissors or a trimming device to snip .159 Increments per COMPONENT.
thread, or cut material apart during the upper making Average
process. **IE PMTS SW-11 Trimming by Hand
PFC INFORMATION
48
中
鞋面部件準備/處理- 毛邊處理:修 (剪) 邊
人工動作 描述 標準秒值 前提說明
修剪鞋面 鞋面製作過程中,以剪刀或修剪器具去修剪線頭或裁 平 均 .159 以部件數量計算
包含:留餘線 (四針六線、滾邊... 切材料的作業方式 *Dynamic Flywire 的修剪不列入計算
等)
**IE PMTS SW-11 Trimming by Hand
PFC 範例
49
48
UPPER PROCESSES
Upper Preparation (25) Upper Construction (29) Upper Embellishment (16)
1 3 1 6
1 4 Attaching Shaping Embroidery Upper Painting
Cutting Edge Treatment
Hot Melt Hammering
Auto Folding Embroidery - Tape Upper Spray Painting
Leather
Sticker Fold/Turn
Manual Folding Embroidery - Pins
Synthetic/Textile 1 Layer Manual Painting
Heat Press Punching
Synthetic/Textile 2 Heating
Layers Heat Gun
Painting 7 Upper Waterproofing
Synthetic/Textile 4 (DWRS)
Apparatus 2
Layers Trimming Upper Screen Printing
4 Upper Waterproofing
No Sew
Synthetic/Textile 6 Lacing (DWRS)
Screen Print - Small
Layers
No Sew - Stacking
Upper Stacking
Synthetic/Textile 8 Screen Print - Medium
8
Layers 5 Press (Component) Vac Tech
Flyknit Preparation Toggle Lace
Screen Print - Large
Part Aligned - Large Press (Full Vamp) Vac Tech (Eco-Fill)
Knit Ironing BOA
Part Aligned - Medium Vac Tech (Attaching)
Knit Cuff
Part Aligned - Large 2 3
Stitching HF Welding
5 9
Pair Matching Dynamic Flywire
Foamposite
Short (<20cm) HF Welding
6
Counter Shaping Dynamic Flywire -
Medium (20-40cm) Foamposite
Manual Winding
Counter Shaping
2 Long Straight (>40 cm) Dynamic Flywire -
Skiving Machine Winding
4 Upper Compression 10
Long Curve (40-60 cm) Sublimation
Molding
Manual Skiving 7
Sock-Gauge Checking Xtra Long Curve(>60cm) Upper Compression Sublimation
Matrix Skiving Molding
Sock-Gauge Checking Closed Seam 6
Sockliner Making
Pre-Buffing Computer w/ Pallet
Molded Sockliner Factory Observed Minutes
Computer w/ Fixed Jig 5
Die Cut Sockliner Laser Etching
3
Standard Minutes
Stitch Marking
Laser Etching With Pins
Stitch Marking - Screen Upper Stamping 7
Weaving
Laser Etching Without Pins
Stitch Marking - Pen
50 W eaving
UPPER PROCESSES—OVERVIEW 中
鞋面部件準備/處理 (25) 鞋面製程 (29) 面部二次加工 (16)
4
貼合處理
1 1 3 1
裁斷 毛邊處理 定型 電繡 6
面部噴漆
皮革 自動摺邊 熱熔膠 捶平 電繡-貼紙固定
部件噴漆
人造皮/紡織品 1 層 手工摺邊 自黏 折/翻 電繡-掛釘固定
人工噴漆
人造皮/紡織品 2 層 烘邊 熱壓 沖孔
塗邊 熱熔膠槍 7
人造皮/紡織品 4 層
2 面部防水處理
修邊 金屬眼扣
4 網版印刷 (DWRS)
人造皮/紡織品 6 層 穿鞋帶
No Sew 網印面積-小 鞋面防水膜噴漆(DWRS)
No Sew – 堆疊
5
鞋面堆疊 (二加用) 網印面積-中
人造皮/紡織品 8 層 Flyknit 準備
熱壓 (部件)
網印面積-大
對位斬-大部件 Knit 燙平處理 穿織帶
熱壓 (一片式鞋頭)
8 Vac Tech
鞋帶束緊器
對位斬-中部件 Knit Cuff 熱壓填補
對位斬-小部件
BOA ®鞋帶系統 PU 料填補
3
配雙 5
高週波 補強料填補
後襯定型
6
Dynamic Flywire
Laser Final Trim (LFT) 2 高週波
EXERCISE
後襯定型 針車 Dynamic Flywire
9
Foamposite
-手工繞線
車縫長度:短 (< 20cm) Foamposite
Dynamic Flywire
削皮
2
7 車縫長度:中 (20-40cm) -機械輔助繞線
確認襪套位置 4 面部模壓
車縫長度:長-直線 (>40 cm)
昇華轉印
削皮 10
確認襪套位置 面部模壓
片薄 車縫長度:長-弧線 (40-60 cm)
6 昇華轉印
車縫長度:超長-弧線 (>60cm)
鞋墊製作
預磨打粗
接合 模壓鞋墊
工廠提供實際測得的時間
5
3
電腦針車 (交換式模板) 刀斬鞋墊 傳統雷射
劃針車記號線(網印/手工) 標準秒值
電腦針車 (固定式模板) 加掛釘
針車記號線-網印 鞋面-蓋日期章 7
編織 不加掛釘
MM Option
針車記號線-手工劃線
編織
51
UPPER PREPARATION—FLYKNIT
Labor Process Description Standard Minutes Assumptions
Knit Ironing Upper Knit Ironing process for the purpose of 0.200 Does not increment
flattening. Fixed
**IE PMTS BP FT-07 Knit Ironing
Knit Cuff Cuff Shape making for the Knit Upper. Factory Observed Minutes Includes processes (Observed Minutes)
1. Weave Knit Cut
2. Arrange Knit Cuff
3. Knot Cuff Lock Stitching
4. Knot Cuff Strobel Stitching
5. Insert Board
6. Hang Board
7. Molding
8. Remove Board
9. Packing
52
中
鞋面部件準備/處理-FLYKNIT
人工動作 描述 標準秒值 前提說明
整燙 KNIT 鞋面整燙流程在於將鞋面燙平 固定值 0.200 不計算任何數量
KNIT整燙 KNIT定型
53
UPPER PROCESSES
Upper Preparation (25) Upper Construction (29) Upper Embellishment (16)
1 3 1 6
1 4 Attaching Shaping Embroidery Upper Painting
Cutting Edge Treatment
Hot Melt Hammering
Leather Auto Folding Embroidery - Tape Upper Spray Painting
Sticker Fold/Turn
Manual Folding Embroidery - Pins
Synthetic/Textile 1 Layer Manual Painting
Heat Press Punching
Synthetic/Textile 2 Heating
Layers Heat Gun
Painting 7 Upper Waterproofing
Synthetic/Textile 4 (DWRS)
Apparatus 2
Layers Screen Printing
Trimming Upper 4 Upper Waterproofing
No Sew
Synthetic/Textile 6 Lacing (DWRS)
Screen Print - Small
Layers
No Sew - Stacking
Upper Stacking
Synthetic/Textile 8 Screen Print - Medium
8
Layers 5 Press (Component) Vac Tech
Flyknit Preparation Toggle Lace
Screen Print - Large
Part Aligned - Large Press (Full Vamp)
Knit Ironing BOA Vac Tech (Eco-Fill)
塗邊 熱熔膠槍 7
人造皮/紡織品 4 層
2 面部防水處理
修邊 金屬眼扣
4 網版印刷 (DWRS)
人造皮/紡織品 6 層 穿鞋帶
No Sew 網印面積-小 鞋面防水膜噴漆(DWRS)
No Sew – 堆疊
5
鞋面堆疊 (二加用) 網印面積-中
人造皮/紡織品 8 層 Flyknit 準備
熱壓 (部件)
網印面積-大
對位斬-大部件 Knit 燙平處理 穿織帶
熱壓 (一片式鞋頭)
8 Vac Tech
鞋帶束緊器
對位斬-中部件 Knit Cuff 熱壓填補
對位斬-小部件
BOA ®鞋帶系統 PU 料填補
3
配雙 6 5
高週波 補強料填補
後襯定型 Dynamic Flywire
Laser Final Trim (LFT) 2 高週波
EXERCISE 後襯定型 針車 Dynamic Flywire
9
Foamposite
-手工繞線
車縫長度:短 (< 20cm) Foamposite
Dynamic Flywire
削皮
2
7 車縫長度:中 (20-40cm) -機械輔助繞線
確認襪套位置 4 面部模壓
車縫長度:長-直線 (>40 cm)
昇華轉印
削皮 10
確認襪套位置 面部模壓
片薄 車縫長度:長-弧線 (40-60 cm)
6 昇華轉印
車縫長度:超長-弧線 (>60cm)
鞋墊製作
預磨打粗
接合 模壓鞋墊
工廠提供實際測得的時間
5
3
電腦針車 (交換式模板) 刀斬鞋墊 傳統雷射
劃針車記號線(網印/手工) 標準秒值
電腦針車 (固定式模板) 加掛釘
針車記號線-網印 鞋面-蓋日期章 7
編織 不加掛釘
MM Option
針車記號線-手工劃線
編織
55
UPPER PREPARATION—COUNTER SHAPING
Labor Process Description Standard Minutes Assumptions
Counter Shaping Thermo-formed counter material must be heated to .070 Does not increment
allow it to take on the shape of the back part of the Average Includes:
last. The two main systems are hot-air blowers and hot • Load pallet to workstation
molds. • Load counter to jig
• Load pallet to oven and remove
• Send pallet back to workstation
• 1 pallet = 12 counters (12 shoes/6 pairs)
COUNTER SHAPING
56
中
鞋面部件準備/處理-後襯定型
人工動作 描述 標準秒值 前提說明
後襯定型 熱成型的後襯材料必須以熱處理的方式將其軟化、定型 平 均 .070 不計算任何數量
以符合楦頭後跟形狀。主要二個加工的設備為“熱風機
與 “熱模” 涵蓋以下作業:
將拖板放到工作台
將後襯放到製具上
將拖板放入加熱器後移除
將拖板放回工作台
1拖板 = 12 個後襯 (12只/6雙)
後襯定型
57
UPPER PROCESSES
Upper Preparation (25) Upper Construction (29) Upper Embellishment (16)
1 3 1 6
1 4 Attaching Shaping Embroidery Upper Painting
Cutting Edge Treatment
Hot Melt Hammering
Auto Folding Embroidery - Tape Upper Spray Painting
Leather
Sticker Fold/Turn
Manual Folding Embroidery - Pins
Synthetic/Textile 1 Layer Manual Painting
Heat Press Punching
Synthetic/Textile 2 Heating
Layers Heat Gun
Painting 7 Upper Waterproofing
Synthetic/Textile 4 (DWRS)
Apparatus 2
Layers Screen Printing
Trimming Upper 4 Upper Waterproofing
No Sew
Synthetic/Textile 6 Lacing (DWRS)
Screen Print - Small
Layers
No Sew - Stacking
Upper Stacking
Synthetic/Textile 8 Screen Print - Medium
5 8
Layers Flyknit Preparation Press (Component) Vac Tech
Toggle Lace
Screen Print - Large
Part Aligned – Large Press (Full Vamp)
Knit Ironing BOA Vac Tech (Eco-Fill)
塗邊 熱熔膠槍 7
人造皮/紡織品 4 層
2 面部防水處理
修邊 金屬眼扣
4 網版印刷 (DWRS)
人造皮/紡織品 6 層 穿鞋帶
No Sew 網印面積-小 鞋面防水膜噴漆(DWRS)
No Sew – 堆疊
5
鞋面堆疊 (二加用) 網印面積-中
人造皮/紡織品 8 層 Flyknit 準備
熱壓 (部件)
網印面積-大
對位斬-大部件 Knit 燙平處理 穿織帶
熱壓 (一片式鞋頭)
8 Vac Tech
鞋帶束緊器
對位斬-中部件 Knit Cuff 熱壓填補
對位斬-小部件
BOA ®鞋帶系統 PU 料填補
3
配雙 6 5
高週波 補強料填補
後襯定型 Dynamic Flywire
Laser Final Trim (LFT) 2 高週波
EXERCISE 後襯定型 針車 Dynamic Flywire
9
Foamposite
-手工繞線
車縫長度:短 (< 20cm) Foamposite
Dynamic Flywire
削皮
2
7 -機械輔助繞線
車縫長度:中 (20-40cm)
確認襪套位置 4 面部模壓
車縫長度:長-直線 (>40 cm)
昇華轉印
削皮 10
確認襪套位置
面部模壓
片薄 車縫長度:長-弧線 (40-60 cm)
6 昇華轉印
車縫長度:超長-弧線 (>60cm)
鞋墊製作
預磨打粗
接合 模壓鞋墊
工廠提供實際測得的時間
5
3
電腦針車 (交換式模板) 刀斬鞋墊 傳統雷射
劃針車記號線(網印/手工) 標準秒值
電腦針車 (固定式模板) 加掛釘
針車記號線-網印 鞋面-蓋日期章 7
編織 不加掛釘
MM Option
針車記號線-手工劃線
編織
59
UPPER PREPARATION—SOCK-GAUGE CHECKING
Labor Process Description Standard Minutes Assumptions
Sock-Gauge Checking Checking the sock dimension with a mark at the top Factory Observed Minutes Includes processes (Observed Minutes):
edge of sock and center of Knit Upper 1. Fix the sock to Real jig
2. Match nick on the Real jig
3. Mark the edge and center of Upper
4. Take out sock from Real jig
5. Check with QC Jig
SOCK-GAUGE CHECKING
60
中
鞋面部件準備/處理-確認襪套位置
人工動作 描述 標準秒值 前提說明
確認襪套位置 檢查襪套尺寸,從套筒上緣到Knit 鞋面 工廠提供實際測得的 涵蓋以下作業:(工廠回饋測得秒值)
的中心(見圖示) 時間 1. 將襪套固定到製具上
2. 將凸齒記號點與製具對齊
3. 將邊緣與鞋面中心做記號
4. 將襪套從製具上移除
5. 以品檢用的製具檢查
確認襪套位置
61
QUESTIONS
62
62 | INTERNAL USE ONLY. KEEP IT TIGHT.
練習 UPPER PREPARATION EXERCISE
範例
(Cutting, Skiving, Stitch Marking,
Edge Treatment)
• Zoom Fly
Upper :
Engineering Mesh
Counter Reinforcement need to have 2
component / shoe.
63
練習 Nike, Inc. Ver 17.8
範例
Production Confirmation (March, 29, 2017) Non Order
MODEL NAME: ZOOMFLY Upper Cutting Schedules Arrow indicates the direction of the
Tightness Page: 4-1
PRODUCTION CODE: 880848-001
COMPONENT NAME 1 UPPER COMPONENT NAME 2 STROBEL SOCK
9
3
4
4
5
5
6
6
7
7
8
8 9 10 10 11 11 12 12 13 13 14 14 15 M'S
3 4 5 6 7 8 9
4 5 6 7 8 9 10 10 11 11 12 12 13 13 14 14 15 M'S
T T T T T T T T T T T T T T T T T T T T T T T T
5
5
6
6
7
7
8
8 9 9 10 10 11 11 12 W'S 5566 7 7 8 8 9 9 10 10 11 11 12 W'S
T T T T T T T T T T T T T T
☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆
☆
PAIR MATCH PAIR MATCH
Hybrid
PART LOCATION PART LOCATION
1 x 裁斷-對位斬-大部件 Φ 2mm
NUMBER OF LAYERS
1
1 x 裁斷-人造皮斬 4 層 Φ 3.5mm
NUMBER OF LAYERS
範例
Production Confirmation (March, 29, 2017) Non Order
MODEL NAME: ZOOMFLY Upper Cutting Schedules (2) Arrow indicates the direction of the
Tightness Page: 4-2
PRODUCTION CODE: 880848-001
COMPONENT NAME 5 EYESTAY REINF COMPONENT NAME 6 MAGWIRE REINF IN/OUT
3 4 5 6 7 8 9 3 4 5 6 7 8 9
4 5 6 7 8 9 10 10 11 11 12 12 13 13 14 14 15 M'S 4 5 6 7 8 9 10 10 11 11 12 12 13 13 14 14 15 M'S
T T T T T T T T T T T T T T T T T T T T T T T T
5
5
6
6
7
7
8
8
9 9 10 10 11 11 12 W'S 5566 7 7 8 8 9 9 10 10 11 11 12 W'S
T T T T T T T T T T T T T T
☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆
PAIR MATCH PAIR MATCH
4
2 x Cutting – Synthetic 4 Layer Φ 2mm
NUMBER OF LAYERS
COMPONENT NAME 7 MAGWIRE SLIT FILM TOP & BOTTOM IN COMPONENT NAME 8 MAGWIRE SLIT FILM TOP & BOTTOM OUT
9
3
4
4
5
5
6
6
7
7
8
8 9 10 10 11 11 12 12 13 13 14 14 15 M'S 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 M'S
T T T T T T T T T T T T T T T T T T T T T T T T
5
5
6
6
7
7
8
8 9 9 10 10 11 11 12 W'S 5566 7 7 8 8 9 9 10 10 11 11 12 W'S
T T T T T T T T T T T T T T
☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆
PAIR MATCH PAIR MATCH
Serrated edge Serrated edge
PART LOCATION PART LOCATION
# OF PARTS 2 # OF PARTS 2
PATTERN EFFICIENCY % PATTERN EFFICIENCY %
Φ 1mm Φ 1mm
NUMBER OF LAYERS NUMBER OF LAYERS
2 x Cutting – Synthetic 2 Layer
**MAGWIRE SLIT FILM TOP & BOTTOM USE SAME CUTTING D IE 2
2**MAGWIRE
x Cutting – Synthetic 2 Layer
SLIT FILM TOP & BOTTOM USE SAME CUTTING DIE 2
範例
Production Confirmation (March, 29, 2017) Non Order
MODEL NAME: ZOOMFLY Upper Cutting Schedules (3) Arrow indicates the direction of the
Tightness Page: 4-3
PRODUCTION CODE: 880848-001
COMPONENT NAME 9 QTR LINING COMPONENT NAME 10 QTR LINING FILM
3 4 5 6 7 8 9 3 4 5 6 7 8
4 5 6 7 8 9 10 10 11 11 12 12 13 13 14 14 15 M'S 4 5 6 7 8 9 910 10 11 11 12 12 13 13 14 14 15 M'S
T T T T T T T T T T T T T T T T T T T T T T T T
5 6 7 8 9 10 11 5 6 7 8 9 10 11
5 6 7 8 9 10 11 12 W'S 5 6 7 8 9 10 11 12 W'S
T T T T T T T T T T T T T T
☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆
PAIR MATCH PAIR MATCH
Serrated edge
PART LOCATION PART LOCATION
1 x 裁斷-人造皮斬 4 層 Φ 2mm
NUMBER OF LAYERS
4
1 x 裁斷-人造皮斬 4 層Φ 2mm NUMBER OF LAYERS
4
範例
Production Confirmation (March, 29, 2017) Non Order
MODEL NAME: ZOOMFLY Upper Cutting Schedules (4) Arrow indicates the direction of the
Tightness Page: 4-4
PRODUCTION CODE: 880848-001
COMPONENT NAME 13 TONGUE O'LAY - 1st CUT COMPONENT NAME 14 TONGUE O'LAY-THOMSONSON CUTTING
3 4 5 6 7 8 9 10 11 11 12 13 13 14 14 3 4 5 6 7 8 9
4 5 6 7 8 9 10 12 15 M'S 4 5 6 7 8 9 10 10 11 11 12 12 13 13 14 14 15 M'S
T T T T T T T T T T T T T T T T T T T T T T T T
1 x 裁斷-人造皮斬 4 層
7 8
5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 W'S 5566 7 8 9 9 10 10 11 11 12 W'S
T T T T T T T T T T T T T T
☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆
沖孔、網版印刷、湯姆遜刀裁斷在另外頁面計算
PAIR MATCH PAIR MATCH
PROCESS: PROCESS:
PART LOCATION PART LOCATION
1. 1st CUT 1. 1st CUT
2. SCREEN PRINT DIE TYPE 2. SCREEN PRINT DIE TYPE
3. PUNCHING HOLE COMBINED DIE 3. PUNCHING HOLE COMBINED DIE
4. THOMSON CUTTING DIE CONSTRUCTION
32mm COLD BEND
4. THOMSON CUTTING DIE CONSTRUCTION
THOMPSON DIE
# OF PARTS 4 # OF PARTS 2
PATTERN EFFICIENCY % PATTERN EFFICIENCY %
NUMBER OF LAYERS
4
1 x 裁斷-對位斬-小部件
Φ 1mm
NUMBER OF LAYERS
1 x 裁斷-人造皮斬 4 層 Φ 1 mm
4
1 x 裁斷-人造皮斬 4 層
Φ 1mm
4
範例
Production Confirmation (March, 29, 2017) Non Order
MODEL NAME: ZOOMFLY Upper Cutting Schedules (5) Arrow indicates the direction of the
Tightness Page: 4-5
PRODUCTION CODE: 880848-001
COMPONENT NAME 17 COLLAR FOAM COMPONENT NAME 18 QTR BOTTOM REINF IN
3 4 5 6 7 8 9 10 11 11 12 12 13 13 14 14 15 3 4 5 6 7 8 9
4 5 6 7 8 9 10 M'S 4 5 6 7 8 9 10 10 11 11 12 12 13 13 14 14 15 M'S
T T T T T T T T T T T T T T T T T T T T T T T T
5 6 7 8 9 10 11 5 6 7 8 9 10 11
5 6 7 8 9 10 11 12 W'S 5 6 7 8 9 10 11 12 W'S
T T T T T T T T T T T T T T
☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆
PAIR MATCH PAIR MATCH
1 x 裁斷-人造皮斬 2 層
NUMBER OF LAYERS NUMBER OF LAYERS
Φ 1. 5mm
2 1 x 裁斷-人造皮斬 4 層
Φ 2mm
4
1 x 裁斷-人造皮斬 4 層 Φ 2 mm 4 1 x 裁斷-人造皮斬 2 層 2
範例
Production Confirmation (March, 29, 2017) Non Order
MODEL NAME: ZOOMFLY Upper Cutting Schedules (6) Arrow indicates the direction of the
Tightness Page: 4-6
PRODUCTION CODE: 880848-001
COMPONENT NAME 21 COUNTER REINF COMPONENT NAME 22 COLLAR REINF 1 IN
3 4 5 6 7 8 9 10 11 12 12 13 13 14 14 3 4 5 6 7 8 9
4 5 6 7 8 9 10 11 15 M'S 4 5 6 7 8 9 10 10 11 11 12 12 13 13 14 14 15 M'S
T T T T T T T T T T T T T T T T T T T T T T T T
5 6 7 8 9 10 11 5 6 7 8 9 10 11
5 6 7 8 9 10 11 12 W'S 5 6 7 8 9 10 11 12 W'S
T T T T T T T T T T T T T T
☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆
PAIR MATCH PAIR MATCH
*Gang die / Group die
PART LOCATION PART LOCATION
2 x 裁斷-人造皮斬 6 層 Φ 2 mm
NUMBER OF LAYERS
6
1 x 裁斷-人造皮斬 6 層
Φ 2mm
NUMBER OF LAYERS
範例
Production Confirmation (March, 29, 2017) Non Order
MODEL NAME: ZOOMFLY Upper Cutting Schedules (7) Arrow indicates the direction of the
Tightness Page: 4-7
PRODUCTION CODE: 880848-001
COMPONENT NAME 25 COLLAR REINF 2 OUT COMPONENT NAME 26 UPPER THOMSON CUTTING-LEFT
3 4 5 6 7 8 9 10 11 11 12 13 14 14 15 3 4 5 6 7 8 9
4 5 6 7 8 9 10 12 13 M'S 4 5 6 7 8 9 10 10 11 11 12 12 13 13 14 14 15 M'S
T T T T T T T T T T T T T T T T T T T T T T T T
5 6 7 8 9 10 11 5 6 7 8 9 10 11
5 T 6 T 7 T 8 9 T 10 11 12 W'S 5 T 6 T 7 T 8 T 9 10 11 12 W'S
T T T T T T
☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆
PAIR MATCH PAIR MATCH
COMPONENT NAME 27 UPPER THOMSON CUTTING-RIGHT COMPONENT NAME 28 EYESTAY HOLES THOMSON CUTTING-LEFT
3 4 5 6 7 8 9 3 4 5 6 7 8
4 5 6 7 8 9 10 10 11 11 12 12 13 13 14 14 15 M'S 4 5 6 7 8 9 9 10 10 11 11 12 12 13 13 14 14 15 M'S
T T T T T T T T T T T T T T T T T T T T T T T T
5 6 7 8 9 10 11 11 12 5 6 7 8 9 10 11 11 12
5 6 7 8 9 10 W'S 5 6 7 8 9 10 W'S
T T T T T T T T T T T T T T
☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆
PAIR MATCH PAIR MATCH
DIE TYPE 6
DIE TYPE
1 3 4 5
SINGLE DIE SINGLE DIE
DIE CONSTRUCTION CNC DIE CONSTRUCTION
THOMPSON DIE THOMPSON DIE
# OF PARTS 1 # OF PARTS 1
PATTERN EFFICIENCY % PATTERN EFFICIENCY %
1 2 2 2
此為右腳,已經算在左腳裡 1 1 x 裁斷-對位斬-大部件 1
範例
Production Confirmation (March, 29, 2017) Non Order
MODEL NAME: ZOOMFLY Upper Cutting Schedules (8) Arrow indicates the direction of the
Tightness Page: 4-8
PRODUCTION CODE: 880848-001
COMPONENT NAME 29 EYESTAY HOLES THOMSON CUTTING-RIGHT COMPONENT NAME 30 QTR SWOOSH OUT
3 4 5 6 7 8 9 3 4 5 6 7 8 9
4 5 6 7 8 9 10 10 11 11 12 12 13 13 14 14 15 M'S 4 5 6 7 8 9 10 10 11 11 12 12 13 13 14 14 15 M'S
T T T T T T T T T T T T T T T T T T T T T T T T
5 6 7 8 9 10 11 11 12 7 7 8 8 9 9 10 10 11 11 12
5 6 7 8 9 10 W'S 5566 W'S
T T T T T T T T T T T T T T
☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆
PAIR MATCH PAIR MATCH
1: ROLL CUTTING
PART LOCATION 2. SCREEN PRINT PART LOCATION
1
**沖孔與網版印刷計算在網印頁面 NUMBER OF LAYERS
1 x 裁斷-對位斬-小部件
**沖孔與網版印刷計算在網印頁面 NUMBER OF LAYERS NUMBER OF LAYERS
1 1 x 裁斷-人造皮-小部件 2
KEY
: Skiving inside (medium)
Surface Backside
2 x 削皮
削皮計算以部件數量為基準;
SKIVED EDG E THICKNESS
SKIVING WIDTH
SKIVED EDGE THIC KNESS
5MM
10MMSKIVING WID TH
0.5MM
6MM
SKIVED EDGE THICKNESS
SKIVING WIDTH
0.5MM
6MM
COMPONE NT :
片皮計算以片表面數量為基準COMPONENT : COMPONENT :
Upper SUilkpSpcereSeknivPinrogcIensstr(u7c2tions
練習 Nike, Inc. Ver 17.8
1 x 手工畫線
PROCESS MANUAL PROCESS MANUAL PROCESS PROCESS
Upper SiUlkpSpcerereMnaPrrkoincgesLso(c7a3tions