CQP N. 589 - Discharge Bin Upper & Lower - AS.421.Q2-M2-DLZ 001 To 004
CQP N. 589 - Discharge Bin Upper & Lower - AS.421.Q2-M2-DLZ 001 To 004
: PTIN/CQP/589
Rev. No. : 0
Component Quality Plan- Development Part Rev.Date : 06.01.2024
Page No. : 1 of 2
Sr. No. Test/Inspection Parameter Specification/ Acceptance Norms Inspection Method Format of Record Sample Size Supplier PTIN Remark
A Material (Plate & Pipe of S235JR For Upper & Lower Bin as per Sheet No. 4)
Chemical Analysis
C - 0.17 Max.
Mn - 1.40 Max
Material TC/ Chemical test Per Heat / Per
i S & P - 0.035 Max. Spectrometer Spectrometer P R
report Thickness
N - 0.012 Max.
Cu - 0.55 Max. 1) Test piece should be 1/3 the thickness or 100 mm
C Equivalent :- 0.35 Max. Thick max- Labs to be NABL approved.
2) Material test certificates as per EN10024 3.1 for
Chemical & Mechanical (UTS, Yield Strength,
Mechanical Test(Yield Strength / UTS / Elongation) Elongation, Impact strength).
Tensile :- 360-510 N/mm²
Yield Strength :- 235 N/mm² Min. UTM / Bend Test Machine / Impact Per Heat / Per
ii UTM Mechanical test report P W
Elongation :- 26 % Min. Test Machine Thickness
Impact 27J at 20°C
Bend Test at R20-28 as per Thk. mentioned in Standard EN10025-2
B Welding Between Pipes & Plates (For Upper & Lower Bin as per Sheet No. 4)
Dimensional / Weld
B-1 Weld Fit Up for Pipes & Plates As Per Respective Drawing Inspection Report 100% P W Need to be offer for inspection on tack Weld Condition.
Edge preparation
Welder Qualification Record as per ASME Sec. IX need
B-2 Welding WPS/WPQ/PQR WPS PQR/WPQ N/A P R to be submitted to PTIN for Review prior to Start the
welding.
B-3 Cleaning of Scaling after Heat Treatment / Shot Blasting Ensure removal of scaling & rust Visual Insp - 100% P -
Weld Joint as
i) DP Test on Weldment ASME Code Section V Article 6 & 24 --- DP Report mentioned in P W* Accpetable Norms as per VIII Div. 1 Appendix 8
Drg.
1) If Required Marking need to be done.
Dimensional & Weld
B-5 Inspection after Complete Fabrication. As per Drawing Inspection Report 100% P W* 2) Weld Size need to be maintained as per drawing
Size
Only.
C Dimensional Inspection after Machining Operation (For Upper & Lower Bin as per Sheet No. 4)
Impact testing
iii Impact Testing at 20°C (Required 41 J Min.) Impact testing report P W
machine
Remarks:- 1) Submission of all test certificate & Inspection Report in the name of Primetals Technologies is mandatory.
Sr. No. Test/Inspection Parameter Specification/ Acceptance Norms Inspection Method Format of Record Sample Size Supplier PTIN Remark
F Dimensional Inspection after Machining Operation (Part No. 1 To 15 mentioned in Sheet No. 2)
Various Measuring
G-1 Dimensional As per Drawing Inspection Report 100% P W
instruments
Free from rust, dust, dent, Damages, 1) Greasing / Lubrication need to be done in Assembly
G-2 Visual Inspection Visual Insp ---- 100% P W
Tool Marks, burr etc wherver necessary requirment shown in drawing.
1) All Hardware need to be used as per DIN 933
By using Torque (Galvanized) mentioned in BOM.
G-3 Tigtnening Of Bolts As per Drawing ---- 100% P W
Wrench 2) Hardware need to be used UNBRAKO, TVS
make only.
1) Brought Parts need to be used as per Make
mentioned in BOM.
G-4 Sub-Part Fitment Verification BOM of Final Assly. Visual Insp Inspection Report 100% P W
2) Btach certificates for Bearing & Hardware need to be
submitted.
By Manual or By 1) Free Movement of Wheel need to be checked during
G-5 Operational / Functional Check As per Drawing Inspection Report 100% P W
Using Crane Final Assembly inspection.
Part number to be Laser
Marked , along with other
information specified.
Drawing No./ Vendor Code/ Sr.No.-
G-6 Identification As per identification procedure on each Sub-Part Visual Insp Even Bar code stickers 100% P W*
Heat No.
can be used for
identification and
traceability
Remarks:- 1) Submission of all test certificate & Inspection Report in the name of Primetals Technologies is mandatory.