Professional Documents
Culture Documents
L02 R02D01 Fos 00 XX DWG Ar 52005
L02 R02D01 Fos 00 XX DWG Ar 52005
1500
1500
10.The South Community villas shutter removal follow the solar shading
shoebox analysis by EOC which is based on SHGCgl 0.35 glass and
SBC and 50 W/m2 solar maximum criteria and 0 Hour of Annual
+2.10 +2.10 overheating and is compliant in all the villa orientations as per the latest
masterplan DMP2 rev18. The shutter removal has not taken into
consideration the potential ‘relaxation’ of the parameters in the winter
months, which will need to be further assessed by Chapman case-by-
12 12 case and Approved by RSG based on EOC’s latest simulation data.
Once confirmed, these relaxed criteria will allow for more shutters to be
removed in all orientations. The final solar response strategy will be
13 11 13 11 issued by F+P via a separate matrix / manual once concluded.
280
280
14 10 14 10
280
280
15 9 15 9
280
280
16 8 16 8
280
280
17 7 17 7
280
280
18 6 18 6
280
280
02 01/12/2023 100% Design Development - EB
19 5 19 5
280
280
Addendum II
01 31/05/2023 100% Design Development - EB
20 4 20 4 Addendum
280
280
00 24/03/2023 100% Design Development EB
Rev. Date Reason For Issue Chk
21 3 21 3
280
280
Design Development
22 2 22 2
280
280
Key Plan.
23 1 23 1
280
280
3 3
L02-R02D01-FOS-00- L02-R02D01-FOS-00-
XX-DWG-AR-52005 XX-DWG-AR-52005
24 24
N
BAL-201 STR-101 BAL-104 BAL-201 STR-101 BAL-104
05 51 00 05 51 00 05 51 00 05 51 00 05 51 00 05 51 00
471-02
471-C 471-D
STR-101 BAL-104
05 51 00 05 51 00
+4.20 +4.20
Level 01 Level 01
24 24
17 17
16 16 Olaya District
Riyadh 11625, KSA
T +966 9200 29750
15 15 F +966 2900 29750
riyadh@dewan-architects.com
14 14 Signature/Design Architect
+2.10 +2.10
13 13
12 12 Riverside, 22 Hester Road © Foster + Partners 2022
175
175
11 11 T +44(0)20 7738 0455
F +44(0)20 7738 1107
175
175
10 10 london@fosterandpartners.com www.fosterandpartners.com
175
175
9 9 Client
175
175
8 8
175
175
7 7
175
175
6 6
175
175
5 5
Project
175
175
4 4
Laheq Island L02
175
175
3 3
Villas South Community
175
175
2 2
+0.00
175
175
1 1
Level 00 Level 00
175
175
Drawing Title
3
Drawn By Checked By Approved By
STR-101 -Type Stair 02 - Section 1
1 : 20 4 STR-101 -Type Stair 02 - Section 2
1 : 20 F+P EB SB
Project No First Issue Date Scale at ISO A0
L02R02 24/03/2023 1 : 20
Drawing Number Revision
L02-R02D01-FOS-00-XX-DWG-AR-52005 02