Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

General Notes

1. Do not scale drawings. Dimensions govern.


2. All dimensions are in millimetres unless noted otherwise.
3. All levels are in metres unless noted otherwise.
4. Foster + Partners shall be notified in writing of any discrepancies.
5. Any area measurements outside of Foster + Partners scope are for
guidance only, subject to final confirmation upon completion of the other
Consultants' Design, which shall be submitted following Foster +
Partners Architectural DD submission
6. Foster + Partners' scope of services is limited to Core & Shell
Architecture services (Signature Architect) only. All representations of
other design / engineering disciplines' design are indicative only - for all
other disciplines' design please refer to their respective Design
submissions.
7. Not for Construction.
8. The Information Models and CAD drawings used as reference in this
submission, represent the documentation available on the 20th of
November 2023 in BIM 360 "L00 Laheq Island Wide" project.
9. The final FFL ground floor levels will vary according to DMP2 V18
topography and villa location on the masterplan.
10.The South Community villas shutter removal follow the solar shading
shoebox analysis by EOC which is based on SHGCgl 0.35 glass and
SBC and 50 W/m2 solar maximum criteria and 0 Hour of Annual
overheating and is compliant in all the villa orientations as per the latest
masterplan DMP2 rev18. The shutter removal has not taken into
consideration the potential ‘relaxation’ of the parameters in the winter
months, which will need to be further assessed by Chapman case-by-
case and Approved by RSG based on EOC’s latest simulation data.
Once confirmed, these relaxed criteria will allow for more shutters to be
471-E 471-04 removed in all orientations. The final solar response strategy will be
issued by F+P via a separate matrix / manual once concluded.

CLG-101 RFS-101
09 21 16 07 55 56

Parapet Level
FFL 9.480

Varies > -0.750

Hot Water
Calorifier &
Expansion
Vessel Room

Varies > -0.750

Roof Maids' Room

01 01/12/2023 100% Design Development - EB


FFL 8.500
Ensuite 01 Addendum II
Majlis 00 31/05/2023 100% Design Development - EB
Addendum
Circulation Laundry

Entrance

+0.000

Level 02 Multipurpose
Office Rev. Date Reason For Issue Chk
Powder Room 02

FFL 8.000
Design Development
Closed Kitchen
Walk-in
FFL +0.000 Wardrobe 01

Powder Room 01

Key Plan.
Bedroom 01

FFL +0.000 Entrance

475
Open Kitchen

FFL +0.000

905
Dinning Living Room Media Room FFL +0.000

Makkah

FFL +0.000 Varies > -0.750

Circulation

N
Ensuite 05
Guest Ensuite

Walk-in
Wardrobe

Entrance

FFL +0.000
Guest Bedroom

SCR-102
SCR-102
03 53 00
03 53 00
2100

2100
Level 01
3 S47 - Keyplan - lift + electrical cabinet
FFL 4.200
7680

Multipurpose
Office
2
L02-R02D01-FOS-00-
XX-DWG-AR-55001

475
1253

CLG-101
09 21 16

Executive Architect/ AOR


Multipurpose Licence number - 1010452878

1384
Entrance Office

Olaya District

2940
Riyadh 11625, KSA
T +966 9200 29750
EWS-202 SCR-102 F +966 2900 29750
riyadh@dewan-architects.com
08 68 00 03 53 00
Signature/Design Architect
2100

2100
SCR-102
03 53 00 Riverside, 22 Hester Road © Foster + Partners 2022

London SW11 4AN


T +44(0)20 7738 0455
F +44(0)20 7738 1107
london@fosterandpartners.com www.fosterandpartners.com

+0.00 Client

1
Level 00 L02-R02D01-FOS-00-
XX-DWG-AR-55001
120

FFL 0.000

Project

900
Laheq Island L02
Villas South Community
1820

1 S47 - Lift section 1


1 : 20 2 S47 - Lift section 2
1 : 20 4 S47 - Lift plan 00
1 : 20
Drawing Title

Details
Lifts and Escalators
Lift Details 01

Model File Reference


L02-R02D01-FOS-00-ZZ-MOD-AR-00001
Drawn By Checked By Approved By

F+P EB SB
Project No First Issue Date Scale at ISO A0
L02R02 31/05/2023 1 : 20
Drawing Number Revision
L02-R02D01-FOS-00-XX-DWG-AR-55001 01

You might also like