Professional Documents
Culture Documents
L02 R02D01 Fos 00 XX DWG Ar 52007
L02 R02D01 Fos 00 XX DWG Ar 52007
4
Cladding/context vary 4
Consultants' Design, which shall be submitted following Foster +
Partners Architectural DD submission
L02-R02D01-FOS-00-
XX-DWG-AR-52007 according to Villa L02-R02D01-FOS-00-
XX-DWG-AR-52007
6. Foster + Partners' scope of services is limited to Core & Shell
Architecture services (Signature Architect) only. All representations of
other design / engineering disciplines' design are indicative only - for all
other disciplines' design please refer to their respective Design
2540 submissions.
7. Not for Construction.
8. The Information Models and CAD drawings used as reference in this
submission, represent the documentation available on the 20th of
November 2023 in BIM 360 "L00 Laheq Island Wide" project.
2540 9. The final FFL ground floor levels will vary according to DMP2 V18
topography and villa location on the masterplan.
10.The South Community villas shutter removal follow the solar shading
shoebox analysis by EOC which is based on SHGCgl 0.35 glass and
+2.10 +2.10 SBC and 50 W/m2 solar maximum criteria and 0 Hour of Annual
overheating and is compliant in all the villa orientations as per the latest
1255
1255
masterplan DMP2 rev18. The shutter removal has not taken into
consideration the potential ‘relaxation’ of the parameters in the winter
months, which will need to be further assessed by Chapman case-by-
case and Approved by RSG based on EOC’s latest simulation data.
Once confirmed, these relaxed criteria will allow for more shutters to be
removed in all orientations. The final solar response strategy will be
issued by F+P via a separate matrix / manual once concluded.
12 12
280
280
11 13 11 13
280
280
10 14 10 14
280
280
9 15 9 15
280
280
8 16 8 16
280
280
7 17 7 17
280
280
6 18 6 18
280
280
5 5 00 01/12/2023 100% Design Development - EB
19 19
Addendum II
280
280
Rev. Date Reason For Issue Chk
4 20 4 20
Design Development
280
280
3 21 3 21
Key Plan.
280
280
2 22 2 22
280
280
1 23 1 23
3 3
280
280
L02-R02D01-FOS-00- L02-R02D01-FOS-00-
XX-DWG-AR-52007 XX-DWG-AR-52007
24 24
+0.00 +4.20
N
BAL-201 STR-101 BAL-104
05 51 00 05 51 00 05 51 00
+4.200
Level 01 +4.200
24 24
175
FFL 4.200 23 23
175
22 22
BAL-201 STR-101
175
21 21
05 51 00 05 51 00
175
20 20
175
19 19
175
18 18
175
17 17
175
16 16
Executive Architect/ AOR
175
14 14
+2.100 SCR-101
175
12
T +966 9200 29750
F +966 2900 29750
riyadh@dewan-architects.com
11
175
70
11 Signature/Design Architect
10
175
10
9
175
7 london@fosterandpartners.com www.fosterandpartners.com
6
175
6 Client
5
175
5
4
175
4
3
175
SCR-101 3
2 03 53 00
175
2 Project
1 +0.000
175
Drawing Title
Details
Stairs / Ramps / Walkways
SCR-101 BAL-104 ST04 Stair Details
03 53 00 05 51 00
Model File Reference
L02-R02D01-FOS-00-ZZ-MOD-AR-00001
F+P
Checked By
EB
Approved By
SB
Project No First Issue Date Scale at ISO A0
L02R02 01/12/2023 1 : 20
Drawing Number Revision
L02-R02D01-FOS-00-XX-DWG-AR-52007 00