General Notes

1. Do not scale drawings. Dimensions govern.


2. All dimensions are in millimetres unless noted otherwise.
3. All levels are in metres unless noted otherwise.
4. Foster + Partners shall be notified in writing of any discrepancies.
00 5. Any area measurements outside of Foster + Partners scope are for
guidance only, subject to final confirmation upon completion of the other

4
Cladding/context vary 4
Consultants' Design, which shall be submitted following Foster +
Partners Architectural DD submission
L02-R02D01-FOS-00-
XX-DWG-AR-52007 according to Villa L02-R02D01-FOS-00-
XX-DWG-AR-52007
6. Foster + Partners' scope of services is limited to Core & Shell
Architecture services (Signature Architect) only. All representations of
other design / engineering disciplines' design are indicative only - for all
other disciplines' design please refer to their respective Design
2540 submissions.
7. Not for Construction.
8. The Information Models and CAD drawings used as reference in this
submission, represent the documentation available on the 20th of
November 2023 in BIM 360 "L00 Laheq Island Wide" project.
2540 9. The final FFL ground floor levels will vary according to DMP2 V18
topography and villa location on the masterplan.
10.The South Community villas shutter removal follow the solar shading
shoebox analysis by EOC which is based on SHGCgl 0.35 glass and
+2.10 +2.10 SBC and 50 W/m2 solar maximum criteria and 0 Hour of Annual
overheating and is compliant in all the villa orientations as per the latest

1255

1255
masterplan DMP2 rev18. The shutter removal has not taken into
consideration the potential ‘relaxation’ of the parameters in the winter
months, which will need to be further assessed by Chapman case-by-
case and Approved by RSG based on EOC’s latest simulation data.
Once confirmed, these relaxed criteria will allow for more shutters to be
removed in all orientations. The final solar response strategy will be
issued by F+P via a separate matrix / manual once concluded.
12 12

280

280
11 13 11 13

280

280
10 14 10 14

280

280
9 15 9 15

280

280
8 16 8 16

280

280
7 17 7 17

280

280
6 18 6 18

280

280
5 5 00 01/12/2023 100% Design Development - EB
19 19
Addendum II

280

280
Rev. Date Reason For Issue Chk
4 20 4 20
Design Development

280

280
3 21 3 21
Key Plan.

280

280
2 22 2 22

280

280
1 23 1 23
3 3

280

280
L02-R02D01-FOS-00- L02-R02D01-FOS-00-
XX-DWG-AR-52007 XX-DWG-AR-52007
24 24

1200 1200 1200 1200 Makkah

+0.00 +4.20

N
BAL-201 STR-101 BAL-104
05 51 00 05 51 00 05 51 00

1 STR-101 - Type Stair 04 - GF - S31, S33, S34, S38, S39, S44


1 : 20 2 STR-101 -Type Stair 04 - FF - S31, S33, S34, S38, S39, S44
1 : 20

391-04 391-05 391-E 391-D

BAL-201 STR-101 BAL-104


05 51 00 05 51 00 05 51 00

+4.200
Level 01 +4.200
24 24
175

FFL 4.200 23 23
175

22 22
BAL-201 STR-101
175

21 21
05 51 00 05 51 00
175

20 20
175

19 19
175

18 18
175

17 17
175

16 16
Executive Architect/ AOR
175

15 15 Licence number - 1010452878


175

14 14
+2.100 SCR-101
175

+2.100 13 13 03 53 00 Olaya District


Riyadh 11625, KSA
12
175

12
T +966 9200 29750
F +966 2900 29750
riyadh@dewan-architects.com

11
175

70
11 Signature/Design Architect
10
175

10
9
175

9 Riverside, 22 Hester Road © Foster + Partners 2022

8 London SW11 4AN


175

8 T +44(0)20 7738 0455


7 F +44(0)20 7738 1107
175

7 london@fosterandpartners.com www.fosterandpartners.com
6
175

6 Client

5
175

5
4
175

4
3
175

SCR-101 3
2 03 53 00
175

2 Project
1 +0.000
175

Level 00 +0.000 1 Laheq Island L02


175

Villas South Community


FFL 0.000

Drawing Title

Details
Stairs / Ramps / Walkways
SCR-101 BAL-104 ST04 Stair Details
03 53 00 05 51 00
Model File Reference
L02-R02D01-FOS-00-ZZ-MOD-AR-00001

3 STR-101 -Type Stair 04 - Section 1


1 : 20 4 STR-101 -Type Stair 04 - Section 2
1 : 20
Drawn By

F+P
Checked By

EB
Approved By

SB
Project No First Issue Date Scale at ISO A0
L02R02 01/12/2023 1 : 20
Drawing Number Revision
L02-R02D01-FOS-00-XX-DWG-AR-52007 00