Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

ZC Global Inc. Project: Initiator: ZC Global Inc.

Engineering consulting and technologies supplies since 1996 Bike Parks and Trails Concept ZC Global Inc. Stage: Conceptualization

BIKE TRAILS CONCEPT EVALUATION QUESTIONNAIRE

Municipalities
Parameters
Market volume
Municipalities having biking trails (BT)
Number of km of BT under construction in May 2016
Number of km of BT under construction annually
Municipalities planning BT within 3 years
Municipalities, presumably wishing to participate in the program
Municipalities, which will be sent a questionnaire
Sources of financing the construction of BT, %
for Review by Third Party Only

municipal
private
mixed
else
Design
ZC Global Inc

Are there any regulations, rules, and requirements of BT design (yes, no)
The ability to obtain regulatory provisions (yes, no)
Presence of the projects of existing BT
The ability to obtain the design of existing BT (yes, no)
The ability to obtain the design of BT under construction
Design organizations
Design budget
The presence of the landscape project of the existing BT (yes, no)
The ability to obtain the materials of landscape design (yes, no)
The desire of the municipalities for landscape design BT to built (yes, no)
Landscape design budget
Annual maintenance budget
Technical equipment (yes, no)
Loader with attachments
else
Specifications
Length in May 2016 km
Type of pavement
Existing BT
BT under construction or planned
Pavement colour
Width, m

Department: Consulting and Development 5/1 Page 1 of 4


ZC Global Inc. Project: Initiator: ZC Global Inc.
Engineering consulting and technologies supplies since 1996 Bike Parks and Trails Concept Stage: Conceptualization

Organization of traffic (yes, no)


single line
one‐sided
double‐sided
Bi line
one‐sided
double‐sided
Route
circular
linear
Lighting (yes, no)
length of lit zones, km
Distribution of lit zones
for Review by Third Party Only

Relief
even with slopes less than 5%
with some average slope areas up to 10%
complex with slop areas more than 10%
ZC Global Inc

The presence of pockets for siding (yes, no)


Siding pocket dimensions, m
The frequency of the arrangement of siding pockets
Diversions (serpentine) in areas with slopes greater than 10%
Are taken into account the needs of persons with disabilities (wheelchair use)
The presence of a pedestrian walkway (yes, no)
Localization and accessibility
In the city (settlement)
Away from the city (settlement)
Accessible by municipal transport (yes, no)
Accessible by individual transport only (yes, no)
Location of existing BT on municipal land
Location of existing BT on private land
Location of planned BT on municipal land
Location of planned BT on private land
Equipment and services
Entrance terminal (yes, no)
Car parking
Dressing room
Public toilets incl. wheelchair accessible
Catering service, café, fast food restaurants
Luggage storage
Equipment storage
Department: Consulting and Development 5/1 Page 2 of 4
ZC Global Inc. Project: Initiator: ZC Global Inc.
Engineering consulting and technologies supplies since 1996 Bike Parks and Trails Concept Stage: Conceptualization

Rain shelters
Maintenance and repair shops
Communication terminals
Bicycles rent
Rental equipment
else
Exit terminal (yes, no)
Car parking
Dressing room
Public toilets incl. wheelchair accessible
Catering service, café, fast food restaurants
Luggage storage
Equipment storage
for Review by Third Party Only

Rain shelters
Maintenance and repair shops
Communication terminals
Bicycles rent
ZC Global Inc

Rental equipment
else
Route
Public toilets incl. wheelchair accessible
Catering service, café, fast food restaurants
Rain shelters
Maintenance and repair shops
Communication terminals
Shortcuts and bypasses to terminals
Management parameters
Is there any operator (yes, no)
municipal
private enterprise
else
Is the BT operator the operator of equipment and services as well (yes, no)
The form of participation of services operators
Owner of premises and equipment
Rent of equipment and facilities
Equipment Leasing
The partnership with BT operator
else
Fees and charges
Are there any fees or charges for BT users (yes, no)
Department: Consulting and Development 5/1 Page 3 of 4
ZC Global Inc. Project: Initiator: ZC Global Inc.
Engineering consulting and technologies supplies since 1996 Bike Parks and Trails Concept Stage: Conceptualization

one‐time single use payment


use card seasonal pass fee
family or group discounting policy
Seasonal price discounts (yes, no)
Beginning of the season, week #
The average temperature of the first decade of the beginning of the season
End of season, week #
The average temperature of the last decade of the end of the season
Total of week s of peak season
Peak days of visitation
Visit Statistics (yes, no)
Estimated annual visiting of existing BT, M
Seasonal visiting of existing BT, M
for Review by Third Party Only

Estimated annual visiting of planned BT, M


The main contingent of users, %
Local population
Domestic tourism
ZC Global Inc

International tourism
Демография пользователей Вт, %
Age restrictions for BT users (yes, no)
6‐10 yrs
10‐15 yrs
15‐20 yrs
20‐30 yrs
30‐45 yrs
45‐55 yrs
55‐65 yrs
over 65 yrs
Availability of first aid medical facilities (yes, no)
Accessibility to emergency health care services

By Dmitry Zaretsky at 11:16 am, May 01, 2016

Department: Consulting and Development 5/1 Page 4 of 4

You might also like