Professional Documents
Culture Documents
Stefan
Stefan
617 42 A1
22
125
VOORKAMER
328
129
K.
SL.K.
105
REVISED BY DESCRIPTION
SL.K.
22
804 K. K.
REVISION TABLE
105
105
K. K.
22
OVERLOOP
76
HAL
DATE
55
NUMBER
OPKAMER
275
WAARONDER
KEUKEN KELDER
177
OMAL A HTAR
M.K.
BADKAMER SL.K.
1575
32
88
Pg 021
W.C
140
PROJECT ID:
DRAWN BY:
184
16
400
GANG
187
KAST
130
27
TUINKAMER
760
125
250
STEFAN
CLIENT NAME:
11 27
27 133 118 401 27 GEW'JZIGDE VERDIEPING
148 94 24 250 200
718 DATE:
18/4/2024
SCALE
GEW'JZIGDE BEGANE GROND AS SHOWN
SHEET:
REVISED BY DESCRIPTION
REVISION TABLE
DATE
NUMBER
OMAL A HTAR
Pg 021
PROJECT ID:
DRAWN BY:
10 135 105 105 408 88 184 130 125 250
STEFAN
66
CLIENT NAME:
DATE:
18/4/2024
171 94 24 250 200 405 254
SCALE
AS SHOWN
GEW'JZIGDE ACHTER GEVEL SHEET: