Professional Documents
Culture Documents
Septic Tank-Sir Ahlan Boq
Septic Tank-Sir Ahlan Boq
Septic Tank-Sir Ahlan Boq
Material Labor
Total
Item No. Particulars Qty Unit
Unit Cost Total Cost Unit Cost Total Cost Amount
STRUCTURAL WORKS
EXCAVATION WORKS
Septic/Cistern/Catch Basin
Construction of Septic/Cistern/Catch Basin 1.00 lot 18,822.09 18,822.09 5,046.63 5,046.63 21,868.71