REQUEST FOR QUOTATION

BLOMMA DESIGN AND CONSTRUCTION


BLK 34 L27,TVG, GENERAL TRIAS, CAVITE
09694276315 REFERENCE NUMBER BOQ CIVIL- 22- ST-01-001
QUOTATION DATE 09/07/2023
VALIDITY: 09/14/2023
TO: AHMARO RESIDENCE
MR./MRS AHLAN AHMARO
PROJECT: CONSTRUCTION OF SEPTIC TANK
OWNER LOCATION: TVG, GENERAL TRIAS, CAVITE
GENERAL TRIAS, CAVITE

Material Labor
Total
Item No. Particulars Qty Unit
Unit Cost Total Cost Unit Cost Total Cost Amount

STRUCTURAL WORKS
EXCAVATION WORKS

Septic Tank 6.47 cum - - 700.00 4,528.13 4,528.13

EXCAVATION WORKS - 4,528.13 4,528.13

Septic/Cistern/Catch Basin

Construction of Septic/Cistern/Catch Basin 1.00 lot 18,822.09 18,822.09 5,046.63 5,046.63 21,868.71

STRUCTURAL WORKS 18,822.09 9,574.75 28,396.84