CLIENT: Vito Cruz Res.


PROJECT: RENOVATION WORKS
LOCATION:MALAGASANG 1G, IMUS, CAVITE

ITEMS DESCRIPTION OF WORKS QTY. UNIT TOTAL AMOUNT

I. Mobilization/ Demobilization (8-working days) 1 lot 6,400.00

II. DEMOLITION WORKS AND PARTITION WALL


1 Removal of Bedframe and Cabinet Shelves 1 lot 2,000.00
2 Removal of Fixed Window and Sliding window @ bedroom 1 lot 700.00
3 Fixing of Electrical Outlets 1 lot 500.00
4 Partition Wall @bedroom 1 lot 5,200.00
8,400.00

III. 2nd Floor Bathroom Renovation


1 2nd Floor Bathroom Renovation 1 lot 61,600.00
61,600.00
IV. Ground Floor Bathroom Renovation
1 Ground Floor Bathroom Renovation
Floor Finishes 2.82 sq.m 4,230.00
Ceiling, Paint and Electrical Works 2.82 sq.m 7,614.00
Additional Works (wall tiles and replacement of doors) 1 lot 19,000.00

2 Bathroom Fixtures
Water Closet 1 set 11,700.00
Shower Set 1 set 8,550.00
Lavatory with Cabinet 1 set 10,800.00
Accessories 1 lot 2,400.00
64,294.00

TOTAL PROJECT COST 140,694.00

By:

TORDILLA, AL NOEL B.
Civil Engineer